LIST KEBUTUHAN MATERIAL SENTUL

No. Uraian Pekerjaan Satuan Volume Harga Satuan RAPP Total Harga

A Trafo Room
1 Pekerjaan Struktur Beton
1.1 Pondasi Pile Cap Uk 1.9x1.9x0.25 m
- Beton K-250 m3 3.61 970,781.27
- Besi dia.12 mm kg 306.936 12,540.50
- Bekisting Bata m2 7.6 134,810.00
1.2 Tie Beam Uk. 20x40 cm
- Beton K-250 m3 1.92 970,781.27
- Besi dia.16 mm kg 151.488 12,540.50
- Besi dia.10 mm kg 90.024 12,540.50
- Bekisting Bata m2 24 134,810.00
1.3 Kolom Uk.30x30 cm
- Beton K-250 m3 2.088 970,781.27
- Besi dia.16 mm kg 231.0192 12,540.50
- Besi dia.10 mm kg 89.28 12,540.50
- Bekisting Kayu m2 27.36 180,430.00
1.4 Plat Lantai tebal 40 cm
- Beton K-250 m3 14.56 970,781.27
- Besi dia.16 mm kg 2092.428 12,540.50
- Bekisting Bata m2 9.12 134,810.00
1.5 Balok Dak tebal Uk.25x50 cm
- Beton K-250 m3 3.714 970,781.27
- Besi dia.16 mm kg 258.792 12,540.50
- Besi dia.10 mm kg 150.722 12,540.50
- Bekisting Kayu m2 39.45 180,430.00
1.6 Plat Dak Beton
- Beton K-250 m3 3.7632 970,781.27
- Besi dia.8 mm kg 302.965 12,540.50
- Bekisting Kayu m2 9.6 180,430.00
1.7 Pasangan Batu Kali m3 12.996 800,000.00

B Fuel Tank
1 Pekerjaan Struktur Beton
1.1 Pondasi Pondasi Tapak
- Beton K-250 m3 2.592 970,781.27
- Besi dia.12 mm kg 310.068 12,540.50
- Bekisting Bata m2 8.64 134,810.00
1.2 Tie Beam
- Beton K-250 m3 1.2 970,781.27
- Besi dia.13 mm kg 66.56 12,540.50
- Besi dia.10 mm kg 73.656 12,540.50
- Bekisting Bata m2 13.6 134,810.00
1.3 Kolom
- Beton K-250 m3 1.62 970,781.27
- Besi dia.13 mm kg 79.872 12,540.50
- Besi dia.10 mm kg 84.816 12,540.50
- Bekisting Kayu m2 14.4 180,430.00
1.5 Balok Dak
- Beton K-250 m3 1.2 970,781.27
- Besi dia.13 mm kg 66.56 12,540.50
- Besi dia.10 mm kg 73.656 12,540.50
- Bekisting Kayu m2 13.6 180,430.00
1.6 Plat Dak Beton
- Beton K-250 m3 1.8 970,781.27
- Besi dia.10 mm kg 604.128 12,540.50
- Bekisting Kayu m2 15 180,430.00

C New Power Room


1 Pekerjaan Struktur Beton
1.1 Pondasi Pondasi Tapak
- Beton K-250 m3 9.53 970,781.27
- Besi dia.12 mm kg 749.472 12,540.50
- Bekisting Bata m2 21.2 134,810.00
1.2 Tie Beam Uk. 20x40 cm
- Beton K-250 m3 2.816 970,781.27
- Besi dia.16 mm kg 242.75952 12,540.50
- Besi dia.10 mm kg 123.5234 12,540.50
- Bekisting Kayu m2 123.5234 134,810.00
1.3 Kolom Uk.30x30 cm
- Beton K-250 m3 6.21 970,781.27
- Besi dia.16 mm kg 901.3536 12,540.50
- Besi dia.10 mm kg 333.9204 12,540.50
- Bekisting Kayu m2 82.8 180,430.00
1.4 Plat Lantai tebal 40 cm
- Beton K-250 m3 35.12 970,781.27
- Besi dia.16 mm kg 4454.9465 12,540.50
- Bekisting m2 30.4 134,810.00
1.5 Balok Dak
- Beton K-250 m3 5.363 970,781.27
- Besi dia.16 mm kg 579.7572 12,540.50
- Besi dia.10 mm kg 322.074 12,540.50
- Bekisting Kayu m2 64.12 180,430.00
1.6 Plat Dak Beton
- Beton K-250 m3 10.84 970,781.27
- Besi dia.8 mm kg 635.3654 12,540.50
- Bekisting m2 84 180,430.00
1.7 Pasangan Batu Kali m3 33.6 800,000.00

