No. Uraian Pekerjaan Satuan Volume Harga Satuan RAPP Total Harga
A Trafo Room
1 Pekerjaan Struktur Beton
1.1 Pondasi Pile Cap Uk 1.9x1.9x0.25 m
- Beton K-250 m3 3.61 970,781.27
- Besi dia.12 mm kg 306.936 12,540.50
- Bekisting Bata m2 7.6 134,810.00
1.2 Tie Beam Uk. 20x40 cm
- Beton K-250 m3 1.92 970,781.27
- Besi dia.16 mm kg 151.488 12,540.50
- Besi dia.10 mm kg 90.024 12,540.50
- Bekisting Bata m2 24 134,810.00
1.3 Kolom Uk.30x30 cm
- Beton K-250 m3 2.088 970,781.27
- Besi dia.16 mm kg 231.0192 12,540.50
- Besi dia.10 mm kg 89.28 12,540.50
- Bekisting Kayu m2 27.36 180,430.00
1.4 Plat Lantai tebal 40 cm
- Beton K-250 m3 14.56 970,781.27
- Besi dia.16 mm kg 2092.428 12,540.50
- Bekisting Bata m2 9.12 134,810.00
1.5 Balok Dak tebal Uk.25x50 cm
- Beton K-250 m3 3.714 970,781.27
- Besi dia.16 mm kg 258.792 12,540.50
- Besi dia.10 mm kg 150.722 12,540.50
- Bekisting Kayu m2 39.45 180,430.00
1.6 Plat Dak Beton
- Beton K-250 m3 3.7632 970,781.27
- Besi dia.8 mm kg 302.965 12,540.50
- Bekisting Kayu m2 9.6 180,430.00
1.7 Pasangan Batu Kali m3 12.996 800,000.00
B Fuel Tank
1 Pekerjaan Struktur Beton
1.1 Pondasi Pondasi Tapak
- Beton K-250 m3 2.592 970,781.27
- Besi dia.12 mm kg 310.068 12,540.50
- Bekisting Bata m2 8.64 134,810.00
1.2 Tie Beam
- Beton K-250 m3 1.2 970,781.27
- Besi dia.13 mm kg 66.56 12,540.50
- Besi dia.10 mm kg 73.656 12,540.50
- Bekisting Bata m2 13.6 134,810.00
1.3 Kolom
- Beton K-250 m3 1.62 970,781.27
- Besi dia.13 mm kg 79.872 12,540.50
- Besi dia.10 mm kg 84.816 12,540.50
- Bekisting Kayu m2 14.4 180,430.00
1.5 Balok Dak
- Beton K-250 m3 1.2 970,781.27
- Besi dia.13 mm kg 66.56 12,540.50
- Besi dia.10 mm kg 73.656 12,540.50
- Bekisting Kayu m2 13.6 180,430.00
1.6 Plat Dak Beton
- Beton K-250 m3 1.8 970,781.27
- Besi dia.10 mm kg 604.128 12,540.50
- Bekisting Kayu m2 15 180,430.00
D LINGKUNGAN
1 Saluran U-DITCH Uk.50x60 + Tutup m 13 750,000.00
Keterangan
Di kontrak Tebal 15 cm
BETON K 250
PONDASI P L T TITIK VOLUME
P1 2.1 2.1 0.25 4 4.41
P2 1.6 1.6 0.25 8 5.12
69.879
KEBUTUHAN MATERIAL NEW POWER ROOM
BEKISTING
PONDASI P L Tebal Jumlah Sisi TITIK VOLUME
P1 2.100 2.100 0.250 4.000 4.000 8.400
P2 1.600 1.600 0.250 4.000 8.000 12.800
PEMBESIAN
PONDASI
PANJANG BESI
P1
Tulangan Bawah 0.050 2.050 0.050 2.150
Tulangan Atas 0.150 2.050 0.150 2.350
P2
Tulangan Bawah 0.050 1.550 0.050 1.650
Tulangan Atas 0.150 1.550 0.150 1.850
KOLOM PEDESTAL
P1 0.15 1.75 1.900
P2 0.15 1.75 1.900
TOTAL TULANGAN UTAMA
KOLOM t = 4
K1 0.05 4 4.050
TOTAL TULANGAN UTAMA
TIE BEAM
