You are on page 1of 57

PASWORD *= ********************* *******

. 127,437,000.00 ******* Yg Diisi


. ********************* ******* ******* ******* *******
SERATUS DUA PULUH TUJUH JUTA EMPAT RATUS TIGA PULUH TUJUH RIBU RUPIAH.
******* ********************* ******* ******* ******* *******
******* SATU DUA TIGA EMPAT LIMA ENAM ***
******* RIBU JUTA MILYAR ***
******* 000127437000 ***
******* ********************* ******* ******* ******* *******
******* 000 1 ***
******* 0 ***
******* SEPULUH ***
******* 0 ***
******* 0 ***
******* ***
******* ***
******* ***
******* ***
******* 437 2 ***
******* 4 TIGA PULUH ***
******* EMPAT RATUS TUJUH BELAS ***
******* 3 TUJUH ***
******* 7 TIGA PULUH TUJUH ***
******* TIGA PULUH TUJUH TIGA PULUH TUJUH ***
******* EMPAT RATUS TIGA PULUH TUJUH RIBU ***
******* ***
******* ***
******* 127 3 ***
******* 1 DUA PULUH ***
******* SERATUS TUJUH BELAS ***
******* 2 TUJUH ***
******* 7 DUA PULUH TUJUH ***
******* DUA PULUH TUJUH DUA PULUH TUJUH ***
******* SERATUS DUA PULUH TUJUH JUTA ***
******* ***
******* ***
******* 000 4 ***
******* 0 ***
******* SEPULUH ***
******* 0 ***
******* 0 ***
******* ***
******* ***
******* ***
******* 000 1 ***
******* 0 ***
******* SEPULUH ***
******* 0 ****
******* 0 ***
******* ***
******* ***
******* ***
******* ********************* ******* ******* ******* *******
******* RUPIAH 69 00
== ******* SERATUS DUA PULUH TSERATUS DUA PULUH TUJUH JUTA EMPAT RATUS TIGA PULUH TUJUH RIBU
== ******* SERATUS DUA PULUH TUJUH JUTA EMPAT RATUS TIGA PULUH TUJUH RIBU RUPIAH
== ******* SERATUS DUA PULUH TUJUH JUTA EMPAT RATUS TIGA PULUH TUJUH RIBU RUPIAH.
******* ********************* ******* ******* ******* *******
Engineer Estimate
REKAPITULAS RENCANA ANGGARAN BIAYA
ENGGINEER ESTIMATE (EE)

PEKERJAAN : PEMBANGUNAN GEDUNG PUSDALOPS PENGANGGULANGAN BENCANA ACEH


LOKASI : BANDA ACEH
SUMBER DANA : MIGAS ACEH
TAHUN : 2019

SUB TOTAL TOTAL


NO. URAIAN PEKERJAAN
(Rp.) (Rp.)

1 PEKERJAAN BANGUNAN GEDUNG

I PEKERJAAN PERSIAPAN 5,640,500.00

II PEKERJAAN RESERVOIR 88,969,064.06


A PEKERJAAN TANAH 3,555,074.56
B PEKERJAAN BETON DAN BETON BERTULANG 68,573,549.90
C PEKERJAAN LANTAI DAN DINDING 10,540,439.60
D PEKERJAAN LAIN-LAIN 6,300,000.00

III BAK AIR PERAWATAN MESIN


A PEKERJAAN BETON DAN BETON BERTULANG 9,380,228.04 21,242,357.84
B PEKERJAAN PASANGAN 3,598,525.88
C PEKERJAAN LANTAI DAN DINDING KERAMIK 6,013,603.92
D PEKERJAAN INSTALASI 2,250,000.00

JUMLAH TOTAL 115,851,921.90


PPN 10% 11,585,192.19
GRAND TOTAL 127,437,114.09
DIBULATKAN 127,437,000.00

TERBILANG : SERATUS DUA PULUH TUJUH JUTA EMPAT RATUS TIGA PULUH TUJUH RIBU RUPIAH.

Banda Aceh, Februari 2019


Konsultan Perencana
CV. NEUFERT CONSULTAN

PRIMA D. WAHYU, ST
Direktur

DED Pembangunan Gedung Laboratorium Perikanan Universitas Teuku Umar Rekapitulasi RAB - Halaman 2/1
Engineer Estimate
RENCANA ANGGARAN BIAYA (RAB)
ENGGINEER ESTIMATE (EE)

PEKERJAAN : PEMBANGUNAN GEDUNG PUSDALOPS PENGANGGULANGAN BENCANA ACEH


LOKASI : BANDA ACEH
KABUPATEN : MIGAS ACEH
TAHUN : 2019

HARGA SATUAN JUMLAH HARGA


NO. URAIAN PEKERJAAN VOLUME SAT. ANALISA
(Rp.) (Rp.)
2 PEMBANGUNAN KOLAM PERIKANAN
A PEKERJAAN PERSIAPAN
1 Pembersihan Dan Perataan Lokasi Pekerjaan 400.000 m2 #REF! #REF! #REF!
2 Pembuangan Hasil Pembersihan Ke Luar Lokasi Pekerjaan (± 20 KM) 1.000 Ls Taksir 10,000,000.00 10,000,000.00
3 Pengukuran dan Pemasangan Bouwplank 100.000 m1 #REF! #REF! #REF!
Jumlah A #REF!
B PEKERJAAN PONDASI KOLAM
1 Galian Tanah Pondasi Menerus 241.920 m3 AHSP PU A.2.3.1.1 65,835.00 15,926,803.20
2 Urugan Kembali Tanah Galian 72.576 m3 AHSP PU A.2.3.1.9 47,520.00 3,448,811.52
3 Pasir Alas Bawah Pondasi Menerus 53.760 m3 AHSP PU A.2.3.1.11 168,894.00 9,079,741.44
4 Pasangan Batu Kosong (Aanstamping) Bawah Pondasi Menerus 53.760 m3 AHSP PU A.3.2.1.9 421,146.00 22,640,808.96
5 Cerucuk Kayu Doken Pondasi Menerus Dia. 8 - 10 cm P 1,5 m 339.000 m P.07.a 26,165.70 8,870,172.30
Pasangan Pondasi Menerus Cor Cyclopen Campuran 1 Pc : 2 PB : 3 Kr
6 Dan 40 % Batu Belah 272.160 m3 #REF! #REF! #REF!
7 Plesteran 1 Pc : 2 Ps Tebal 20 mm Bagian Luar, Dalam Dan Atas 315.200 m2 AHSP PU A.4.4.2.13 84,448.19 26,618,068.86
8 Urugan Tanah Humus T = 20 cm 8.960 m3 AHSP PU A.2.3.1.11.a 174,121.20 1,560,125.95
9 Penanaman Tanaman Lavender 112.000 m Taksir 100,000.00 11,200,000.00

Jumlah B #REF!
C PEKERJAAN DALAM KOLAM
1 Urugan Sirtu Tebal = 10 cm 28.800 m3 AHSP PU A.2.3.1.14 273,240.00 7,869,312.00
2 Urugan Pasir Tebal = 10 cm 28.800 m3 AHSP PU A.2.3.1.11 168,894.00 4,864,147.20
3 Pekerjaan Lantai Kolam
- Beton Cor Lantak K-250 Tebal 15 cm 43.200 m3 AHSP PU A.4.1.1.8 1,120,538.10 48,407,245.92
- Pembesian Polos Wire Mesh 2,850.242 Kg AHSP PU A.4.1.1.17 14,088.27 40,154,994.44
4 Plesteran Lantai 1 Pc : 1 Pp Tebal 15 mm 288.000 m2 AHSP PU A.4.4.2.1 70,652.74 20,347,987.97
Jumlah C 121,643,687.53
D PEKERJAAN AKHIR
1 Pembersihan Akhir 1.000 Ls Taksir 5,000,000.00 5,000,000.00
2 Pembuatan Tangga Kolam 16.000 Unit Taksir 700,000.00 11,200,000.00
Jumlah D 16,200,000.00

Disetujui Oleh : Meulaboh, Desember 2015


PEJABAT PEMBUAT KOMITMEN (PPK) Konsultan Perencana
UNIVERSITAS TEUKU UMAR #REF!
KABUPATEN ACEH BARAT

Ir. RUSDI FAIZIN, M. Si #REF!


NIP. 19630811 199203 1 001 #REF!

Mengetahui/Disetujui :
REKTOR UNIVERSITAS TEUKU UMAR
KABUPATEN ACEH BARAT
SELAKU PENGGUNA ANGGARAN

Prof. DR. JASMAN MA'RUF, SE. MBA


NIP. 19600916 198703 1 003

DED Pembangunan Gedung Laboratorium Perikanan Universitas Teuku Umar Rencana Anggaran Biaya (RAB) - Halaman 3/11
Engineer Estimate
RENCANA ANGGARAN BIAYA (RAB)
ENGGINEER ESTIMATE (EE)

PEKERJAAN : PEMBANGUNAN GEDUNG PUSDALOPS PENGANGGULANGAN BENCANA ACEH


LOKASI : BANDA ACEH
KABUPATEN : MIGAS ACEH
TAHUN : 2019

HARGA SATUAN JUMLAH HARGA


NO. URAIAN PEKERJAAN VOLUME SAT. ANALISA
(Rp.) (Rp.)
1 PEKERJAAN BANGUNAN GEDUNG
I PEKERJAAN PERSIAPAN
1 Pengukuran Dan pemasangan Bowplang 1.00 Ls Taksir 1,000,000.00 1,000,000.00
2 Sistem Manajemen Keselamatan dan Kesehatan Kerja (SM K3) 1.00 Ls Taksir 1,500,000.00 1,500,000.00
3 Administrasi dan Dokumentasi 1.00 Ls Taksir 1,000,000.00 1,000,000.00
4 Banner/Papan Nama Proyek 1.00 Unit Taksir 500,000.00 500,000.00
5 Mobilisasi Dan Demobilisasi 1.00 Ls Taksir 1,640,500.00 1,640,500.00
TOTAL JUMLAH I 5,640,500.00
II PEKERJAAN RESERVOIR
A PEKERJAAN TANAH
1 Galian Tanah 40.39 m3 AHSP PU A.2.3.1.2 80,635.50 3,257,029.12
2 Urungan Tanah Kembali 6.27 m3 AHSP PU A.2.3.1.9 47,520.00 298,045.44
SUB JUMLAH 3,555,074.56
B PEKERJAAN BETON DAN BETON BERTULANG
1 Lantai Kerja Beton 2.38 m3 AHSP PU A.4.1.1.5 974,364.60 2,315,090.29
2 Sloff 20/25
- Beton K.225 1.05 m3 AHSP PU A.4.1.1.7 1,039,209.60 1,091,170.08
- Besi Tulangan Ø 12 136.75 Kg AHSP PU A.4.1.1.17 14,088.27 1,926,599.67
- Besi Behel Ø 6 29.64 Kg AHSP PU A.4.1.1.17 14,088.27 417,565.46
- Papan Bekisting 10.30 m2 AHSP PU A.4.1.1.21 257,827.28 2,655,621.03
3 Kolom 20/20
- Beton K.225 0.37 m3 AHSP PU A.4.1.1.7 1,039,209.60 386,585.97
- Besi Tulangan Ø 12 42.62 Kg AHSP PU A.4.1.1.17 14,088.27 600,498.60
- Besi Behel Ø 6 9.65 Kg AHSP PU A.4.1.1.17 14,088.27 135,956.64
- Papan Bekisting 3.72 m2 AHSP PU A.4.1.1.22 435,321.61 1,619,396.40
4 Lantai Beton t= 20 Cm
- Beton K.225 3.14 m3 AHSP PU A.4.1.1.7 1,039,209.60 3,258,961.31
- Besi Tulangan Ø 10 250.63 Kg AHSP PU A.4.1.1.17 14,088.27 3,530,879.36
5 Dinding Beton t= 20 Cm
- Beton K.225 5.21 m3 AHSP PU A.4.1.1.7 1,039,209.60 5,412,203.60
- Besi Tulangan Ø 10 414.38 Kg AHSP PU A.4.1.1.17 14,088.27 5,837,859.62
- Papan Bekisting 26.04 m2 AHSP PU A.4.1.1.25 564,736.61 14,705,741.38
6 Balok 20/30
- Beton K.225 1.26 m3 AHSP PU A.4.1.1.7 1,039,209.60 1,309,404.10
- Besi Tulangan Ø 12 136.75 Kg AHSP PU A.4.1.1.17 14,088.27 1,926,599.67
- Besi Behel Ø 6 33.39 Kg AHSP PU A.4.1.1.17 14,088.27 470,421.85
- Papan Bekisting 12.36 m2 AHSP PU A.4.1.1.23 452,250.61 5,589,817.56
7 Cor Plat Penutup Bak t= 15 Cm
- Beton K.225 2.35 m3 AHSP PU A.4.1.1.7 1,039,209.60 2,444,220.98
- Besi Tulangan Ø 10 345.77 Kg AHSP PU A.4.1.1.17 14,088.27 4,871,257.49
- Papan Bekisting 15.68 m2 AHSP PU A.4.1.1.24 514,521.61 8,067,698.88
SUB JUMLAH 68,573,549.90
C PEKERJAAN LANTAI DAN DINDING
1 Lantai Keramik Ukr. 40 X 40 Cm 16.24 m2 AHSP PU A.4.4.3.35.f 210,625.67 3,420,560.85
2 Dinding Keramik Ukr. 20 x 25 Cm 26.66 m2 AHSP PU A.4.4.3.54.c 233,137.08 6,215,434.55
3 Acian Dinding 26.87 m2 AHSP PU A.4.4.2.27 33,660.00 904,444.20
SUB JUMLAH 10,540,439.60
D PEKERJAAN LAIN-LAIN
1 Plat Penutup Bak Ukr. 60 x 60 Cm 1.00 unit Taksir 1,200,000.00 1,200,000.00
2 Tangga Holow 40 x 40 1.00 unit Taksir 900,000.00 900,000.00
3 Instalasi Pipa Air Bersih 1.00 ttk Taksir 2,500,000.00 2,500,000.00
4 Instalasi Pipa Air Pembuangan 1.00 ttk Taksir 750,000.00 750,000.00
5 Mesin Pompa 1.00 bh Taksir 950,000.00 950,000.00
SUB JUMLAH 6,300,000.00
TOTAL JUMLAH II 88,969,064.06
III BAK AIR PERAWATAN MESIN
A PEKERJAAN BETON DAN BETON BERTULANG
1 Sloof 13/20
- Beton K.225 0.45 m3 AHSP PU A.4.1.1.7 1,039,209.60 464,734.53
- Besi Tulangan Ø 12 61.09 kg AHSP PU A.4.1.1.17 14,088.27 860,714.66
- Besi Behel Ø 6 17.58 kg AHSP PU A.4.1.1.17 14,088.27 247,705.67
- Papan Bekisting 6.88 m2 AHSP PU A.4.1.1.21 257,827.28 1,773,851.71
2 Kolom 13/13
- Beton K.225 0.11 m3 AHSP PU A.4.1.1.7 1,039,209.60 112,400.91
- Besi Tulangan Ø 12 34.10 kg AHSP PU A.4.1.1.17 14,088.27 480,398.88
- Besi Behel Ø 6 3.91 kg AHSP PU A.4.1.1.17 14,088.27 55,139.53
- Papan Bekisting 3.33 m2 AHSP PU A.4.1.1.22 435,321.61 1,448,750.32
3 Balok 13/20
- Beton K.225 0.38 m3 AHSP PU A.4.1.1.7 1,039,209.60 394,483.96
- Besi Tulangan Ø 12 51.86 kg AHSP PU A.4.1.1.17 14,088.27 730,606.63
- Besi Behel Ø 6 12.09 kg AHSP PU A.4.1.1.17 14,088.27 170,297.65
- Papan Bekisting 5.84 m2 AHSP PU A.4.1.1.23 452,250.61 2,641,143.57
SUB JUMLAH 9,380,228.04
B PEKERJAAN PASANGAN
1 Pasanagan Bata 1 : 2 11.68 m2 AHSP PU A.4.4.1.7 123,898.50 1,447,134.48
2 Plasteran Bata 1 : 2 23.36 m2 AHSP PU A.4.4.2.2 63,120.82 1,474,502.26
3 Acian Dinding 20.11 m2 AHSP PU A.4.4.2.27 33,660.00 676,889.14
SUB JUMLAH 3,598,525.88
C PEKERJAAN LANTAI DAN DINDING KERAMIK
1 Beton Cor Lantai K.175 1.31 m3 AHSP PU A.4.1.1.5 974,364.60 1,279,087.39
2 Lantai Keramik Ukr. 20 x 20 6.87 m2 AHSP PU A.4.4.3.36 211,410.54 1,451,946.45
3 Dinding Keramik Ukr. 20 x 25 14.08 m2 AHSP PU A.4.4.3.54.c 233,137.08 3,282,570.09
SUB JUMLAH 6,013,603.92
D PEKERJAAN INSTALASI
1 Instalasi Pipa Air Bersih 1.00 ttk Taksir 750,000.00 750,000.00
2 Instalasi Pipa Air Pembuangan 1.00 ttk Taksir 550,000.00 550,000.00
3 Mesin Pompa 1.00 unit Taksir 950,000.00 950,000.00
SUB JUMLAH 2,250,000.00
TOTAL JUMLAH III 21,242,357.84