D LINGKUNGAN
1 Saluran U-DITCH Uk.50x60 + Tutup m 13 750,000.00
Keterangan

Tidak ada di kontrak


Tidak ada di kontrak
Tidak ada di kontrak
Di kontrak Uk.30x50 cm

Di kontrak Uk. 40x40 cm

Di kontrak Tebal 15 cm

Di kontrak Tebal 30x50 cm


KEBUTUHAN MATERIAL NEW POWER ROOM

BETON K 250
PONDASI P L T TITIK VOLUME
P1 2.1 2.1 0.25 4 4.41
P2 1.6 1.6 0.25 8 5.12

PEDESTAL P L T TITIK VOLUME


P1 0.3 0.3 1.75 4 0.63
P2 0.3 0.3 1.75 8 1.26

KOLOM P L T TITIK VOLUME


K1 0.3 0.3 4 12 4.32

TIE BEAM P L T TITIK VOLUME


TB1 1.9 0.2 0.4 2 0.304
2 0.2 0.4 2 0.32
1.9 0.2 0.4 2 0.304

3.55 0.2 0.4 2 0.568


4.7 0.2 0.4 2 0.752
3.55 0.2 0.4 2 0.568

BALOK P L T TITIK VOLUME


B1 1.95 0.25 0.5 4 0.975
2 0.25 0.5 2 0.500
B2 11.4 0.2 0.4 2 1.824

B3 11.4 0.2 0.3 2 1.368


1.9 0.2 0.3 4 0.456
2 0.2 0.3 2 0.24

LANTAI P L T TITIK VOLUME


7 12 0.4 33.6
0.2 0.2 38 1.52

DAK P L T TITIK VOLUME


7 12 0.12 10.08
0.2 0.1 38 0.76

69.879
KEBUTUHAN MATERIAL NEW POWER ROOM

BEKISTING
PONDASI P L Tebal Jumlah Sisi TITIK VOLUME
P1 2.100 2.100 0.250 4.000 4.000 8.400
P2 1.600 1.600 0.250 4.000 8.000 12.800

PEDESTAL P T Jumlah Sisi TITIK


P1 0.300 1.750 4.000 4.000 8.400
P2 0.300 1.750 4.000 8.000 16.800

KOLOM P T Jumlah Sisi TITIK


K1 0.300 4.000 4.000 12.000 57.600

TIE BEAM P L Jumlah Sisi TITIK


TB1 1.900 0.400 2.000 2.000 3.040
2.000 0.400 2.000 2.000 3.200
1.900 0.400 2.000 2.000 3.040

3.550 0.400 2.000 2.000 5.680


4.700 0.400 2.000 2.000 7.520
3.550 0.400 2.000 2.000 5.680

BALOK P L Jumlah Sisi TITIK


B1 1.950 0.250 1.000 4.000 1.950
1.950 0.500 2.000 4.000 7.800
2.100 0.250 1.000 2.000 1.050
2.100 0.500 2.000 2.000 4.200

B2 3.550 0.400 2.000 4.000 11.360


3.550 0.200 1.000 4.000 2.840
3.700 0.400 2.000 2.000 5.920
3.700 0.200 1.000 2.000 1.480

B3 1.900 0.200 1.000 4.000 1.520


1.900 0.300 2.000 4.000 4.560
VERTIKAL
2.000 0.200 1.000 2.000 0.800
2.000 0.300 2.000 2.000 2.400
11.400 0.200 1.000 2.000 4.560
MENDATAR
11.400 0.300 2.000 2.000 13.680

