You are on page 1of 12

CALCULATION SUMMARY

Project Name : Santa Cruz 2 Project Location: Piso 9

Drawing No. : City: Lima, Peru

Design Areas
Design Area Calc. Mode Occupancy Area of Total Water Pressure @ Min. Min. Min. Calculated Hose Margin To
Name (Model) Application Source Density Pressure Flow Heads Streams Source

(ft²) (gpm) (psi) (gpm/ft²) (psi) (gpm) # (gpm) (psi)

DesignArea_1 Demand (HW) 1920 536.5 192.6 0.125 7.2 15 16 250 31.2

File: D:\Dávila\Proyectos\001839 - Santa Cruz 2\05_15\CH_Piso9.tyc3


Date 22/05/2019 Copyright © 2002-2012 Tyco Fire Protection Products Page 1
HYDRAULIC CALCULATIONS
for
Job Information
Project Name : Santa Cruz 2

Contract No. : City: Lima, Peru

Project Location: Piso 9 Date: 20/05/2019

Contractor Information
Name of Contractor: Engineering Services SAC

Address: Av. República de Panamá 4575 Oficina 803 - Surquillo City: Lima, Perú

E-mail: www.essac.com.pe
Phone Number: 445-8215

Name of Designer: H. Dávila

Authority Having Jurisdiction: CGBVP


Design
Remote Area Name DesignArea_1

Remote Area Location

Occupancy Classification

Density (gpm/ft²) 0.125

Area of Application (ft²) 1920

Coverage per Sprinkler (ft²) 120

Number of Calculated Sprinklers 16

In-Rack Demand (gpm) 0

Special Heads

Hose Streams (gpm) 250

Total Water Required (incl. Hose Streams) (gpm) 536.5

Required Pressure at Source (psi) 161.3

Type of System Wet

Volume - Entire System (gal) 244.5 gal

Water Supply Information


Date 20/05/2019

Location

Source W1

Notes

File: D:\Dávila\Proyectos\001839 - Santa Cruz 2\05_15\CH_Piso9.tyc3


Date 22/05/2019 Copyright © 2002-2012 Tyco Fire Protection Products Page 2
Job : Santa Cruz 2 Node Labels: Off
Pipe Labels: Off

Diagram for Design Area : DesignArea_1

File: D:\Dávila\Proyectos\001839 - Santa Cruz 2\05_15\CH_Piso9.tyc3


Date 22/05/2019 Copyright © 2002-2012 Tyco Fire Protection Products Page 3
Job : Santa Cruz 2

Hydraulic Analysis for : DesignArea_1


Calculation Info
Calculation Mode Demand
Hydraulic Model Hazen-Williams
Fluid Name Water @ 60F (15.6C)
Fluid Weight, (lb/ft³) N/A for Hazen-Williams calculation.
Fluid Dynamic Viscosity, (lb·s/ft²) N/A for Hazen-Williams calculation.

Water Supply Parameters

Supply 1 : W1 Flow (gpm) Pressure (psi)


0 213
750 175
1125 135

Hoses
Inside Hose Flow / Standpipe Demand (gpm) 250

Outside Hose Flow (gpm) 0

Additional Outside Hose Flow (gpm)

Other (custom defined) Hose Flow (gpm) 0

Total Hose Flow (gpm) 250

Sprinklers
Ovehead Sprinkler Flow (gpm) 286.5

InRack Sprinkler Flow (gpm) 0

Other (custom defined) Sprinkler Flow (gpm) 0

Total Sprinkler Flow (gpm) 286.5

Other
Required Margin of Safety (psi) 0

W1 - Pressure (psi) 161.3

W1 - Flow (gpm) 536.5

Demand w/o System Pump(s) N/A

File: D:\Dávila\Proyectos\001839 - Santa Cruz 2\05_15\CH_Piso9.tyc3


Date 22/05/2019 Copyright © 2002-2012 Tyco Fire Protection Products Page 4
Job : Santa Cruz 2

Hydraulic Analysis for : DesignArea_1

System Demand

240

220 S1

200

S2
180

D2

160

S3
Pressure, psi

140
125.387

120

100

80
D1

60

40

20

0
0 400 500 600 700 800 900 1000 1100 1200
Flow, gpm

File: D:\Dávila\Proyectos\001839 - Santa Cruz 2\05_15\CH_Piso9.tyc3


Date 22/05/2019 Copyright © 2002-2012 Tyco Fire Protection Products Page 5
Job : Santa Cruz 2

