E M C C: Ill of Uantity
E M C C: Ill of Uantity
BILL OF QUANTITY
The Tenderer is obliged to check the number of the pages of the Bill of Quantities and should any be found
missing or duplicated or the figures or writing indistinct, the Tenderer must notify the Employer/Engineer at once
and have the matter rectified before the Tender is submitted. No liability whatsoever will be accepted in respect of
any claim for errors in the Tenderer’s offer resulting from failure to comply with the afore-going.
The Tenderer is deemed to have visited the site and fully acquainted himself as to the location of each of the pipes
work to be carried out and to all conditions which may affect the performance of the works, including but not
limited to:
The Tenderer is also deemed to have surveyed the actual condition of the site and made his own assessment of the
type and extent of the works prior to submitting his offer.
2. QUANTITIES
Notwithstanding that practical care was exercised in preparing the BOQ, but all quantities given herein shall be
deemed to be estimated quantities of the work to be done but they are not to be taken as actual and correct
quantities of the work to be executed and they are not to absolve the contractor of his obligations under the
Contract. They are not to be taken as guarantee that the actual quantities increase or decrease, and any claim
whatsoever submitted for cost or extra expenses incurred from such increase or decrease will not be accepted by
Employer/Engineer except where else stipulated in the Contract.
3. MATERIALS
All materials used are to be of the best new available and subject to the Employer/Engineer approval, and of
durable nature, guaranteed, not liable to any base exchange and manufactured according to applicable BS, ASTM
or DIN Standards. Execution also is subject to approval of Employer/Engineer and shall be the best available
common practice in engineering codes at the time of execution.
Items that contain materials or products of special make with names of manufacturers are to be taken as samples
of what will be required. Subject to the Employer/Engineer approval, the Contractor may, at his discretion, offer
similar products of other make if the equivalent quality of the specified materials is guaranteed. In this case, the
Contractor shall submit a description and/or drawings showing all technical conditions, characteristics, make, type
and address of Manufacturer … etc., of the materials offered as alternatives.
Contractor Signature i
ITB 2011-023
Lot # 2: “Construction of Storage Tank, and Booster Pumping Station at Beit Hanoun”
4. PRICES AND CURRENCY
The prices given, by the Contract, hereunder in the BOQ shall be in United States Dollars and shall not be
exchangeable with other foreign currencies. Furthermore inflation and escalation or changes whatsoever shall not
be subject of claim later on.
The Unit Prices entered against the various items in the following Bill of Quantities include all operations for
execution, completion and maintenance of the various items of the works finished completely in every respect till
the final acceptance as specified or described in the Tender Documents, with or without modifications, either by
way of additions or deductions, or alterations as may be offered in writing during the progress of the works, and
include, without being limited to, all matters and things particularly referred to in the Tender Documents.
The Unit Price shall cover all costs of every kind whatsoever including, without being limited to, all charges for
additional site installations, relocation, supervision, labor, transportation and supply of materials; the provision,
maintenance, use and efficient repair of all plant, equipment and appliance of every kind, the construction and
maintenance of all temporary works, the performance of all services and the fulfillment of all obligations and
responsibilities herein defined.
The Tenderer shall be deemed to have fully considered all the conditions, obligations, and requirements of the
Tender Documents before entering the respective unit price against the various items of the Bill of Quantities.
The Unit Prices given hereunder the BOQ shall also include erection, installation, fixing, and re-fixing of all
elements. These prices shall also include taxes, visa for labor, gate passes, accommodations for the Contractor’s
staff and labors, all required insurance and work permits, guarantees, bonds etc. and all requirements necessary to
have the work maintained until its final handing over.
The Unit Prices given hereunder in the Bill of Quantities for this work shall also include overheads, risks, profit
etc. and all other financial matters to have all these civil works completed.
The works, materials or activities listed in the following shall always be considered as auxiliary works to be
included in the Unit Prices bid for any item in the Bill of Quantities:
Any measurement for execution and payment of the works, including the provision of measuring
instruments, gauges, setting out marks, marking paint and relevant tools, labor, etc., the maintenance and
preservation of gauges and setting-out marks during the execution of the works.
Provision of small tackle tools or any other equipment required for the execution of the works.
Supply of consumable for the Contractor’s equipment.
Removal of all contamination (refuse, debris, building rubbish and the like) arising from or in connection
with the Contractor’s work.
Protection of the executed works and of the items made available for execution of the works from damage,
fire, inclement weather, vandalism and theft etc., to the time of final acceptance.
Transportation of all materials and structural components from the storage places on site to the points of use
and return transportation, if required.
Submitting and transporting any samples required.
Carrying out tests on materials and works, etc., that is required by the Engineer.
Fuel and lubricants for operation of Contractor’s equipment.
All safety precautions and measures for safeguarding labor as well as securing surrounding areas.
Lighting of the work site.
5. RIGHTS OF EMPLOYER
Contractor Signature ii
ITB 2011-023
Lot # 2: “Construction of Storage Tank, and Booster Pumping Station at Beit Hanoun”
Any order and/or delivery of material or equipment by the Contractor for performance of the works may only be
based on instructions and/or approved execution drawings by the Employer/Engineer.
All equipment and materials for installation and finishing works to be incorporated in this contract shall prior to
ordering and/or delivery by the Contractor, be approved by the Employer/Engineer both in respect of quality and
type as well as of quantity.
7. SITE INSTALLATION
All costs of labor, works, provisions, materials and equipment for Site Installations required by the Contractor and
stipulated in the Tender Documents shall be included in the various unit prices of the Bill of Quantities. No extra
payment will be allowed by the Employer for any of these activities.
The required Data to be transferred from the well to the client is:
1- Status of pump ( on, off, fault)
2- Current, voltage, frequency, Active , Reactive power, hour meter and power consumption
3- Type of Fault ( Starter fault, phase loss, pressure fault, temp fault, dosing fault)
4- Status of changeover (Main or GEN.)