Banda Aceh, Februari 2019


Konsultan Perencana
CV. NEUFERT CONSULTAN

PRIMA D. WAHYU, ST
Direktur

DED Pembangunan Gedung Laboratorium Perikanan Universitas Teuku Umar Rencana Anggaran Biaya (RAB) - Halaman 4/11
BACKUP DATA
PEKERJAAN : PEMBANGUNAN GEDUNG PUSDALOPS PENGANGGULANGAN BENCANA ACEH
LOKASI : BANDA ACEH
TAHUN : 2019

Gambar Kerja

NO URAIAN PEKERJAAN HITUNGAN

I PEKERJAAN PERSIAPAN
1 Pengukuran Dan pemasangan Bowplang Volume :

VOLUME 1.00 Ls

2 Sistem Manajemen Keselamatan dan Kesehatan Kerja (SM K3)


Volume :

VOLUME 1.00 Ls

3 Administrasi dan Dokumentasi Volume :

VOLUME 1.00 Ls

4 Banner/Papan Nama Proyek Volume :

VOLUME 1.00 Unit

5 Mobilisasi Dan Demobilisasi Volume

VOLUME 1.00 Ls
BACKUP DATA
PEKERJAAN : PEMBANGUNAN GEDUNG PUSDALOPS PENGANGGULANGAN BENCANA ACEH
LOKASI : BANDA ACEH
TAHUN : 2019

Gambar Kerja

NO URAIAN PEKERJAAN HITUNGAN

II PEKERJAAN RESERVOIR
A PEKERJAAN TANAH
1 Galian Tanah V = 3.60 x 6.60 x 1.70 = 40.39

VOLUME 40.39 m3

2 Urungan Tanah Kembali V = 19.6 x 0.2 x 1.6 = 6.27

VOLUME 6.27 m3
BACKUP DATA
PEKERJAAN : PEMBANGUNAN GEDUNG PUSDALOPS PENGANGGULANGAN BENCANA ACEH
LOKASI : BANDA ACEH
TAHUN : 2019

Gambar Kerja

NO URAIAN PEKERJAAN HITUNGAN

B PEKERJAAN BETON DAN BETON BERTULANG


1 Lantai Kerja Beton V = 3.60 x 6.60 x 0.10 = 2.38

VOLUME 2.38 m3
BACKUP DATA
PEKERJAAN : PEMBANGUNAN GEDUNG PUSDALOPS PENGANGGULANGAN BENCANA ACEH
LOKASI : BANDA ACEH
TAHUN : 2019

Gambar Kerja

NO URAIAN PEKERJAAN HITUNGAN

2 Sloff 20/25
- Beton K.225 V = 0.20 x 0.25 x 21.00 = 1.05

VOLUME 1.05 m3

- Besi Tulangan Ø 12 V = 0.89 x 7.00 x 22.00 = 136.75

VOLUME 136.75 Kg

- Besi Behel Ø 6 V = 0.22 x 0.79 x 169.00 = 29.64

VOLUME 29.64 Kg

- Papan Bekisting V = 0.25 x 41.20 = 10.30

VOLUME 10.30 m2
BACKUP DATA
PEKERJAAN : PEMBANGUNAN GEDUNG PUSDALOPS PENGANGGULANGAN BENCANA ACEH
LOKASI : BANDA ACEH
TAHUN : 2019

Gambar Kerja

NO URAIAN PEKERJAAN HITUNGAN

3 Kolom 20/20
- Beton K.225 V = 0.20 x 0.20 x 1.55 x 6.00
= 0.37

VOLUME 0.37 m3

- Besi Tulangan Ø 12 V = 0.89 x 4.00 x 2.00 x 6.00


= 42.62

VOLUME 42.62 Kg

- Besi Behel Ø 6 V = 0.22 x 0.69 x 63.00 = 9.65

VOLUME 9.65 Kg

- Papan Bekisting V = 0.40 x 1.55 x 6.00 = 3.72

VOLUME 3.72 m2
BACKUP DATA
PEKERJAAN : PEMBANGUNAN GEDUNG PUSDALOPS PENGANGGULANGAN BENCANA ACEH
LOKASI : BANDA ACEH
TAHUN : 2019

Gambar Kerja

NO URAIAN PEKERJAAN HITUNGAN

4 Lantai Beton t= 20 Cm
- Beton K.225 V = 2.80 x 2.80 x 0.20 x 2.00
= 3.14

VOLUME 3.14 m3

- Besi Tulangan Ø 10 V = 0.62 x 6.20 x 33.00 = 126.24


= 0.62 x 3.20 x 63.00 = 124.39

V = 126.24 + 124.39 = 250.63

VOLUME 250.63 Kg
BACKUP DATA
PEKERJAAN : PEMBANGUNAN GEDUNG PUSDALOPS PENGANGGULANGAN BENCANA ACEH
LOKASI : BANDA ACEH
TAHUN : 2019

Gambar Kerja

NO URAIAN PEKERJAAN HITUNGAN

5 Dinding Beton t= 20 Cm
- Beton K.225 V = 2.80 x 1.55 x 0.20 x 6.00
= 5.21

VOLUME 5.21 m3

- Besi Tulangan Ø 10 V = 0.62 x 6.20 x 34.00 = 130.06


= 0.62 x 3.20 x 34.00 = 67.13
= 0.62 x 2.00 x 176.00 = 217.18

V = 130.06 + 67.13 + 217.18 = 414.38

VOLUME 414.38 Kg

- Papan Bekisting V = 2.80 x 1.55 x 6.00 = 26.04

VOLUME 26.04 m2
BACKUP DATA
PEKERJAAN : PEMBANGUNAN GEDUNG PUSDALOPS PENGANGGULANGAN BENCANA ACEH
LOKASI : BANDA ACEH
TAHUN : 2019

Gambar Kerja

NO URAIAN PEKERJAAN HITUNGAN

6 Balok 20/30
- Beton K.225 V = 0.20 x 0.30 x 21.00 = 1.26

VOLUME 1.26 m3

- Besi Tulangan Ø 12 V = 0.89 x 7.00 x 22.00 = 136.75

VOLUME 136.75 Kg

- Besi Behel Ø 6 V = 0.22 x 0.89 x 169.00 = 33.39

VOLUME 33.39 Kg

- Papan Bekisting V = 0.30 x 41.20 = 12.36

VOLUME 12.36 m2
BACKUP DATA
PEKERJAAN : PEMBANGUNAN GEDUNG PUSDALOPS PENGANGGULANGAN BENCANA ACEH
LOKASI : BANDA ACEH
TAHUN : 2019

Gambar Kerja

NO URAIAN PEKERJAAN HITUNGAN

7 Cor Plat Penutup Bak t= 15 Cm


- Beton K.225 V = 2.80 x 2.80 x 0.15 x 2.00
= 2.35

VOLUME 2.35 m3

- Besi Tulangan Ø 10 V = 0.62 x 6.20 x 23.00 x 2.00


= 175.97
= 0.62 x 3.20 x 43.00 x 2.00
= 169.80
V = 169.80 + 175.97 = 345.77

VOLUME 345.77 Kg

- Papan Bekisting V = 2.80 x 2.80 x 2.00 = 15.68


VOLUME 15.68 m2

BACKUP DATA
PEKERJAAN : PEMBANGUNAN GEDUNG PUSDALOPS PENGANGGULANGAN BENCANA ACEH
LOKASI : BANDA ACEH
TAHUN : 2019

Gambar Kerja

NO URAIAN PEKERJAAN HITUNGAN

C PEKERJAAN LANTAI DAN DINDING

1 Lantai Keramik Ukr. 40 X 40 Cm V = 5.80 x 2.80 = 16.24

VOLUME 16.24 m2

2 Dinding Keramik Ukr. 20 x 25 Cm V = 17.20 x 1.55 = 26.66

VOLUME 26.66 m2

3 Acian Dinding V = 0.40 x 18.80 = 7.52


= 6.20 x 3.20 = 19.84
= 0.70 x 0.70 = 0.49

= 7.52 + 19.84 - 0.49 = 26.87


VOLUME 26.87 m2

BACKUP DATA
PEKERJAAN : PEMBANGUNAN GEDUNG PUSDALOPS PENGANGGULANGAN BENCANA ACEH
LOKASI : BANDA ACEH
TAHUN : 2019

Gambar Kerja

NO URAIAN PEKERJAAN HITUNGAN

D PEKERJAAN LAIN-LAIN

1 Plat Penutup Bak Ukr. 60 x 60 Cm V =

VOLUME 1.00 unit

2 Tangga Holow 40 x 40 V =

VOLUME 1.00 unit

3 Instalasi Pipa Air Bersih V =

VOLUME 1.00 ttk

4 Instalasi Pipa Air Pembuangan V =

VOLUME 1.00 ttk

5 Mesin Pompa V =
VOLUME 1.00 bh

BACKUP DATA
PEKERJAAN : PEMBANGUNAN GEDUNG PUSDALOPS PENGANGGULANGAN BENCANA ACEH
LOKASI : BANDA ACEH
TAHUN : 2019

Gambar Kerja

NO URAIAN PEKERJAAN HITUNGAN

III BAK AIR PERAWATAN MESIN


A PEKERJAAN BETON DAN BETON BERTULANG
1 Sloof 13/20
- Beton K.225 V = 0.13 x 0.20 x 17.20 = 0.45

VOLUME 0.45 m3

- Besi Tulangan Ø 12 V = 0.89 x 4.00 x 17.20 = 61.09

VOLUME 61.09 Kg
- Besi Behel Ø 6 V = 0.22 x 0.55 x 144.00 = 17.58

VOLUME 17.58 Kg

- Papan Bekisting V = 0.40 x 17.20 = 6.88

VOLUME 6.88 m2

BACKUP DATA
PEKERJAAN : PEMBANGUNAN GEDUNG PUSDALOPS PENGANGGULANGAN BENCANA ACEH
LOKASI : BANDA ACEH
TAHUN : 2019

Gambar Kerja

NO URAIAN PEKERJAAN HITUNGAN

2 Kolom 13/13
- Beton K.225 V = 0.13 x 0.13 x 0.80 x 8.00
= 0.11

VOLUME 0.11 m3

- Besi Tulangan Ø 12 V = 0.89 x 4.00 x 1.20 x 8.00


= 34.10

VOLUME 34.10 Kg

- Besi Behel Ø 6 V = 0.22 x 0.41 x 43.00 = 3.91


VOLUME 3.91 Kg

- Papan Bekisting V = 0.52 x 0.80 x 8.00 = 3.33

VOLUME 3.33 m2

BACKUP DATA
PEKERJAAN : PEMBANGUNAN GEDUNG PUSDALOPS PENGANGGULANGAN BENCANA ACEH
LOKASI : BANDA ACEH
TAHUN : 2019

Gambar Kerja

NO URAIAN PEKERJAAN HITUNGAN

3 Balok 13/20
- Beton K.225 V = 0.13 x 0.20 x 14.60 = 0.38

VOLUME 0.38 m3

- Besi Tulangan Ø 12 V = 0.89 x 4.00 x 14.60 = 51.86

VOLUME 51.86 Kg
- Besi Behel Ø 6 V = 0.22 x 0.55 x 99.00 = 12.09

VOLUME 12.09 Kg

- Papan Bekisting V = 0.40 x 14.60 = 5.84

VOLUME 5.84 m2

BACKUP DATA
PEKERJAAN : PEMBANGUNAN GEDUNG PUSDALOPS PENGANGGULANGAN BENCANA ACEH
LOKASI : BANDA ACEH
TAHUN : 2019

Gambar Kerja

NO URAIAN PEKERJAAN HITUNGAN

B PEKERJAAN PASANGAN
1 Pasanagan Bata 1 : 2 V = 14.60 x 0.80 = 11.68

VOLUME 11.68 m2

2 Plasteran Bata 1 : 2 V = 11.68 x 2.00 = 23.36

VOLUME 23.36 m2
3 Acian Dinding V = 1.20 x 15.12 = 18.14
= 0.13 x 15.12 = 1.97

= 18.14 + 1.97 = 20.11

VOLUME 20.11 m2

BACKUP DATA
PEKERJAAN : PEMBANGUNAN GEDUNG PUSDALOPS PENGANGGULANGAN BENCANA ACEH
LOKASI : BANDA ACEH
TAHUN : 2019

Gambar Kerja

NO URAIAN PEKERJAAN HITUNGAN

C PEKERJAAN LANTAI DAN DINDING KERAMIK


1 Beton Cor Lantai K.175 V = 1.87 x 1.17 x 0.20 x 3.00
= 1.31

VOLUME 1.31 m3
2 Lantai Keramik Ukr. 20 x 20 V = 5.87 x 1.17 = 6.87

VOLUME 6.87 m2

3 Dinding Keramik Ukr. 20 x 25 V = 14.08 x 1.00 = 14.08

VOLUME 14.08 m2

BACKUP DATA
PEKERJAAN : PEMBANGUNAN GEDUNG PUSDALOPS PENGANGGULANGAN BENCANA ACEH
LOKASI : BANDA ACEH
TAHUN : 2019

Gambar Kerja

NO URAIAN PEKERJAAN HITUNGAN

D PEKERJAAN INSTALASI

1 Instalasi Pipa Air Bersih V =

VOLUME 1.00 unit

2 Instalasi Pipa Air Pembuangan V =

VOLUME 1.00 unit

3 Mesin Pompa V =

VOLUME 1.00 ttk


Engineer Estimate

ANALISA HARGA SATUAN PEKERJAAN


ENGGINEER ESTIMATE (EE)