Hydraulic Analysis for : DesignArea_1

Graph Labels
Values
Label Description
Flow (gpm) Pressure (psi)
S1 Supply point #1 - Static 0 213
S2 Supply point #2 750 175
S3 Supply point #3 1125 135
D1 Elevation Pressure 0 65.7
D2 System Demand 536.5 161.3

Curve Intersections & Safety Margins


Intersection Safety Margin
Curve Name
Pressure (psi) Flow (gpm) Pressure (psi) @ Flow (gpm)
Supply 187.1 610.2 31.2 536.5

Open Heads
Required Calculated
Head Ref. Head Type Coverage K-Factor
Density Flow Pressure Density Flow Pressure

(ft²) (gpm/psi½) (gpm/ft²) (gpm) (psi) (gpm/ft²) (gpm) (psi)

Overhead
463 120 5.6 0.125 18 7.2 0.125 15 7.2
Sprinkler

Overhead
464 120 5.6 0.125 18 7.2 0.13 15.6 7.8
Sprinkler

Overhead
465 120 5.6 0.125 18 7.2 0.154 18.5 10.9
Sprinkler

Overhead
466 120 5.6 0.125 18 7.2 0.167 20 12.8
Sprinkler

Overhead
467 120 5.6 0.125 18 7.2 0.146 17.6 9.8
Sprinkler

Overhead
468 120 5.6 0.125 18 7.2 0.145 17.5 9.7
Sprinkler

Overhead
469 120 5.6 0.125 18 7.2 0.128 15.3 7.5
Sprinkler

Overhead
470 120 5.6 0.125 18 7.2 0.133 16 8.1
Sprinkler

Overhead
471 120 5.6 0.125 18 7.2 0.157 18.8 11.3
Sprinkler

Overhead
472 120 5.6 0.125 18 7.2 0.17 20.4 13.3
Sprinkler

Overhead
473 120 5.6 0.125 18 7.2 0.154 18.5 10.9
Sprinkler

Overhead
474 120 5.6 0.125 18 7.2 0.154 18.5 10.9
Sprinkler

Overhead
475 120 5.6 0.125 18 7.2 0.136 16.3 8.5
Sprinkler

Overhead
476 120 5.6 0.125 18 7.2 0.141 17 9.2
Sprinkler

File: D:\Dávila\Proyectos\001839 - Santa Cruz 2\05_15\CH_Piso9.tyc3


Date 22/05/2019 Copyright © 2002-2012 Tyco Fire Protection Products Page 6
Overhead
477 120 5.6 0.125 18 7.2 0.167 20 12.7
Sprinkler

Overhead
478 120 5.6 0.125 18 7.2 0.181 21.7 15
Sprinkler

File: D:\Dávila\Proyectos\001839 - Santa Cruz 2\05_15\CH_Piso9.tyc3


Date 22/05/2019 Copyright © 2002-2012 Tyco Fire Protection Products Page 7
Job name: Santa Cruz 2 Sheet number:___________________

PIPE INFORMATION
Node 1 Elev 1 K-Factor 1 Flow added(q)* Nominal ID Fittings L C Factor total (Pt)
Node 2 Elev 2 K-Factor 2 Total flow (Q) Actual ID quantity x (name) = length F Pf per ft elev (Pe) NOTES
T frict (Pf)

(ft) (gpm/psi½) (gpm) (ft) (ft) (psi) (psi)