PLAT DAK P L Jumlah Sisi TITIK


7.000 12.000 1.000 1.000 84.000
TOTAL 271.080
KEBUTUHAN MATERIAL NEW POWER ROOM

PEMBESIAN
PONDASI
PANJANG BESI

P1
Tulangan Bawah 0.050 2.050 0.050 2.150
Tulangan Atas 0.150 2.050 0.150 2.350

P2
Tulangan Bawah 0.050 1.550 0.050 1.650
Tulangan Atas 0.150 1.550 0.150 1.850

TOTAL TULANGAN PONDASI TAPAK

KOLOM PEDESTAL
P1 0.15 1.75 1.900
P2 0.15 1.75 1.900
TOTAL TULANGAN UTAMA

P1 0.25 0.25 0.25 0.25 0.05 0.05 1.100


P2 0.25 0.25 0.25 0.25 0.05 0.05 1.100
TOTAL TULANGAN SENGKANG

KOLOM t = 4
K1 0.05 4 4.050
TOTAL TULANGAN UTAMA

K1 0.25 0.25 0.25 0.25 0.05 0.05 1.100


TOTAL TULANGAN SENGKANG

TIE BEAM
TB 1 0.050 11.690 0.050 11.790
OVERLAP 0.640
TB 1 0.050 6.700 0.050 6.800
TOTAL TULANGAN UTAMA

TB 1 0.35 0.15 0.35 0.15 0.05 0.05 1.100


TB 1 0.35 0.15 0.35 0.15 0.05 0.05 1.100
TOTAL TULANGAN SENGKANG
BALOK
B1 , P = 2.2 M, N = 4
TULANGAN ATAS 0.050 1.100 0.050 1.200
0.050 1.100 0.050 1.200
TULANGAN BAWAH 0.050 1.100 0.050 1.200
0.050 1.100 0.050 1.200

B1 , P = 2.3 M, N = 2
TULANGAN ATAS 0.050 1.150 0.050 1.250
0.050 1.150 0.050 1.250
TULANGAN BAWAH 0.050 1.150 0.050 1.250
0.050 1.150 0.050 1.250
TOTAL TULANGAN UTAMA B1

B2 , P = 3.85 M, N = 4
TULANGAN ATAS 0.050 1.925 0.050 2.025
0.050 1.925 0.050 2.025
TULANGAN BAWAH 0.050 1.925 0.050 2.025
0.050 1.925 0.050 2.025

B2 , P = 4 M, N = 2
TULANGAN ATAS 0.050 2.000 0.050 2.100
0.050 2.000 0.050 2.100
TULANGAN BAWAH 0.050 2.000 0.050 2.100
0.050 2.000 0.050 2.100
TOTAL TULANGAN UTAMA B2

B3 , P = 2.2 M, N = 4
TULANGAN ATAS 0.050 1.100 0.050 1.200
0.050 1.100 0.050 1.200
TULANGAN BAWAH 0.050 1.100 0.050 1.200
0.050 1.100 0.050 1.200

B3 , P = 2.3 M, N = 2
TULANGAN ATAS 0.050 1.150 0.050 1.250
0.050 1.150 0.050 1.250
TULANGAN BAWAH 0.050 1.150 0.050 1.250
0.050 1.150 0.050 1.250

B3 , P = 3.85 M, N = 4
TULANGAN ATAS 0.050 1.925 0.050 2.025
0.050 1.925 0.050 2.025
TULANGAN BAWAH 0.050 1.925 0.050 2.025
0.050 1.925 0.050 2.025
B3 , P = 4 M, N = 2
TULANGAN ATAS 0.050 2.000 0.050 2.100
0.050 2.000 0.050 2.100
TULANGAN BAWAH 0.050 2.000 0.050 2.100
0.050 2.000 0.050 2.100
TOTAL TULANGAN UTAMA B3