PEKERJAAN : PEMBANGUNAN GEDUNG PUSDALOPS PENGANGGULANGAN BENCANA ACEH


LOKASI : BANDA ACEH
KABUPATEN : MIGAS ACEH
TAHUN : 2019

Jenis Pekerjaan : Galian Tanah Biasa Sedalam 1 Meter


Satuan / Unit : M3
Analisa : AHSP PU A.2.3.1.1

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.7500 76,500.00 57,375.00
2 Mandor OH 0.0250 99,000.00 2,475.00
Jumlah Tenaga Kerja 59,850.00
B. BAHAN
Jumlah Bahan -
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 59,850.00
E Overhead & Profit 10% X D 5,985.00
F Harga Satuan Pekerjaan ( D + E ) 65,835.00

Jenis Pekerjaan : Galian Tanah Biasa Sedalam 2 Meter


Satuan / Unit : M3
Analisa : AHSP PU A.2.3.1.2

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.9000 76,500.00 68,850.00
2 Mandor OH 0.0450 99,000.00 4,455.00
Jumlah Tenaga Kerja 73,305.00
B. BAHAN
Jumlah Bahan -
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 73,305.00
E Overhead & Profit 10% X D 7,330.50
F Harga Satuan Pekerjaan ( D + E ) 80,635.50

Jenis Pekerjaan : Galian Tanah Biasa Sedalam 3 Meter


Satuan / Unit : M3
Analisa : AHSP PU A.2.3.1.3

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 1.0500 76,500.00 80,325.00
2 Mandor OH 0.0670 99,000.00 6,633.00
Jumlah Tenaga Kerja 86,958.00
B. BAHAN
Jumlah Bahan -
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 86,958.00
E Overhead & Profit 10% X D 8,695.80
F Harga Satuan Pekerjaan ( D + E ) 95,653.80

DED Pembangunan Gedung Laboratorium Perikanan Universitas Teuku Umar AHSP - Halaman 23/93
Engineer Estimate

Jenis Pekerjaan : Mengurug Kembali Galian


Satuan / Unit : M3
Analisa : AHSP PU A.2.3.1.9

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.5000 76,500.00 38,250.00
2 Mandor OH 0.0500 99,000.00 4,950.00
Jumlah Tenaga Kerja 43,200.00
B. BAHAN
Jumlah Bahan -
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 43,200.00
E Overhead & Profit 10% X D 4,320.00
F Harga Satuan Pekerjaan ( D + E ) 47,520.00

Jenis Pekerjaan : Memadatkan tanah (per 20 cm)


Satuan / Unit : M3
Analisa : AHSP PU A.2.3.1.10

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.5000 76,500.00 38,250.00
2 Mandor OH 0.0500 99,000.00 4,950.00
Jumlah Tenaga Kerja 43,200.00
B. BAHAN
Jumlah Bahan -
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 43,200.00
E Overhead & Profit 10% X D 4,320.00
F Harga Satuan Pekerjaan ( D + E ) 47,520.00

Jenis Pekerjaan : Timbunan Tanah didatangkan Termasuk Perataan dan Pemadatan


Satuan / Unit : M3
Analisa : AHSP PU - T.14 E

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.5000 76,500.00 38,250.00
2 Mandor OH 0.0500 99,000.00 4,950.00
Jumlah Tenaga Kerja 43,200.00
B. BAHAN
1 Tanah Timbun M3 1.200 111,960.00 134,352.00
Jumlah Bahan 134,352.00
C. PERALATAN
1 Pemadat Timbunan (Stamper) Sewa-Hari 0.050 144,000.00 7,200.00
Jumlah Peralatan 7,200.00
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 184,752.00
E Overhead & Profit 10% X D 18,475.20
F Harga Satuan Pekerjaan ( D + E ) 203,227.20

Jenis Pekerjaan : Timbunan Tanah Dari Hasil Galian Diratakan dan Dipadatkan
Satuan / Unit : M3
Analisa : AHSP PU - T.14 E (a)

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.5000 76,500.00 38,250.00
2 Mandor OH 0.0500 99,000.00 4,950.00
Jumlah Tenaga Kerja 43,200.00
B. BAHAN
1 Tanah Timbun M3 - - -
Jumlah Bahan -
C. PERALATAN
1 Pemadat Timbunan (Stamper) Sewa-Hari 0.050 144,000.00 7,200.00
Jumlah Peralatan 7,200.00
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 50,400.00
E Overhead & Profit 10% X D 5,040.00
F Harga Satuan Pekerjaan ( D + E ) 55,440.00

DED Pembangunan Gedung Laboratorium Perikanan Universitas Teuku Umar AHSP - Halaman 24/93
Engineer Estimate

Jenis Pekerjaan : Urugan Pasir


Satuan / Unit : M3
Analisa : AHSP PU A.2.3.1.11

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.3000 76,500.00 22,950.00
2 Mandor OH 0.0100 99,000.00 990.00
Jumlah Tenaga Kerja 23,940.00
B. BAHAN
1 Pasir Urug M3 1.200 108,000.00 129,600.00
Jumlah Bahan 129,600.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 153,540.00
E Overhead & Profit 10% X D 15,354.00
F Harga Satuan Pekerjaan ( D + E ) 168,894.00

Jenis Pekerjaan : Timbunan Tanah


Satuan / Unit : M3
Analisa : AHSP PU A.2.3.1.11.a

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.3000 76,500.00 22,950.00
2 Mandor OH 0.0100 99,000.00 990.00
Jumlah Tenaga Kerja 23,940.00
B. BAHAN
1 Tanah Timbun M3 1.200 111,960.00 134,352.00
Jumlah Bahan 134,352.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 158,292.00
E Overhead & Profit 10% X D 15,829.20
F Harga Satuan Pekerjaan ( D + E ) 174,121.20

Jenis Pekerjaan : Pemasangan Lapisan Ijuk Tebal 10 cm Untuk Bidang Resapan


Satuan / Unit : M2
Analisa : AHSP PU A.2.3.1.13

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.1500 76,500.00 11,475.00
2 Mandor OH 0.0150 99,000.00 1,485.00
Jumlah Tenaga Kerja 12,960.00
B. BAHAN
1 Ijuk M3 6.000 22,392.00 134,352.00
Jumlah Bahan 134,352.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 147,312.00
E Overhead & Profit 10% X D 14,731.20
F Harga Satuan Pekerjaan ( D + E ) 162,043.20

Jenis Pekerjaan : 1 m panjang cerucuk kayu/dolken diameter 8 cm – 10 cm


Satuan / Unit : M1
Analisa : P.07.a

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0600 76,500.00 4,590.00
2 Mandor OH 0.0030 99,000.00 297.00
Jumlah Tenaga Kerja 4,887.00
B. BAHAN
1 Kayu Dolken Dia. 8 - 10 cm m1 1.050 18,000.00 18,900.00
Jumlah Bahan 18,900.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 23,787.00
E Overhead & Profit 10% X D 2,378.70
F Harga Satuan Pekerjaan ( D + E ) 26,165.70

DED Pembangunan Gedung Laboratorium Perikanan Universitas Teuku Umar AHSP - Halaman 25/93
Engineer Estimate

Jenis Pekerjaan : Pengurugan 1 M3 Sirtu


Satuan / Unit : M3
Analisa : AHSP PU A.2.3.1.14

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.2500 76,500.00 19,125.00
2 Mandor OH 0.0250 99,000.00 2,475.00
Jumlah Tenaga Kerja 21,600.00
B. BAHAN
1 Sirtu M3 1.200 189,000.00 226,800.00
Jumlah Bahan 226,800.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 248,400.00
E Overhead & Profit 10% X D 24,840.00
F Harga Satuan Pekerjaan ( D + E ) 273,240.00

Jenis Pekerjaan : Pondasi Batu Belah / Kali Campuran 1 : 4


Satuan / Unit : M3
Analisa : AHSP PU A.3.2.1.2

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 1.5000 76,500.00 114,750.00
2 Tukang OH 0.7500 85,500.00 64,125.00
3 Kepala Tukang OH 0.0750 108,000.00 8,100.00
4 Mandor OH 0.0750 99,000.00 7,425.00
Jumlah Tenaga Kerja 194,400.00
B. BAHAN
1 Batu Gunung/ Batu Kali M3 1.200 195,930.00 235,116.00
2 Semen Portland (PC) Kg 163.000 1,440.00 234,720.00
3 Pasir Pasang M3 0.520 189,000.00 98,280.00
Jumlah Bahan 568,116.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 762,516.00
E Overhead & Profit 10% X D 76,251.60
F Harga Satuan Pekerjaan ( D + E ) 838,767.60

Jenis Pekerjaan : Pasangan Batu Kosong ( Anstamping )


Satuan / Unit : M3
Analisa : AHSP PU A.3.2.1.9

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.7800 76,500.00 59,670.00
2 Tukang OH 0.3900 85,500.00 33,345.00
3 Kepala Tukang OH 0.0390 108,000.00 4,212.00
4 Mandor OH 0.0390 99,000.00 3,861.00
Jumlah Tenaga Kerja 101,088.00
B. BAHAN
1 Batu Gunung/ Batu Kali M3 1.2000 195,930.00 235,116.00
2 Pasir Urug M3 0.4320 108,000.00 46,656.00
Jumlah Bahan 281,772.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 382,860.00
E Overhead & Profit 10% X D 38,286.00
F Harga Satuan Pekerjaan ( D + E ) 421,146.00

DED Pembangunan Gedung Laboratorium Perikanan Universitas Teuku Umar AHSP - Halaman 26/93
Engineer Estimate

Jenis Pekerjaan : Membuat Beton Mutu F'c = 7,4 Mpa (K 100), Slump (12 ± 2) cm, W/c = 0,87
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.1

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 1.6500 76,500.00 126,225.00
2 Tukang OH 0.2750 85,500.00 23,512.50
3 Kepala Tukang OH 0.0280 108,000.00 3,024.00
4 Mandor OH 0.0830 99,000.00 8,217.00
Jumlah Tenaga Kerja 160,978.50
B. BAHAN
1 Semen Portland (PC) Kg 247.00 1,440.00 355,680.00
2 Pasir Beton (PB) Kg 869.00 135.00 117,315.00
3 Kerikil (KR) Kg 999.00 140.00 139,860.00
4 Air Liter 215.00 40.50 8,707.50
Jumlah Bahan 621,562.50
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 782,541.00
E Overhead & Profit 10% X D 78,254.10
F Harga Satuan Pekerjaan ( D + E ) 860,795.10
- Wc Faktor; Pasir; 1.400 Kg, dan Kerikil = 1.350 Kg

Jenis Pekerjaan : Membuat Beton Mutu F'c = 12,2 Mpa (K 150), Slump (12 ± 2) cm, W/c = 0,72
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.3

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 1.6500 76,500.00 126,225.00
2 Tukang OH 0.2750 85,500.00 23,512.50
3 Kepala Tukang OH 0.0280 108,000.00 3,024.00
4 Mandor OH 0.0830 99,000.00 8,217.00
Jumlah Tenaga Kerja 160,978.50
B. BAHAN
1 Semen Portland (PC) Kg 299.00 1,440.00 430,560.00
2 Pasir Beton (PB) Kg 799.00 135.00 107,865.00
3 Kerikil (KR) Kg 1,017.00 140.00 142,380.00
4 Air Liter 215.00 40.50 8,707.50
Jumlah Bahan 689,512.50
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 850,491.00
E Overhead & Profit 10% X D 85,049.10
F Harga Satuan Pekerjaan ( D + E ) 935,540.10
- Wc Faktor; Pasir; 1.400 Kg, dan Kerikil = 1.350 Kg

Jenis Pekerjaan : Membuat Lantai Kerja Beton Mutu F'c = 7,4 Mpa (K 100), Slump (3 - 6) cm, W/c = 0,87
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.4

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 1.2000 76,500.00 91,800.00
2 Tukang OH 0.2000 85,500.00 17,100.00
3 Kepala Tukang OH 0.0200 108,000.00 2,160.00
4 Mandor OH 0.0600 99,000.00 5,940.00
Jumlah Tenaga Kerja 117,000.00
B. BAHAN
1 Semen Portland (PC) Kg 230.00 1,440.00 331,200.00
2 Pasir Beton (PB) Kg 893.00 135.00 120,555.00
3 Kerikil (KR) Kg 1,027.00 140.00 143,780.00
4 Air Liter 200.00 40.50 8,100.00
Jumlah Bahan 603,635.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 720,635.00
E Overhead & Profit 10% X D 72,063.50
F Harga Satuan Pekerjaan ( D + E ) 792,698.50
- Wc Faktor; Pasir; 1.400 Kg, dan Kerikil = 1.350 Kg

DED Pembangunan Gedung Laboratorium Perikanan Universitas Teuku Umar AHSP - Halaman 27/93
Engineer Estimate

Jenis Pekerjaan : Beton Mutu F'c = 14,5 Mpa (K 175), Slump (12 ± 2) cm, W/c = 0,66
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.5

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 1.6500 76,500.00 126,225.00
2 Tukang OH 0.2750 85,500.00 23,512.50
3 Kepala Tukang OH 0.0280 108,000.00 3,024.00
4 Mandor OH 0.0830 99,000.00 8,217.00
Jumlah Tenaga Kerja 160,978.50
B. BAHAN
1 Semen Portland (PC) Kg 326.00 1,440.00 469,440.00
2 Pasir Beton (PB) Kg 760.00 135.00 102,600.00
3 Kerikil (KR) Kg 1,029.00 140.00 144,060.00
4 Air Liter 215.00 40.50 8,707.50
Jumlah Bahan 724,807.50
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 885,786.00
E Overhead & Profit 10% X D 88,578.60
F Harga Satuan Pekerjaan ( D + E ) 974,364.60
- Wc Faktor; Pasir; 1.400 Kg, dan Kerikil = 1.350 Kg

Jenis Pekerjaan : Beton Mutu F'c = 16,9 Mpa (K 200), Slump (12 ± 2) cm, W/c = 0,61
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.6

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 1.6500 76,500.00 126,225.00
2 Tukang OH 0.2750 85,500.00 23,512.50
3 Kepala Tukang OH 0.0280 108,000.00 3,024.00
4 Mandor OH 0.0830 99,000.00 8,217.00
Jumlah Tenaga Kerja 160,978.50
B. BAHAN
1 Semen Portland (PC) Kg 352.00 1,440.00 506,880.00
2 Pasir Beton (PB) Kg 731.00 135.00 98,685.00
3 Kerikil (KR) Kg 1,031.00 140.00 144,340.00
4 Air Liter 215.00 40.50 8,707.50
Jumlah Bahan 758,612.50
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 919,591.00
E Overhead & Profit 10% X D 91,959.10
F Harga Satuan Pekerjaan ( D + E ) 1,011,550.10
- Wc Faktor; Pasir; 1.400 Kg, dan Kerikil = 1.350 Kg

Jenis Pekerjaan : Beton Mutu F'c = 19,3 Mpa (K 225), Slump (12 ± 2) cm, W/c = 0,58
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.7

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 1.6500 76,500.00 126,225.00
2 Tukang OH 0.2750 85,500.00 23,512.50
3 Kepala Tukang OH 0.0280 108,000.00 3,024.00
4 Mandor OH 0.0830 99,000.00 8,217.00
Jumlah Tenaga Kerja 160,978.50
B. BAHAN
1 Semen Portland (PC) Kg 371.00 1,440.00 534,240.00
2 Pasir Beton (PB) Kg 698.00 135.00 94,230.00
3 Kerikil (KR) Kg 1,047.00 140.00 146,580.00
4 Air Liter 215.00 40.50 8,707.50
Jumlah Bahan 783,757.50
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 944,736.00
E Overhead & Profit 10% X D 94,473.60
F Harga Satuan Pekerjaan ( D + E ) 1,039,209.60
- Wc Faktor; Pasir; 1.400 Kg, dan Kerikil = 1.350 Kg