(in)
463 103.84 5.6 15 25 1x(us.90)=2 0.38 120 7.2
258 104.22 15 1.049 2 0.0764 -0.2
2.38 0.2
258 104.22 0 25 1x(us.90)=2 0.98 120 7.2
257 104.22 15 1.049 2 0.0764 0
2.98 0.2
257 104.22 0 25 11.56 120 7.4
256 104.22 15 1.049 0 0.0764 0
11.56 0.9
256 104.22 15.6 25 11.56 120 8.3
255 104.22 30.7 1.049 0 0.2862 0
11.56 3.3
255 104.22 18.5 32 11.56 120 11.6
254 104.22 49.1 1.38 0 0.1802 0
11.56 2.1
254 104.22 20 40 1x(us.90)=4 2.46 120 13.7
253 104.22 69.2 1.61 4 0.1602 0
6.46 1
253 104.22 0 40 3.31 120 14.8
252 104.22 69.2 1.61 0 0.1602 0
3.31 0.5
252 104.22 35 50 7.11 120 15.3
251 104.22 104.2 2.067 0 0.1013 0
7.11 0.7
251 104.22 70.5 50 5.43 120 16
250 104.22 174.7 2.067 0 0.264 0
5.43 1.4
250 104.22 36.9 65 4.99 120 17.4
249 104.22 211.6 2.635 0 0.1154 0
4.99 0.6
249 104.22 74.9 50 1x(us.90)=6.15 60.15 120 18
248 104.22 286.5 2.157 6.15 0.5362 0
66.31 35.6
248 104.22 0 65 1x(us.90)=8.24 28.83 120 53.6
247 104.22 286.5 2.635 8.24 0.2023 0
37.07 7.5
247 104.22 0 80 1x(us.Tee-Br)=20.16 5.43 120 61.1
246 104.22 286.5 3.26 20.16 0.0718 0
25.59 1.8
246 104.22 250 80 1x(us.90)=9.41 20.59 120 62.9
245 104.22 536.5 3.26 9.41 0.2293 0
29.99 6.9
245 104.22 0 100 1x(us.90)=13.17 95.69 120 69.8
244 8.53 536.5 4.26 13.17 0.0623 41.5
108.85 6.8
244 8.53 0 100 1x(us.90)=13.17 0.66 120 118
243 8.53 536.5 4.26 13.17 0.0623 0
13.82 0.9
243 8.53 0 100 1x(us.90)=13.17 5.07 120 118.9
242 8.53 536.5 4.26 13.17 0.0623 0
18.24 1.1
242 8.53 0 100 1x(us.90)=13.17 0.82 120 120
241 8.53 536.5 4.26 13.17 0.0623 0
13.99 0.9
241 8.53 0 100 1x(us.90)=13.17 9.51 120 120.9
240 2.49 536.5 4.26 13.17 0.0623 2.6
22.68 1.4

© 2006 National Fire Protection Association Page 8


Job name: Santa Cruz 2 Sheet number:___________________

PIPE INFORMATION
Node 1 Elev 1 K-Factor 1 Flow added(q)* Nominal ID Fittings L C Factor total (Pt)
Node 2 Elev 2 K-Factor 2 Total flow (Q) Actual ID quantity x (name) = length F Pf per ft elev (Pe) NOTES
T frict (Pf)

(ft) (gpm/psi½) (gpm) (ft) (ft) (psi) (psi)


(in)
240 2.49 0 100 1x(us.90)=13.17 0.82 120 124.9
239 2.49 536.5 4.26 13.17 0.0623 0
13.99 0.9
239 2.49 0 100 1x(us.90)=13.17 3.42 120 125.8
238 2.49 536.5 4.26 13.17 0.0623 0
16.58 1
238 2.49 0 100 1x(us.90)=13.17 0.72 120 126.8
237 2.49 536.5 4.26 13.17 0.0623 0
13.89 0.9
237 2.49 0 100 1x(us.90)=13.17 39.58 120 127.7
235 -37.09 536.5 4.26 13.17 0.0623 17.2
52.75 3.3
235 -37.09 0 100 1x(us.90)=13.17 2.76 120 148.1
234 -37.09 536.5 4.26 13.17 0.0623 0
15.93 1
234 -37.09 0 100 1x(us.90)=13.17 4.09 120 149.1
233 -37.09 536.5 4.26 13.17 0.0623 0
17.25 1.1
233 -37.09 0 100 1x(us.90)=13.17 10.03 120 150.2
232 -41.68 536.5 4.26 13.17 0.0623 2
23.2 1.4
232 -41.68 0 100 1x(us.90)=13.17 1.09 120 153.6
231 -41.68 536.5 4.26 13.17 0.0623 0
14.26 0.9
231 -41.68 0 100 1x(us.45)=5.27 4.5 120 154.5
230 -41.68 536.5 4.26 5.27 0.0623 0
9.77 0.6
230 -41.68 0 100 1x(us.45)=5.27 1.86 120 155.1
229 -41.68 536.5 4.26 5.27 0.0623 0
7.12 0.4
229 -41.68 0 100 1x(us.Tee-Br)=26.33 12.83 120 155.6
220 -41.68 536.5 4.26 26.33 0.0623 0
39.17 2.4
220 -41.68 0 150 1x(us.90)=17.6 6.02 120 158
226 -41.68 536.5 6.357 17.6 0.0089 0
23.63 0.2
226 -41.68 0 150 1x(us.90)=17.6 8.15 120 158.2
227 -41.68 536.5 6.357 17.6 0.0089 0
25.75 0.2
227 -41.68 0 150 1x(us.90)=17.6 6.06 120 158.5
228 -47.74 536.5 6.357 17.6 0.0089 2.6
23.66 0.2
228 -47.74 0 150 5.04 120 161.3
W1 -47.74 536.5 6.357 0 0.0089 0
5.04 0.0
469 103.84 5.6 15.3 25 1x(us.90)=2 0.38 120 7.5
271 104.22 15.3 1.049 2 0.0792 -0.2
2.38 0.2
271 104.22 0 25 1x(us.90)=2 0.98 120 7.5
270 104.22 15.3 1.049 2 0.0792 0
2.98 0.2
270 104.22 0 25 11.56 120 7.8
269 104.22 15.3 1.049 0 0.0792 0
11.56 0.9
269 104.22 16 25 11.56 120 8.7
268 104.22 31.3 1.049 0 0.297 0
11.56 3.4