B1 25/50 , P = 2.2 M, N = 4
LAPANGAN 0.200 0.450 0.200 0.450 0.05 0.05 1.400

TUMPUAN 0.200 0.450 0.200 0.450 0.05 0.05 1.400

B1 25/50 , P = 2.3 M, N = 2
LAPANGAN 0.200 0.450 0.200 0.450 0.05 0.05 1.400

TUMPUAN 0.200 0.450 0.200 0.450 0.05 0.05 1.400


TOTAL TULANGAN SENGKANG B1

B2 20/40 , P = 3.85 M, N = 4
LAPANGAN 0.150 0.350 0.150 0.350 0.05 0.05 1.100

TUMPUAN 0.150 0.350 0.150 0.350 0.05 0.05 1.100

B2 20/40 , P = 4 M, N = 2
LAPANGAN 0.150 0.350 0.150 0.350 0.05 0.05 1.100

TUMPUAN 0.150 0.350 0.150 0.350 0.05 0.05 1.100

TOTAL TULANGAN SENGKANG B2

B3 20/30 , P = 2.2 M, N = 4
LAPANGAN 0.150 0.250 0.150 0.250 0.05 0.05 0.900

TUMPUAN 0.150 0.250 0.150 0.250 0.05 0.05 0.900

B3 20/30 , P = 2.3 M, N = 2
LAPANGAN 0.150 0.250 0.150 0.250 0.05 0.05 0.900

TUMPUAN 0.150 0.250 0.150 0.250 0.05 0.05 0.900

B3 20/30 , P = 3.85 M, N = 4
LAPANGAN 0.150 0.250 0.150 0.250 0.05 0.05 0.900
TUMPUAN 0.150 0.250 0.150 0.250 0.05 0.05 0.900

B3 20/30 , P = 4 M, N = 2
LAPANGAN 0.150 0.250 0.150 0.250 0.05 0.05 0.900

TUMPUAN 0.150 0.250 0.150 0.250 0.05 0.05 0.900

TOTAL TULANGAN SENGKANG B3

PLAT LANTAI DAK


P = 2.2 , 2.3 , 2.2
TULANGAN ATAS 0.050 6.700 0.050 6.800
TULANGAN BAWAH 0.070 6.700 0.070 6.840

P = 3.85, 3.85, 4
TULANGAN ATAS 0.050 11.700 0.050 11.800
TULANGAN BAWAH 0.070 11.700 0.070 11.840
TOTAL TULANGAN PLAT LANTAI DAK

PLAT LANTAI
P = 2.2 , 2.3 , 2.2
TULANGAN ATAS 0.050 6.700 0.050 6.800
TULANGAN BAWAH 0.070 6.700 0.070 6.840

P = 3.85, 3.85, 4
TULANGAN ATAS 0.050 11.700 0.050 11.800
TULANGAN BAWAH 0.070 11.700 0.070 11.840
TOTAL TULANGAN PLAT LANTAI
BERAT JENIS JUMLAH PER PCS JUMLAH TITIK VOLUME
Ø 12

0.888 22.000 4.000 168.010


0.888 22.000 4.000 183.638

0.888 16.000 8.000 187.546


0.888 16.000 8.000 210.278

NDASI TAPAK 749.472

Ø 16
1.578 8.000 4.000 95.942
TULANGAN UTAMA
1.578 8.000 8.000 191.885
UTAMA 287.827

Ø 10 - 150
0.617 13.000 4.000 35.292
SENGKANG
0.617 13.000 8.000 70.585
ENGKANG 105.877

Ø 16
1.578 8.000 12.000 613.526 TULANGAN UTAMA
UTAMA 613.526 605.952
Ø 10 - 150
27.667 0.617 28.000 12.000 228.043 SENGKANG
ENGKANG 228.043

Ø 16
1.578 4.000 2.000 148.837
1.578 4.000 2.000 8.079 TULANGAN UTAMA
1.578 4.000 2.000 85.843
UTAMA 242.760

Ø 10 - 200
0.617 58.000 2.000 78.729
SENGKANG
0.617 33.000 2.000 44.794
ENGKANG 123.523
Ø 16
1.578 2.000 4.000 15.149 LAPANGAN
1.578 4.000 4.000 30.298 TUMPUAN
1.578 4.000 4.000 30.298 LAPANGAN
1.578 2.000 4.000 15.149 TUMPUAN