DED Pembangunan Gedung Laboratorium Perikanan Universitas Teuku Umar AHSP - Halaman 28/93
Engineer Estimate

Jenis Pekerjaan : Beton Mutu F'c = 21,7 Mpa (K 250), Slump (12 ± 2) cm, W/c = 0,56
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.8

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 1.6500 76,500.00 126,225.00
2 Tukang OH 0.2750 85,500.00 23,512.50
3 Kepala Tukang OH 0.0280 108,000.00 3,024.00
4 Mandor OH 0.0830 99,000.00 8,217.00
Jumlah Tenaga Kerja 160,978.50
B. BAHAN
1 Semen Portland (PC) Kg 384.00 1,440.00 552,960.00
2 Pasir Beton (PB) Kg 692.00 135.00 93,420.00
3 Kerikil (KR) / split Kg 1,039.00 195.00 202,605.00
4 Air Liter 215.00 40.50 8,707.50
Jumlah Bahan 857,692.50
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 1,018,671.00
E Overhead & Profit 10% X D 101,867.10
F Harga Satuan Pekerjaan ( D + E ) 1,120,538.10
- Wc Faktor; Pasir; 1.400 Kg, dan Kerikil = 1.350 Kg

Jenis Pekerjaan : Beton Mutu F'c = 24,0 Mpa (K 275), Slump (12 ± 2) cm, W/c = 0,53
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.9

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 1.6500 76,500.00 126,225.00
2 Tukang OH 0.2750 85,500.00 23,512.50
3 Kepala Tukang OH 0.0280 108,000.00 3,024.00
4 Mandor OH 0.0830 99,000.00 8,217.00
Jumlah Tenaga Kerja 160,978.50
B. BAHAN
1 Semen Portland (PC) Kg 406.00 1,440.00 584,640.00
2 Pasir Beton (PB) Kg 684.00 135.00 92,340.00
3 Kerikil (KR) Kg 1,026.00 195.00 200,070.00
4 Air Liter 215.00 40.50 8,707.50
Jumlah Bahan 885,757.50
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 1,046,736.00
E Overhead & Profit 10% X D 104,673.60
F Harga Satuan Pekerjaan ( D + E ) 1,151,409.60
- Wc Faktor; Pasir; 1.400 Kg, dan Kerikil = 1.350 Kg

Jenis Pekerjaan : Pembesian 1 Kg Dengan Besi Polos


Satuan / Unit : Kg
Analisa : AHSP PU A.4.1.1.17

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0700 76,500.00 5,355.00
2 Tukang OH 0.0700 85,500.00 5,985.00
3 Kepala Tukang OH 0.0070 108,000.00 756.00
4 Mandor OH 0.0040 99,000.00 396.00
Jumlah Tenaga Kerja 12,492.00
B. BAHAN
1 Besi Beton Polos Kg 10.500 10,800.00 113,400.00
2 Kawat Beton Kg 0.150 14,554.80 2,183.22
Jumlah Bahan 115,583.22
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 128,075.22
E Per Kg Pembesian = D / 10 12,807.52
F Overhead & Profit 10% X E 1,280.75
G Harga Satuan Pekerjaan ( E + F ) 14,088.27

DED Pembangunan Gedung Laboratorium Perikanan Universitas Teuku Umar AHSP - Halaman 29/93
Engineer Estimate

Jenis Pekerjaan : Pembesian 1 Kg Dengan Besi Ulir


Satuan / Unit : Kg
Analisa : AHSP PU A.4.1.1.17.a

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0700 76,500.00 5,355.00
2 Tukang OH 0.0700 85,500.00 5,985.00
3 Kepala Tukang OH 0.0070 108,000.00 756.00
4 Mandor OH 0.0400 99,000.00 3,960.00
Jumlah Tenaga Kerja 16,056.00
B. BAHAN
1 Besi Beton Ulir Kg 10.500 13,050.00 137,025.00
2 Kawat Beton Kg 0.150 14,554.80 2,183.22
Jumlah Bahan 139,208.22
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 155,264.22
E Per Kg Pembesian = D / 10 15,526.42
F Overhead & Profit 10% X E 1,552.64
G Harga Satuan Pekerjaan ( E + F ) 17,079.06

Jenis Pekerjaan : Memasang Bekisting Untuk Sloof


Satuan / Unit : M2
Analisa : AHSP PU A.4.1.1.21

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.5200 76,500.00 39,780.00
2 Tukang OH 0.2600 85,500.00 22,230.00
3 Kepala Tukang OH 0.0260 108,000.00 2,808.00
4 Mandor OH 0.0260 99,000.00 2,574.00
Jumlah Tenaga Kerja 67,392.00
B. BAHAN
1 Kayu Kelas III M3 0.045 3,600,000.00 162,000.00
2 Paku 5 cm - 10 cm Kg 0.300 14,554.80 4,366.44
3 Minyak Bekisting Liter 0.100 6,300.00 630.00
Jumlah Bahan 166,996.44
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 234,388.44
E Overhead & Profit 10% X D 23,438.84
F Harga Satuan Pekerjaan ( D + E ) 257,827.28
G Harga Satuan Pekerjaan ( F )Pemakaian 1 x 257,827.28

Jenis Pekerjaan : Memasang Bekisting Untuk Kolom


Satuan / Unit : M2
Analisa : AHSP PU A.4.1.1.22

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.6600 76,500.00 50,490.00
2 Tukang OH 0.3300 85,500.00 28,215.00
3 Kepala Tukang OH 0.0330 108,000.00 3,564.00
4 Mandor OH 0.0330 99,000.00 3,267.00
Jumlah Tenaga Kerja 85,536.00
B. BAHAN
1 Kayu Kelas III M3 0.0400 3,600,000.00 144,000.00
2 Paku 5 cm - 10 cm Kg 0.4000 14,554.80 5,821.92
3 Minyak Bekisting Liter 0.2000 6,300.00 1,260.00
4 Balok Kayu Kelas II M3 0.0150 5,130,000.00 76,950.00
5 Mutipleks tebal 9 mm Lbr 0.3500 131,940.00 46,179.00
6 Kayu dolken dia. 8-10 cm, L = 4 M Batang 2.0000 18,000.00 36,000.00
Jumlah Bahan 310,210.92
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 395,746.92
E Overhead & Profit 10% X D 39,574.69
F Harga Satuan Pekerjaan ( D + E ) 435,321.61
G Harga Satuan Pekerjaan ( F )Pemakaian 1 x 435,321.61

Jenis Pekerjaan : Memasang Bekisting Untuk Balok


Satuan / Unit : M2
Analisa : AHSP PU A.4.1.1.23

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
DED Pembangunan Gedung Laboratorium Perikanan Universitas Teuku Umar AHSP - Halaman 30/93
Engineer Estimate

1 Pekerja OH 0.6600 76,500.00 50,490.00


2 Tukang OH 0.3300 85,500.00 28,215.00
3 Kepala Tukang OH 0.0330 108,000.00 3,564.00
4 Mandor OH 0.0330 99,000.00 3,267.00
Jumlah Tenaga Kerja 85,536.00
B. BAHAN
1 Kayu Kelas III M3 0.0400 3,600,000.00 144,000.00
2 Paku 5 cm - 10 cm Kg 0.4000 14,554.80 5,821.92
3 Minyak Bekisting Liter 0.2000 6,300.00 1,260.00
4 Balok Kayu Kelas II M3 0.0180 5,130,000.00 92,340.00
5 Mutipleks tebal 9 mm Lbr 0.3500 131,940.00 46,179.00
6 Kayu dolken dia. 8-10 cm, L = 4 M Batang 2.0000 18,000.00 36,000.00
Jumlah Bahan 325,600.92
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 411,136.92
E Overhead & Profit 10% X D 41,113.69
F Harga Satuan Pekerjaan ( D + E ) 452,250.61
G Harga Satuan Pekerjaan ( F )Pemakaian 1 x 452,250.61

DED Pembangunan Gedung Laboratorium Perikanan Universitas Teuku Umar AHSP - Halaman 31/93
Engineer Estimate

Jenis Pekerjaan : Memasang Bekisting Untuk Plat Lantai


Satuan / Unit : M2
Analisa : AHSP PU A.4.1.1.24

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.6600 76,500.00 50,490.00
2 Tukang OH 0.3300 85,500.00 28,215.00
3 Kepala Tukang OH 0.0330 108,000.00 3,564.00
4 Mandor OH 0.0330 99,000.00 3,267.00
Jumlah Tenaga Kerja 85,536.00
B. BAHAN
1 Kayu Kelas III M3 0.0400 3,600,000.00 144,000.00
2 Paku 5 cm - 10 cm Kg 0.4000 14,554.80 5,821.92
3 Minyak Bekisting Liter 0.2000 6,300.00 1,260.00
4 Balok Kayu Kelas II M3 0.0150 5,130,000.00 76,950.00
5 Mutipleks tebal 9 mm Lbr 0.3500 131,940.00 46,179.00
6 Kayu dolken dia. 8-10 cm, L = 4 M Batang 6.0000 18,000.00 108,000.00
Jumlah Bahan 382,210.92
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 467,746.92
E Overhead & Profit 10% X D 46,774.69
F Harga Satuan Pekerjaan ( D + E ) 514,521.61
G Harga Satuan Pekerjaan ( F )Pemakaian 1 x 514,521.61

Jenis Pekerjaan : Memasang Bekisting Untuk Dinding


Satuan / Unit : M2
Analisa : AHSP PU A.4.1.1.25

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.6600 76,500.00 50,490.00
2 Tukang OH 0.3300 85,500.00 28,215.00
3 Kepala Tukang OH 0.0330 108,000.00 3,564.00
4 Mandor OH 0.0330 99,000.00 3,267.00
Jumlah Tenaga Kerja 85,536.00
B. BAHAN
1 Kayu Kelas III M3 0.030 3,600,000.00 108,000.00
2 Paku 5 cm - 10 cm Kg 0.400 14,554.80 5,821.92
3 Minyak Bekisting Liter 0.200 6,300.00 1,260.00
4 Balok Kayu Kelas II M3 0.020 5,130,000.00 102,600.00
5 Mutipleks tebal 9 mm Lbr 0.350 131,940.00 46,179.00
6 Kayu dolken dia. 8-10 cm, L = 4 M Batang 3.000 18,000.00 54,000.00
7 Penjaga jarak bekisting/ Spacer Bh 4.000 27,500.00 110,000.00
Jumlah Bahan 427,860.92
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 513,396.92
E Overhead & Profit 10% X D 51,339.69
F Harga Satuan Pekerjaan ( D + E ) 564,736.61
G Harga Satuan Pekerjaan ( F )Pemakaian 1 x 564,736.61

Jenis Pekerjaan : Memasang Bekisting Untuk Tangga


Satuan / Unit : M2
Analisa : AHSP PU A.4.1.1.26

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.6600 76,500.00 50,490.00
2 Tukang OH 0.3300 85,500.00 28,215.00
3 Kepala Tukang OH 0.0330 108,000.00 3,564.00
4 Mandor OH 0.0330 99,000.00 3,267.00
Jumlah Tenaga Kerja 85,536.00
B. BAHAN
1 Kayu Kelas III M3 0.030 3,600,000.00 108,000.00
2 Paku 5 cm - 10 cm Kg 0.400 14,554.80 5,821.92
3 Minyak Bekisting Liter 0.150 6,300.00 945.00
4 Balok Kayu Kelas II M3 0.015 5,130,000.00 76,950.00
5 Mutipleks tebal 9 mm Lbr 0.350 131,940.00 46,179.00
6 Kayu dolken dia. 8-10 cm, L = 4 M Batang 2.000 18,000.00 36,000.00
Jumlah Bahan 273,895.92
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 359,431.92
E Overhead & Profit 10% X D 35,943.19
F Harga Satuan Pekerjaan ( D + E ) 395,375.11
DED Pembangunan Gedung Laboratorium Perikanan Universitas Teuku Umar AHSP - Halaman 32/93
Engineer Estimate

G Harga Satuan Pekerjaan ( F )Pemakaian 1 x 395,375.11

DED Pembangunan Gedung Laboratorium Perikanan Universitas Teuku Umar AHSP - Halaman 33/93
Engineer Estimate

Jenis Pekerjaan : Memasang Bekisting Untuk Jembatan Pengecoran


Satuan / Unit : M2
Analisa : AHSP PU A.4.1.1.27

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.1500 76,500.00 11,475.00
2 Tukang OH 0.0500 85,500.00 4,275.00
3 Kepala Tukang OH 0.0050 108,000.00 540.00
4 Mandor OH 0.0080 99,000.00 792.00
Jumlah Tenaga Kerja 17,082.00
B. BAHAN
1 Kayu Kelas III M3 0.0264 3,600,000.00 95,040.00
2 Paku 5 cm - 12 cm Kg 0.6000 14,554.80 8,732.88
3 Minyak Bekisting Liter 0.1500 6,300.00 945.00
4 Kayu dolken dia. 8-10 cm, L = 4 M Batang 0.5000 18,000.00 9,000.00
Jumlah Bahan 113,717.88
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 130,799.88
E Overhead & Profit 10% X D 13,079.99
F Harga Satuan Pekerjaan ( D + E ) 143,879.87
G Harga Satuan Pekerjaan ( F )Pemakaian 1 x 143,879.87

Jenis Pekerjaan : Bongkar 1 m² bekisting secara biasa


Satuan / Unit : M2
Analisa : B.35

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0400 76,500.00 3,060.00
2 Mandor OH 0.0040 99,000.00 396.00
Jumlah Tenaga Kerja 3,456.00
B. BAHAN
- -
Jumlah Bahan -
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 3,456.00
E Overhead & Profit 10% X D 345.60
F Harga Satuan Pekerjaan ( D + E ) 3,801.60

Jenis Pekerjaan : Bahan Grouting Campuran


Satuan / Unit : M3
Analisa : AHSP PU A.4.1.2.20

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
Jumlah Tenaga Kerja -
B. BAHAN
1 Semen Grout Kg 1,200.0000 3,825.00 4,590,000.00
2 Screening Kg 650.0000 22,500.00 14,625,000.00
3 Air Liter 350.0000 50.00 17,500.00
Jumlah Bahan 19,232,500.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 19,232,500.00
E Overhead & Profit 10% X D 1,923,250.00
F Harga Satuan Pekerjaan ( D + E ) 21,155,750.00
G Harga Satuan Pekerjaan ( F )Pemakaian 3 x 7,051,916.67

Jenis Pekerjaan : Bahan Grouting Tidak Campuran


Satuan / Unit : M3
Analisa : AHSP PU A.4.1.2.21

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
Jumlah Tenaga Kerja -
B. BAHAN
1 Semen Grout Kg 1,850.0000 3,825.00 7,076,250.00
2 Air Liter 400.0000 50.00 20,000.00
Jumlah Bahan 7,096,250.00
C. PERALATAN
DED Pembangunan Gedung Laboratorium Perikanan Universitas Teuku Umar AHSP - Halaman 34/93
Engineer Estimate

Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 7,096,250.00
E Overhead & Profit 10% X D 709,625.00
F Harga Satuan Pekerjaan ( D + E ) 7,805,875.00
G Harga Satuan Pekerjaan ( F )Pemakaian 3 x 2,601,958.33