5- Status of Dosing Unit ( on, off, fault)
6- level of fuel in the fuel tank
7- Level of Chlorine
8- Panel door ( open, closed)
1- Acquisition of DATA (motor status, generator status, readings [KW, Volt, Amp, KWH, fuel level,
pressure,.…etc])
2- Changing the status of any register of the R-log
3- Set pump On or off
4- Set Generator on or off
5- Soft Starter Fault Reset
6- Other related orders may be required by the engineer.
Any water or Electricity cut required for completion of the work shall be coordinated with the CMWU local
staff.
The contractor will also be responsible for any defect that may result from his work and shall be corrected
on his own cost.
The contractor shall also be full responsible for the availability and transfer of the required materials to
Gaza.
The Engineer has the right to increase, decrease or even cancel any specific item in the BOQ without any
change in unit or contract price
The work should not start before the delivery of all required materials and after approval of all concerned
parties
The contract price includes the submissions of all user manuals, catalogues, software’s and other related
submittals the Engineer may request.
The contractor shall include in his price for the required training of the local staff to be familiar with the new
monitoring control system
The maintenance of the work will be the responsibility of the contractor for the first six months in
coordination with the local staff
Contractor Signature iv
ITB 2011-023
Lot # 2: “Construction of Storage Tank, and Booster Pumping Station at Beit Hanoun”
BILL OF QUANTITY
Item Unit Price Total
Description
No. Unit Qty. (US$) (US$)
GENERAL:
The Contractor shall consider in his price all costs or expenses of all requirements
stipulated in the section entitled “General and Preambles” preceding this Bill.
1. The rates to be inserted shall include for all costs associated with the
followings:
All items listed in the contract data sheet – scope of works and detailed bill of
quantities.
The contractor's supplied materials, water and electrical connections, testing
labor and overheads.
Protection of materials, Municipality property and public service equipment in
the vicinity of the works.
Clearing and cleaning the places and transport the debris and litter collected to
a place approved by the corresponding municipality.
2. The quantities listed in the bill of quantities to follow are anticipated. The
actual quantities may be less or more than the bill of quantities. Claims for
changes in the quantities will not be accepted. The Engineer reserves the right
to increase or decrease the quantities of works without any change in unit price
or other terms and conditions
3. All used bolts, washers, nuts … etc should be made of stainless steel grade
304.
4. The contractor should carryout testing the tank for leakage –chlorination and
flushing as specified.
5. All the works should be done by coordination with Beit Hanoun Municipality
and CMWU.
6. Submission of shop drawing to be approved by the Engineer before starting
any work activity.
7. Making trial pits for identifying existing services, connecting existing water
pipelines if required.
8. Repair any damage of any service at full satisfaction of relevant Service
Authority.
9. The contractor shall carry out full survey (X,Y,Z) for the tank site and water
pipes lines according to the Palestinian Grid.
Contractor Signature 1
ITB 2011-023
Lot # 2: “Construction of Storage Tank, and Booster Pumping Station at Beit Hanoun”
Contractor Signature 2
ITB 2011-023
Lot # 2: “Construction of Storage Tank, and Booster Pumping Station at Beit Hanoun”
2.5 Ditto, but for Ring Beam M3 35
2.6 Supply and install complete precast concrete manhole of 1.25m internal diameter,
B300 with cast iron cover 25 tones 60 cm opening as per specifications and
drawings. The item includes excavation, supporting the trench sides and
backfilling using clean sand with watering, compaction after approval of the
engineer. NO 1
2.7 Ditto, but 1 m dia. NO 1
2.8 Ditto, but 0.8 m dia. NO 1
3. INSULATION WORKS
GENERAL:
1. Cleaning of internal or external surfaces before applying the insulation
materials.
2. Leakage test should be performed before applying the insulation paint. The
leakage test duration is at least 72 hours.
3. The price includes insulation tests, disinfection, and leakage treatment.
4. The contractor shall submit the catalogue of the insulation material or internal
painting indicating the suitability for drinking water.
5. All the following items shall be completed according to drawings,
specifications, conditions and instructions by the Engineer or his representative.
6. The consultant should provide the required maintenance to prevent leakage,
honeycomb …etc and surface flatness.
3.1 Supply and install fix water stopper swelled hydrophilic solid rubber strip (Sika V-
24E or equivalent) size 10x250mm cross section construction joint. The price shall
include workmanship with all required works. MR 180
3.2 Supply and install painting for internal faces (walls, footings, ring beams and roof
slab) at minimum 2-coats of Epoxy painting (SikaTop-Seal 107 or equivalent) for
wetted surfaces (water). The price includes water testing and workmanship. All
according to the specifications, conditions and instructions of the supervisor
engineer or his representatives. M2 2150
3.3 Supply and install painting for external faces (walls, roof slab and ring beam) with
one coat of repellent material (SikaGard 550W or equivalent) to fill voids as
approved and two coats of Dekguard FC (FOSROC or equivalent) . The price
should include water testing and workmanship. All according to the specifications,
conditions and instructions of the supervisory engineer or his representatives. M2 1500
4. MECHANICAL WORKS
GENERAL:
1. The Contractor shall when pricing this Bill take into consideration, include and
allow for costs or expenses of all requirements stipulated in the section entitled
“General and Preambles” preceding this Bill.
2. The exact lengths of the required pipes, the exact number of the required
valves and the exact quantities of concrete will be determined during the
implementation of the Works.
3. Price should include all excavation, warning tape backfilling, supporting of
trenches and all associated works.
4. The price includes all fittings, supports, and special fittings and elements
(diffusers, steel mesh … etc) required to finish the works.
5. The prices should include all required tests and any temporary works such as
the temporary installation of fittings (blind flanges, thrust blocks ... etc).
