Lr No: JNTUH/CEH/CIVIL/MTL/QUA/TEM/L2/2019

Date: 11-10-2019
Client: CPWD Vishakhapatnam
Reference: Your Lr.No:23(67)/VCSD-V/2019/L2
Name of Organisation: Teemage Builders (P) Ltd
Agreement No: 17/VCD/2018-2019
Name of Work: O.T.M Complex - Indian Coast Guard - Visakhapatnam, Project ID: 1903010

LOAD TEST FOR HOLLOW CORE SLAB

Details of the Specimen:


1) Element ID: 3HB-25,
2) Thickness: 200 mm
3) Element Sectional Details : 5810 X 1200 X 200 mm
4) Grading of Concrete: M 50

Table 1: Observation Details after Loading (Load Test)

S. No Date Time Load (Kgs) Deflection Remarks


(mm), Dial
gauge
reading
1 12:00 PM 0 Kg 0 After 1 hr of
2 12:10 PM 900 Kg 0/71 (0.71 Loading,
mm) observed dial
3 12:30 PM 1800 Kg 1/62 gauge reading
4 12:40 PM 2700 Kg 2/50 is 6/80 i.e.
5 11/10/2019 12:56 PM 3600 Kg 3/40 6.80 mm
6 13:11 PM 4500 Kg 4/12
7 13:20 PM 5400 Kg 5/05
8 13:30 PM 6300 Kg 5/98
9 13:35 PM 6800 Kg 6/56
10 14:35 PM 6800 Kg 6/80
(After 1 hr
Loading)
Table 2: Observation Details after Unloading (Load Test)

S. No Date Time Load (Kgs) Deflection Remarks


(mm), Dial
gauge
reading
1 15:15 PM 6300 Kg 6/62 After 1 hr of
(6.62 mm) Unloading,
2 15:30 PM 5400 Kg 5/66 observed
3 15:38 PM 4500 Kg 4/92 deflection is
4 15:59 PM 3600 Kg 4/15 0.22 mm
5 11/10/2019 16:07 PM 2700 Kg 3/30
6 16:20 PM 1800 Kg 2/45
7 16:26 PM 900 Kg 1/40
8 16:36 PM 0 Kg 0/48
9 17:35 PM 0 Kg 0/22
(1 hr Wait)

Observations:
1) The deflection observed for the Slab is well within the permissible limits. Further, there was
no damage or cracks on the surface of the of Slab.

Chief Coordinator