© 2006 National Fire Protection Association Page 9


Job name: Santa Cruz 2 Sheet number:___________________

PIPE INFORMATION
Node 1 Elev 1 K-Factor 1 Flow added(q)* Nominal ID Fittings L C Factor total (Pt)
Node 2 Elev 2 K-Factor 2 Total flow (Q) Actual ID quantity x (name) = length F Pf per ft elev (Pe) NOTES
T frict (Pf)

(ft) (gpm/psi½) (gpm) (ft) (ft) (psi) (psi)


(in)
268 104.22 18.8 32 11.56 120 12.1
267 104.22 50.1 1.38 0 0.1869 0
11.56 2.2
267 104.22 20.4 40 1x(us.Tee-Br)=8 2.46 120 14.3
251 104.22 70.5 1.61 8 0.1662 0
10.46 1.7
464 103.84 5.6 15.6 25 1x(us.90)=2 0.38 120 7.8
259 104.22 15.6 1.049 2 0.0823 -0.2
2.38 0.2
259 104.22 0 25 1x(us.Tee-Br)=5 0.98 120 7.8
256 104.22 15.6 1.049 5 0.0823 0
5.98 0.5
470 103.84 5.6 16 25 1x(us.90)=2 0.38 120 8.1
272 104.22 16 1.049 2 0.0854 -0.2
2.38 0.2
272 104.22 0 25 1x(us.Tee-Br)=5 0.98 120 8.2
269 104.22 16 1.049 5 0.0854 0
5.98 0.5
475 103.84 5.6 16.3 25 1x(us.90)=2 0.38 120 8.5
284 104.22 16.3 1.049 2 0.0888 -0.2
2.38 0.2
284 104.22 0 25 1x(us.90)=2 0.98 120 8.5
283 104.22 16.3 1.049 2 0.0888 0
2.98 0.3
283 104.22 0 25 11.56 120 8.8
282 104.22 16.3 1.049 0 0.0888 0
11.56 1
282 104.22 17 25 11.56 120 9.8
281 104.22 33.3 1.049 0 0.3326 0
11.56 3.8
281 104.22 20 32 11.56 120 13.7
280 104.22 53.2 1.38 0 0.2091 0
11.56 2.4
280 104.22 21.7 40 1x(us.Tee-Br)=8 2.46 120 16.1
249 104.22 74.9 1.61 8 0.1858 0
10.46 1.9
476 103.84 5.6 17 25 1x(us.90)=2 0.38 120 9.2
285 104.22 17 1.049 2 0.0956 -0.2
2.38 0.2
285 104.22 0 25 1x(us.Tee-Br)=5 0.98 120 9.2
282 104.22 17 1.049 5 0.0956 0
5.98 0.6
468 103.84 5.6 17.5 25 1x(us.90)=2 0.38 120 9.7
266 104.22 17.5 1.049 2 0.1008 -0.2
2.38 0.2
266 104.22 0 25 1x(us.90)=2 2.21 120 9.8
265 104.22 17.5 1.049 2 0.1008 0
4.21 0.4
265 104.22 0 25 1x(us.Tee-Br)=5 3.12 120 10.2
262 104.22 17.5 1.049 5 0.1008 0
8.12 0.8
262 104.22 17.6 25 1x(us.Tee-Br)=5 6.64 120 11
252 104.22 35 1.049 5 0.3657 0
11.64 4.3
467 103.84 5.6 17.6 25 1x(us.90)=2 0.38 120 9.8
264 104.22 17.6 1.049 2 0.1018 -0.2
2.38 0.2

© 2006 National Fire Protection Association Page 10


Job name: Santa Cruz 2 Sheet number:___________________

PIPE INFORMATION
Node 1 Elev 1 K-Factor 1 Flow added(q)* Nominal ID Fittings L C Factor total (Pt)
Node 2 Elev 2 K-Factor 2 Total flow (Q) Actual ID quantity x (name) = length F Pf per ft elev (Pe) NOTES
T frict (Pf)

(ft) (gpm/psi½) (gpm) (ft) (ft) (psi) (psi)


