You are on page 1of 13

TABEL XII.

ANALISA HARGA SATUAN (AHS) PEKERJAAN INSTALASI AIR

Harga Sat. Jumlah Harga Jumlah Harga


No. Uraian Jenis pekerjaan Sat. Koeff. Bahan / Upah / Alat Bahan Upah Alat Bahan + Upah
Rp. Rp. Rp. Rp. Rp.
1 2 3 4 5 6 7 8 9
XII PEKERJAAN INSTALASI AIR DAN SANITASI
XII.1 1 M' PIPA PVC MASPION ABU DIAMETER 1"
Pipa PVC maspion abu diameter 1" (AW) bt 0.167 Rp30,000.00 Rp5,001.00 - -
Perlengkapan (35% x harga pipa) lot 1.000 Rp10,500.00 - - Rp10,500.00
Tukang batu Oh 0.060 Rp48,000.00 - Rp2,880.00 -
Kepala tukang batu Oh 0.006 Rp52,000.00 - Rp312.00 -
Pekerja Oh 0.036 Rp38,000.00 - Rp1,368.00 -
Mandor Oh 0.002 Rp60,000.00 - Rp108.00 -
Jumlah Rp5,001.00 Rp4,668.00 Rp10,500.00 Rp20,169.00
XII.2 1 M' PIPA PVC MASPION ABU DIAMETER 3"
Pipa PVC maspion abu diameter 3" (AW) bt 0.167 Rp153,000.00 Rp25,505.10 - -
Perlengkapan (35% x harga pipa) lot 1.000 Rp53,550.00 - - Rp53,550.00
Tukang batu Oh 0.060 Rp48,000.00 - Rp2,880.00 -
Kepala tukang batu Oh 0.006 Rp52,000.00 - Rp312.00 -
Pekerja Oh 0.036 Rp38,000.00 - Rp1,368.00 -
Mandor Oh 0.002 Rp60,000.00 - Rp108.00 -
Jumlah Rp25,505.10 Rp4,668.00 Rp53,550.00 Rp83,723.10
XII.3 1 M' PIPA PVC MASPION ABU DIAMETER 4"
Pipa PVC maspion abu diameter 4" (AW) bt 0.167 Rp235,000.00 Rp39,174.50 - -
Perlengkapan (35% x harga pipa) lot 1.000 Rp82,250.00 - - Rp82,250.00
Tukang batu Oh 0.060 Rp48,000.00 - Rp2,880.00 -
Kepala tukang batu Oh 0.006 Rp52,000.00 - Rp312.00 -
Pekerja Oh 0.036 Rp38,000.00 - Rp1,368.00 -
Mandor Oh 0.002 Rp60,000.00 - Rp108.00 -
Jumlah Rp39,174.50 Rp4,668.00 Rp82,250.00 Rp126,092.50
XII.4 1 BUAH BAK MANDI FIBERGLASS 60 x 60
Bak fiberglass bh 1.000 Rp95,000.00 Rp95,000.00 - -
Perlengkapan (35% x harga pipa) lot 1.000 Rp33,250.00 - - Rp33,250.00
Tukang batu Oh 2.700 Rp48,000.00 - Rp129,600.00 -
Kepala tukang batu Oh 0.540 Rp52,000.00 - Rp28,080.00 -
Pekerja Oh 1.800 Rp38,000.00 - Rp68,400.00 -
Mandor Oh 0.110 Rp60,000.00 - Rp6,600.00 -
Jumlah Rp95,000.00 Rp232,680.00 Rp33,250.00 Rp360,930.00
XII.5 1 BUAH BATHTUBE
Bathtube standard bh 1.000 Rp2,745,000.00 Rp2,745,000.00 - -
Perlengkapan (35% x harga pipa) lot 1.000 Rp960,750.00 - - Rp960,750.00
Tukang batu Oh 2.700 Rp48,000.00 - Rp129,600.00 -
Kepala tukang batu Oh 0.540 Rp52,000.00 - Rp28,080.00 -
Pekerja Oh 1.800 Rp38,000.00 - Rp68,400.00 -
Mandor Oh 0.110 Rp60,000.00 - Rp6,600.00 -
Jumlah Rp2,745,000.00 Rp232,680.00 Rp960,750.00 Rp3,938,430.00
XII.6 1 BUAH KERAN
Kran stainless lokal kait bh 1.000 Rp22,000.00 Rp22,000.00 - -
Perlengkapan (6% x harga pipa) lot 1.000 Rp1,320.00 - - Rp1,320.00
Pekerja Oh 0.040 Rp38,000.00 - Rp1,520.00 -
Mandor Oh 0.040 Rp60,000.00 - Rp2,400.00 -
Jumlah Rp22,000.00 Rp3,920.00 Rp1,320.00 Rp27,240.00
XII.7 1 KLOSET DUDUK
Kloset duduk warna standard TOTO C 240 lengkap bh 1.000 Rp2,050,000.00 Rp2,050,000.00 - -
Perlengkapan (6% x harga pipa) lot 1.000 Rp123,000.00 - - Rp123,000.00
Tukang batu Oh 1.100 Rp48,000.00 - Rp52,800.00 -
Kepala tukang batu Oh 0.010 Rp52,000.00 - Rp520.00 -
Pekerja Oh 3.300 Rp38,000.00 - Rp125,400.00 -
Mandor Oh 0.160 Rp60,000.00 - Rp9,600.00 -
Jumlah Rp2,050,000.00 Rp188,320.00 Rp123,000.00 Rp2,361,320.00
XII.8 1 KITCHEN ZINK STAINLESS 2 LUBANG
Kitchen zink stainless 2 lubang bh 1.000 Rp425,000.00 Rp425,000.00 - -
Perlengkapan (612% x harga pipa) lot 1.000 Rp51,000.00 - - Rp51,000.00
Tukang batu Oh 1.100 Rp48,000.00 - Rp52,800.00 -
Kepala tukang batu Oh 0.010 Rp52,000.00 - Rp520.00 -
Pekerja Oh 3.300 Rp38,000.00 - Rp125,400.00 -
Mandor Oh 0.160 Rp60,000.00 - Rp9,600.00 -
Jumlah Rp425,000.00 Rp188,320.00 Rp51,000.00 Rp664,320.00
XII.9 1 UNIT SEPTICTANK 2 X 1,5 X 1,5 M + REMBESANNYA (KANTOR TYPE KECIL)
Galian tanah M3 4.500 Rp36,900.00 Rp166,050.00 - -
Pasir urug M3 0.214 Rp50,000.00 Rp10,710.00 - -
Lantai kerja t = 10 cm M2 2.250 Rp57,084.53 Rp128,440.19 - -
Pas. Bata 1 PC : 2 PS + plesteran M2 15.000 Rp71,656.00 Rp1,074,840.00 - -
Plat beton penutup dan balok M3 0.300 Rp8,591,412.59 Rp2,577,423.78 - -
Pipa PVC 4" jenis AW + sambungan M1 5.400 Rp40,000.00 Rp216,000.00 - -
Pipa GIP 1 1/2" btg 1.200 Rp294,000.00 Rp352,800.00 - -
Galian tanah untuk rembesan M3 3.375 Rp36,900.00 Rp124,537.50 - -
Pas.ijuk Kg 5.400 Rp7,000.00 Rp37,800.00 - -
Urugan kerikil 3,5 cm M3 1.050 Rp36,500.00 Rp38,325.00 - -
Pipa PVC 4" berlobang jenis AW M1 9.000 Rp58,750.00 Rp528,750.00 - -
Urugan kembali perataan tanah M3 1.125 Rp9,998.00 Rp11,247.75 - -
Pekerja Oh 7.078 Rp38,000.00 - Rp268,957.03
Tukang batu Oh 3.000 Rp48,000.00 - Rp144,000.00
Kepala tukang batu Oh 0.800 Rp52,000.00 - Rp41,600.00
Mandor Oh 0.500 Rp60,000.00 - Rp30,000.00 -
Jumlah Rp5,266,924.22 Rp484,557.03 Rp0.00 Rp5,751,481.25
XII.10 1 BUAH POMPA ZET PUMP
Pompa zetpump 250 watt sanyo bh 1.000 Rp4,850,000.00 Rp4,850,000.00 - -
Pekerja Oh 0.250 Rp38,000.00 - Rp9,500.00 -
Mandor Oh 0.125 Rp60,000.00 - Rp7,500.00 -
Jumlah Rp4,850,000.00 Rp17,000.00 Rp0.00 Rp4,867,000.00
TABEL XII.2