4.1 Supply and install 14” diameter, 3/16” thickness Steel pipes coated externally with
Epoxy primer and two layers of extruded polyethylene coating and internal cement
mortar lining factory made, the item include all required fittings as shown on
drawings. MR 16
4.2 Ditto, but 10” diameter above ground. MR 23
4.3 Ditto, but 8” diameter. MR 9
4.4 Supply and install 8” diameter, 3/16” thickness, galvanized steel pipe for
ventilation, including fixing plates, stainless steel insect screen, fittings, supports
and elbows, and painting with one prime coat, and two oil coats, all according to
the specifications, drawings and instructions of the supervisory engineer or his
representatives. No. 4
4.5 Supply and install 14” gate valve Hakokav type or equivalent including all the
required fittings (reducer, flange coupling, etc...), joining and supports as shown
on the Drawings and described in the Specifications or directed by the Engineer. NO 1
4.6 Ditto, but 10” diameter gate valve. NO 4
4.7 Ditto, but 8” diameter gate valve. NO 1
4.8 Supply and install 10” Altitude Control Valve Rafael type or equivalent including
all the required pipes and tank level float, water tubing between the tank and the
Altitude control valve as shown on Drawings and described in the Specifications NO 1
Contractor Signature 3
ITB 2011-023
Lot # 2: “Construction of Storage Tank, and Booster Pumping Station at Beit Hanoun”
or directed by the Engineer.
4.9 Supply and install 8” factory made flap Valve. NO 1
4.10 Supply and install 10" Diameter electromagnetic flow meter - equipped and
connected with data logger sensor, ABB type or equivalent, including but not
limited to the following: bolts, Gaskets, reducers, coupling, flanges, jacking and
concrete supports, complete all as described in the Specifications and as shown on
the Drawings and as directed by the Engineer. NO 1
4.11 Supply and install buried 10"x10''x10'' steel tee with external extruded
polyethylene coating and internal cement mortar lining factory made. NO 2
4.12 Supply and install buried 10'' steel elbow 90o with external extruded polyethylene
coating and internal cement mortar lining factory made. NO 4
4.13 Ditto, but 45o. NO 2
4.14 Supply and install buried 8'' steel elbow 90o with external extruded polyethylene
coating and internal cement mortar lining factory made NO 5
4.15 Ditto, but 45o NO 2
4.16 Ditto, but 14” diameter. NO 1
4.17 Supply and install Fire extinguisher (Powder 6kg ) NO 2
4.18 Supply and install Fire extinguisher (CO2 6kg ). NO 2
5. TANK MISCELLANEOUS WORKS
5.1 Supply and install galvanized steel water scale as according to drawings,
specifications and engineer's instructions. Scale should be mechanically and
clearly marked using permanent paint and according to engineer's instructions. All
internal parts of the item (wire, float, pully ...etc) should be of stainless steel. NO 1
5.2 Supply and install galvanized steel external access ladder with cage to the tank,
installed complete and including all supports to the concrete base and skeleton of
the tank, locks, painting with two coats of oil paint on one prime coat, accessories,
all as specified and shown on drawings. NO 1
5.3 Supply and install stainless steel internal access ladder, installed complete and
including all supports to the concrete base and skeleton of the tank, with frame and
cage, painting, accessories, all as specified and shown on drawings. NO 1
5.4 Supply and install galvanized steel cover (1.0x1.0m) for the tank upper access to
internal ladder, and painting with one prime coat, and two oil coats all according to
Drawings, Specifications and instructions of the Engineer. NO 1
Total of Bill (A) - US$
Contractor Signature 4
ITB 2011-023
Lot # 2: “Construction of Storage Tank, and Booster Pumping Station at Beit Hanoun”
Contractor Signature 5
ITB 2011-023
Lot # 2: “Construction of Storage Tank, and Booster Pumping Station at Beit Hanoun”
Item Unit Price Total
Description Unit Qty.
No. (US$) (US$)
1.12 Supply materials and make emulsion paint (Supercryl) three coats and base coat
for all internal walls and ceiling, all according to Drawings, Specifications and
instructions of the Engineer. M2 60
1.13 Supply and install galvanized metal door 120x 220 m (type D1) with double sheet
(2-mm) complete with frame, ironmongery. The price should include painting with
two coats and base coat and union type lock or equivalent, all according to
Drawings, Specifications and instructions of the Engineer. No. 1
1.14 Supply and install galvanized metal window type (W6) overall size 150x120cm
with louvers complete with frame, ironmongery, for service building. The price
should include painting with two coats and base coat and Galvanized steel lock or
equivalent, all according to Drawings, Specifications and instructions of the
Engineer. No. 2
2. MECHANICAL WORKS
a) Buried Pipes
Supply and install underground pipelines complete but not limited to following:
excavation in all types of soil and disposal of excess material to locations
acceptable to the Engineer, bedding, pipe laying including all piping works such as
welding, cutting and shaping, supplying and installing all kinds of fittings (flanges
and blind flanges, etc.), testing, bedding material surround the pipe, backfilling
and compaction, disinfection and reinstatement, complete all as described in the
Specifications and as shown on the Drawings and as directed by the Engineer.
2.1 Supply and install, 500mm diameter, Sch.40 steel pipes internally painted with
epoxy, and externally insulated with bituminous sheets 5 mm thick. to form
underground water borehole for vertical turbine booster pumps including stainless
steel bottom plat 4mm thickness, with all associated drilling works, fittings,
accessories, pipes connections and tested. MR 18
2.2 Supply and install 14” diameter X 3/16” thickness Steel pipes coated externally
with Epoxy primer and two layers of extruded polyethylene coating and internal
cement mortar lining factory made, the item include all required fittings as shown
on drawings. MR 9
2.3 Ditto, but 10” diameter. MR 4
b) Non-Buried Pipes
Supply and install pipelines complete including but not limited to: pipe laying
including all piping works such as welding, cutting and shaping, supplying and
flanges, testing, disinfection and supports including concrete bases, complete all as
described in the Specifications and as shown on the Drawings and as directed by
the Engineer.