Jenis Pekerjaan : Pemasangan Baja Profil


Satuan / Unit : Kg
Analisa : AHSP PU A.4.2.1.1

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0600 76,500.00 4,590.00
2 Tukang OH 0.0600 85,500.00 5,130.00
3 Kepala Tukang OH 0.0060 108,000.00 648.00
4 Mandor OH 0.0030 99,000.00 297.00
Jumlah Tenaga Kerja 10,665.00
B. BAHAN
1 Besi Baja Profil Kg 1.150 16,200.00 18,630.00
Jumlah Bahan 18,630.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 29,295.00
E Overhead & Profit 10% X E 2,929.50
F Harga Satuan Pekerjaan ( E + F ) 32,224.50

Jenis Pekerjaan : Pemasangan Rangka Kuda-Kuda Baja IWF


Satuan / Unit : Kg
Analisa : AHSP PU A.4.2.1.2

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0600 76,500.00 4,590.00
2 Tukang OH 0.0600 85,500.00 5,130.00
3 Kepala Tukang OH 0.0060 108,000.00 648.00
4 Mandor OH 0.0030 99,000.00 297.00
Jumlah Tenaga Kerja 10,665.00
B. BAHAN
1 Besi Baja IWF Kg 1.150 16,200.00 18,630.00
Jumlah Bahan 18,630.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 29,295.00
E Overhead & Profit 10% X E 2,929.50
F Harga Satuan Pekerjaan ( E + F ) 32,224.50

Jenis Pekerjaan : Pemasangan Pintu Rolling Door Besi


Satuan / Unit : M2
Analisa : AHSP PU A.4.2.1.7

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 1.2000 76,500.00 91,800.00
2 Tukang OH 1.2000 85,500.00 102,600.00
3 Kepala Tukang OH 0.1200 108,000.00 12,960.00
4 Mandor OH 0.0060 99,000.00 594.00
Jumlah Tenaga Kerja 207,954.00
B. BAHAN
1 Pintu Gulung Besi M2 1.000 450,000.00 450,000.00
Jumlah Bahan 450,000.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 657,954.00
E Overhead & Profit 10% X E 65,795.40
F Harga Satuan Pekerjaan ( E + F ) 723,749.40

Jenis Pekerjaan : Pemasangan Pintu Lipat (Folding Door) bahan Plastik/PVC


Satuan / Unit : M2
Analisa : AHSP PU A.4.2.1.8

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.4400 76,500.00 33,660.00
2 Tukang OH 0.4400 85,500.00 37,620.00
DED Pembangunan Gedung Laboratorium Perikanan Universitas Teuku Umar AHSP - Halaman 35/93
Engineer Estimate

3 Kepala Tukang OH 0.0440 108,000.00 4,752.00


4 Mandor OH 0.0220 99,000.00 2,178.00
Jumlah Tenaga Kerja 78,210.00
B. BAHAN
1 Pintu Lipat M2 1.000 378,000.00 378,000.00
Jumlah Bahan 378,000.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 456,210.00
E Overhead & Profit 10% X E 45,621.00
F Harga Satuan Pekerjaan ( E + F ) 501,831.00

Jenis Pekerjaan : Pemasangan Sunscreen Alluminium


Satuan / Unit : M2
Analisa : AHSP PU A.4.2.1.9

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0800 76,500.00 6,120.00
2 Tukang OH 0.8000 85,500.00 68,400.00
3 Kepala Tukang OH 0.0800 108,000.00 8,640.00
4 Mandor OH 0.0040 99,000.00 396.00
Jumlah Tenaga Kerja 83,556.00
B. BAHAN
1 Sunscreen Alluminium M2 1.000 270,000.00 270,000.00
Jumlah Bahan 270,000.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 353,556.00
E Overhead & Profit 10% X E 35,355.60
F Harga Satuan Pekerjaan ( E + F ) 388,911.60

Jenis Pekerjaan : Pemasangan Rolling Door Alluminum


Satuan / Unit : M2
Analisa : AHSP PU A.4.2.1.10

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 1.0000 76,500.00 76,500.00
2 Tukang OH 1.0000 85,500.00 85,500.00
3 Kepala Tukang OH 0.1000 108,000.00 10,800.00
4 Mandor OH 0.0500 99,000.00 4,950.00
Jumlah Tenaga Kerja 177,750.00
B. BAHAN
1 Rolling Door Alluminium M2 1.000 405,000.00 405,000.00
Jumlah Bahan 405,000.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 582,750.00
E Overhead & Profit 10% X E 58,275.00
F Harga Satuan Pekerjaan ( E + F ) 641,025.00

Jenis Pekerjaan : Pemasangan Kusen Pintu Aluminum


Satuan / Unit : M
Analisa : AHSP PU A.4.2.1.11

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0430 76,500.00 3,289.50
2 Tukang OH 0.0430 85,500.00 3,676.50
3 Kepala Tukang OH 0.0043 108,000.00 464.40
4 Mandor OH 0.0021 99,000.00 207.90
Jumlah Tenaga Kerja 7,638.30
B. BAHAN
1 Profil Alluminium M 1.100 58,500.00 64,350.00
2 Sekrup fixer Buah 2.000 720.00 1,440.00
3 Sealant Tube 0.060 108,000.00 6,480.00
Jumlah Bahan 72,270.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 79,908.30
E Overhead & Profit 10% X E 7,990.83
F Harga Satuan Pekerjaan ( E + F ) 87,899.13

DED Pembangunan Gedung Laboratorium Perikanan Universitas Teuku Umar AHSP - Halaman 36/93
Engineer Estimate

Jenis Pekerjaan : Pemasangan Pintu Aluminum Strip Lebar 8 cm


Satuan / Unit : M2
Analisa : AHSP PU A.4.2.1.12

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0850 76,500.00 6,502.50
2 Tukang OH 0.0850 85,500.00 7,267.50
3 Kepala Tukang OH 0.0085 108,000.00 918.00
4 Mandor OH 0.0042 99,000.00 415.80
Jumlah Tenaga Kerja 15,103.80
B. BAHAN
1 Profil Alluminium M 4.400 58,500.00 257,400.00
2 Alluminium Strip M 14.600 22,500.00 328,500.00
Jumlah Bahan 585,900.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 601,003.80
E Overhead & Profit 10% X E 60,100.38
F Harga Satuan Pekerjaan ( E + F ) 661,104.18

Jenis Pekerjaan : Pemasangan Pintu Kaca Rangka Alluminium


Satuan / Unit : M2
Analisa : AHSP PU A.4.2.1.13

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0850 76,500.00 6,502.50
2 Tukang OH 0.0850 85,500.00 7,267.50
3 Kepala Tukang OH 0.0090 108,000.00 972.00
4 Mandor OH 0.0050 99,000.00 495.00
Jumlah Tenaga Kerja 15,237.00
B. BAHAN
1 Pintu Alluminium M 4.400 99,000.00 435,600.00
2 Profil Kaca (AHSP PU A.4.6.2.19) M 4.500 #REF! #REF!
3 Sealant Tube 0.270 108,000.00 29,160.00
Jumlah Bahan #REF!
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) #REF!
E Overhead & Profit 10% X E #REF!
F Harga Satuan Pekerjaan ( E + F ) #REF!

Jenis Pekerjaan : Pemasangan Venetions Blinds Dan Vertical Blinds (Tirai)


Satuan / Unit : M2
Analisa : AHSP PU A.4.2.1.14

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.3500 76,500.00 26,775.00
2 Tukang OH 0.3500 85,500.00 29,925.00
3 Kepala Tukang OH 0.0350 108,000.00 3,780.00
4 Mandor OH 0.0180 99,000.00 1,782.00
Jumlah Tenaga Kerja 62,262.00
B. BAHAN
1 Venections Blinds dan Vertical Blids (TIRAI) M2 1.000 225,000.00 225,000.00
Jumlah Bahan 225,000.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 287,262.00
E Overhead & Profit 10% X E 28,726.20
F Harga Satuan Pekerjaan ( E + F ) 315,988.20

Jenis Pekerjaan : Pemasangan Teralis Besi Strip (2x3) mm


Satuan / Unit : M2
Analisa : AHSP PU A.4.2.1.15

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 1.6700 76,500.00 127,755.00
2 Tukang OH 1.6700 85,500.00 142,785.00
3 Kepala Tukang OH 0.1670 108,000.00 18,036.00
4 Mandor OH 0.0830 99,000.00 8,217.00
Jumlah Tenaga Kerja 296,793.00
B. BAHAN
DED Pembangunan Gedung Laboratorium Perikanan Universitas Teuku Umar AHSP - Halaman 37/93
Engineer Estimate

1 Besi Strip Kg 6.177 16,200.00 100,067.40


2 Pengelasan Cm 27.080 4,500.00 121,860.00
Jumlah Bahan 221,927.40
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 518,720.40
E Overhead & Profit 10% X E 51,872.04
F Harga Satuan Pekerjaan ( E + F ) 570,592.44

Jenis Pekerjaan : Pemasangan Kawat Nyamuk


Satuan / Unit : M2
Analisa : AHSP PU A.4.2.1.16

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.1000 76,500.00 7,650.00
2 Tukang OH 0.1000 85,500.00 8,550.00
3 Kepala Tukang OH 0.0100 108,000.00 1,080.00
4 Mandor OH 0.0050 99,000.00 495.00
Jumlah Tenaga Kerja 17,775.00
B. BAHAN
1 Kawat Nyamuk M2 1.100 26,870.40 29,557.44
2 Pengelasan Cm 11.110 4,500.00 49,995.00
3 Baja Strip (0.2 x 2) cm Kg 1.716 16,200.00 27,799.20
Jumlah Bahan 107,351.64
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 125,126.64
E Overhead & Profit 10% X E 12,512.66
F Harga Satuan Pekerjaan ( E + F ) 137,639.30

Jenis Pekerjaan : PemasanganJendela Nako & Teralis


Satuan / Unit : M2
Analisa : AHSP PU A.4.2.1.17

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.2000 76,500.00 15,300.00
2 Tukang OH 0.2000 85,500.00 17,100.00
3 Kepala Tukang OH 0.0200 108,000.00 2,160.00
4 Mandor OH 0.0010 99,000.00 99.00
Jumlah Tenaga Kerja 34,659.00
B. BAHAN
1 Jendela Nako (Rangka + Kaca 5 mm) M2 1.100 405,000.00 445,500.00
2 Paku Skrup 1 cm - 2.5 cm Buah 10.000 2,025.00 20,250.00
3 Besi Strip Kg 7.000 16,200.00 113,400.00
Jumlah Bahan 579,150.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 613,809.00
E Overhead & Profit 10% X E 61,380.90
F Harga Satuan Pekerjaan ( E + F ) 675,189.90

Jenis Pekerjaan : Pemasangan Talang Datar/Jurai Seng Bjls 28 Lebar 90 cm


Satuan / Unit : M
Analisa : AHSP PU A.4.2.1.18

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.2000 76,500.00 15,300.00
2 Tukang OH 0.2000 85,500.00 17,100.00
3 Kepala Tukang OH 0.0200 108,000.00 2,160.00
4 Mandor OH 0.0010 99,000.00 99.00
Jumlah Tenaga Kerja 34,659.00
B. BAHAN
1 Seng Plat M 1.050 50,000.00 52,500.00
2 Paku 1 cm - 2.5 cm Kg 0.015 14,554.80 218.32
3 Papan Kayu Kelas II M3 0.019 5,130,000.00 97,470.00
Jumlah Bahan 150,188.32
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 184,847.32
E Overhead & Profit 10% X E 18,484.73
F Harga Satuan Pekerjaan ( E + F ) 203,332.05

DED Pembangunan Gedung Laboratorium Perikanan Universitas Teuku Umar AHSP - Halaman 38/93
Engineer Estimate

Jenis Pekerjaan : Pasangan Dinding Bata ( 5 x 11 x 22 ) cm Tebal 1 Bata Camp. 1Pc : 2 PP.
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.1

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.6000 76,500.00 45,900.00
2 Tukang OH 0.2000 85,500.00 17,100.00
3 Kepala Tukang OH 0.0200 108,000.00 2,160.00
4 Mandor OH 0.0300 99,000.00 2,970.00
Jumlah Tenaga Kerja 68,130.00
B. BAHAN
1 Batu Bata Bh 140.000 630.00 88,200.00
2 Semen Portland (PC) Kg 43.500 1,440.00 62,640.00
3 Pasir Pasang M3 0.080 189,000.00 15,120.00
Jumlah Bahan 165,960.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 234,090.00
E Overhead & Profit 10% X E 23,409.00
F Harga Satuan Pekerjaan ( E + F ) 257,499.00

Jenis Pekerjaan : Pasangan Dinding Bata ( 4 x 10 x 20 ) cm Tebal 1 Bata Camp. 1Pc : 2 PP.
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.1.a

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.6000 76,500.00 45,900.00
2 Tukang OH 0.2000 85,500.00 17,100.00
3 Kepala Tukang OH 0.0200 108,000.00 2,160.00
4 Mandor OH 0.0300 99,000.00 2,970.00
Jumlah Tenaga Kerja 68,130.00
B. BAHAN
1 Batu Bata Bh 170.000 630.00 107,100.00
2 Semen Portland (PC) Kg 43.500 1,440.00 62,640.00
3 Pasir Pasang M3 0.080 189,000.00 15,120.00
Jumlah Bahan 184,860.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 252,990.00
E Overhead & Profit 10% X E 25,299.00
F Harga Satuan Pekerjaan ( E + F ) 278,289.00

Jenis Pekerjaan : Pasangan Dinding Bata Tebal 1 Bata Camp. 1Pc : 3 PP


Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.2

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.6000 76,500.00 45,900.00
2 Tukang OH 0.2000 85,500.00 17,100.00
3 Kepala Tukang OH 0.0200 108,000.00 2,160.00
4 Mandor OH 0.0300 99,000.00 2,970.00
Jumlah Tenaga Kerja 68,130.00
B. BAHAN
1 Batu Bata Bh 140.000 630.00 88,200.00
2 Semen Portland (PC) Kg 32.950 1,440.00 47,448.00
3 Pasir Pasang M3 0.091 189,000.00 17,199.00
Jumlah Bahan 152,847.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 220,977.00
E Overhead & Profit 10% X E 22,097.70
F Harga Satuan Pekerjaan ( E + F ) 243,074.70

DED Pembangunan Gedung Laboratorium Perikanan Universitas Teuku Umar AHSP - Halaman 39/93
Engineer Estimate

Jenis Pekerjaan : Pasangan Dinding Bata ( 5x11x22) cm Tebal 1 Bata Camp. 1Pc : 4 PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.3

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.6000 76,500.00 45,900.00
2 Tukang OH 0.2000 85,500.00 17,100.00
3 Kepala Tukang OH 0.0200 108,000.00 2,160.00
4 Mandor OH 0.0300 99,000.00 2,970.00
Jumlah Tenaga Kerja 68,130.00
B. BAHAN
1 Batu Bata Bh 140.000 630.00 88,200.00
2 Semen Portland (PC) Kg 26.550 1,440.00 38,232.00
3 Pasir Pasang M3 0.093 189,000.00 17,577.00
Jumlah Bahan 144,009.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 212,139.00
E Overhead & Profit 10% X E 21,213.90
F Harga Satuan Pekerjaan ( E + F ) 233,352.90