TB 1 0.050 11.690 0.050 11.790
OVERLAP 0.640
TB 1 0.050 6.700 0.050 6.800
TOTAL TULANGAN UTAMA
B1 , P = 2.3 M, N = 2
TULANGAN ATAS 0.050 1.150 0.050 1.250
0.050 1.150 0.050 1.250
TULANGAN BAWAH 0.050 1.150 0.050 1.250
0.050 1.150 0.050 1.250
TOTAL TULANGAN UTAMA B1
B2 , P = 3.85 M, N = 4
TULANGAN ATAS 0.050 1.925 0.050 2.025
0.050 1.925 0.050 2.025
TULANGAN BAWAH 0.050 1.925 0.050 2.025
0.050 1.925 0.050 2.025
B2 , P = 4 M, N = 2
TULANGAN ATAS 0.050 2.000 0.050 2.100
0.050 2.000 0.050 2.100
TULANGAN BAWAH 0.050 2.000 0.050 2.100
0.050 2.000 0.050 2.100
TOTAL TULANGAN UTAMA B2
B3 , P = 2.2 M, N = 4
TULANGAN ATAS 0.050 1.100 0.050 1.200
0.050 1.100 0.050 1.200
TULANGAN BAWAH 0.050 1.100 0.050 1.200
0.050 1.100 0.050 1.200
B3 , P = 2.3 M, N = 2
TULANGAN ATAS 0.050 1.150 0.050 1.250
0.050 1.150 0.050 1.250
TULANGAN BAWAH 0.050 1.150 0.050 1.250
0.050 1.150 0.050 1.250
B3 , P = 3.85 M, N = 4
TULANGAN ATAS 0.050 1.925 0.050 2.025
0.050 1.925 0.050 2.025
TULANGAN BAWAH 0.050 1.925 0.050 2.025
0.050 1.925 0.050 2.025
B3 , P = 4 M, N = 2
TULANGAN ATAS 0.050 2.000 0.050 2.100
0.050 2.000 0.050 2.100
TULANGAN BAWAH 0.050 2.000 0.050 2.100
0.050 2.000 0.050 2.100
TOTAL TULANGAN UTAMA B3
B1 25/50 , P = 2.2 M, N = 4
LAPANGAN 0.200 0.450 0.200 0.450 0.05 0.05 1.400
B1 25/50 , P = 2.3 M, N = 2
LAPANGAN 0.200 0.450 0.200 0.450 0.05 0.05 1.400
B2 20/40 , P = 3.85 M, N = 4
LAPANGAN 0.150 0.350 0.150 0.350 0.05 0.05 1.100
B2 20/40 , P = 4 M, N = 2
LAPANGAN 0.150 0.350 0.150 0.350 0.05 0.05 1.100
B3 20/30 , P = 2.2 M, N = 4
LAPANGAN 0.150 0.250 0.150 0.250 0.05 0.05 0.900
B3 20/30 , P = 2.3 M, N = 2
LAPANGAN 0.150 0.250 0.150 0.250 0.05 0.05 0.900
B3 20/30 , P = 3.85 M, N = 4
LAPANGAN 0.150 0.250 0.150 0.250 0.05 0.05 0.900
TUMPUAN 0.150 0.250 0.150 0.250 0.05 0.05 0.900
B3 20/30 , P = 4 M, N = 2
LAPANGAN 0.150 0.250 0.150 0.250 0.05 0.05 0.900
P = 3.85, 3.85, 4
TULANGAN ATAS 0.050 11.700 0.050 11.800
TULANGAN BAWAH 0.070 11.700 0.070 11.840
TOTAL TULANGAN PLAT LANTAI DAK
PLAT LANTAI
P = 2.2 , 2.3 , 2.2
TULANGAN ATAS 0.050 6.700 0.050 6.800
TULANGAN BAWAH 0.070 6.700 0.070 6.840
P = 3.85, 3.85, 4
TULANGAN ATAS 0.050 11.700 0.050 11.800
TULANGAN BAWAH 0.070 11.700 0.070 11.840
TOTAL TULANGAN PLAT LANTAI
BERAT JENIS JUMLAH PER PCS JUMLAH TITIK VOLUME
Ø 12
Ø 16
1.578 8.000 4.000 95.942
TULANGAN UTAMA
1.578 8.000 8.000 191.885
UTAMA 287.827
Ø 10 - 150
0.617 13.000 4.000 35.292
SENGKANG
0.617 13.000 8.000 70.585
ENGKANG 105.877
Ø 16
1.578 8.000 12.000 613.526 TULANGAN UTAMA
UTAMA 613.526 605.952
Ø 10 - 150