2.4 10” diameter Sch.40 Steel pipes coated externally with Epoxy coating (Discharge
side of Booster Pumps). MR 4
2.5 8” diameter Sch.40 Steel pipes coated externally with Epoxy coating (Discharge
and suction side of Booster Pumps). MR 18
2.6 Supply and install Ø10'' approved stainless steel pipe 4 mm thick provided with
Ø1/2'' feeding point for disinfection, complete all as described in the
Specifications and as shown on the Drawings and as directed by the Engineer. MR 0.7
c) Valves
Supply and install valves complete including but not limited to the following:
valves, fittings (Dresser, Flange Coupling...etc), connectors, fixed, jack and
concrete supports, complete all as described in the Specifications and as shown on
the Drawings and as directed by the Engineer.
2.7 Gate Valve, 10'' – PN 16 bar No. 1
2.8 Gate Valve, 8'' – PN 16 bar No. 6
2.9 Check Valve, with top bolted cover and swing arm ARI or equivalent, 8'' – PN 16
bar. No. 3
2.10 Air Release and Vacuum Release Valve, 50 mm, PN 16 bar, ARI or equivalent,
with 2" ball valve PN16 bar connected to it with drain pipe and all accessories
required. No. 3
d) Fittings and Others
Supply and install Fittings, Tees and Bends, Reducers, Couplings, gauges, …etc
including welding, SS bolts and nuts, gaskets, and all required accessories to
complete the works, all as described in the Specifications and as shown on the
Drawings and as directed by the Engineer.
2.11 Supply and install standard steel flange 14” No. 2
2.12 Supply and install standard steel blind flange 14” No. 2
2.13 Supply and install buried 8'' steel elbow 45" with external extruded polyethylene
coating and internal cement mortar lining factory made. No. 6
Contractor Signature 6
ITB 2011-023
Lot # 2: “Construction of Storage Tank, and Booster Pumping Station at Beit Hanoun”
Item Unit Price Total
Description Unit Qty.
No. (US$) (US$)
o
2.14 Ditto, but 10' steel 45 No. 2
2.15 Supply and install 100mm diameter pressure gauge ,liquid filled (0-15 bar ) with
built in 1/2" diameter ball valve No. 3
2.16 Supply and install Danfos type or equivalent approved pressure switch (0-12 bar)
with hand held modulating top wheel. The works shall include for all associated
electrical materials and installations required to connect it and operate it with
existing panel board. No. 3
e) Booster Pumps
The bid shall include for all technical data and details of equipment and materials
listed here below. Specialized and qualified contractor shall carry out all works
and installations listed here below with all required tools, equipment and qualified
skilled labor force. All materials and equipment and installations shall be complied
with ISO and relevant British standards and to be warranted for 12 months defects
liability period counted from the date of certified taking over certificate issued by
Engineer in charge. All mechanical installations should include for all required
fittings, and Prior to any materials ordering the contractor must submit complete
shop drawings with detailed equipment technical data and specifications for
engineer's approval .All works should be finally tested and commissioned by
specialized team to verify all mechanical and electrical installations.
2.17 Supply, install and connect to the electrical board, multistage Vertical Turbine
Pump, Saudi National Pump, KSB, Hamecdash, Paterson type or equivalent
approved vertical turbine water booster pump complete with all associated fittings
and accessories recommended for installations by the pump manufacturer with
electrical motor US motors type or equivalent (Hollow shaft electric motor
400V,1450RPM,50HZ ). The pump shall be hydraulically capable to deliver
300m3/hour of water at total dynamic head (TDH) of 2.6 bar at minimum
efficiency of 79.1%. The unit should be comprised of vertical line shaft driven
turbine pump of 9" cast iron bowls with rubber bearings, bronze impellers, suction
strainer, bronze line shaft bearings with rubber inserts, including stainless steel
grade (ASTM A582 grade 416 stainless steel) 1¼” Dia. column drive shafts, and
epoxy painted steel column pipes 8” diameter. Sch. 40, well head foundation, steel
discharge head 8/8” epoxy painted, in addition to any fittings and components
required for the satisfactory operation of the system and all necessary works
according to specifications, drawings, and instructions by the Engineer.
The works, installations and prices should include for all mechanical pipe work
installations, electrical installations with cables including builders work
installations with all associated reinforced concrete plinths specified by the
manufacturer's installation manual. No. 3
f) Flow Meter
Supply and install 10" Diameter electromagnetic flow meter - equiped and
connected with data logger sensor, ABB type or equivalent, including but not
limited to the following: bolts, Gaskets, reducers, coupling, flanges, jacking and
concrete supports, complete all as described in the Specifications and as shown on
2.18 the Drawings and as directed by the Engineer. No. 1
g) Fuel Tank
Supply and install cylindrical steel fuel tank with 5 m3 capacity and 6 mm
thickness complete with all the required valves, fittings, fuel pump, float, pipe
works, excavation, reinforced concrete foundation and backfilling all according to
Drawings, Specifications and instructions of the Engineer. The item includes the
2.19 filling of the tank with fuel up to its full capacity. L.S 1
CHLORINATION SYSTEM:
GENERAL NOTES:
The contractor must submit all required technical specifications for prior
approval. All materials must be manufactured and produced in accordance
with relevant clauses of BS ,ISO ,ASTM standards and specifications provided
here-into.
