APQP Progress Report - Coversheet
DRAWING
1 Drawing is understood, all specs. in hand.
2 Tolerances are realistic and attainable.
3 Significant characteristics are agreed upon.
4 Team feasibility commitment complete.
RAW MATERIALS/COMPONENTS
1 Sub-contractors/Suppliers are determined.
2 APQP is on time. (components).
3 Raw materials are ordered.
4 Raw materials are in-house.
5 Raw materials have been tested/verified.
PFMEA
1 Header complete to AIAG standards.
2 Cross functional team formed.
3 RPN value for corrective action established.
4 Corrective action for high RPN.
CONTROL PLAN
1 Header complete to AIAG standards.
2 All significant characteristics included.
3 Evaluation method included.
4 Sample sizes adequate.
5 Sample frequencies adequate.
6 Reaction plan for nonconforming matl.
7 Pre-launch control plan is completed.
CAPITAL EQUIPMENT
1 Equipment is on time.
2 Run off at supplier complete.
3 Run off at installation to machine specs.
4 Capacity has been verified.
5 Equipment is properly identified.
OPERATOR INSTRUCTIONS
1 approved.
2 Includes instructions for nonconforming material.
3 Includes packaging requirements.
INSPECTION INSTRUCTIONS
1 Incoming inspection instructions are complete.
2 In-process inspection instructions are complete.
3 Final inspection instructions are complete.
4 All are keyed to the Control Plan, Flow Chart.
PACKAGING INSTRUCTIONS
1 Packaging per customer specifications.
2 Ensures product integrity.