Professional Documents
Culture Documents
Page: 1 2 3 4 5 6 Index
A) Four pieces of 65mm x 45mm (1 1/2" x 2 1/2") wood which are 500mm (20") long for the
vertical pieces of the central support unit.
B) One piece of 90mm x 45mm (1 1/2" x 3 1/2") wood which is 342mm (13 1/2") long for the
spacer.
C) One piece of 20mm (3/4") galvanized water pipe which is 342mm (13 1/2") long for the
pivot bar.
Note: Water pipe is measured by the inside diameter, so the actual overall diameter of the
pipe will be approximately 27mm (1 1/8").
D) One piece of 190mm x 45mm (1 1/2" x 7 1/2") wood which is 3000mm (10ft) long for the
seesaw plank.
E) Four pipe saddle clips (size to suit) to fix the water pipe (pivot bar) to the seesaw plank.
F) Four 12mm (1/2") galvanized carriage bolts which are 150mm (6") long.
G) A used car tire about 175mm (7") thick, 600mm (2ft) overall diameter and with (at least) a
360mm (14 1/8") hole diameter.
H) Some pieces of thin wood to cover the base of the tire so the concrete does not spill out.
I) A bit of gravel, sand and cement to make the concrete for the inside of the tire. You will
need approximately 3/4 of a wheelbarrow-full, which will be about 6 spades-full of gravel, 4
spades-full of sand and 2 spades-full of cement (which is a ratio of 1 part cement, 2 parts
sand and 3 parts gravel).
Mixing details are given in the instructions.
Encuentra Nuevos
Clientes - Muestra tu
Anuncio en Google
Coloca tu Anuncio en los
Resultados de Búsqueda y Llega
a Más Clientes. Pruébalo
adwords.google.com
Search
Custom Search