The works and installations should include for all associated fittings and
accessories required to accommodate and connect the desired system feeding
point all according to drawings, specifications and instructions by the
3. Engineer.
Supply, Installation, Commissioning and Testing of complete chlorination system
including the following:
Complete Sodium hypochlorite dosing system comprising of solenoid,
adjustable dosing and injection pump of PROMINENT type or equivalent
3.1 approved type with dosing capacity range 0-4 Liter/hour at 16 bar back Set 1
Contractor Signature 7
ITB 2011-023
Lot # 2: “Construction of Storage Tank, and Booster Pumping Station at Beit Hanoun”
Item Unit Price Total
Description Unit Qty.
No. (US$) (US$)
pressure.
500 Liter polyethylene white chlorination tank with built in factory made
manual stainless steel mixer in addition to motorized mixer. The works and
installations should include for all associated fittings and accessories required
to accommodate and connect the desired tank feeding point through
underground ½” stainless steel pipe, all according to specifications and
instructions by the Engineer.
Programmable residual chlorine analyzer of Dulcometer type or equivalent
approved type, complete with its associated accessories including all required
connections so that the system will check the residual chlorine concentration
and automatically operate and control the dosing pump to cope with the
desired concentration of the residual chlorine at the tank.
Total of Bill (B) - US$
Contractor Signature 8
ITB 2011-023
Lot # 2: “Construction of Storage Tank, and Booster Pumping Station at Beit Hanoun”
Contractor Signature 9
ITB 2011-023
Lot # 2: “Construction of Storage Tank, and Booster Pumping Station at Beit Hanoun”
Contractor Signature 11
ITB 2011-023
Lot # 2: “Construction of Storage Tank, and Booster Pumping Station at Beit Hanoun”
Item Unit Price Total
Description Unit Qty.
No. (US$) (US$)
cement paste, cutting the tiles to the required shapes and dimensions,
polishing, cleaning the site all required tests, required equipment &
workmanship to complete the work according to specifications and
directions of the engineer.
2. Local marble ( Khalili) Grade “A”, free from cracks and holes,
homogeneous in color shall be used. Imported glazed ceramic tiles (floor
and wall) of Grade “A” shall be used. White cement shall be used for
Granite tiling. Color of Granite shall be as directed and approved by the
Engineer.
3. The works shall be executed according to drawings, specifications and as
required and directed by the Engineer
4.1 Supply and install non-slipping white ceramic floor tiles size 30×30×0.8 cm.
(Europe type). for service building. The price should include 2.5cm mortar bed
and 5cm thick sand bed, skirting of same kind and color of the floor tiles size
30×7×0.8 cm thick laid on 1cm mortar backing, and all required finishing
including grouting, cleaning, mechanical polishing ... etc, all according to
Drawings, Specifications and instructions of the Engineer. M2 55
4.2 Supply and install non-slipping white ceramic floor tiles size 20x20x0.8 cm. The
price should include 2.5cm mortar bed and 5cm thick sand bed, all according to
Drawings, Specifications and instructions of the Engineer. M2 4
4.3 Supply and install white glazed wall tiles size 20x20x0.6 cm. The price should
include mortar backing up to lintel level, all according to Drawings,
Specifications and instructions of the Engineer. M2 16
4.4 Supply and install local marble size 25cm x 3cm thick for window sills, doors
including 2.5cm mortar bed, all according to Drawings, Specifications and
instructions of the Engineer. MR 14
4.5 Supply and erect 60cm wide and 90 cm high marble 2cm thick granite (Tiger
eye) for the top surface with round edges and skirting 10 cm high, including
vertical dividers, internal horizontal shelves, back of cupboards, floors, all of
local marble 3cm thick. and making the needed opening for basins as shown in
drawings. L.S 1
5. PLUMPING WORKS
5.1 Supply and install thermo- plastic pipes Ø16mm, to be concreted between
collector boxes with W.C , hand basin, sinks, and bathtubs, etc. for cold and hot
water with all connections. LS 1
5.2 Supply and install (C.B-1), wooden collector box, (60x50x10 cm) with cover
door, with all connections and fittings. No. 1
5.3 Supply and install white fire clay washing basin Harza Type or equivalent size
51x38 cm including trapped waste fittings, plug and chain, steel brackets supports
and the drainage line to the floor trap, chromium plated water tap 1/2" diameter
Hamat type or equivalent including cold water supply lines 1/2" dia., all
according to Drawings, Specifications and instructions of the Engineer. No. 1
5.4 Supply and install white glazed fire clay squatting WC suite (Asiatic WC)
complete with flushing cistern, 4" dia. UPVC drainage pipe to the nearest
Manhole and white glazed toilet paper holder, chromium plated water pillar valve
1/2" Dia. including 1/2" water supply pipe and 100cm long rubber hose inside the
toilet, all according to Drawings, Specifications and instructions of the Engineer. No. 1
5.5 Supply and install 4/2” PVC floor drain including 4” PVC pipe to nearest
manhole all according to Drawings, Specifications and instructions of the
Engineer. L.S. 1
5.6 Supply and install circular 60 cm internal diameter concrete class B300 main
sewage collection manholes as per specifications and drawings complete with
20cm reinforced concrete base, cast iron cover (8 tons capacity), frame, rings,
special joint required to fix the pipe to the manhole, external bitumen painting.
The item also includes excavation, supporting the trench sides and backfilling
using clean sand with watering, and compaction after approval of the engineer.
Locations are as shown on in drawings and depths up to 1 m. No. 1
5.7 Supply and install 3” PVC drainage pipes including all necessary bends
connections and making good, all according to Drawings, Specifications and
instructions of the Engineer. L.S 1
5.8 Supply and fix HDPE 25mm water supply pipes from the fire hydrant feeder to
the service building roof top tank and from the tank to toilet fixtures and pumps
room fixture and including valves, jointing and fittings, all according to
Drawings, Specifications and instructions of the Engineer. MR 40
5.9 Supply and install plastic water storage tank 1.5 M3 capacity complete with
lockable cover, float valve 1/2" dia., cleaning opening with plug 3/4" dia., No. 1
Contractor Signature 12
ITB 2011-023
Lot # 2: “Construction of Storage Tank, and Booster Pumping Station at Beit Hanoun”
Item Unit Price Total
Description Unit Qty.