27.667 0.617 28.000 12.000 228.043 SENGKANG
ENGKANG 228.043
Ø 16
1.578 4.000 2.000 148.837
1.578 4.000 2.000 8.079 TULANGAN UTAMA
1.578 4.000 2.000 85.843
UTAMA 242.760
Ø 10 - 200
0.617 58.000 2.000 78.729
SENGKANG
0.617 33.000 2.000 44.794
ENGKANG 123.523
Ø 16
1.578 2.000 4.000 15.149 LAPANGAN
1.578 4.000 4.000 30.298 TUMPUAN
1.578 4.000 4.000 30.298 LAPANGAN
1.578 2.000 4.000 15.149 TUMPUAN
Ø 10 - 200
1.100 0.617 6.000 4.000 20.731
Ø 10 - 100
0.550 0.617 12.000 4.000 41.462
5.500
Ø 10 - 200
1.150 0.617 6.000 2.000 10.366
Ø 10 - 100
0.575 0.617 12.000 2.000 20.731
NGKANG B1 93.290
Ø 10 - 200
1.925 0.617 10.000 4.000 27.148
Ø 10 - 100
0.963 0.617 20.000 4.000 54.296
Ø 10 - 200
2.000 0.617 10.000 2.000 13.574
Ø 10 - 100
1.000 0.617 20.000 2.000 27.148
NGKANG B2 122.166
Ø 10 - 200
1.100 0.617 6.000 4.000 13.327
Ø 10 - 200
0.550 0.617 6.000 4.000 13.327
Ø 10 - 200
1.150 0.617 6.000 2.000 6.664
Ø 10 - 200
0.575 0.617 6.000 2.000 6.664
Ø 10 - 200
1.925 0.617 10.000 4.000 22.212
Ø 10 - 200
0.963 0.617 10.000 4.000 22.212
Ø 10 - 200
2.000 0.617 10.000 2.000 11.106
Ø 10 - 200
1.000 0.617 10.000 2.000 11.106
NGKANG B3 106.618
Ø 8 - 200
11.700 0.395 59.000 1.000 158.474
11.700 0.395 59.000 1.000 159.406
Ø 8 - 200
6.700 0.395 34.000 1.000 158.474
6.700 0.395 34.000 1.000 159.011
T LANTAI DAK 635.365
Ø 16 - 150
16.500 1.578 110.000 1.000 1180.344
12.500 1.578 84.000 1.000 906.656
Ø 16 - 150
11.500 1.578 77.000 1.000 1433.771
7.500 1.578 50.000 1.000 934.176
AT LANTAI 4454.946
Panjang Lebar Tinggi Jumlah Volume
No. Uraian Pekerjaan (m) (m) (m) (bh) (m3)
1 TRAFO ROOM
Beton K-250
Pondasi (P1) 1.9 1.9 0.25 4 3.61
Tie Beam 24 0.2 0.4 1 1.92
Kolom 0.3 0.3 5.8 4 2.088
Plat Lantai 5.6 5.6 0.4 1 12.544
22.4 0.3 0.3 1 2.016
Dak Beton 5.6 5.6 0.12 1 3.7632
Balok Dak
B1 24 0.25 0.5 1 3
B2 10.2 0.2 0.35 1 0.714
TOTAL 29.6552
2 FUEL TANK
Beton K -250
Pondasi (P1) 1.2 1.2 0.3 6 2.592
Tie Beam 16 0.25 0.3 1 1.2
Kolom 3 0.3 0.3 6 1.62
Dak Beton 3 5 0.12 1 1.8
Balok Dak
B1 16 0.25 0.3 1 1.2
TOTAL 8.412
KEBUTUHAN PEMBESIA
a b c d
a b c
Tinggi Kolom +
Jumlah
No. Uraian Pekerjaan Lengkungan Dia. Besi
Tulangan
(m)
a b c
Tulangan Utama Kolom 6.1 6 16
a b c
PELAT LANTAI
a b c d
PELAT DAK
a b c d
Panjang Besi Jarak Antar Besi Total Panjang Berat Besi Total Berat Per Jumlah
Jumlah
(m) (m) (m) Per m Titik Pondasi (kg) Pondasi
e f g = (b/f+1)*2 h = exg i j k
N TIE BEAM
d=axb e f=dxe
96 1.578 151.488
151.488
Jumlah Dia. Besi Total Panjang Berat Besi Per m Total Berat
Tulangan (m) (kg)
d=(a/c+1) e f=dxb g h=fxg
