You are on page 1of 1

PROPOSED PROJECT

A. Name of Project: NURSERY


Total Area: 7mx3mx3m

QUANTIT APPROXIMATE
MATERIALS UNIT TOTAL PRICE
Y PRICE
CHB pcs 80 14.00 1, 120.00
Puod pcs 8 180.00 1, 440.00
#9 Steel Rod (RSB) pcs 4 200.00 800.00
#16 Tire Wire kl 4 70.00 280.00
Cyclone wire pcs 2 480.00 960.00
Washed Sand m3 1 650.00 650.00
Washd Gravel m3 0.5 900.00 450.00
Net m 8 60.00 480.00
Salog bugkos 2 150 300.00
Cement bag 3 240 720.00
#5 Nails kl 4 70.00 280.00
#1 1/2 Nails kl 4 60.00 240.00

Total Cost of Estimated Materials: ₱7, 720.00

30% Cost of Labor: ₱2, 316.00

Total Cost of Propose Project: ₱10, 036.00

Prepared by:

DEAN PIERRE H. BESANA


Property Custodian

Noted:

MARIA LUISA N. LAGAÑA


Principal III