1.578 2.000 2.000 7.890 LAPANGAN


1.578 4.000 2.000 15.780 TUMPUAN
1.578 4.000 2.000 15.780 LAPANGAN
1.578 2.000 2.000 7.890 TUMPUAN
UTAMA B1 138.233

1.578 2.000 4.000 25.564 LAPANGAN


1.578 3.000 4.000 38.345 TUMPUAN
1.578 3.000 4.000 38.345 LAPANGAN
1.578 2.000 4.000 25.564 TUMPUAN

1.578 2.000 2.000 13.255 LAPANGAN


1.578 3.000 2.000 19.883 TUMPUAN
1.578 3.000 2.000 19.883 LAPANGAN
1.578 2.000 2.000 13.255 TUMPUAN
UTAMA B2 194.094

1.578 2.000 4.000 15.149 LAPANGAN


1.578 2.000 4.000 15.149 TUMPUAN
1.578 2.000 4.000 15.149 LAPANGAN
1.578 2.000 4.000 15.149 TUMPUAN

1.578 2.000 2.000 7.890 LAPANGAN


1.578 2.000 2.000 7.890 TUMPUAN
1.578 2.000 2.000 7.890 LAPANGAN
1.578 2.000 2.000 7.890 TUMPUAN

1.578 2.000 4.000 25.564 LAPANGAN


1.578 2.000 4.000 25.564 TUMPUAN
1.578 2.000 4.000 25.564 LAPANGAN
1.578 2.000 4.000 25.564 TUMPUAN
1.578 2.000 2.000 13.255 LAPANGAN
1.578 2.000 2.000 13.255 TUMPUAN
1.578 2.000 2.000 13.255 LAPANGAN
1.578 2.000 2.000 13.255 TUMPUAN
UTAMA B3 247.430

Ø 10 - 200
1.100 0.617 6.000 4.000 20.731
Ø 10 - 100
0.550 0.617 12.000 4.000 41.462
5.500
Ø 10 - 200
1.150 0.617 6.000 2.000 10.366
Ø 10 - 100
0.575 0.617 12.000 2.000 20.731
NGKANG B1 93.290

Ø 10 - 200
1.925 0.617 10.000 4.000 27.148
Ø 10 - 100
0.963 0.617 20.000 4.000 54.296

Ø 10 - 200
2.000 0.617 10.000 2.000 13.574
Ø 10 - 100
1.000 0.617 20.000 2.000 27.148

NGKANG B2 122.166

Ø 10 - 200
1.100 0.617 6.000 4.000 13.327
Ø 10 - 200
0.550 0.617 6.000 4.000 13.327

Ø 10 - 200
1.150 0.617 6.000 2.000 6.664
Ø 10 - 200
0.575 0.617 6.000 2.000 6.664

Ø 10 - 200
1.925 0.617 10.000 4.000 22.212
Ø 10 - 200
0.963 0.617 10.000 4.000 22.212

Ø 10 - 200
2.000 0.617 10.000 2.000 11.106
Ø 10 - 200
1.000 0.617 10.000 2.000 11.106

NGKANG B3 106.618

Ø 8 - 200
11.700 0.395 59.000 1.000 158.474
11.700 0.395 59.000 1.000 159.406

Ø 8 - 200
6.700 0.395 34.000 1.000 158.474
6.700 0.395 34.000 1.000 159.011
T LANTAI DAK 635.365

Ø 16 - 150
16.500 1.578 110.000 1.000 1180.344
12.500 1.578 84.000 1.000 906.656

Ø 16 - 150
11.500 1.578 77.000 1.000 1433.771
7.500 1.578 50.000 1.000 934.176
AT LANTAI 4454.946
Panjang Lebar Tinggi Jumlah Volume
No. Uraian Pekerjaan (m) (m) (m) (bh) (m3)

1 TRAFO ROOM
Beton K-250
Pondasi (P1) 1.9 1.9 0.25 4 3.61
Tie Beam 24 0.2 0.4 1 1.92
Kolom 0.3 0.3 5.8 4 2.088
Plat Lantai 5.6 5.6 0.4 1 12.544
22.4 0.3 0.3 1 2.016
Dak Beton 5.6 5.6 0.12 1 3.7632
Balok Dak
B1 24 0.25 0.5 1 3
B2 10.2 0.2 0.35 1 0.714

TOTAL 29.6552

2 FUEL TANK
Beton K -250
Pondasi (P1) 1.2 1.2 0.3 6 2.592
Tie Beam 16 0.25 0.3 1 1.2
Kolom 3 0.3 0.3 6 1.62
Dak Beton 3 5 0.12 1 1.8
Balok Dak
B1 16 0.25 0.3 1 1.2

TOTAL 8.412
KEBUTUHAN PEMBESIA

No. Uraian Pekerjaan Panjang (m) Lebar (m) Dia. Besi

a b c d

1 P1 (Sisi Atas) 1.9 1.9 12


2 P1 (Sisi Bawah) 1.9 1.9 12

TOTAL BESI DIA.12

KEBUTUHAN PEMBESIAN TIE BEAM

No. Uraian Pekerjaan Panjang Balok Jumlah Dia. Besi


(m) Tulangan

a b c

Tulangan Utama Tie Beam 24 4 16

TOTAL BESI D.16

No. Uraian Pekerjaan Panjang Balok Keliling Jarak Antar


(m) Balok Tulangan (m)
a b c

Tulangan Sengkang Tie Beam 24 1.2 0.2

TOTAL BESI D.10

KEBUTUHAN PEMBESIAN KOLOM

Tinggi Kolom +
Jumlah
No. Uraian Pekerjaan Lengkungan Dia. Besi
Tulangan
(m)
a b c
Tulangan Utama Kolom 6.1 6 16