Jenis Pekerjaan : Pasangan Dinding Bata ( 4x10x20) cm Tebal 1 Bata Camp. 1Pc : 4 PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.3.a

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.6000 76,500.00 45,900.00
2 Tukang OH 0.2000 85,500.00 17,100.00
3 Kepala Tukang OH 0.0200 108,000.00 2,160.00
4 Mandor OH 0.0300 99,000.00 2,970.00
Jumlah Tenaga Kerja 68,130.00
B. BAHAN
1 Batu Bata Bh 170.000 630.00 107,100.00
2 Semen Portland (PC) Kg 26.550 1,440.00 38,232.00
3 Pasir Pasang M3 0.093 189,000.00 17,577.00
Jumlah Bahan 162,909.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 231,039.00
E Overhead & Profit 10% X E 23,103.90
F Harga Satuan Pekerjaan ( E + F ) 254,142.90

Jenis Pekerjaan : Pasangan Dinding Bata Tebal 1 Bata Camp. 1Pc : 5 PP


Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.4

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.6000 76,500.00 45,900.00
2 Tukang OH 0.2000 85,500.00 17,100.00
3 Kepala Tukang OH 0.0200 108,000.00 2,160.00
4 Mandor OH 0.0300 99,000.00 2,970.00
Jumlah Tenaga Kerja 68,130.00
B. BAHAN
1 Batu Bata Bh 140.000 630.00 88,200.00
2 Semen Portland (PC) Kg 22.200 1,440.00 31,968.00
3 Pasir Pasang M3 0.102 189,000.00 19,278.00
Jumlah Bahan 139,446.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 207,576.00
E Overhead & Profit 10% X E 20,757.60
F Harga Satuan Pekerjaan ( E + F ) 228,333.60

DED Pembangunan Gedung Laboratorium Perikanan Universitas Teuku Umar AHSP - Halaman 40/93
Engineer Estimate

Jenis Pekerjaan : Pasangan Dinding Bata ( 5x11x22) cm Tebal 1/2 Bata Camp. 1Pc : 2 PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.7

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.3000 76,500.00 22,950.00
2 Tukang OH 0.1000 85,500.00 8,550.00
3 Kepala Tukang OH 0.0100 108,000.00 1,080.00
4 Mandor OH 0.0150 99,000.00 1,485.00
Jumlah Tenaga Kerja 34,065.00
B. BAHAN
1 Batu Bata Bh 70.000 630.00 44,100.00
2 Semen Portland (PC) Kg 18.950 1,440.00 27,288.00
3 Pasir Pasang M3 0.038 189,000.00 7,182.00
Jumlah Bahan 78,570.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 112,635.00
E Overhead & Profit 10% X E 11,263.50
F Harga Satuan Pekerjaan ( E + F ) 123,898.50

Jenis Pekerjaan : Pasangan Dinding Bata ( 4x10x20) cm Tebal 1/2 Bata Camp. 1Pc : 2 PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.7.a

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.3000 76,500.00 22,950.00
2 Tukang OH 0.1000 85,500.00 8,550.00
3 Kepala Tukang OH 0.0100 108,000.00 1,080.00
4 Mandor OH 0.0150 99,000.00 1,485.00
Jumlah Tenaga Kerja 34,065.00
B. BAHAN
1 Batu Bata Bh 85.000 630.00 53,550.00
2 Semen Portland (PC) Kg 18.950 1,440.00 27,288.00
3 Pasir Pasang M3 0.038 189,000.00 7,182.00
Jumlah Bahan 88,020.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 122,085.00
E Overhead & Profit 10% X E 12,208.50
F Harga Satuan Pekerjaan ( E + F ) 134,293.50

Jenis Pekerjaan : Pasangan Dinding Bata Tebal 1/2 Bata Camp. 1Pc : 3 PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.8

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.3000 76,500.00 22,950.00
2 Tukang OH 0.1000 85,500.00 8,550.00
3 Kepala Tukang OH 0.0100 108,000.00 1,080.00
4 Mandor OH 0.0150 99,000.00 1,485.00
Jumlah Tenaga Kerja 34,065.00
B. BAHAN
1 Batu Bata Bh 70.000 630.00 44,100.00
2 Semen Portland (PC) Kg 14.370 1,440.00 20,692.80
3 Pasir Pasang M3 0.040 189,000.00 7,560.00
Jumlah Bahan 72,352.80
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 106,417.80
E Overhead & Profit 10% X E 10,641.78
F Harga Satuan Pekerjaan ( E + F ) 117,059.58

DED Pembangunan Gedung Laboratorium Perikanan Universitas Teuku Umar AHSP - Halaman 41/93
Engineer Estimate

Jenis Pekerjaan : Pasangan Dinding Bata ( 5 x 11 x 22 ) cmTebal 1/2 Bata Camp. 1Pc : 4 PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.9

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.3000 76,500.00 22,950.00
2 Tukang OH 0.1000 85,500.00 8,550.00
3 Kepala Tukang OH 0.0100 108,000.00 1,080.00
4 Mandor OH 0.0150 99,000.00 1,485.00
Jumlah Tenaga Kerja 34,065.00
B. BAHAN
1 Batu Bata Bh 70.000 630.00 44,100.00
2 Semen Portland (PC) Kg 11.500 1,440.00 16,560.00
3 Pasir Pasang M3 0.043 189,000.00 8,127.00
Jumlah Bahan 68,787.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 102,852.00
E Overhead & Profit 10% X E 10,285.20
F Harga Satuan Pekerjaan ( E + F ) 113,137.20

Jenis Pekerjaan : Pasangan Dinding Bata ( 5 x 10 x 20 ) cm Tebal 1/2 Bata Camp. 1Pc : 4 PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.9.a

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.3000 76,500.00 22,950.00
2 Tukang OH 0.1000 85,500.00 8,550.00
3 Kepala Tukang OH 0.0100 108,000.00 1,080.00
4 Mandor OH 0.0150 99,000.00 1,485.00
Jumlah Tenaga Kerja 34,065.00
B. BAHAN
1 Batu Bata Bh 85.000 630.00 53,550.00
2 Semen Portland (PC) Kg 11.500 1,440.00 16,560.00
3 Pasir Pasang M3 0.043 189,000.00 8,127.00
Jumlah Bahan 78,237.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 112,302.00
E Overhead & Profit 10% X E 11,230.20
F Harga Satuan Pekerjaan ( E + F ) 123,532.20

Jenis Pekerjaan : Pasangan Dinding Bata Tebal 1/2 Bata Camp. 1Pc : 5 PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.10

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.3000 76,500.00 22,950.00
2 Tukang OH 0.1000 85,500.00 8,550.00
3 Kepala Tukang OH 0.0100 108,000.00 1,080.00
4 Mandor OH 0.0150 99,000.00 1,485.00
Jumlah Tenaga Kerja 34,065.00
B. BAHAN
1 Batu Bata Bh 70.000 630.00 44,100.00
2 Semen Portland (PC) Kg 9.680 1,440.00 13,939.20
3 Pasir Pasang M3 0.045 189,000.00 8,505.00
Jumlah Bahan 66,544.20
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 100,609.20
E Overhead & Profit 10% X E 10,060.92
F Harga Satuan Pekerjaan ( E + F ) 110,670.12

Jenis Pekerjaan : Pasangan Dinding Conblock HB15 Campuran 1 Pc : 4 PP


Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.19

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.3500 76,500.00 26,775.00
2 Tukang OH 0.1500 85,500.00 12,825.00
3 Kepala Tukang OH 0.0150 108,000.00 1,620.00
DED Pembangunan Gedung Laboratorium Perikanan Universitas Teuku Umar AHSP - Halaman 42/93
Engineer Estimate

4 Mandor OH 0.0180 99,000.00 1,782.00


Jumlah Tenaga Kerja 43,002.00
B. BAHAN
1 HB15 M3 12.500 67,500.00 843,750.00
2 Semen Portland (PC) Kg 18.200 #REF! #REF!
3 Pasir Pasang M3 0.582 #REF! #REF!
4 Besi Angker dia 8 Kg 0.280
Jumlah Bahan #REF!
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) #REF!
E Overhead & Profit 10% X E #REF!
F Harga Satuan Pekerjaan ( E + F ) #REF!

Jenis Pekerjaan : Pasangan Dinding Conblock HB10 Campuran 1 Pc : 4 PP


Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.21

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.3000 76,500.00 22,950.00
2 Tukang OH 0.1000 85,500.00 8,550.00
3 Kepala Tukang OH 0.0100 108,000.00 1,080.00
4 Mandor OH 0.0150 99,000.00 1,485.00
Jumlah Tenaga Kerja 34,065.00
B. BAHAN
1 HB10 M3 12.500 67,500.00 843,750.00
2 Semen Portland (PC) Kg 12.130 #REF! #REF!
3 Pasir Pasang M3 0.388 #REF! #REF!
4 Besi Angker dia 8 Kg 0.280
Jumlah Bahan #REF!
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) #REF!
E Overhead & Profit 10% X E #REF!
F Harga Satuan Pekerjaan ( E + F ) #REF!

Jenis Pekerjaan : Pasangan Dinding Kerawang (Roster) Camp. 1 PC : 3 PP


Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.22

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.3000 76,500.00 22,950.00
2 Tukang OH 0.1000 85,500.00 8,550.00
3 Kepala Tukang OH 0.0100 108,000.00 1,080.00
4 Mandor OH 0.0150 99,000.00 1,485.00
Jumlah Tenaga Kerja 34,065.00
B. BAHAN
1 Kerawang/ Roster Bh 30.000 6,930.00 207,900.00
2 Semen Portland (PC) Kg 11.000 1,440.00 15,840.00
3 Pasir Pasang M3 0.035 189,000.00 6,615.00
Jumlah Bahan 230,355.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 264,420.00
E Overhead & Profit 10% X E 26,442.00
F Harga Satuan Pekerjaan ( E + F ) 290,862.00

Jenis Pekerjaan : Pasangan Dinding Kerawang (Roster) Camp. 1 PC : 4 PP


Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.23

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.3000 76,500.00 22,950.00
2 Tukang OH 0.1000 85,500.00 8,550.00
3 Kepala Tukang OH 0.0100 108,000.00 1,080.00
4 Mandor OH 0.0150 99,000.00 1,485.00
Jumlah Tenaga Kerja 34,065.00
B. BAHAN
1 Kerawang/ Roster Bh 30.000 6,930.00 207,900.00
2 Semen Portland (PC) Kg 11.000 1,440.00 15,840.00
3 Pasir Pasang M3 0.035 189,000.00 6,615.00
Jumlah Bahan 230,355.00
DED Pembangunan Gedung Laboratorium Perikanan Universitas Teuku Umar AHSP - Halaman 43/93
Engineer Estimate

C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 264,420.00
E Overhead & Profit 10% X E 26,442.00
F Harga Satuan Pekerjaan ( E + F ) 290,862.00

Jenis Pekerjaan : Pasangan Dinding Bata Berongga Ekspose 12x11x24 Campuran 1 Pc : 3 PP


Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.24

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.3000 76,500.00 22,950.00
2 Tukang OH 0.1500 85,500.00 12,825.00
3 Kepala Tukang OH 0.0150 108,000.00 1,620.00
4 Mandor OH 0.0150 99,000.00 1,485.00
Jumlah Tenaga Kerja 38,880.00
B. BAHAN
1 Kerawang/ Roster Bh 70.000 6,930.00 485,100.00
2 Semen Portland (PC) Kg 14.000 1,440.00 20,160.00
3 Pasir Pasang M3 0.032 189,000.00 6,048.00
Jumlah Bahan 511,308.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 550,188.00
E Overhead & Profit 10% X E 55,018.80
F Harga Satuan Pekerjaan ( E + F ) 605,206.80

Jenis Pekerjaan : Plesteran 1 PC : 1 PP Tebal 15 mm


Satuan / Unit : M2
Analisa : AHSP PU A.4.4.2.1

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.3000 76,500.00 22,950.00
2 Tukang OH 0.1500 85,500.00 12,825.00
3 Kepala Tukang OH 0.0150 108,000.00 1,620.00
4 Mandor OH 0.0150 99,000.00 1,485.00
Jumlah Tenaga Kerja 38,880.00
B. BAHAN
1 Semen Portland (PC) Kg 15.504 1,440.00 22,325.76
2 Pasir Pasang M3 0.016 189,000.00 3,024.00
Jumlah Bahan 25,349.76
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 64,229.76
E Overhead & Profit 10% X E 6,422.98
F Harga Satuan Pekerjaan ( E + F ) 70,652.74

DED Pembangunan Gedung Laboratorium Perikanan Universitas Teuku Umar AHSP - Halaman 44/93
Engineer Estimate

Jenis Pekerjaan : Plesteran 1 PC : 2 PP Tebal 15 mm


Satuan / Unit : M2
Analisa : AHSP PU A.4.4.2.2

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.3000 76,500.00 22,950.00
2 Tukang OH 0.1500 85,500.00 12,825.00
3 Kepala Tukang OH 0.0150 108,000.00 1,620.00
4 Mandor OH 0.0150 99,000.00 1,485.00
Jumlah Tenaga Kerja 38,880.00
B. BAHAN
1 Semen Portland (PC) Kg 10.224 1,440.00 14,722.56
2 Pasir Pasang M3 0.020 189,000.00 3,780.00
Jumlah Bahan 18,502.56
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 57,382.56
E Overhead & Profit 10% X E 5,738.26
F Harga Satuan Pekerjaan ( E + F ) 63,120.82

Jenis Pekerjaan : Plesteran 1 PC : 4 PP Tebal 15 mm


Satuan / Unit : M2
Analisa : AHSP PU A.4.4.2.4

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.3000 76,500.00 22,950.00
2 Tukang OH 0.1500 85,500.00 12,825.00
3 Kepala Tukang OH 0.0150 108,000.00 1,620.00
4 Mandor OH 0.0150 99,000.00 1,485.00
Jumlah Tenaga Kerja 38,880.00
B. BAHAN
1 Semen Portland (PC) Kg 6.240 1,440.00 8,985.60
2 Pasir Pasang M3 0.024 189,000.00 4,536.00
Jumlah Bahan 13,521.60
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 52,401.60
E Overhead & Profit 10% X E 5,240.16
F Harga Satuan Pekerjaan ( E + F ) 57,641.76

Jenis Pekerjaan : Plesteran 1 PC : 5 PP Tebal 15 mm


Satuan / Unit : M2
Analisa : AHSP PU A.4.4.2.5

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.3000 76,500.00 22,950.00
2 Tukang OH 0.1500 85,500.00 12,825.00
3 Kepala Tukang OH 0.0150 108,000.00 1,620.00
4 Mandor OH 0.0150 99,000.00 1,485.00
Jumlah Tenaga Kerja 38,880.00
B. BAHAN
1 Semen Portland (PC) Kg 5.184 1,440.00 7,464.96
2 Pasir Pasang M3 0.026 189,000.00 4,914.00
Jumlah Bahan 12,378.96
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 51,258.96
E Overhead & Profit 10% X E 5,125.90
F Harga Satuan Pekerjaan ( E + F ) 56,384.86

Jenis Pekerjaan : Plesteran 1 PC : 2 PP Tebal 20 mm


Satuan / Unit : M2
Analisa : AHSP PU A.4.4.2.13

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.4000 76,500.00 30,600.00
2 Tukang OH 0.2000 85,500.00 17,100.00
3 Kepala Tukang OH 0.0200 108,000.00 2,160.00
4 Mandor OH 0.0220 99,000.00 2,178.00
Jumlah Tenaga Kerja 52,038.00
B. BAHAN
DED Pembangunan Gedung Laboratorium Perikanan Universitas Teuku Umar AHSP - Halaman 45/93
Engineer Estimate