RAB BAHAN PEKERJAAN INSTALASI AIR DAN SANITASI

HARGA SAT JUMLAH HARGA


NO URAIAN PEKERJAAN VOL SAT
BAHAN Biaya Bahan Bid Price Biaya Bahan Pelaksanaan
1 2 3 4 5 6 7
L. PEKERJAAN INSTALASI AIR DAN SANITASI
L.1 Pipa PVC 1'' 13 m' Rp5,001 Rp65,013.00 Rp65,013.00
L.2 Pipa PVC 3'' 7 m' Rp25,505 Rp178,535.70 Rp178,535.70
L.3 Pipa PVC 4" 9 m' Rp39,175 Rp352,570.50 Rp352,570.50
L.4 Bak 2 bh Rp95,000 Rp190,000.00 Rp190,000.00
L.5 Bathtub 2 bh Rp2,745,000 Rp5,490,000.00 Rp5,490,000.00
L.6 Keran 6 bh Rp22,000 Rp132,000.00 Rp132,000.00
L.7 Kloset Duduk 2 bh Rp2,050,000 Rp4,100,000.00 Rp4,100,000.00
L.8 Kitchen zink stainless 2 lobang 1 bh Rp425,000 Rp425,000.00 Rp425,000.00
L.9 Septictank 1 unit Rp5,266,924 Rp5,266,924.22 Rp5,266,924.22
L.10 Pompa Zet Pump 1 unit Rp4,850,000 Rp4,850,000.00 Rp4,850,000.00
Jumlah Rp21,050,043 Rp21,050,043

RAB UPAH PEKERJAAN INSTALASI AIR DAN SANITASI

HARGA SAT JUMLAH HARGA


NO URAIAN PEKERJAAN VOL SAT
UPAH Biaya Upah Bid Price Biaya Upah Pelaksanaan
1 2 3 4 5 6 7
L. PEKERJAAN PENGECATAN
L.1 Pipa PVC 1'' 13 m' Rp4,668 Rp60,684.00 Rp54,615.60
L.2 Pipa PVC 3'' 7 m' Rp4,668 Rp32,676.00 Rp29,408.40
L.3 Pipa PVC 4" 9 m' Rp4,668 Rp42,012.00 Rp37,810.80
L.4 Bak 2 bh Rp232,680 Rp465,360.00 Rp418,824.00
L.5 Bathtub 2 bh Rp232,680 Rp465,360.00 Rp418,824.00
L.6 Keran 6 bh Rp3,920 Rp23,520.00 Rp21,168.00
L.7 Kloset Duduk 2 bh Rp188,320 Rp376,640.00 Rp338,976.00
L.8 Kitchen zink stainless 2 lobang 1 bh Rp188,320 Rp188,320.00 Rp169,488.00
L.9 Septictank 1 unit Rp484,557 Rp484,557.03 Rp436,101.33
L.10 Pompa Zet Pump 1 unit Rp17,000 Rp17,000.00 Rp15,300.00
Jumlah Rp2,156,129 Rp1,940,516
TABEL XII.3

