You are on page 1of 12

MPH floor +8960 P L T n V

1 17.00 8.00 0.10 1.00 13.60 136


8.00 3.50 0.10 -1.00 -2.80 -28
2 24.00 15.00 0.10 1.00 36.00 360
3 17.00 17.00 0.10 1.00 28.90 289
4 21.00 2.00 0.10 1.00 4.20 42
5 24.00 2.00 0.10 1.00 4.80 48
5 16.00 1.50 0.10 1.00 2.40 24
87.1 871
Soil Excavation
JC6 Bawah 2.80 2.80 2.10 1.00 16.46
JC17 Bawah 5.75 3.30 2.10 1.00 39.85
JC18 Bawah 5.80 3.50 2.10 1.00 42.63
JC19 Bawah 5.20 2.80 2.10 1.00 30.58
129.5175
LC K-150 Formwork
JC6 Bawah 2.80 2.80 0.10 1.00 0.78 1.12
JC17 Bawah 5.75 3.30 0.10 1.00 1.90 1.81
JC18 Bawah 5.80 3.50 0.10 1.00 2.03 1.86
JC19 Bawah 5.20 2.80 0.10 1.00 1.46 1.60
6.17
Concrete K-300
JC6 Bawah 2.60 2.60 0.30 1.00 2.03 3.12
Atas 1.60 1.60 0.30 1.00 0.77 1.92
Pedestal 0.90 0.90 1.10 1.00 0.89 3.96 1.3725
JC17 Bawah 5.55 3.10 0.30 1.00 5.16 5.19
Atas 4.25 1.80 0.30 1.00 2.30 3.63
Pedestal 0.90 0.90 1.10 2.00 1.78 7.92 2.5425
JC18 Bawah 5.60 3.30 0.60 1.00 11.09 10.68
Pedestal 0.90 0.90 1.10 3.00 2.67 11.88 3.7125
JC19 Bawah 5.00 2.60 0.30 1.00 3.90 4.56
Atas 3.90 1.50 0.30 1.00 1.76 3.24
Pedestal 0.90 0.90 1.10 2.00 1.78 7.92 2.5425
34.12 70.41 10.17

Feed Water Pump


Concrete K300
8.28 2.43 2.35 1.00 47.28
0.30 0.30 0.90 -14.00 -1.13
0.12 0.12 0.40 -3.00 -0.02
0.08 0.08 0.30 -4.00 -0.01
0.80 0.42 2.35 1.00 0.78
1.17 0.58 2.35 1.00 1.59
1.21 0.42 2.35 1.00 1.18
49.67
Formwork
8.28 2.43 2.35 1.00 50.34
0.30 0.30 0.90 14.00 16.38
0.12 0.12 0.40 3.00 0.62
0.08 0.08 0.30 4.00 0.41
67.75
Grouting
0.30 0.30 0.90 14.00 1.13
8.28 2.43 0.05 1.00 1.01
0.12 0.12 0.40 3.00 0.02
0.08 0.08 0.30 4.00 0.01
2.16

Acid Alkali
Concrete K-300
Slab bwh 19.55 9.05 0.45 1.00 79.62
dinding 57.20 3.60 0.45 1.00 92.66
sudut 3.60 0.40 0.40 2.00 1.15
slab atas 19.55 9.05 0.20 1.00 35.39
208.82
Formwork
Slab bwh 19.55 9.05 0.45 1.00 25.74
dinding
luar 57.20 3.60 1.00 1.00 121.60
dalam 55.40 3.15 1.00 1.00 117.10
sudut 3.60 0.57 1.00 4.00 33.33
slab atas 19.55 9.05 1.00 1.00 57.20
354.97
5 Pipe rack west side T0324-008
Soil Excavation m3
Soil Disposal > 3 km m3
Lean Concrete K-150 m3
Concrete K-300 m3
Rebar Reinforcement ton
Formwork m2
Total Progress x%
129.5175 0
89.2265 0
6.1675 0
34.1235 0
3.753585 0
80.58 0
ACTUAL MANPOW
140
132

