Acid Alkali
Concrete K-300
Slab bwh 19.55 9.05 0.45 1.00 79.62
dinding 57.20 3.60 0.45 1.00 92.66
sudut 3.60 0.40 0.40 2.00 1.15
slab atas 19.55 9.05 0.20 1.00 35.39
208.82
Formwork
Slab bwh 19.55 9.05 0.45 1.00 25.74
dinding
luar 57.20 3.60 1.00 1.00 121.60
dalam 55.40 3.15 1.00 1.00 117.10
sudut 3.60 0.57 1.00 4.00 33.33
slab atas 19.55 9.05 1.00 1.00 57.20
354.97
5 Pipe rack west side T0324-008
Soil Excavation m3
Soil Disposal > 3 km m3
Lean Concrete K-150 m3
Concrete K-300 m3
Rebar Reinforcement ton
Formwork m2
Total Progress x%
129.5175 0
89.2265 0
6.1675 0
34.1235 0
3.753585 0
80.58 0
ACTUAL MANPOW
140
132
120
104 104 1
100
98
89
80 76
67
60
40
20
0 0
0
30-Dec 31-Dec 1-Jan 2-Jan 3-Jan 4-Jan 5-Jan 6-Jan 7-Jan 8
Dec-20
30-Dec 31-Dec 1-Jan 2-Jan 3-Jan 4-Jan 5-Jan 6-Jan
105 109
104 104 104 103
94 91
83 85
76 79
7
an 6-Jan 7-Jan 8-Jan 9-Jan 10-Jan 11-Jan 12-Jan 13-Jan 14-Jan 15-Jan 16-Jan 17-Jan
Jan-21
7-Jan 8-Jan 9-Jan 10-Jan 11-Jan 12-Jan 13-Jan 14-Jan 15-Jan
0 0 1 -29 3 4 2 24 -6
ONLY)
124
107 110
103 103
94 96
91
-9 -3 12 4 -11 28 -14
WEEKLY BASIS CIVIL WORK MONITORING
Project PP7
Dec-20
12/15/2020 12/16/2020 12/17/2020 12/18/2020 12/19/2020 12/20/2020 12/21/2020 12/22/2020 12/23/2020 12/24/2020 12/25/2020 12/26/2020 12/27/2020 12/28/2020 12/29/
M A N P OWER
A C TU A L 127 127 124 124 127 97 125 76 132 130 99 129 129 129 10
IN C O M IN G
M A N P OWER 0 -3 0 3 -30 28 -49 56 -2 -31 30 0 0 -24 -2
A C TU A L
Volume Volume New Target
No Area Unit Target Date Remarks
Drawing Actual Date
MPH floor +8960 MPH floor Upper +8960 Fly Ash Silo Electric Feed Water Pump