KEBUTUHAN TENAGA KERJA

Koeff.
No. Uraian Jenis pekerjaan Sat. Koeff. (Awal) Volume Sat Kebutuhan Tenaga Kerja
(Akhir)

1 2 3 4 5 6 7 8=5x6
XII PEKERJAAN INSTALASI AIR DAN SANITASI
XII.1 Pipa PVC 1''
Tukang batu Oh 0.0600 0.0540 13.000 m' 0.702
Kepala tukang batu Oh 0.0060 0.0054 13.000 m' 0.070
Pekerja Oh 0.0360 0.0324 13.000 m' 0.421
Mandor Oh 0.0018 0.0016 13.000 m' 0.021
Jumlah 1.214
XII.2 Pipa PVC 3''
Tukang batu Oh 0.0600 0.0540 7.000 m' 0.378
Kepala tukang batu Oh 0.0060 0.0054 7.000 m' 0.038
Pekerja Oh 0.0360 0.0324 7.000 m' 0.227
Mandor Oh 0.0018 0.0016 7.000 m' 0.011
Jumlah 0.654
XII.3 Pipa PVC 4"
Tukang batu Oh 0.0600 0.0540 9.000 m' 0.486
Kepala tukang batu Oh 0.0060 0.0054 9.000 m' 0.049
Pekerja Oh 0.0360 0.0324 9.000 m' 0.292
Mandor Oh 0.0018 0.0016 9.000 m' 0.015
Jumlah 0.841
XII.4 Bak
Tukang batu Oh 2.7000 2.4300 2.000 bh 4.860
Kepala tukang batu Oh 0.5400 0.4860 2.000 bh 0.972
Pekerja Oh 1.8000 1.6200 2.000 bh 3.240
Mandor Oh 0.1100 0.0990 2.000 bh 0.198
Jumlah 9.270
XII.5 Bathtub
Tukang batu Oh 2.7000 2.4300 2.000 bh 4.860
Kepala tukang batu Oh 0.5400 0.4860 2.000 bh 0.972
Pekerja Oh 1.8000 1.6200 2.000 bh 3.240
Mandor Oh 0.1100 0.0990 2.000 bh 0.198
Jumlah 9.270
XII.6 Keran
Pekerja Oh 0.0400 0.0360 6.000 bh 0.216
Mandor Oh 0.0400 0.0360 6.000 bh 0.216
Jumlah 0.432
XII.7 Kloset Duduk
Tukang batu Oh 1.1000 0.9900 2.000 bh 1.980
Kepala tukang batu Oh 0.0100 0.0090 2.000 bh 0.018
Pekerja Oh 3.3000 2.9700 2.000 bh 5.940
Mandor Oh 0.1600 0.1440 2.000 bh 0.288
Jumlah 8.226
XII.8 Kitchen zink stainless 2 lobang
Tukang batu Oh 1.1000 0.9900 1.000 bh 0.990
Kepala tukang batu Oh 0.0100 0.0090 1.000 bh 0.009
Pekerja Oh 3.3000 2.9700 1.000 bh 2.970
Mandor Oh 0.1600 0.1440 1.000 bh 0.144
Jumlah 4.113
XII.9 Septictank
Pekerja Oh 7.078 6.3700 1.000 unit 6.370
Tukang batu Oh 3.000 2.7000 1.000 unit 2.700
Kepala tukang batu Oh 0.800 0.7200 1.000 unit 0.720
Mandor Oh 0.500 0.4500 1.000 unit 0.450
Jumlah 10.240
XII.10 Pompa Zet Pump
Pekerja Oh 0.2500 0.2250 1.000 unit 0.225
Mandor Oh 0.1250 0.1125 1.000 unit 0.113
Jumlah 0.338
TABEL XII.4