TOTAL BESI D.16

Tinggi Kolom Keliling Jarak Antar


No. Uraian Pekerjaan
(m) Kolom Tulangan (m)
a b c

Tulangan Sengkang Kolom 5.8 1.2 0.2

TOTAL BESI D.10

KEBUTUHAN PEMBESIAN BALOK DAK

Panjang Balok Jumlah


No. Uraian Pekerjaan (m) Tulangan Dia. Besi

a b c

Tulangan Utama Balok Dak (B1) 24 5 16


Tulangan Utama Balok Dak (B2) 11 4 16

TOTAL BESI D.16

No. Uraian Pekerjaan Panjang Balok Keliling Jarak Antar


(m) Balok Tulangan (m)
a b c

Tulangan Sengkang Balok Dak (B1) 24 1.5 0.2


Tulangan Sengkang Balok Dak (B2) 11 1.1 0.2

TOTAL BESI D.10

PELAT LANTAI

No. Uraian Pekerjaan Panjang (m) Lebar (m) Dia. Besi

a b c d

1 Plat Lantai (Sisi Atas) 5.7 5.7 16


2 Plat Lantai (Sisi Bawah) 5.7 5.7 16
TOTAL BESI DIA.16

PELAT DAK

No. Uraian Pekerjaan Panjang (m) Lebar (m) Dia. Besi

a b c d

1 Plat Lantai (Sisi Atas) 5.7 5.7 8


2 Plat Lantai (Sisi Bawah) 5.7 5.7 8

TOTAL BESI DIA.8


KEBUTUHAN PEMBESIAN PONDASI

Panjang Besi Jarak Antar Besi Total Panjang Berat Besi Total Berat Per Jumlah
Jumlah
(m) (m) (m) Per m Titik Pondasi (kg) Pondasi

e f g = (b/f+1)*2 h = exg i j k

1.7 0.15 28 47.6 0.87 41.412 4


1.45 0.15 28 40.6 0.87 35.322 4

TOTAL BESI DIA.12

N TIE BEAM

Total Panjang Berat Besi Per m Total Berat (kg)


(m)

d=axb e f=dxe

96 1.578 151.488

151.488

Jumlah Dia. Besi Total Panjang Berat Besi Per m Total Berat
Tulangan (m) (kg)
d=(a/c+1) e f=dxb g h=fxg

121 10 145.2 0.62 90.024

SI D.10 90.024

PEMBESIAN KOLOM

Total Panjang Berat Besi Per


Jumlah Kolom Total Berat (kg)
(m) m

d e=axbxd f g=exf
4 146.4 1.578 231.0192

231.0192

Jumlah Total Panjang Berat Besi Per


Dia. Besi Jumlah Kolom Total Berat (kg)
Tulangan (m) m
d=(a/c+1) e f f=dxb g h=fxg

30 10 4 144 0.62 89.28

TAL BESI D.10 89.28

EMBESIAN BALOK DAK

Total Panjang
(m) Berat Besi Per m Total Berat (kg)

d=axb e f=dxe

120 1.578 189.36


44 1.578 69.432

258.792

Jumlah Dia. Besi Total Panjang Berat Besi Per m Total Berat
Tulangan (m) (kg)
d=(a/c+1) e f=dxb g h=fxg