SI D.10 90.024
PEMBESIAN KOLOM
d e=axbxd f g=exf
4 146.4 1.578 231.0192
231.0192
Total Panjang
(m) Berat Besi Per m Total Berat (kg)
d=axb e f=dxe
258.792
Jumlah Dia. Besi Total Panjang Berat Besi Per m Total Berat
Tulangan (m) (kg)
d=(a/c+1) e f=dxb g h=fxg
SI D.10 150.722
PELAT LANTAI
PELAT DAK
l=jxk
165.648
141.288
306.936
KEBUTUHAN PEMB
a b c d
a b c
Tinggi Kolom +
Jumlah
No. Uraian Pekerjaan Lengkungan Dia. Besi
Tulangan
(m)
a b c
Tulangan Utama Kolom 3.2 4 13
a b c
PELAT LANTAI
a b c d
Jarak Antar Besi Total Panjang Berat Besi Total Berat Per
Panjang Besi (m) Jumlah
(m) (m) Per m Titik Pondasi (kg)
e f g = (b/f+1)*2 h = exg i j
d=axb e f=dxe
64 1.04 66.56
66.56
Jumlah Tulangan Dia. Besi Total Panjang (m) Berat Besi Per m Total Berat
(kg)
d=(a/c+1) e f=dxb g h=fxg
AN PEMBESIAN KOLOM
Total Panjang
Jumlah Kolom Berat Besi Per m Total Berat (kg)
(m)
d e=axbxd f g=exf
6 76.8 1.04 79.872
13 79.872
d=axb e f=dxe
64 1.04 66.56
66.56
Total Berat
Jumlah Tulangan Dia. Besi Total Panjang (m) Berat Besi Per m
(kg)
d=(a/c+1) e f=dxb g h=fxg
604.128
Jumlah Total
Pondasi Berat (kg)
k l=jxk
6 169.128
6 140.94
310.068
KEBUTUHAN BEKISTING PONDASI
No. Uraian Pekerjaan Panjang (m) Lebar (m) Tinggi (m) Luas (m) Jumlah Sisi
a b c d = axb e
TRAFO ROOM
1 Pondasi 1.9 1.9 0.25 0.475 4
2 Tie Beam 24 0.2 0.4 4.8 1
9.6 2
3 Kolom 5.7 0.3 0.3 1.71 4
4 Balok Dak (B1) 24 0.25 0.5 6 1
12 2
Balok Dak (B2) 10.5 0.2 0.35 2.1 1
3.675 2
5 Plat Lantai 5.7 5.7 0.4 2.28 4
6 Plat Dak 5.7 5.7 0.12 32.49 1
FUEL TANK
1 Pondasi 1.2 1.2 0.3 0.36 4
2 Tie Beam 16 0.25 0.3 4 1
4.8 2
3 Kolom 3 0.3 0.3 0.9 4
4 Balok Dak 16 0.25 0.3 4 1
4.8 2
5 Plat Dak 3 5 0.12 15 1
ONDASI
4 7.6
1 4.8
1 19.2
4 27.36
1 6
1 24
1 2.1
1 7.35
1 9.12
1 32.49
6 8.64
1 4
1 9.6
4 14.4
1 4
1 9.6
1 15
No. Uraian Pekerjaan Panjang (mLebar (m) Tebal (m) Volume (m3)
Trafo Room
DPT di bawah Plat Lantai 5.7 5.7 0.4 12.996
1 PEKERJAAN BETON K-250 PER M3
a Bahan
- Semen kg 384.00 1,200
- Pasir m3 0.49 195,000
- Split m3 0.577 250,000
Jumlah.a
b Upah
- Pekerja ht 1.650 120,000
- Tukang ht 0.275 175,000
- Kep.Tukang ht 0.028 190,000
- Mandor ht 0.083 215,000
Jumlah.b
Jumlah.a+b
Total
198,000.00
48,125.00
5,320.00
17,845.00
269,290.00
970,781.27
970,781.27
9,000.00
500.00
9,500.00
1,140.00
1,662.50
152.00
86.00
3,040.50
12,540.50
12,540.50
54,000.00
13,800.00
8,385.00
76,185.00
36,000.00
17,500.00
1,900.00
3,225.00
58,625.00
134,810.00
134,810.00
60,000.00
2,100.00
34,300.00
96,400.00
42,000.00
31,500.00
4,940.00
5,590.00
84,030.00
180,430.00
180,430.00