ANALISIS PRODUKTIVITAS KERJA

Kebutuhan Harga Satuan Durasi Volume


No. Uraian Pekerja Sat Biaya Upah Sat Kebutuhan Tenaga Kerja Produktivitas Kerja Sat
Tenaga Kerja Upah (Hari) Pekerjaan (Per Hari) (Per Hari)
1 2 3 4 5 6=4x5 7 8 9 10 = 4 ÷ 7 11 = 8 ÷ 10 12
XII. PEKERJAAN INSTALASI AIR DAN SANITASI
XII.1 Pipa PVC 1''
Tukang batu Oh 0.702 Rp48,000 Rp33,696 0.351
Kepala tukang batu Oh 0.070 Rp52,000 Rp3,650 0.035
Pekerja Oh 0.421 Rp38,000 Rp16,006 2 13 m' 0.211 6.500 m'
Mandor Oh 0.021 Rp60,000 Rp1,264 0.011
Jumlah Rp54,616
XII. 2 Pipa PVC 3''
Tukang batu Oh 0.378 Rp48,000 Rp18,144 0.189
Kepala tukang batu Oh 0.038 Rp52,000 Rp1,966 0.019
Pekerja Oh 0.227 Rp38,000 Rp8,618 2 7 m' 0.113 3.500 m'
Mandor Oh 0.011 Rp60,000 Rp680 0.006
Jumlah Rp29,408
XII.3 Pipa PVC 4"
Tukang batu Oh 0.486 Rp48,000 Rp23,328 0.243
Kepala tukang batu Oh 0.049 Rp52,000 Rp2,527 0.024
2 9 m' 4.500 m'
Pekerja Oh 0.292 Rp38,000 Rp11,081 0.146
Mandor Oh 0.015 Rp60,000 Rp875 0.007
Jumlah Rp37,811
XII.4 Bak
Tukang batu Oh 4.860 Rp48,000 Rp233,280 2.430
Kepala tukang batu Oh 0.972 Rp52,000 Rp50,544 0.486
Pekerja Oh 3.240 Rp38,000 Rp123,120 2 2 bh 1.620 1.000 bh
Mandor Oh 0.198 Rp60,000 Rp11,880 0.099
Jumlah Rp418,824
XII. 5 Bathtub
Tukang batu Oh 4.860 Rp48,000 Rp233,280 1.620
Kepala tukang batu Oh 0.972 Rp52,000 Rp50,544 0.324
Pekerja Oh 3.240 Rp38,000 Rp123,120 3 2 bh 1.080 0.667 bh
Mandor Oh 0.198 Rp60,000 Rp11,880 0.066
Jumlah Rp418,824
XII.6 Keran
Pekerja Oh 0.216 Rp38,000 Rp8,208 0.216
Mandor Oh 0.216 Rp60,000 Rp12,960 1 6 bh 0.216 6.000 bh
Jumlah Rp21,168
XII.7 Kloset Duduk
Tukang batu Oh 1.980 Rp48,000 Rp95,040 0.990
Kepala tukang batu Oh 0.018 Rp52,000 Rp936 0.009
Pekerja Oh 5.940 Rp38,000 Rp225,720 2 2 bh 2.970 1.000 bh
Mandor Oh 0.288 Rp60,000 Rp17,280 0.144
Jumlah Rp338,976
XII. 8 Kitchen zink stainless 2 lobang
Tukang batu Oh 0.990 Rp48,000 Rp47,520 0.990
Kepala tukang batu Oh 0.009 Rp52,000 Rp468 0.009
Pekerja Oh 2.970 Rp38,000 Rp112,860 1 1 bh 2.970 1.000 bh
Mandor Oh 0.144 Rp60,000 Rp8,640 0.144
Jumlah Rp169,488
XII.9 Septictank
Pekerja Oh 6.370 Rp38,000 Rp242,061 3.185
Tukang batu Oh 2.700 Rp48,000 Rp129,600 1.350
2 1 unit 0.500 unit
Kepala tukang batu Oh 0.720 Rp52,000 Rp37,440 0.360
Mandor Oh 0.450 Rp60,000 Rp27,000 0.225
Jumlah Rp436,101
XII.10 Pompa Zet Pump
Pekerja Oh 0.225 Rp38,000 Rp8,550 0.225
Mandor Oh 0.113 Rp60,000 Rp6,750 1 1.000 unit 0.113 1.000 unit
Jumlah Rp15,300
TABEL XII.5

ANALISIS BAHAN DAN KEBUTUHAN BAHAN

Harga Satuan Durasi Kebutuhan Produktivitas/


No. Uraian Jenis pekerjaan Sat. Koeff. Volume Sat Kebutuhan Bahan Sat Bahan
RAB Bahan
(Hari) Bahan/Hari
Sat
Hari
Sat

1 2 3 4 5 6 7=5x4 7 8 9 10 11 12 13 14
XII PEKERJAAN INSTALASI AIR DAN SANITASI
XII.1 Pipa PVC 1''
Pipa PVC maspion abu diameter 1" (AW) bt 0.1667 13.00 m' 2.167 bt Rp30,000 Rp65,013 1.084 bt
2 6.50 m'
Jumlah Rp65,013
XII.2 Pipa PVC 3''
Pipa PVC maspion abu diameter 3" (AW) bt 0.1667 7.00 m' 1.167 bt Rp153,000 Rp178,536 0.583 bt 3.50 m'
2
Jumlah Rp178,536
XII.3 Pipa PVC 4"
Pipa PVC maspion abu diameter 4" (AW) bt 0.1667 9.00 m' 1.500 bt Rp235,000 Rp352,571 0.750 bt 4.50 m'
2
Jumlah Rp352,571
XII.4 Bak
Bak fiberglass bh 1.0000 2.00 bh 2.000 bh Rp95,000 Rp190,000 0.667 bh 0.67 bh
3
Jumlah Rp190,000
XII.5 Bathtub
Bathtube standard bh 1.0000 2.00 bh 2.000 bh Rp2,745,000 Rp5,490,000 0.667 bh 0.67 bh
3
Jumlah Rp5,490,000
XII.6 Keran
Kran stainless lokal kait bh 1.0000 6.00 bh 6.000 bh Rp22,000 Rp132,000 6.000 bh 6.00 bh
1
Jumlah Rp132,000
XII.7 Kloset Duduk
Kloset duduk warna standard TOTO C 240 lengkap bh 1.0000 2.00 bh 2.000 bh Rp2,050,000 Rp4,100,000 1.000 bh 1.00 bh
2
Jumlah Rp4,100,000
XII.8 Kitchen zink stainless 2 lobang
Kitchen zink stainless 2 lubang bh 1.0000 1.00 bh 1.000 bh Rp425,000 Rp425,000 1.000 bh 1.00 bh
1
Jumlah Rp425,000
XII.9 Septictank
Galian tanah M3 4.5000 1.00 unit 4.500 M3 Rp36,900 Rp166,050 2.250 M3
Pasir urug M3 0.2142 1.00 unit 0.214 M3 Rp50,000 Rp10,710 0.107 M3
Lantai kerja t = 10 cm M2 2.2500 1.00 unit 2.250 M2 Rp57,085 Rp128,440 1.125 M2
Pas. Bata 1 PC : 2 PS + plesteran M2 15.0000 1.00 unit 15.000 M2 Rp71,656 Rp1,074,840 7.500 M2
Plat beton penutup dan balok M3 0.3000 1.00 unit 0.300 M3 Rp8,591,413 Rp2,577,424 0.150 M3
Pipa PVC 4" jenis AW + sambungan M1 5.4000 1.00 unit 5.400 M1 Rp40,000 Rp216,000 2.700 M1
0.50 unit
2
0.50 unit
Pipa GIP 1 1/2" btg 1.2000 1.00 unit 1.200 btg Rp294,000 Rp352,800 2 0.600 btg
Galian tanah untuk rembesan M3 3.3750 1.00 unit 3.375 M3 Rp36,900 Rp124,538 1.688 M3
Pas.ijuk Kg 5.4000 1.00 unit 5.400 Kg Rp7,000 Rp37,800 2.700 Kg
Urugan kerikil 3,5 cm M3 1.0500 1.00 unit 1.050 M3 Rp36,500 Rp38,325 0.525 M3
Pipa PVC 4" berlobang jenis AW M1 9.0000 1.00 unit 9.000 M1 Rp58,750 Rp528,750 4.500 M1
Urugan kembali perataan tanah M3 1.1250 1.00 unit 1.125 M3 Rp9,998 Rp11,248 0.563 M3
Jumlah Rp5,266,924
XII.10 Pompa Zet Pump
Pompa zetpump 250 watt sanyo bh 1.0000 1.00 bh 1.000 unit Rp4,850,000 Rp4,850,000 1.000 unit 1.00 unit
1
Jumlah Rp4,850,000
TABEL XII.6
REKAPITULASI