121 10 181.5 0.62 112.53


56 10 61.6 0.62 38.192

SI D.10 150.722

PELAT LANTAI

Panjang Besi Jarak Antar Besi Total Panjang Berat Besi


Jumlah Total Berat (kg)
(m) (m) (m) Per m
e f g = (b/f+1)*2 h = exg i k=ixj

10.5 0.15 78 819 1.578 1292.382


6.5 0.15 78 507 1.578 800.046
TOTAL BESI DIA.16 2092.428

PELAT DAK

Panjang Besi Jarak Antar Besi Total Panjang Berat Besi


Jumlah Total Berat (kg)
(m) (m) (m) Per m
e f g = (b/f+1)*2 h = exg i k=ixj

6.5 0.2 59 383.5 0.395 151.4825


6.5 0.2 59 383.5 0.395 151.4825

TOTAL BESI DIA.8 302.965


Total
Berat (kg)

l=jxk

165.648
141.288

306.936
KEBUTUHAN PEMB

No. Uraian Pekerjaan Panjang (m) Lebar (m) Dia. Besi

a b c d

1 P1 (Sisi Atas) 1.2 1.2 12


2 P1 (Sisi Bawah) 1.2 1.2 12

TOTAL BESI DIA.1

KEBUTUHAN PEMBESIAN TIE BEA

No. Uraian Pekerjaan Panjang Balok Jumlah Dia. Besi


(m) Tulangan

a b c

Tulangan Utama Tie Beam 16 4 13

TOTAL BESI D.13

No. Uraian Pekerjaan Panjang Balok Keliling Jarak Antar


(m) Balok Tulangan (m)
a b c

Tulangan Sengkang Tie Beam 16 1.1 0.15

TOTAL BESI D.10

KEBUTUHAN PEMBESIAN KOLO

Tinggi Kolom +
Jumlah
No. Uraian Pekerjaan Lengkungan Dia. Besi
Tulangan
(m)
a b c
Tulangan Utama Kolom 3.2 4 13

TOTAL BESI D.13

Tinggi Kolom Keliling Jarak Antar


No. Uraian Pekerjaan
(m) Kolom Tulangan (m)
a b c

Tulangan Sengkang Kolom 2.7 1.2 0.15

TOTAL BESI D.10

KEBUTUHAN PEMBESIAN BALOK D

Panjang Balok Jumlah


No. Uraian Pekerjaan (m) Tulangan Dia. Besi

a b c

Tulangan Utama Balok Dak (B1) 16 4 13

TOTAL BESI D.13

Panjang Balok Keliling Jarak Antar


No. Uraian Pekerjaan
(m) Balok Tulangan (m)
a b c

Tulangan Sengkang Balok Dak (B1) 16 1.1 0.15

TOTAL BESI D.10

PELAT LANTAI

No. Uraian Pekerjaan Panjang (m) Lebar (m) Dia. Besi

a b c d

1 Plat Lantai (Sisi Atas) 5.2 3.2 10


2 Plat Lantai (Sisi Bawah) 5.2 3.2 10

TOTAL BESI DIA.13


KEBUTUHAN PEMBESIAN PONDASI

Jarak Antar Besi Total Panjang Berat Besi Total Berat Per
Panjang Besi (m) Jumlah
(m) (m) Per m Titik Pondasi (kg)

e f g = (b/f+1)*2 h = exg i j

1.8 0.15 18 32.4 0.87 28.188


1.5 0.15 18 27 0.87 23.49

TOTAL BESI DIA.12

AN PEMBESIAN TIE BEAM

Total Panjang (m) Berat Besi Per m Total Berat (kg)

d=axb e f=dxe

64 1.04 66.56

66.56

Jumlah Tulangan Dia. Besi Total Panjang (m) Berat Besi Per m Total Berat
(kg)
d=(a/c+1) e f=dxb g h=fxg

108 10 118.8 0.62 73.656

AL BESI D.10 73.656

AN PEMBESIAN KOLOM

Total Panjang
Jumlah Kolom Berat Besi Per m Total Berat (kg)
(m)

d e=axbxd f g=exf
6 76.8 1.04 79.872

13 79.872

Total Panjang Berat Besi Per


Jumlah Tulangan Dia. Besi Jumlah Kolom Total Berat (kg)
(m) m
d=(a/c+1) e f f=dxb g h=fxg

19 10 6 136.8 0.62 84.816

TOTAL BESI D.10 84.816

N PEMBESIAN BALOK DAK

Total Panjang (m) Berat Besi Per m Total Berat (kg)

d=axb e f=dxe

64 1.04 66.56

66.56

Total Berat
Jumlah Tulangan Dia. Besi Total Panjang (m) Berat Besi Per m
(kg)
d=(a/c+1) e f=dxb g h=fxg

108 10 118.8 0.62 73.656

AL BESI D.10 73.656

PELAT LANTAI DAK

Jarak Antar Besi Total Berat


Jumlah Total Panjang (m) Berat Besi Per m
(m) (kg)
g = (b/f+1)+
f h = exg i k=ixj
(c/f+1)