(in)
264 104.22 0 25 1x(us.90)=2 0.98 120 9.9
263 104.22 17.6 1.049 2 0.1018 0
2.98 0.3
263 104.22 0 25 1x(us.Tee-Br)=5 3.12 120 10.2
262 104.22 17.6 1.049 5 0.1018 0
8.12 0.8
474 103.84 5.6 18.5 25 1x(us.90)=2 0.38 120 10.9
279 104.22 18.5 1.049 2 0.1117 -0.2
2.38 0.3
279 104.22 0 25 1x(us.90)=2 0.98 120 11
278 104.22 18.5 1.049 2 0.1117 0
2.98 0.3
278 104.22 0 25 1x(us.Tee-Br)=5 3.54 120 11.3
275 104.22 18.5 1.049 5 0.1117 0
8.54 1
275 104.22 18.5 25 1x(us.Tee-Br)=5 7.87 120 12.3
250 104.22 36.9 1.049 5 0.4034 0
12.87 5.2
473 103.84 5.6 18.5 25 1x(us.90)=2 0.38 120 10.9
277 104.22 18.5 1.049 2 0.1117 -0.2
2.38 0.3
277 104.22 0 25 1x(us.90)=2 0.98 120 11
276 104.22 18.5 1.049 2 0.1117 0
2.98 0.3
276 104.22 0 25 1x(us.Tee-Br)=5 3.54 120 11.3
275 104.22 18.5 1.049 5 0.1117 0
8.54 1
465 103.84 5.6 18.5 25 1x(us.90)=2 0.38 120 10.9
260 104.22 18.5 1.049 2 0.1118 -0.2
2.38 0.3
260 104.22 0 25 1x(us.Tee-Br)=5 0.98 120 11
255 104.22 18.5 1.049 5 0.1118 0
5.98 0.7
471 103.84 5.6 18.8 25 1x(us.90)=2 0.38 120 11.3
273 104.22 18.8 1.049 2 0.1159 -0.2
2.38 0.3
273 104.22 0 25 1x(us.Tee-Br)=5 0.98 120 11.4
268 104.22 18.8 1.049 5 0.1159 0
5.98 0.7
477 103.84 5.6 20 25 1x(us.90)=2 0.38 120 12.7
286 104.22 20 1.049 2 0.1295 -0.2
2.38 0.3
286 104.22 0 25 1x(us.Tee-Br)=5 0.98 120 12.9
281 104.22 20 1.049 5 0.1295 0
5.98 0.8
466 103.84 5.6 20 25 1x(us.90)=2 0.38 120 12.8
261 104.22 20 1.049 2 0.1301 -0.2
2.38 0.3
261 104.22 0 25 1x(us.Tee-Br)=5 0.98 120 12.9
254 104.22 20 1.049 5 0.1301 0
5.98 0.8
472 103.84 5.6 20.4 25 1x(us.90)=2 0.38 120 13.3
274 104.22 20.4 1.049 2 0.1348 -0.2
2.38 0.3
274 104.22 0 25 1x(us.Tee-Br)=5 0.98 120 13.5
267 104.22 20.4 1.049 5 0.1348 0
5.98 0.8

© 2006 National Fire Protection Association Page 11


Job name: Santa Cruz 2 Sheet number:___________________

PIPE INFORMATION
Node 1 Elev 1 K-Factor 1 Flow added(q)* Nominal ID Fittings L C Factor total (Pt)
Node 2 Elev 2 K-Factor 2 Total flow (Q) Actual ID quantity x (name) = length F Pf per ft elev (Pe) NOTES
T frict (Pf)

(ft) (gpm/psi½) (gpm) (ft) (ft) (psi) (psi)


(in)
478 103.84 5.6 21.7 25 1x(us.90)=2 0.38 120 15
287 104.22 21.7 1.049 2 0.1505 -0.2
2.38 0.4
287 104.22 0 25 1x(us.Tee-Br)=5 0.98 120 15.2
280 104.22 21.7 1.049 5 0.1505 0
5.98 0.9
his1 99.25 250 65 1x(us.90)=8.24 0.66 120 59.5
293 99.25 250 2.635 8.24 0.1571 0
8.89 1.4
293 99.25 0 80 1x(us.90)=9.41 4.97 120 60.9
292 104.22 250 3.26 9.41 0.0557 -2.2
14.38 0.8
292 104.22 0 80 1x(us.90)=9.41 6.15 120 59.5
291 104.22 250 3.26 9.41 0.0557 0
15.56 0.9
291 104.22 0 80 1x(us.Tee-Br)=20.16 25.23 120 60.4
246 104.22 250 3.26 20.16 0.0557 0
45.39 2.5

* Discharge shown for flowing nodes only

© 2006 National Fire Protection Association Page 12