No. (US$) (US$)
overflow pipe 3/4" dia., steel base and the connection with the feeding and
distribution lines, all according to Drawings, Specifications and instructions of
the Engineer, the item includes painted steel frame base made of angles
L50X50X4 mm and the upper steel sheet 3 mm thick.
5.10 Supply and lay 4" UPVC sewage pipes SN 8 including excavation, bedding,
jointing, backfilling, testing and connect to the nearest wastewater disposal
location or municipal sewage system, all according to Drawings, Specifications
and instructions of the Engineer. MR 25
Total of Bill (D) - US$
Contractor Signature 13
ITB 2011-023
Lot # 2: “Construction of Storage Tank, and Booster Pumping Station at Beit Hanoun”
Contractor Signature 14
ITB 2011-023
Lot # 2: “Construction of Storage Tank, and Booster Pumping Station at Beit Hanoun”
Item Unit Price Total
Description Unit Qty.
No. (US$) (US$)
Supply, install and commissioning fire alarm system as per drawings including fire
resist PVC pipes, pull boxes special wires including:
5.1 Fire alarm control panel 4 zones complete with batteries and all necessary
accessories.(Type is TELEFIRE or equivalent). No. 1
5.2 Lionization smoke detector, the detectors shall be twin-chamber with latching
electronic circuitry, two wire connection.(Type is TELEFIRE or equivalent). No. 3
5.3 Ditto, but heat detector. No. 2
5.4 Supply, install break glass cal point as per drawings the unit shall be standard type
for interior use with key operated test facility, with plastic coated glass. No. 3
5.5 Supply, install 95 db electronic horn ultra sound for indoor and outdoor used.
(Type is TELEFIRE or equivalent). No. 2
6. MAIN DISTRIBUTION BOARD (MDB)
6.1 Supply, install and commission main distribution panel board (MDB) as specified
and as shown on drawings, factory assembled wired and tested in accordance with
international standards, including 2mm Galv. steel frame with anti static paint , the
panel should be supplied with built in ventilation under cuts with panel filters. The
work includes busbars, neutral bus bar and earthing terminal and all necessary
civil works for foundations , cable trenches and handing over clean, tested and in
operating conditions. (Type is MOELLER or equivalent). Set 1
6.2 Over-load, current limiting switch, with over load and short circuit releases,
adjustable 4-6A. (Type is MOELLER PKZM0-6 or equivalent). No. 4
6.3 Signal lamps R.S.T with 25 Resistance 220V. Set 3
6.4 Current transformer 3x(400/5A). Set 7
6.5 Kwh meter 3 phase 3x5A. No. 1
6.6 KVAR meter, 3 phase 3x5A. No. 1
6.7 Kwh meter, 1 phase 1x5A. No. 3
6.8 Ammeter 0-300A. No. 9
6.9 Frequency meter( 47-53Hz ). No. 3
6.10 Voltmeter 0-500V with 7 positions selector switch. Set 3
6.11 MCCB 3x200FA/3X250TA. (Type is MOELLER NZMN3-AE200 or equivalent). No. 1
6.12 MCCB3x160FA/3X160TA. (Type is MOELLER NZMN2-A160 or equivalent). No. 1
6.13 MCCB 3x32FA/3X32TA. (Type is MOELLER NZMN1-A32 or equivalent). No. 3
6.14 Ditto but MCB 3X40A. (Type is MOELLER FAZ-C40/3 or equivalent). No. 1
6.15 Ditto but MCB 3X32A. (Type is MOELLER FAZ-C32/3 or equivalent). No. 1
6.16 Ditto but MCB 3X20A. (Type is MOELLER FAZ-C20/3 or equivalent). No. 2
6.17 Panel ventilation system including ,four extract fans, thermistor relay, temperature
sensors(30-70 OC),16A contactor, mcb 1X10A. Set 1
6.18 Contactor 3 poles,380V, 10kVAr, with 2 auxiliary contacts,220V coil, AC3
category (Type is MOELLER DIL00MK-02 or equivalent). No. 3
6.19 Three phase static capacitor bank 10Kvar. No. 3
6.20 Toggle switch 10A, 230VAC (1,0,2) with indication lamp. Set 3
6.21 Supply and install surge protection at the incoming feeder 3- phase including
connection to the ground. The system shall protect the switch panel against the
lightning shocks. (Type Furse or equivalent). No. 1
6.22 LTL fuse 3x160A/100A. No. 1
6.23 Three-phase mains/generator automatic change over switch, motorized type, made
of two 250A 400V 4poles switches with electrical and mechanical inter-lock
K.Moller or equivalent ,the work includes automatic changeover control unit
(ACU) ADMAR type or equivalent. No. 1
6.24 Panel ventilation system including, six extract fans, thermistor relay, temperature
sensors (30-70 OC),16A contactor, mcb 1X10A. Set 1
7. MOTOR CONTROL CENTER (MCC)
7.1 Supply, install and commission MCC panel board as specified and as shown on
drawings, factory assembled wired and tested in accordance with international
standards, including 2mm Galv. steel frame with anti static paint, the panel should
be supplied with built in ventilation under cuts with panel filters .The work
includes burbars, neutral bus bar and earthing terminal and all necessary civil
works for foundations, cable trenches and handing over clean, tested and in
operating conditions. (Type is MOELLER or equivalent). Set 1
7.2 Current transformer 3x(100/5A). Set 3
7.3 Current transformer 3x(40/5A). Set 1
7.4 Ammeter 0-100A. No. 9
7.5 Ammeter 0-40A. No. 3
7.6 Electrical digital hour counter 3.5 digits, supply voltage 24V dc and/or 230V ac,
panel mounting. No. 4
Contractor Signature 15
ITB 2011-023
Lot # 2: “Construction of Storage Tank, and Booster Pumping Station at Beit Hanoun”
Item Unit Price Total
Description Unit Qty.