REKAPITULASI UPAH TENAGA KERJA PEKERJAAN INSTALASI AIR BERSIH DAN AIR KOTOR

No. Jenis Pekerja Sat Jumlah Pekerja Sat Harga Satuan RAB Upah Jumlah Biaya
Upah Pekerja/Hari Upah/Hari
1 Pekerja Oh 23.141 Oh Rp38,000 Rp879,344 2.571 Rp97,705
2 Tukang batu Oh 16.956 Oh Rp48,000 Rp813,888 1.884 Rp90,432
3 Kepala tukang batu Oh 2.848 Oh Rp52,000 Rp148,075 0.316 Rp16,453
4 Mandor Oh 1.653 Oh Rp60,000 Rp99,209 0.184 Rp11,023
Jumlah Rp1,940,516 Jumlah Rp215,613

REKAPITULASI BAHAN PEKERJAAN INSTALASI AIR BERSIH DAN AIR KOTOR

No. Jenis Bahan Sat Jumlah Bahan Sat Harga Satuan RAB Bahan Jumlah Biaya
Bahan Bahan/Hari Bahan/Hari
1 Pipa PVC maspion abu diameter 1" (AW) bt 2.167 bt Rp30,000 Rp65,013 0.241 Rp7,224
2 Pipa PVC maspion abu diameter 3" (AW) bt 1.167 bt Rp153,000 Rp178,536 0.130 Rp19,837
3 Pipa PVC maspion abu diameter 4" (AW) bt 1.500 bt Rp235,000 Rp352,571 0.167 Rp39,175
4 Bak fiberglass bh 2.000 bh Rp95,000 Rp190,000 0.222 Rp21,111
5 Bathtube standard bh 2.000 bh Rp2,745,000 Rp5,490,000 0.222 Rp610,000
6 Kran stainless lokal kait bh 6.000 bh Rp22,000 Rp132,000 0.667 Rp14,667
7 Kloset duduk warna standard TOTO C 240 lengkap bh 2.000 bh Rp2,050,000 Rp4,100,000 0.222 Rp455,556
8 Kitchen zink stainless 2 lubang bh 1.000 bh Rp425,000 Rp425,000 0.111 Rp47,222
9 Galian tanah M3 4.500 M3 Rp36,900 Rp166,050 0.500 Rp18,450
10 Pasir urug M3 0.214 M3 Rp50,000 Rp10,710 0.024 Rp1,190
11 Lantai kerja t = 10 cm M2 2.250 M2 Rp57,085 Rp128,440 0.250 Rp14,271
12 Pas. Bata 1 PC : 2 PS + plesteran M2 15.000 M2 Rp71,656 Rp1,074,840 1.667 Rp119,427
13 Plat beton penutup dan balok M3 0.300 M3 Rp8,591,413 Rp2,577,424 0.033 Rp286,380
14 Pipa PVC 4" jenis AW + sambungan M1 5.400 M1 Rp40,000 Rp216,000 0.600 Rp24,000
15 Pipa GIP 1 1/2" btg 1.200 btg Rp294,000 Rp352,800 0.133 Rp39,200
16 Galian tanah untuk rembesan M3 3.375 M3 Rp36,900 Rp124,538 0.375 Rp13,838
17 Pas.ijuk Kg 5.400 Kg Rp7,000 Rp37,800 0.600 Rp4,200
18 Urugan kerikil 3,5 cm M3 1.050 M3 Rp36,500 Rp38,325 0.117 Rp4,258
19 Pipa PVC 4" berlobang jenis AW M1 9.000 M1 Rp58,750 Rp528,750 1.000 Rp58,750
20 Urugan kembali perataan tanah M3 1.125 M3 Rp9,998 Rp11,248 0.125 Rp1,250
21 Pompa zetpump 250 watt sanyo bh 1.000 bh Rp4,850,000 Rp4,850,000 0.111 Rp538,889
Jumlah Rp21,050,043 Jumlah Rp2,338,894
RAB BAHAN PEKERJAAN INSTALASI AIR DAN SANITASI