1 Semen Portland (PC) Kg 13.632 1,440.00 19,630.08


2 Pasir Pasang M3 0.027 189,000.00 5,103.00
Jumlah Bahan 24,733.08
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 76,771.08
E Overhead & Profit 10% X E 7,677.11
F Harga Satuan Pekerjaan ( E + F ) 84,448.19

Jenis Pekerjaan : Plesteran 1 PC : 4 PP Tebal 20 mm


Satuan / Unit : M2
Analisa : AHSP PU A.4.4.2.15

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.4000 76,500.00 30,600.00
2 Tukang OH 0.2000 85,500.00 17,100.00
3 Kepala Tukang OH 0.0200 108,000.00 2,160.00
4 Mandor OH 0.0220 99,000.00 2,178.00
Jumlah Tenaga Kerja 52,038.00
B. BAHAN
1 Semen Portland (PC) Kg 8.320 1,440.00 11,980.80
2 Pasir Pasang M3 0.032 189,000.00 6,048.00
Jumlah Bahan 18,028.80
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 70,066.80
E Overhead & Profit 10% X E 7,006.68
F Harga Satuan Pekerjaan ( E + F ) 77,073.48

Jenis Pekerjaan : Plesteran Skoning 1 PC : 3 PP Lebar 10 cm


Satuan / Unit : M
Analisa : AHSP PU A.4.4.2.20

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0800 76,500.00 6,120.00
2 Tukang OH 0.4000 85,500.00 34,200.00
3 Kepala Tukang OH 0.0400 108,000.00 4,320.00
4 Mandor OH 0.0040 99,000.00 396.00
Jumlah Tenaga Kerja 45,036.00
B. BAHAN
1 Semen Portland (PC) Kg 0.500 1,440.00 720.00
2 Pasir Pasang M3 0.013 189,000.00 2,457.00
Jumlah Bahan 3,177.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 48,213.00
E Overhead & Profit 10% X E 4,821.30
F Harga Satuan Pekerjaan ( E + F ) 53,034.30

Jenis Pekerjaan : Plesteran Granit 1 PC : 2 Granit Tebal 1 cm


Satuan / Unit : M2
Analisa : AHSP PU A.4.4.2.21

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.4500 76,500.00 34,425.00
2 Tukang OH 0.2250 85,500.00 19,237.50
3 Kepala Tukang OH 0.0230 108,000.00 2,484.00
4 Mandor OH 0.0230 99,000.00 2,277.00
Jumlah Tenaga Kerja 58,423.50
B. BAHAN
1 Semen Portland (PC) Kg 10.000 1,440.00 14,400.00
2 Batu Granit M2 15.000 1,350,000.00 20,250,000.00
Jumlah Bahan 20,264,400.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 20,322,823.50
E Overhead & Profit 10% X E 2,032,282.35
F Harga Satuan Pekerjaan ( E + F ) 22,355,105.85

Jenis Pekerjaan : Plesteran Ciprat 1 PC : 2 PP


Satuan / Unit : M2
DED Pembangunan Gedung Laboratorium Perikanan Universitas Teuku Umar AHSP - Halaman 46/93
Engineer Estimate

Analisa : AHSP PU A.4.4.2.23

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.3000 76,500.00 22,950.00
2 Tukang OH 0.1000 85,500.00 8,550.00
3 Kepala Tukang OH 0.0100 108,000.00 1,080.00
4 Mandor OH 0.0150 99,000.00 1,485.00
Jumlah Tenaga Kerja 34,065.00
B. BAHAN
1 Semen Portland (PC) Kg 4.320 1,440.00 6,220.80
2 Pasir Pasang M3 0.006 189,000.00 1,134.00
Jumlah Bahan 7,354.80
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 41,419.80
E Overhead & Profit 10% X E 4,141.98
F Harga Satuan Pekerjaan ( E + F ) 45,561.78

Jenis Pekerjaan : Finishing Siar Pasangan Bata Merah


Satuan / Unit : M2
Analisa : AHSP PU A.4.4.2.24

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.1500 76,500.00 11,475.00
2 Tukang OH 0.0750 85,500.00 6,412.50
3 Kepala Tukang OH 0.0080 108,000.00 864.00
4 Mandor OH 0.0080 99,000.00 792.00
Jumlah Tenaga Kerja 19,543.50
B. BAHAN
1 Semen Portland (PC) Kg 3.108 1,440.00 4,475.52
Jumlah Bahan 4,475.52
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 24,019.02
E Overhead & Profit 10% X E 2,401.90
F Harga Satuan Pekerjaan ( E + F ) 26,420.92

Jenis Pekerjaan : Finishing Siar Pasangan Conblock Ekspose


Satuan / Unit : M2
Analisa : AHSP PU A.4.4.2.25

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0700 76,500.00 5,355.00
2 Tukang OH 0.0350 85,500.00 2,992.50
3 Kepala Tukang OH 0.0040 108,000.00 432.00
4 Mandor OH 0.0040 99,000.00 396.00
Jumlah Tenaga Kerja 9,175.50
B. BAHAN
1 Semen Portland (PC) Kg 1.600 1,440.00 2,304.00
Jumlah Bahan 2,304.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 11,479.50
E Overhead & Profit 10% X E 1,147.95
F Harga Satuan Pekerjaan ( E + F ) 12,627.45

Jenis Pekerjaan : Finishing Siar Pasangan Batu Kali, Campuran 1 PC : 2 PP


Satuan / Unit : M2
Analisa : AHSP PU A.4.4.2.26

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.3000 76,500.00 22,950.00
2 Tukang OH 0.1500 85,500.00 12,825.00
3 Kepala Tukang OH 0.0150 108,000.00 1,620.00
4 Mandor OH 0.0150 99,000.00 1,485.00
Jumlah Tenaga Kerja 38,880.00
B. BAHAN
1 Semen Portland (PC) Kg 6.340 1,440.00 9,129.60
2 Pasir Pasang M3 0.012 189,000.00 2,268.00
Jumlah Bahan 11,397.60
C. PERALATAN
DED Pembangunan Gedung Laboratorium Perikanan Universitas Teuku Umar AHSP - Halaman 47/93
Engineer Estimate

Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 50,277.60
E Overhead & Profit 10% X E 5,027.76
F Harga Satuan Pekerjaan ( E + F ) 55,305.36

Jenis Pekerjaan : Acian


Satuan / Unit : M2
Analisa : AHSP PU A.4.4.2.27

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.2000 76,500.00 15,300.00
2 Tukang OH 0.1000 85,500.00 8,550.00
3 Kepala Tukang OH 0.0100 108,000.00 1,080.00
4 Mandor OH 0.0100 99,000.00 990.00
Jumlah Tenaga Kerja 25,920.00
B. BAHAN
1 Semen Portland (PC) Kg 3.250 1,440.00 4,680.00
Jumlah Bahan 4,680.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 30,600.00
E Overhead & Profit 10% X E 3,060.00
F Harga Satuan Pekerjaan ( E + F ) 33,660.00

Jenis Pekerjaan : Pasangan Keramik Lantai Uk. 20 x 20 cm


Satuan / Unit : M2
Analisa : AHSP PU A.4.4.3.36

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.7000 76,500.00 53,550.00
2 Tukang OH 0.3500 85,500.00 29,925.00
3 Kepala Tukang OH 0.0350 108,000.00 3,780.00
4 Mandor OH 0.0350 99,000.00 3,465.00
Jumlah Tenaga Kerja 90,720.00
B. BAHAN
1 Keramik Lantai 20 x 20 cm UnPholished Bh 26.500 2,844.00 75,366.00
2 Semen Portland (PC) Kg 10.400 1,440.00 14,976.00
3 Pasir Pasang M3 0.045 189,000.00 8,505.00
4 Semen Warna Kg 1.620 1,620.00 2,624.40
Jumlah Bahan 101,471.40
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 192,191.40
E Overhead & Profit 10% X E 19,219.14
F Harga Satuan Pekerjaan ( E + F ) 211,410.54

Jenis Pekerjaan : Pasangan Dinding Keramik Uk. 20 x 25 cm


Satuan / Unit : M2
Analisa : AHSP PU A.4.4.3.54.c

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.9000 76,500.00 68,850.00
2 Tukang OH 0.4500 85,500.00 38,475.00
3 Kepala Tukang OH 0.0450 108,000.00 4,860.00
4 Mandor OH 0.0450 99,000.00 4,455.00
Jumlah Tenaga Kerja 116,640.00
B. BAHAN
1 Keramik Dinding 20 x 25 cm Bh 21.200 3,555.00 75,366.00
2 Semen Portland (PC) Kg 9.300 1,440.00 13,392.00
3 Pasir Pasang M3 0.018 189,000.00 3,402.00
4 Semen Warna Kg 1.940 1,620.00 3,142.80
Jumlah Bahan 95,302.80
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 211,942.80
E Overhead & Profit 10% X E 21,194.28
F Harga Satuan Pekerjaan ( E + F ) 233,137.08

Jenis Pekerjaan : Pasangan Lantai Keramik Uk. 40 x 40 cm


Satuan / Unit : M2
Analisa : AHSP PU A.4.4.3.35.f

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


DED Pembangunan Gedung Laboratorium Perikanan Universitas Teuku Umar AHSP - Halaman 48/93
Engineer Estimate

A. TENAGA
1 Pekerja OH 0.7000 76,500.00 53,550.00
2 Tukang OH 0.3500 85,500.00 29,925.00
3 Kepala Tukang OH 0.0350 108,000.00 3,780.00
4 Mandor OH 0.0350 99,000.00 3,465.00
Jumlah Tenaga Kerja 90,720.00
B. BAHAN
1 Keramik 40 x 40 cm Bh 6.630 11,376.00 75,422.88
2 Semen Portland (PC) Kg 10.000 1,440.00 14,400.00
3 Pasir Pasang M3 0.045 189,000.00 8,505.00
4 Semen Warna Kg 1.500 1,620.00 2,430.00
Jumlah Bahan 100,757.88
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 191,477.88
E Overhead & Profit 10% X E 19,147.79
F Harga Satuan Pekerjaan ( E + F ) 210,625.67

Jenis Pekerjaan : Memasang Atap Seng Genteng Metal


Satuan / Unit : M2
Analisa : AHSP PU A.4.5.2.32

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.2000 76,500.00 15,300.00
2 Tukang OH 0.1000 85,500.00 8,550.00
3 Kepala Tukang OH 0.0100 108,000.00 1,080.00
4 Mandor OH 0.0010 99,000.00 99.00
Jumlah Tenaga Kerja 25,029.00
B. BAHAN
1 Atap Genteng Metal 0,3 Lbr 1.0200 74,700.00 76,194.00
2 Paku Seng Kg 0.2000 16,794.00 3,358.80
Jumlah Bahan 79,552.80
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 104,581.80
E Overhead & Profit 10% X D 10,458.18
F Harga Satuan Pekerjaan ( D + E ) 115,039.98

DED Pembangunan Gedung Laboratorium Perikanan Universitas Teuku Umar AHSP - Halaman 49/93
Engineer Estimate

Jenis Pekerjaan : Memasang Rabung Seng Genteng Metal


Satuan / Unit : M
Analisa : AHSP PU A.4.5.2.36

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.2500 76,500.00 19,125.00
2 Tukang OH 0.1500 85,500.00 12,825.00
3 Kepala Tukang OH 0.0150 108,000.00 1,620.00
4 Mandor OH 0.0130 99,000.00 1,287.00
Jumlah Tenaga Kerja 34,857.00
B. BAHAN
1 Rabung Genteng Metal Lbr 1.1000 30,600.00 33,660.00
2 Paku Seng Kg 0.0500 16,794.00 839.70
Jumlah Bahan 34,499.70
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 69,356.70
E Overhead & Profit 10% X D 6,935.67
F Harga Satuan Pekerjaan ( D + E ) 76,292.37

Jenis Pekerjaan : Pengikisan/Pengerokan Permukaan Cat Lama


Satuan / Unit : M2
Analisa : AHSP PU A.4.7.1.1

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.1500 76,500.00 11,475.00
2 Mandor OH 0.0030 99,000.00 297.00
Jumlah Tenaga Kerja 11,772.00
B. BAHAN
1 Soda Api Kg 0.0500 18,000.00 900.00
Jumlah Bahan 900.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 12,672.00
E Overhead & Profit 10% X D 1,267.20
F Harga Satuan Pekerjaan ( D + E ) 13,939.20

Jenis Pekerjaan : Pencucian Bidang Permukaan Tembok yang Pernah di Cat


Satuan / Unit : M2
Analisa : AHSP PU A.4.7.1.2

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.1500 76,500.00 11,475.00
2 Mandor OH 0.0030 99,000.00 297.00
Jumlah Tenaga Kerja 11,772.00
B. BAHAN
1 Sabun Kg 0.0500 13,500.00 675.00
Jumlah Bahan 675.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 12,447.00
E Overhead & Profit 10% X D 1,244.70
F Harga Satuan Pekerjaan ( D + E ) 13,691.70

Jenis Pekerjaan : Pengerokan karat Pada Permukaan Baja cara manual


Satuan / Unit : M2
Analisa : AHSP PU A.4.7.1.3

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.1500 76,500.00 11,475.00
2 Mandor OH 0.0080 99,000.00 792.00
Jumlah Tenaga Kerja 12,267.00
B. BAHAN
1 Sabun Kg 0.0500 13,500.00 675.00
Jumlah Bahan 675.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 12,942.00
E Overhead & Profit 10% X D 1,294.20
F Harga Satuan Pekerjaan ( D + E ) 14,236.20

DED Pembangunan Gedung Laboratorium Perikanan Universitas Teuku Umar AHSP - Halaman 50/93
Engineer Estimate

Jenis Pekerjaan : Pengecatan Tembok Baru Baru (1 lapis Plamir, 1 lapis Cat Dasar, 2 lapis cat Penutup)
Satuan / Unit : M2
Analisa : AHSP PU A.4.7.1.10

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0200 76,500.00 1,530.00
2 Tukang OH 0.0630 85,500.00 5,386.50
3 Kepala Tukang OH 0.0063 108,000.00 680.40
4 Mandor OH 0.0030 99,000.00 297.00
Jumlah Tenaga Kerja 7,893.90
B. BAHAN
1 Plamir Kg 0.1000 42,300.00 4,230.00
2 Cat Dasar Kg 0.1000 55,980.00 5,598.00
3 Cat Penutup Kg 0.2600 54,000.00 14,040.00
Jumlah Bahan 23,868.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 31,761.90
E Overhead & Profit 10% X D 3,176.19
F Harga Satuan Pekerjaan ( D + E ) 34,938.09

Jenis Pekerjaan : Pengecatan Tembo Baru Lama (1 lapis Cat Dasar, 2 lapis cat Penutup)
Satuan / Unit : M2
Analisa : AHSP PU A.4.7.1.11

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0280 76,500.00 2,142.00
2 Tukang OH 0.0420 85,500.00 3,591.00
3 Kepala Tukang OH 0.0042 108,000.00 453.60
4 Mandor OH 0.0030 99,000.00 297.00
Jumlah Tenaga Kerja 6,483.60
B. BAHAN
1 Cat Dasar Kg 0.1200 55,980.00 6,717.60
2 Cat Penutup Kg 0.1800 54,000.00 9,720.00
Jumlah Bahan 16,437.60
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 22,921.20
E Overhead & Profit 10% X D 2,292.12
F Harga Satuan Pekerjaan ( D + E ) 25,213.32