No. (US$) (US$)
7.7 Toggle switch 10A, 24V dc and/or 230V ac, (1,0,2). No. 4
7.8 Emergency push button switch. No. 4
7.9 MCCB3x40FA/3X40TA.(Type is MOELLER NZMN1-A40 or equivalent).
7.10 MCCB3x100FA/3X100TA. (Type is MOELLER NZMN1-A100 or equivalent). No. 3
7.11 Three poles, 380V, 37KW, with 2 auxiliary contacts,220V coil, AC3 category
(By-pass). (Type is MOELLER DIL0AM/22 or equivalent). No. 3
7.12 Three-phase solid state reduced voltage starter, 37KW, for pump, fully featured,
digital microprocessor based, with its control, as per specifications and engineer's
instructions ( Type is Solcon. RVS-DN-72 ). No. 3
7.13 Motor protective circuit breaker 3X10A. (Type is MOELLER PKZM0-10 or
equivalent). No. 4
7.14 MCB 2X20A or 2x10A /2X6. (Type is MOELLER FAZ-C 20/2 or equivalent). A 2
7.15 Panel ventilation system including ,three extract fans, thermistor relay,
temperature sensors(30-70 OC),16A contactor, mcb 1X10A. Set 1
8. PLC CABINET
8.1 Supply, install and commission PLC panel board as specified and as shown on
drawings, factory assembled wired and tested in accordance with international
standards, including 2mm Galv. steel frame with anti static paint including
busbars, terminal blocks and all necessary civil works for foundations , cable
trenches and handing over clean, tested and in operating conditions. (Type is
MOELLER or equivalent). Set 1
8.2 Programmable logic controller PLC, 128 I/O points, with hand programmer,
computer software and interface, with sufficient updated RAM, and memory
packs, logic memory. The unit shall be as per drawings, specifications, and
engineer's instructions and the new version manufactured at the time of tendering.
The work includes programming the PLC to operate the pumping station with 4
pumps(3-duty/1-standby), as specified by the engineer and according to the
sequence to operate the pumps equal times, including all necessary extra relays
and/or switches, cables and conductors, according to specifications and engineer's
instructions. L.S. 1
8.3 Phase failure, loss of phase, under voltage, and phase sequence relay, with the
necessary control. No. 1
8.4 Time delay electronic relay, with one N.O. and one N.C. 10A output contacts, and
2 sensor input points, supply voltage 24V dc and/or 230V ac, according to
specifications and engineer's instructions. No. 9
8.5 Control relay, with N.O. and N.C. 10A output contacts, supply voltage 24V dc
and/or 230V ac, according to specifications and engineer's instructions. No. 21
8.6 Push button switch with N.C. and N.O. contacts 10A, 24V and/or 230V AC. set 6
8.7 Supplying and erecting uninterruptible power supply U.P.S. 1000W rating, 50-60
minutes full load discharging time, 230V sine wave output, with all protection and
indicators, as per specifications, and engineer's instructions. No. 1
8.8 Isolating transformer 380/220V of 2000VA capacity. No. 1
8.9 Ditto but 220/24V of 700VA capacity. No. 1
8.10 Manual change over switch 2X16A. No. 1
8.11 Indication lamps with 25 Resistance 220V. set 30
8.12 Over-load, current limiting switch, with over load and short circuit releases,
adjustable 4-6A. (Type is MOELLER PKZM0-6 or equivalent). set 1
8.13 MCB 2X20A. (Type is MOELLER FAZ-C 20/2 or equivalent). No. 2
8.14 MCB 2X16A. (Type is MOELLER FAZ-C 16/2 or equivalent). No. 1
8.15 MCB 2X10A. (Type is MOELLER FAZ-C 10/2 or equivalent). No. 1
8.16 MCB 2X6A. (Type is MOELLER FAZ-C 6/2 or equivalent). No. 1
8.17 Ditto but MCB 1X6A. (Type is MOELLER FAZ-C 6/1 or equivalent). No. 4
8.18 Humidity sensitive relay, with N.O. and N.C. 10A output contacts, supply voltage
24V dc and/or 230V ac, according to specifications and engineer's instructions. No. 3
8.19 Temperature control relay, with N.O. and N.C. 10A output contacts, supply
voltage 24V dc and/or 230V ac, according to specifications and engineer's
instructions.
(Type is MOELLER EMT6 or equivalent). No. 3
8.20 Panel ventilation system including, one extract fans, thermistor relay, temperature
sensors (30-70 OC),16A contactor, mcb 1X10A. Set 1
9. SUB-DISTRIBUTION BOARDS (DB-S)
9.1 Supply, install sub-distribution board consists of lockable board frames as per
specifications including 2m Galv. steel sheets with anti-static paint, bus bars for
incoming cables, neutral and earthing terminal with all necessary accessories and
material to hand over clean and tested ad in operating conditions. (Type is No. 1
Contractor Signature 16
ITB 2011-023
Lot # 2: “Construction of Storage Tank, and Booster Pumping Station at Beit Hanoun”
Item Unit Price Total
Description Unit Qty.
No. (US$) (US$)
MOELLER or equivalent).