HARGA SAT JUMLAH HARGA


NO URAIAN PEKERJAAN VOL SAT
BAHAN Biaya Bahan Bid Price Biaya Bahan Pelaksanaan
1 2 3 4 5 6 7
L. PEKERJAAN INSTALASI AIR DAN SANITASI
L.1 Pipa PVC 1'' 47 m' Rp5,001 Rp235,047.00 Rp235,047.00
L.2 Pipa PVC 3'' 47 m' Rp25,505 Rp1,198,739.70 Rp1,198,739.70
L.3 Pipa PVC 4" 60 m' Rp39,175 Rp2,350,470.00 Rp2,350,470.00
L.4 Bak 3 bh Rp95,000 Rp285,000.00 Rp285,000.00
L.5 Bathtub 2 bh Rp2,745,000 Rp5,490,000.00 Rp5,490,000.00
L.6 Keran 6 bh Rp22,000 Rp132,000.00 Rp132,000.00
L.7 Kloset Duduk 4 bh Rp2,050,000 Rp8,200,000.00 Rp8,200,000.00
L.8 Kitchen zink stainless 2 lobang 1 bh Rp425,000 Rp425,000.00 Rp425,000.00
L.9 Septictank 1 unit Rp5,266,924 Rp5,266,924.22 Rp5,266,924.22
L.10 Pompa Zet Pump 1 unit Rp4,850,000 Rp4,850,000.00 Rp4,850,000.00
Jumlah Rp28,433,181 Rp28,433,181

RAB UPAH PEKERJAAN INSTALASI AIR DAN SANITASI

HARGA SAT JUMLAH HARGA


NO URAIAN PEKERJAAN VOL SAT
UPAH Biaya Upah Bid Price Biaya Upah Pelaksanaan
1 2 3 4 5 6 7
L. PEKERJAAN PENGECATAN
L.1 Pipa PVC 1'' 47 m' Rp4,668 Rp219,396.00 Rp197,456.40
L.2 Pipa PVC 3'' 47 m' Rp4,668 Rp219,396.00 Rp197,456.40
L.3 Pipa PVC 4" 60 m' Rp4,668 Rp280,080.00 Rp252,072.00
L.4 Bak 3 bh Rp232,680 Rp698,040.00 Rp628,236.00
L.5 Bathtub 2 bh Rp232,680 Rp465,360.00 Rp418,824.00
L.6 Keran 6 bh Rp3,920 Rp23,520.00 Rp21,168.00
L.7 Kloset Duduk 4 bh Rp188,320 Rp753,280.00 Rp677,952.00
L.8 Kitchen zink stainless 2 lobang 1 bh Rp188,320 Rp188,320.00 Rp169,488.00
L.9 Septictank 1 unit Rp484,557 Rp484,557.03 Rp436,101.33
L.10 Pompa Zet Pump 1 unit Rp17,000 Rp17,000.00 Rp15,300.00
Jumlah Rp3,348,949 Rp3,014,054
REKAPITULASI UPAH TENAGA KERJA PEKERJAAN INSTALASI AIR BERSIH DAN AIR KOTOR
Jumlah
No. Jenis Pekerja Sat Jumlah Pekerja Sat RAB Upah Pekerja/H Biaya
Harga Satuan Upah ari Upah/Hari
1 Pekerja Oh 34.751 Oh Rp38,000 Rp1,320,524 4.964 Rp188,646
2 Tukang batu Oh 28.116 Oh Rp48,000 Rp1,349,568 4.017 Rp192,795
3 Kepala tukang batu Oh 4.027 Oh Rp52,000 Rp209,383 0.575 Rp29,912
4 Mandor Oh 2.243 Oh Rp60,000 Rp134,579 0.320 Rp19,226
Jumlah Rp3,014,054 Jumlah Rp430,579

