Note:

Week 0 is when any works start on site, E.g. if an activity is to start only 2 weeks after any works starts, Week 0-2 would no

Activity is defined as work by a same team of


workers to complete a component or part of
building or to create space to facilitate the
construction of underground structures.
Workers of the same activity must be staying at
dedicated accommodation and are defined as Please provide location of
Instruction one team. activity by Floor and Zone

Location of activity
For DfMA factories and supply
Serial No Activity chain firms, Please provide
location of activity by Floor and
Zone

1 SBC-XXX-Steel Structures erection V12-STR104- NE Corner


2 SBC-XXY-Grating erection V12-STR104- NE Corner
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
fter any works starts, Week 0-2 would not have any workers for that activity.

Estimated number of workers (per day) required Estimated number of w


for the following weeks the fo
Start date of this
activity (dd/mm/yyyy) End date of this activity
(dd/mm/yyyy)
i.e. Week 0
(WPH + SPass) (SC
Week Week Week Week Week Week Week 0-
0-2 2-4 4-6 6-8 8-10 10-12 2
6/22/2020 7/21/2020 9.00 9.00 1.00
7/22/2020 8/23/2020 9.00 9.00
Estimated number of workers (per day) required for
the following weeks

(SC + PR + EP)
Week 2- Week 4- Week 6- Week 8- Week
4 6 8 10 10-12
1.00
1.00 1.00
1. Please provide details used for SafeEntry NRIC Registration.
2. For all, please enter values that were input to these respective fields
3. For DfMA facilities/RMC Plants/Aggregate Terminals , please select
UEN of the Company that number”’.
Instruction register for SafeEntry NRIC 4. Please provide the Branch code that has been generated by SafeEnt
Serial No UEN Category

1
2
3
4
5
used for SafeEntry NRIC Registration.
lues that were input to these respective fields in SafeEntry NRIC when setup a business premise for the construction site / f
C Plants/Aggregate Terminals , please select “Others” under Category and leave blank for “Project Name / Business Name”

nch code that has been generated by SafeEntry (NRIC) after signing up at https://www.safeentry.gov.sg
Project Name / Business Name Project reference Postal Code
number
ness premise for the construction site / facility.
ank for “Project Name / Business Name” and “Project reference

ww.safeentry.gov.sg
Street Address Unit number Branch Code
Provide information for the Safe Management Officers (“SMO”) and Safe Distancing Officers (“SDO”) who have been appo

Serial No Roles Name Mobile Number

1 Safe Distancing Officer LI ZENGJIAN 97988670


(SDO)
2 Safe Distancing Officer KALIYAMOORTHY 87384114
(SDO) VELMURUGAN
3
4
5
6
7
8
9
10
11
12
tancing Officers (“SDO”) who have been appointed

Email address Original occupation other Main Safe Management Measures


than SMO/SDO (If (SMM) scope
applicable)

yuanfangconstruction@gmail Project Manager SMM at daily toolbox briefing


.com
yuanfangconstruction@gmail Site safety supervisor SMM at daily toolbox briefing
.com
Firm Role of Firm

YUAN FANG CONSTRUCTION PTE LTD Sub Contractor - Architecture

YUAN FANG CONSTRUCTION PTE LTD Sub Contractor - Architecture


Note:
All workers as declared in the main submission excel have to be accounted for in this sheet, with the information on their r

Instruction Please fill in all the worker details and which team they are assigned to.
Serial No Role Firm Team identifier
e.g. A/ B/ Red team,
etc

1 CIVIL WORKS SBC SBC 1 SBC1-XXX


2 CONCRETE WORKS SBC 1.1
3
4
5
6
7
8
is sheet, with the information on their role, the activity they will be carrying out and the team they have been allocated.

o.
FIN/NRIC No. of Name of worker/staff Activity to be carried out
worker/staff
have been allocated.

Location of work - Location of work - Arrival time Morning break Lunch time
Floor Zone (HH:MM AM/PM) (HH:MM AM/PM, (HH:MM AM/PM,
duration) duration)

8:30 AM 10:00 AM, 30min 12:00 PM, 1h


9:00 AM 10:30 AM, 30min 1:00 PM, 1h
Afternoon break Exit time (HH:MM
(HH:MM AM/PM, AM/PM)
duration)

3.00 PM, 30min 6:00 PM


3.30 PM, 30min 6:30 PM
Instruction Please fill in the information of staff who will have to make occasional visits to any of the living quarters/ded
Serial No Name of staff Occupation

1 Sample Data Admin assistant


2
3
to any of the living quarters/dedicated accommodations
Firm Frequency of visit to on- Duration of visit (e.g.
site/facilities living 15min per room)
quarters

CSC Once a week 15min per room


Instruction If applicable, please fill in the information of the transportion plan of ALL employees (incl. workers) to the work
Serial No Firm Name of Vehicle Driver

1 YUAN FANG CONSTRUCTION PTE LTD KALIYAMOORTHY VELMURUGAN


2 YUAN FANG CONSTRUCTION PTE LTD KALIYAMOORTHY VELMURUGAN
3
4
5
6
7
8
ALL employees (incl. workers) to the worksite/facility.
NRIC/FIN of Vehicle Vehicle License Number of Departure time at Arrival time at
Driver Plate Number workers in this Accommodations Worksite (HH:MM
vehicle (HH:MM AM/PM) AM/PM, duration)

G8327431Q GBJ 7447Y 7 6:30 AM 7.00 AM, 15 MINS


G8327431Q GBJ 7447Y 3 7:15 AM 7.30 AM, 15 MINS
Departure time at Arrival time at
Worksite (HH:MM Accommodations
AM/PM, duration) (HH:MM AM/PM,
duration)

6:30 PM, 15 MINS 6.45 PM, 15 MINS


7:00 PM, 15 MINS 7.30 PM, 15 MINS