0.15 58 487.2 0.62 302.064


0.15 58 487.2 0.62 302.064

604.128
Jumlah Total
Pondasi Berat (kg)

k l=jxk

6 169.128
6 140.94

310.068
KEBUTUHAN BEKISTING PONDASI

No. Uraian Pekerjaan Panjang (m) Lebar (m) Tinggi (m) Luas (m) Jumlah Sisi
a b c d = axb e

TRAFO ROOM
1 Pondasi 1.9 1.9 0.25 0.475 4
2 Tie Beam 24 0.2 0.4 4.8 1
9.6 2
3 Kolom 5.7 0.3 0.3 1.71 4
4 Balok Dak (B1) 24 0.25 0.5 6 1
12 2
Balok Dak (B2) 10.5 0.2 0.35 2.1 1
3.675 2
5 Plat Lantai 5.7 5.7 0.4 2.28 4
6 Plat Dak 5.7 5.7 0.12 32.49 1

FUEL TANK
1 Pondasi 1.2 1.2 0.3 0.36 4
2 Tie Beam 16 0.25 0.3 4 1
4.8 2
3 Kolom 3 0.3 0.3 0.9 4
4 Balok Dak 16 0.25 0.3 4 1
4.8 2
5 Plat Dak 3 5 0.12 15 1
ONDASI

Jumlah Bangun Total Luas (m2)


f g=dxexf

4 7.6
1 4.8
1 19.2
4 27.36
1 6
1 24
1 2.1
1 7.35
1 9.12
1 32.49

6 8.64
1 4
1 9.6
4 14.4
1 4
1 9.6
1 15
No. Uraian Pekerjaan Panjang (mLebar (m) Tebal (m) Volume (m3)

Trafo Room
DPT di bawah Plat Lantai 5.7 5.7 0.4 12.996
1 PEKERJAAN BETON K-250 PER M3
a Bahan
- Semen kg 384.00 1,200
- Pasir m3 0.49 195,000
- Split m3 0.577 250,000
Jumlah.a
b Upah
- Pekerja ht 1.650 120,000
- Tukang ht 0.275 175,000
- Kep.Tukang ht 0.028 190,000
- Mandor ht 0.083 215,000
Jumlah.b
Jumlah.a+b
Total

1 PEKERJAAN PEMBESIAN PER M3


a Bahan
- Besi kg 1.00 9,000
- Kawat Ikat kg 0.03 20,000
Jumlah.a
b Upah
- Pekerja ht 0.010 120,000
- Tukang ht 0.010 175,000
- Kep.Tukang ht 0.001 190,000
- Mandor ht 0.000 215,000
Jumlah.b
Jumlah.a+b
Total

1 PEKERJAAN BEKISTING BATA PER M2


a Bahan
- Batu Bata m2 90.00 600
- Semen kg 11.50 1,200
- Pasir m3 0.043 195,000
Jumlah.a
b Upah
- Pekerja ht 0.300 120,000
- Tukang ht 0.100 175,000
- Kep.Tukang ht 0.010 190,000
- Mandor ht 0.015 215,000
Jumlah.b
Jumlah.a+b
Total

1 PEKERJAAN BEKISTING KAYU PER M2


a Bahan
- Kayu Kelas III m3 0.02 3,000,000
- Minyak Bekisting ltr 0.10 21,000
- Plywood 9 mm lbr 0.350 98,000
Jumlah.a
b Upah
- Pekerja ht 0.350 120,000
- Tukang ht 0.180 175,000
- Kep.Tukang ht 0.026 190,000
- Mandor ht 0.026 215,000
Jumlah.b
Jumlah.a+b
Total
460,800.00
96,385.71
144,305.56
701,491.27

198,000.00
48,125.00
5,320.00
17,845.00
269,290.00
970,781.27
970,781.27

9,000.00
500.00
9,500.00

1,140.00
1,662.50
152.00
86.00
3,040.50
12,540.50
12,540.50

54,000.00
13,800.00
8,385.00
76,185.00

36,000.00
17,500.00
1,900.00
3,225.00
58,625.00
134,810.00
134,810.00

60,000.00
2,100.00
34,300.00
96,400.00

42,000.00
31,500.00
4,940.00
5,590.00
84,030.00
180,430.00
180,430.00