REKAPITULASI BAHAN PEKERJAAN INSTALASI AIR BERSIH DAN AIR KOTOR


Jumlah
No. Jenis Bahan Sat Jumlah Bahan Sat RAB Bahan Bahan/Ha Biaya
Harga Satuan Bahan ri Bahan/Hari
1 Pipa PVC maspion abu diameter 1" (AW) bt 7.835 bt Rp30,000 Rp235,047 1.119 Rp33,578
2 Pipa PVC maspion abu diameter 3" (AW) bt 7.835 bt Rp153,000 Rp1,198,740 1.119 Rp171,249
3 Pipa PVC maspion abu diameter 4" (AW) bt 10.002 bt Rp235,000 Rp2,350,470 1.429 Rp335,781
4 Bak fiberglass bh 3.000 bh Rp95,000 Rp285,000 0.429 Rp40,714
5 Bathtube standard bh 2.000 bh Rp2,745,000 Rp5,490,000 0.286 Rp784,286
6 Kran stainless lokal kait bh 6.000 bh Rp22,000 Rp132,000 0.857 Rp18,857
7 Kloset duduk warna standard TOTO C 240 lengkap bh 4.000 bh Rp2,050,000 Rp8,200,000 0.571 Rp1,171,429
8 Kitchen zink stainless 2 lubang bh 1.000 bh Rp425,000 Rp425,000 0.143 Rp60,714
9 Galian tanah M3 4.500 M3 Rp36,900 Rp166,050 0.643 Rp23,721
10 Pasir urug M3 0.214 M3 Rp50,000 Rp10,710 0.031 Rp1,530
11 Lantai kerja t = 10 cm M2 2.250 M2 Rp57,085 Rp128,440 0.321 Rp18,349
12 Pas. Bata 1 PC : 2 PS + plesteran M2 15.000 M2 Rp71,656 Rp1,074,840 2.143 Rp153,549
13 Plat beton penutup dan balok M3 0.300 M3 Rp8,591,413 Rp2,577,424 0.043 Rp368,203
14 Pipa PVC 4" jenis AW + sambungan M1 5.400 M1 Rp40,000 Rp216,000 0.771 Rp30,857
15 Pipa GIP 1 1/2" btg 1.200 btg Rp294,000 Rp352,800 0.171 Rp50,400
16 Galian tanah untuk rembesan M3 3.375 M3 Rp36,900 Rp124,538 0.482 Rp17,791
17 Pas.ijuk Kg 5.400 Kg Rp7,000 Rp37,800 0.771 Rp5,400
18 Urugan kerikil 3,5 cm M3 1.050 M3 Rp36,500 Rp38,325 0.150 Rp5,475
19 Pipa PVC 4" berlobang jenis AW M1 9.000 M1 Rp58,750 Rp528,750 1.286 Rp75,536
20 Urugan kembali perataan tanah M3 1.125 M3 Rp9,998 Rp11,248 0.161 Rp1,607
21 Pompa zetpump 250 watt sanyo bh 1.000 bh Rp4,850,000 Rp4,850,000 0.143 Rp692,857
Jumlah Rp28,433,181 Jumlah Rp4,061,883
KEBUTUHAN TENAGA KERJA ANALISIS PRODUKTIVITAS KERJA
Harga Kebutuhan
Kebutuhan Durasi Volume Tenaga Kerja Produktivitas
Koeff. Koeff. Kebutuhan No. Uraian Pekerja Sat Tenaga Kerja Satuan Biaya Upah (Hari) Pekerjaan Sat Sat
No. Uraian Jenis pekerjaan Sat. Volume Sat Upah (Per Hari) Kerja (Per Hari)
(Awal) (Akhir) Tenaga Kerja
1 2 3 4 5 6=4x5 7 8 9 10 = 4 ÷ 7 11 = 8 ÷ 10 12
1 2 3 4 5 6 7 8=5x6 XII. PEKERJAAN INSTALASI AIR DAN SANITASI
XII PEKERJAAN INSTALASI AIR DAN SANITASI XII.1 Pipa PVC 1''
XII.1 Pipa PVC 1'' Tukang batu Oh 2.538 Rp48,000 Rp121,824 1.269
Tukang batu Oh 0.0600 0.0540 47.000 m' 2.538 Kepala tukang batu Oh 0.254 Rp52,000 Rp13,198 0.127
Kepala tukang batu Oh 0.0060 0.0054 47.000 m' 0.254 Pekerja Oh 1.523 Rp38,000 Rp57,866 2 47 m' 0.761 23.500 m'
Pekerja Oh 0.0360 0.0324 47.000 m' 1.523 Mandor Oh 0.076 Rp60,000 Rp4,568 0.038
Mandor Oh 0.0018 0.0016 47.000 m' 0.076 Jumlah Rp197,456
Jumlah 4.391 XII. 2 Pipa PVC 3''
XII.2 Pipa PVC 3'' Tukang batu Oh 2.538 Rp48,000 Rp121,824 1.269
Tukang batu Oh 0.0600 0.0540 47.000 m' 2.538 Kepala tukang batu Oh 0.254 Rp52,000 Rp13,198 0.127
Kepala tukang batu Oh 0.0060 0.0054 47.000 m' 0.254 Pekerja Oh 1.523 Rp38,000 Rp57,866 2 47 m' 0.761 23.500 m'
Pekerja Oh 0.0360 0.0324 47.000 m' 1.523 Mandor Oh 0.076 Rp60,000 Rp4,568 0.038
Mandor Oh 0.0018 0.0016 47.000 m' 0.076 Jumlah Rp197,456
Jumlah 4.391 XII.3 Pipa PVC 4"
XII.3 Pipa PVC 4" Tukang batu Oh 3.240 Rp48,000 Rp155,520 1.620
Tukang batu Oh 0.0600 0.0540 60.000 m' 3.240 Kepala tukang batu Oh 0.324 Rp52,000 Rp16,848 0.162
2 60 m' 30.000 m'
Kepala tukang batu Oh 0.0060 0.0054 60.000 m' 0.324 Pekerja Oh 1.944 Rp38,000 Rp73,872 0.972
Pekerja Oh 0.0360 0.0324 60.000 m' 1.944 Mandor Oh 0.097 Rp60,000 Rp5,832 0.049
Mandor Oh 0.0018 0.0016 60.000 m' 0.097 Jumlah Rp252,072
Jumlah 5.605 XII.4 Bak
XII.4 Bak Tukang batu Oh 7.290 Rp48,000 Rp349,920 3.645
Tukang batu Oh 2.7000 2.4300 3.000 bh 7.290 Kepala tukang batu Oh 1.458 Rp52,000 Rp75,816 0.729
Kepala tukang batu Oh 0.5400 0.4860 3.000 bh 1.458 Pekerja Oh 4.860 Rp38,000 Rp184,680 2 3 bh 2.430 1.500 bh
Pekerja Oh 1.8000 1.6200 3.000 bh 4.860 Mandor Oh 0.297 Rp60,000 Rp17,820 0.149
Mandor Oh 0.1100 0.0990 3.000 bh 0.297 Jumlah Rp628,236
Jumlah 13.905 XII. 5 Bathtub
XII.5 Bathtub Tukang batu Oh 4.860 Rp48,000 Rp233,280 1.620
Tukang batu Oh 2.7000 2.4300 2.000 bh 4.860 Kepala tukang batu Oh 0.972 Rp52,000 Rp50,544 0.324
Kepala tukang batu Oh 0.5400 0.4860 2.000 bh 0.972 Pekerja Oh 3.240 Rp38,000 Rp123,120 3 2 bh 1.080 0.667 bh
Pekerja Oh 1.8000 1.6200 2.000 bh 3.240 Mandor Oh 0.198 Rp60,000 Rp11,880 0.066
Mandor Oh 0.1100 0.0990 2.000 bh 0.198 Jumlah Rp418,824
Jumlah 9.270 XII.6 Keran
XII.6 Keran Pekerja Oh 0.216 Rp38,000 Rp8,208 0.216
Pekerja Oh 0.0400 0.0360 6.000 bh 0.216 Mandor Oh 0.216 Rp60,000 Rp12,960 1 6 bh 0.216 6.000 bh
Mandor Oh 0.0400 0.0360 6.000 bh 0.216 Jumlah Rp21,168
Jumlah 0.432 XII.7 Kloset Duduk
XII.7 Kloset Duduk Tukang batu Oh 3.960 Rp48,000 Rp190,080 1.980
Tukang batu Oh 1.1000 0.9900 4.000 bh 3.960 Kepala tukang batu Oh 0.036 Rp52,000 Rp1,872 0.018
Kepala tukang batu Oh 0.0100 0.0090 4.000 bh 0.036 Pekerja Oh 11.880 Rp38,000 Rp451,440 2 4.000 bh 5.940 2.000 bh
Pekerja Oh 3.3000 2.9700 4.000 bh 11.880 Mandor Oh 0.576 Rp60,000 Rp34,560 0.288
Mandor Oh 0.1600 0.1440 4.000 bh 0.576 Jumlah Rp677,952
Jumlah 16.452 XII. 8 Kitchen zink stainless 2 lobang
XII.8 Kitchen zink stainless 2 lobang Tukang batu Oh 0.990 Rp48,000 Rp47,520 0.990
Tukang batu Oh 1.1000 0.9900 1.000 bh 0.990 Kepala tukang batu Oh 0.009 Rp52,000 Rp468 0.009
Kepala tukang batu Oh 0.0100 0.0090 1.000 bh 0.009 Pekerja Oh 2.970 Rp38,000 Rp112,860 1 1 bh 2.970 1.000 bh
Pekerja Oh 3.3000 2.9700 1.000 bh 2.970 Mandor Oh 0.144 Rp60,000 Rp8,640 0.144
Mandor Oh 0.1600 0.1440 1.000 bh 0.144 Jumlah Rp169,488
Jumlah 4.113 XII.9 Septictank
XII.9 Septictank Pekerja Oh 6.370 Rp38,000 Rp242,061 3.185
Pekerja Oh 7.078 6.3700 1.000 unit 6.370 Tukang batu Oh 2.700 Rp48,000 Rp129,600 1.350
2 1.000 unit 0.500 unit
Tukang batu Oh 3.000 2.7000 1.000 unit 2.700 Kepala tukang batu Oh 0.720 Rp52,000 Rp37,440 0.360
Kepala tukang batu Oh 0.800 0.7200 1.000 unit 0.720 Mandor Oh 0.450 Rp60,000 Rp27,000 0.225
Mandor Oh 0.500 0.4500 1.000 unit 0.450 Jumlah Rp436,101
Jumlah 10.240 XII.10 Pompa Zet Pump
XII.10 Pompa Zet Pump Pekerja Oh 0.225 Rp38,000 Rp8,550 0.225
Pekerja Oh 0.2500 0.2250 1.000 unit 0.225 Mandor Oh 0.113 Rp60,000 Rp6,750 1 1.000 unit 0.113 1.000 unit
Mandor Oh 0.1250 0.1125 1.000 unit 0.113 Jumlah Rp15,300
Jumlah 0.338