9.2 Miniature Circuit Breaker MCB 3X50A. (Type is MOELLER FAZ-B 50/3 or
equivalent). No. 1
9.3 Miniature Circuit Breaker MCB 3X32A. (Type is MOELLER FAZ-B 32/3 or
equivalent). No. 1
9.4 Miniature Circuit Breaker MCB 3X16A. (Type is MOELLER FAZ-B 16/3 or
equivalent). No. 1
9.5 Ditto but MCB 1X16A. (Type is MOELLER FAZ-B 16/1 or equivalent). No. 4
9.6 Ditto but MCB 1X10A. (Type is MOELLER FAZ-B 10/1 or equivalent). No. 6
9.7 Ditto but residual current circuit breaker 4X40/0.03A. (Type is MOELLER FI-
40/4/003-A or equivalent). No. 3
9.8 External lighting control unit including contractor (DIL 1AM ), selector switch
10A, photocell (KAJA type), 24 hours timer, 1X6A MCB. Set 1
10. CABLES AND CONDUITS
10.1 Supply, laying underground PVC piping system for the underground electrical
network as per drawings. The work includes manholes, excavation, laying pipes,
warning tapes, backfilling, new junction manhole and all required cable joints and
cable extensions for the existing building cables. L.S 1
10.2 Supply, laying and termination of XLPE cable, (3X150+70) mm2. L.M 120
10.3 Ditto, but NYY 1X150 mm2. L.M 120
10.4 Ditto, but XLPE 3X50+35 mm2. L.M 100
10.5 Ditto, but XLPE 3X25+16 mm2. L.M 50
10.6 Ditto, but XLPE 4X16 mm2. L.M 50
10.7 Ditto, but XLPE 5X10 mm2. L.M 50
10.8 Ditto, but XLPE 5X6 mm2. L.M 50
10.9 Ditto, but XLPE 5X4 mm2. L.M 50
10.10 Ditto, but control cable 12X2.5 mm2. L.M 120
10.11 Ditto, but control cable 4X2.5 mm2. L.M 100
10.12 Ditto, but control cable 3X6 mm2. L.M 20
11. MISCELLANEOUS
11.1 Supplying and erecting complete lightning protection system including air
terminal, copper conductors , PVC chairs, inspection boxes, earthing pit according
to specifications, drawings and engineer's instructions.(Type is PULSAR 45 or
equivalent). L.S. 1
11.2 Supplying and erecting micro-switches connected to NVRs on the check valves. No. 6
11.3 Supplying and erecting electrical bell with flashing rotary lamp , 24V dc and or
220V ac, IP55 category, for outside use (external). No. 2
11.4 Supplying and erecting local isolated On/Off switch 3X100A rating lockable type
for maintenance purpose to be installed close to the pumps inside weather proof
enclosure (60X80X25cm), including emergency stop push button connected to
control circuit in MCC. Type K. Moller or equivalent. No. 3
11.5 Ditto but 3X40A. No. 3
11.6 Supply and install pressure switch on the main header connected to PLC panel, the
switch shall be adjustable (0-10 bars). No. 4
11.7 Supplying and erecting electrical float switch inside the water tank, IP 65 category,
with N.O. and N.C. 10A contacts points, supply voltage 24V and/or 230V ac,
according to specifications and engineer's instructions. No. 5
11.8 Supplying and erecting cables tray, MTK type or equivalent, 50cm width, with all
fittings and accessories. No. 15
11.9 Ditto but 30cm width. No. 15
11.10 Ditto but ladder type cables tray 50cm width. No. 25
11.11 Ditto but 30cm width. No. 10
11.12 Ditto but 20cm width. No. 10
11.13 Ditto but 10cm width. No. 10
11.14 Supplying and erecting IP54 category connection boxes, with the needed metal
and/or PVC 2" pipes and accessories for cables connections. The boxes shall
contain the control and power connection separately outdoor use. No. 4
12. GENERATOR SET
12.1 Supplying and erecting electrical generator and connect it to the storage fuel tank,
the item shall include automatic start and stop, exhaust system, fuel pump and
control, with automatic float, control, protection and digital control panel, sensors
for heat, speed, under voltage, over voltage, oil pressure, phase sequence and
phase failure, measuring instruments, air duct, built in fuel tank, alternator, diesel
engine, exciter, automatic charger, main circuit breaker, sound attenuated
enclosure (original) as recommended by the manufacturer. All fittings and fixing L.S 1
Contractor Signature 17
ITB 2011-023
Lot # 2: “Construction of Storage Tank, and Booster Pumping Station at Beit Hanoun”
Item Unit Price Total
Description Unit Qty.
No. (US$) (US$)
materials and control needed are included in the price. The generator shall be rated
110kVA standby rating. The price shall include also the supply and install of the
generator steel shed, concrete pad and foundation, excavation for foundation and
all works associated as shown in the Drawings and described in the Specifications
and as directed by the Engineer.
The item includes the supply of all recommended spare parts by the manufacturer
for 2 years period.
13. MAIN ELECTRICAL CONNECTION TO GENERAL NET ELECTRICAL NET WORK
13.1 Electrical connection to general Electrical network 3 x200 A. The Work including
the installation of LTL Box 3x400A/250A and all requirements under the terms of
the electricity distribution company. L.S 1
Total of Bill (E) - US$
Contractor Signature 18
ITB 2011-023
Lot # 2: “Construction of Storage Tank, and Booster Pumping Station at Beit Hanoun”
During the period of operation, the contractor should provide the following
training courses for 7 to 10 employees (Engineers and Technicians):
(15 Training Hours): “Operation and Maintenance”
The training should cover the operation of all components at the project
including the operation, maintenance, monitoring, and control system.
The contractor price should include the provision of all needed tool kits
that may be required for training purposes, the training material and tool
kits should be delivered to CMWU after the end of the training course.
(10 Training Hours): Safety Procedures and First Aid”
In addition to the training course, the contractor should provide all safety
tools and requirements including first aid kits, helmets, vests,
eyewear protection glasses … etc. the training material and tool kits
should be delivered to CMWU after the end of the training course. L.S 1
TOTAL OF BILL (F) - US$
Contractor Signature 19
ITB 2011-023
Lot # 2: “Construction of Storage Tank, and Booster Pumping Station at Beit Hanoun”
GENERAL SUMMARY
Stamp: ______________________
Contractor Signature 20