Jenis Pekerjaan : Pengecatan Permukaan Baja dengan Menie Besi


Satuan / Unit : M2
Analisa : AHSP PU A.4.7.1.16

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0200 76,500.00 1,530.00
2 Tukang OH 0.2000 85,500.00 17,100.00
3 Kepala Tukang OH 0.0200 108,000.00 2,160.00
4 Mandor OH 0.0025 99,000.00 247.50
Jumlah Tenaga Kerja 21,037.50
B. BAHAN
1 Menie Besi Kg 0.1000 52,621.20 5,262.12
2 Kuas Bh 1.1000 6,300.00 6,930.00
Jumlah Bahan 12,192.12
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 33,229.62
E Overhead & Profit 10% X D 3,322.96
F Harga Satuan Pekerjaan ( D + E ) 36,552.58

Banda Aceh, Februari 2019


Konsultan Perencana
CV. NEUFERT CONSULTAN

DED Pembangunan Gedung Laboratorium Perikanan Universitas Teuku Umar AHSP - Halaman 51/93
Engineer Estimate

PRIMA D. WAHYU, ST
Direktur

DED Pembangunan Gedung Laboratorium Perikanan Universitas Teuku Umar AHSP - Halaman 52/93
Engineer Estimate
DAFTAR HARGA
UPAH, BAHAN & PERALATAN
ENGGINEER ESTIMATE (EE)

PEKERJAAN : PEMBANGUNAN GEDUNG PUSDALOPS PENGANGGULANGAN BENCANA ACEH


LOKASI : BANDA ACEH
KABUPATEN : MIGAS ACEH
TAHUN : 2019

A. PERSONIL
HARGA SAT.
NO URAIAN SAT. KET
(RP)

- Pekerja Hari 76,500


- Tukang Batu/Besi Hari 85,500
- Tukang Kayu/Cat Hari 85,500
- Kepala Tukang Batu/Besi Hari 108,000
- Kepala Tukang Kayu/Cat Hari 108,000
- Mandor Hari 99,000
- Pekerja Galian Tanah Hari 78,300
- Operator Alat Berat Hari 150,300
- Pembantu Operator Hari 100,800

B. BAHAN
HARGA SAT.
NO URAIAN SAT. (RP) KET

- Air Liter 41
- Atap Genteng Metal M 74,700
- Atap Seng Bitumen Sellulose 3 mm Lembar 148,500
- Atap Spandek 0,30 M2 83,970
- Atap Spandek 0,35 M2 100,800
- Batu Bata Buah 630
- Batu Kali/Batu Belah (Sungai/Gunung) M3 195,930
- Besi Beton Polos Kg 10,800
- Besi Beton Ulir Kg 13,050
- Besi Strip Kg 16,200
- Besi Baja IWF Kg 16,200
- Besi CNP Kg 16,200
- Beton Batching Plan (Readymix) K-300 M3 1,620,000
- Beton Batching Plan (Readymix) K-250 M4 1,440,000
- Baut Reng Buah 450
- Baut Trus Buah 720
- Bubungan Seng Bitumen Sellulose Lembar 76,500
- Bubungan Seng Spandek/Metal M' 30,600
Box Panel Induk Komplet Assesoreis (MCB + NFB + Busbar + Fuse + Voltmeter + Amperemeter +
- Unit 9,000,000
Lampu Indikator + Selector Switch + Kabel) Lengkap Terpasang
- Cat Dasar Kg 55,980
- Cat Menie Kg 52,621
- Cat Kayu/Minyak Kg 61,578
- Cat Dinding Setara Dulux/Jotun/Nippon Kg 54,000
- Closet Duduk Unit 2,700,000
- Closet Jongkok Bh 675,000
- Door Holder Bh 225,000
- Door Closer Set 130,500
- Door Stop Bh 99,000
- Door Holder Setara SES + Aksesorie Terpasang Set 495,000
- Double Cylinder Setara SES Terpasang + Cylinder Cover Zink Aloy Terpasang Set 171,000
- Dempul Kayu Kg 22,392

DED Pembangunan Gedung Laboratorium Perikanan Universitas Teuku Umar Harga Upah, Bahan Peralatan - Halaman 53/5
Engineer Estimate

NO URAIAN SAT. HARGA SAT. KET


(RP)
- Dolken Kayu ø 8-10 btg 18,000
Dry Chemical Powder Fire Extinguisher (Racun Api) Kapasitas 10 Kg + Box Dan Assesorie Lengkap
- Terpasang Unit 9,000,000
- Downlight Phillips Type 1380 Series 3 Bahan Nikel + Lampu LED Bulb Philips 12 Watt Putih Unit 315,000
- Engsel Pintu Bh 18,000
- Engsel Jendela kupu - Kupu Bh 22,500
- Engsel Angin Bh 16,200
- Engsel Stainles Uk. 3" Setara SES Terpasang Set 49,500
- Engsel Casement Solid 621 Uk. 8" Tebal 3 mm Unit 135,000
- Flooor Hinge 84 Unit 1,080,000
- Floor Drain Bh 27,990
- Genteng Beton Bh 20,153
- Genteng Aspal Bh 63,000
- Gypsum Board 6 mm Lembar 76,500
- Gypsum Board 9 mm Lembar 85,500
- Gypsum Board 12 mm Lembar 95,166
- Hak Angin Jendela Bh 19,033
- Instalasi Air Bersih Titik 225,000
- Instalasi Air Kotor Titik 225,000
- Instalasi Titik Nyala Termasuk Kabel Dan Pipa + Aksesories Titik 225,000
- Instalas Titik Kontak Termasuk Kabel Dan Pipa + Aksesories Titik 225,000
- Ijuk M3 22,392
- Kaca Tebal 3 mm M2 72,774
- Kaca Tebal 5 mm M2 111,960
- Kaca Tebal 8 mm M2 307,890
- Kunci Tanam Bh 167,940
- Kawat Beton Kg 14,555
- Kerikil Beton M3 189,000
- Kerikil Beton Kg 140.00
- Koral Beton 2/3 (split) M3 351,000
- Koral Beton 2/3 (split) Kg 195
- Kayu Kelas I M3 6,300,000
- Kayu Kelas II M3 5,130,000
- Kayu Klas III M3 3,600,000
- Kayu Perancah M3 2,700,000
- Kertas Amplas Lembar 6,718
- Kuas cat/vernis Buah 6,300
- Keramik Dinding 20 x 20 cm Bh 2,844
- Keramik Dinding 20 x 25 cm Bh 3,555
- Keramik Dinding 20 x 45 cm Bh 6,399
- Keramik Dinding 25 x 40 cm Bh 7,999
- Keramik Lantai 30 x 30 cm Bh 6,399
- Keramik Lantai 40 x 40 cm Bh 11,376
- Keramik Lantai 60 x 60 cm Polished Bh 58,320
- Keramik Lantai 60 x 60 cm Unpolished Bh 53,460
- Granit Tile 60 x 60 cm Bh 113,400
- Keramik Lantai 20 x 20 cm Bh 2,844
- Keramik Lantai 25 x 25 cm Bh 4,548
- Keramik Porslen 11 x 11 cm Bh 2,250
- Keramik Porslen 10 x 20 cm Bh 2,250
- Keramik Porslen 20 x 20 cm Bh 2,250
- Keramik Bon-bon m 16,200
- Kawat dia. 4 mm Kg 14,555
- Kunci Tanam Silinder Bh 118,800
- Kunci Tanam Silinder Merk Gradino Bh 148,500
- Kunci Bulat Setara SES ET 3000 SS Terpasang Set 247,500
- Kran Air 3/4" Stainless Bh 31,500
- Kunci Slot Bh 108,000
- Kusen UPVC Terpasang m1 162,000
- Kusen Jendela UPVC Type Sliding Terpasang m1 198,000
- Kawat Nyamuk M2 26,870
- Kerawang/Rooster M3 6,930
- Lem Kg 8,100
- List Profil Gipsum Uk.10 M 36,000
- Lem Kayu M2 24,750
- MCCB 3 P 90 Ampere Unit 2,250,000
- Mesin Air Jet Pump Setara Sanyo PDH 405 JP + Rumah Pompa + Terpasang Unit 5,400,000
- Minyak Cat Liter 27,990
- Minyak Bekisting Liter 6,300
- Multipleks 9 mm Lembar 131,940
- Multipleks 4 mm Lembar 89,568

DED Pembangunan Gedung Laboratorium Perikanan Universitas Teuku Umar Harga Upah, Bahan Peralatan - Halaman 54/5
Engineer Estimate

NO URAIAN SAT. HARGA SAT. KET


(RP)
- Multipleks 6 mm Lembar 106,362

DED Pembangunan Gedung Laboratorium Perikanan Universitas Teuku Umar Harga Upah, Bahan Peralatan - Halaman 55/5
Engineer Estimate

NO URAIAN SAT. HARGA SAT. KET


(RP)
- Pitting Unit 144,000
- Pasir Pasang M3 189,000
- Pasir Urug M3 108,000
- Pasir Batu M3 189,000
- Pasir Beton M3 189,000
- Pasir Beton Kg 135.00
- Plint Keramik 10 x 20 cm Bh 12,870
- Plint Keramik 10 x 10 cm Bh 8,550
- Plint Keramik 5 x 20 cm Bh 6,525
- Parquet Kayu M2 238,500
- Paku Pancing Kg 13,950
- Paku Kayu 2" - 5" Kg 14,555
- Paku Skrup Kg 14,555
- Paku Seng Bitumen Sellulose (sekrup) Bh 2,025
- Paku Seng Kg 16,794
- Paku Hak Pnjng 15 cm Kg 16,650
- Paku Skrup 1 cm - 2.5 cm Bh 2,025
- Profil Kaca M 67,500
- Profil Alluminium M 58,500
- Pengelasan Cm 4,500
- Plamir Kg 42,300
- Pacok Jendela Bh 10,350
- Rangka Furing M2 54,000
- Rabung Asbes Gelombang Lembar 45,000
- Rabung Genteng Beton Lembar 44,550
- Rabung Genteng Aspal Lembar 44,550
- Rabung Genteng Metal Lembar 30,600
- Residu Liter 30,600
- Semen Andalas @ 40 Kg Zak 57,600 1,440
- Semen / Kg Kg 1,440 36
- Semen Warna @ 50 Kg Zak 81,000 1,620
- Semen Grout (SIKA) Zak 153,000
- Stop Kontak Setara Phillips Essential Unit 40,500
- Saklar Tunggal Setara Phillips Essential Unit 31,500
- Saklar Ganda Setara Phillips Essential Unit 38,700
- Saklar Triple Setara Phillips Essential Unit 54,000
- Taekwood 4 mm Lembar 79,200
- Tinner Liter 25,200
- Tanah Timbun yang didatangkan M3 111,960
- Urinoir Keramik Bh 1,800,000
- Westafel Keramik Bh 720,000
- Waterdrain Bh 40,500
- Water Tank Stainlees Steel 1000 L + Kaki Dudukan Unit 4,500,000

C. PERALATAN
HARGA SAT.
NO URAIAN SAT. (RP) KET

1 Stamper Sewa-hari 144,000

Banda Aceh, Februari 2019


Konsultan Perencana
CV. NEUFERT CONSULTAN

PRIMA D. WAHYU, ST
Direktur

DED Pembangunan Gedung Laboratorium Perikanan Universitas Teuku Umar Harga Upah, Bahan Peralatan - Halaman 56/5
Engineer Estimate

PEKERJAAN : PEMBANGUNAN GEDUNG PUSDALOPS PENGANGGULANGAN BENCANA ACEH


LOKASI : BANDA ACEH
KABUPATEN : MIGAS ACEH
T. A : 2019

BACK UP DATA

2 PEKERJAAN BANGUNAN GEDUNG

NO. URAIAN PEKERJAAN P L T JLH. UNIT JLH PIAS VOLUME SAT

A PEKERJAAN PERSIAPAN

1 Pembersihan Dan Perataan Lokasi Pekerjaan 40.000 10.000 = 400.000 m2

B PEKERJAAN PONDASI KOLAM

#REF! Galian Tanah Pondasi Menerus 112.000 2.400 0.900 = 241.920 m3

2 Urugan Kembali Tanah Galian 30% x Jumlah Volume Galian = 72.576 m3

3 Pasir Alas Bawah Pondasi Menerus 112.000 2.400 0.200 = 53.760 m3

4 Pasangan Batu Kosong (Aanstamping) Bawah Pondasi Menerus 112.000 2.400 0.200 = 53.760 m3

5 Cerucuk Kayu Doken Pondasi Menerus Dia. 8 - 10 cm P 1,5 m


Panjang Pemasangan 112.000 m
Jarak Cerucuk 1.000 m
Jlh Titik Pemasangan 113.000 Titik
Jlh Btg Per titik 2.000 Btg
Jlh Btg Per titik 226.000 Btg
Panjang Cerucuk/btg 1.500 m
Total Panjang 339.000 m

6 Pasangan Pondasi Menerus Cor Cyclopen Campuran 1 Pc : 2 PB : 3 Kr D 112.000 1.500 1.700 = 285.600 m3

Pengurangan Terhadap Penampang Urugan Tanah Humus 112.000 0.400 0.300 = 13.440 m3
SISA = 272.160 m3

7 Plesteran 1 Pc : 2 Ps Tebal 20 mm Bagian Luar, Dalam Dan Atas


Pias Luar Keliling 112.000 1.250 = 140.000 m2
Pias Dalam Keliling 40.000 0.900 3.00 Pias = 108.000 m2
Pias Atas Keliling 112.000 0.600 = 67.200 m2
TOTAL = 315.200 m2

8 Urugan Tanah Humus T = 20 cm 112.000 0.400 0.200 = 8.960 m3

C PEKERJAAN DALAM KOLAM

1 Urugan Sirtu Tebal = 10 cm 8.000 12.000 0.100 3.00 Pias = 28.800 m3

2 Urugan Pasir Tebal = 10 cm 8.000 12.000 0.100 3.00 Pias = 28.800 m3

3 Pekerjaan Lantai Kolam


- Beton Cor Lantak K-250 Tebal 15 cm 8.000 12.000 0.150 3.00 Pias = 43.200 m3

- Pembesian Polos Wire Mesh


Arah Panjang
Panjang Kolam 12.000 m
Jarak Pembesian 0.200 m
Jlh Btg 61.000 Btg
Panjang 1 Batang 12.100 m
Jlh Panjang Besi 738.100 m
Diameter Tulangan Yang Dipakai 12.000 mm (Polos)
Jumlah Kilogram Pembesian 655.256 Kg

Arah Lebar
Lebar Kolam 8.000 m
Jarak Pembesian 0.200 m
Jlh Btg 41.000 Btg
Panjang 1 Batang 8.100 m
Jlh Panjang Besi 332.100 m
Diameter Tulangan Yang Dipakai 12.000 mm (Polos)
Jumlah Kilogram Pembesian 294.825 Kg

Total 950.081 Kg 3.00 Pias = 2,850.242 Kg

4 Plesteran Lantai 1 Pc : 1 Pp Tebal 15 mm 8.000 12.000 3.00 Pias = 288.000 m2

#REF!
#REF!
#REF!

#REF!
#REF!

DED Pembangunan Gedung Laboratorium Perikanan Universitas Teuku Umar Back Up Data - Halaman 57/5

You might also like