120

104 104 1
100
98
89
80 76
67
60

40

20

0 0
0
30-Dec 31-Dec 1-Jan 2-Jan 3-Jan 4-Jan 5-Jan 6-Jan 7-Jan 8

Dec-20
30-Dec 31-Dec 1-Jan 2-Jan 3-Jan 4-Jan 5-Jan 6-Jan

Manpower Actual 76 132 0 0 98 89 67 104

Deviation 0 56 -132 0 98 -9 -22 37


ACTUAL MANPOWER CHART PBS DEC-JAN'21 (WORKER ONLY)

105 109
104 104 104 103
94 91
83 85
76 79
7

an 6-Jan 7-Jan 8-Jan 9-Jan 10-Jan 11-Jan 12-Jan 13-Jan 14-Jan 15-Jan 16-Jan 17-Jan

Jan-21
7-Jan 8-Jan 9-Jan 10-Jan 11-Jan 12-Jan 13-Jan 14-Jan 15-Jan

104 104 105 76 79 83 85 109 103

0 0 1 -29 3 4 2 24 -6
ONLY)

124

107 110
103 103
94 96
91

15-Jan 16-Jan 17-Jan 18-Jan 19-Jan 20-Jan 21-Jan 22-Jan

16-Jan 17-Jan 18-Jan 19-Jan 20-Jan 21-Jan 22-Jan

94 91 103 107 96 124 110

-9 -3 12 4 -11 28 -14
WEEKLY BASIS CIVIL WORK MONITORING
Project PP7

Volume Volume New Target


No Area Unit Target Date Remarks
Drawing Actual Date
11 Secondary Fan Total Progress - 1 Mar'2021 Start excavation on 7 Jan'21
Soil Excavation m3 68.06
Backfill and soil compaction m3 46.98 -
Soil Disposal > 3 km m3 21.08
Pile cut off nos 10.00
Lean Concrete K-150 m3 3.05
Rebar Reinforcement ton 3.63
Formwork m2 79.43
Concrete K-300 m3 25.83 -
Grouting m3 0.24 -
Anchor bolt (labor only) ton 0.33 -

Remaining work: Cover concrete,


11 Cable Trench Progress 85% 1. 23 Dec'20
finishing and backfilling
2. 20 Jan'21

Dec-20
12/15/2020 12/16/2020 12/17/2020 12/18/2020 12/19/2020 12/20/2020 12/21/2020 12/22/2020 12/23/2020 12/24/2020 12/25/2020 12/26/2020 12/27/2020 12/28/2020 12/29/
M A N P OWER
A C TU A L 127 127 124 124 127 97 125 76 132 130 99 129 129 129 10
IN C O M IN G
M A N P OWER 0 -3 0 3 -30 28 -49 56 -2 -31 30 0 0 -24 -2
A C TU A L
Volume Volume New Target
No Area Unit Target Date Remarks
Drawing Actual Date

Demin (MCC & WTP


Acid Alkali 20 KV Pipe rack west side
Foundation)
Volume Volume New Target
No Area Unit Target Date Remarks
Drawing Actual Date

Demin (MCC & WTP


Acid Alkali 20 KV Pipe rack west side
Foundation)

MPH floor +8960 MPH floor Upper +8960 Fly Ash Silo Electric Feed Water Pump

Primary Fan Foundation Coal Hopper Cable Trench


Primary Fan Foundation CoalVolume
Hopper Cable Trench
Volume New Target
No Area Unit Target Date Remarks
Drawing Actual Date
Jan-21
2020 12/26/2020 12/27/2020 12/28/2020 12/29/2020 12/30/2020 12/31/2020 1/1/2021 1/2/2021 1/3/2021 1/4/2021 1/5/2021 1/6/2021 1/7/2021

9 129 129 129 105 82 77 0 0 98 88 92 81 0

0 0 0 -24 -23 -5 7 98 -10 4 -23