cairns SSL gE | SITE SURVEILLANCE
TANGGUH EXPANSION PROJECT
UG PIPING WORKS - HOPE PIPE
pasos = ar pas
va ect foment oe eons, [ene evs
a [Tony Febryan
wee fuscia Rata Yih |recend: c:comy —NC:Net Comply WA: NotAppictie
rveillance Result
No Descrinion
ce [onc | wa
Comment
|cattraton of Meceurement Devies for Preesre Gauge 2EA)
+ etn nti cite y 8 728 y
2. [Ave the device calibrated? v
3 |pntecocesantaietreabenican? y
« [erwesioneatonsteatysattiead svg tacoain sau? | y
5 te seven sed wan? v :
4 fasterapcone nei cen teecone? vi
7 [isthe resut of inspection secaptable? v
«foie temernine tc nb cen? v
«fine tairce ans en edn enon i
{ceteatestsuance nol yet done
Ispecton i waling or cercate
issuance
Inspection nas not bon
lerormes
iets nt bee attached ue’
to nspecion has not been,
perenne.
IReisvatn nas been done
{whew certseaten number