ANALISIS BAHAN DAN KEBUTUHAN BAHAN

Harga Satuan Durasi Kebutuhan


No. Uraian Jenis pekerjaan Sat. Koeff. Volume Sat Kebutuhan Bahan Sat Bahan
RAB Bahan
(Hari) Bahan/Hari
Sat Produktivitas/Hari Sat

1 2 3 4 5 6 7=5x4 7 8 9 10 11 12 13 14
XII PEKERJAAN INSTALASI AIR DAN SANITASI
XII.1 Pipa PVC 1''
Pipa PVC maspion abu diameter 1" (AW) bt 0.1667 47.00 m' 7.835 bt Rp30,000 Rp235,047 3.917 bt
2 23.50 m'
Jumlah Rp235,047
XII.2 Pipa PVC 3''
Pipa PVC maspion abu diameter 3" (AW) bt 0.1667 47.00 m' 7.835 bt Rp153,000 Rp1,198,740 3.917 bt 23.50 m'
2
Jumlah Rp1,198,740
XII.3 Pipa PVC 4"
Pipa PVC maspion abu diameter 4" (AW) bt 0.1667 60.00 m' 10.002 bt Rp235,000 Rp2,350,470 5.001 bt 30.00 m'
2
Jumlah Rp2,350,470
XII.4 Bak
Bak fiberglass bh 1.0000 3.00 bh 3.000 bh Rp95,000 Rp285,000 1.000 bh 1.00 bh
3
Jumlah Rp285,000
XII.5 Bathtub
Bathtube standard bh 1.0000 2.00 bh 2.000 bh Rp2,745,000 Rp5,490,000 0.667 bh 0.67 bh
3
Jumlah Rp5,490,000
XII.6 Keran
Kran stainless lokal kait bh 1.0000 6.00 bh 6.000 bh Rp22,000 Rp132,000 6.000 bh 6.00 bh
1
Jumlah Rp132,000
XII.7 Kloset Duduk
Kloset duduk warna standard TOTO C 240 lengkap bh 1.0000 4.00 bh 4.000 bh Rp2,050,000 Rp8,200,000 2.000 bh 2.00 bh
2
Jumlah Rp8,200,000
XII.8 Kitchen zink stainless 2 lobang
Kitchen zink stainless 2 lubang bh 1.0000 1.00 bh 1.000 bh Rp425,000 Rp425,000 1.000 bh 1.00 bh
1
Jumlah Rp425,000
XII.9 Septictank
Galian tanah M3 4.5000 1.00 unit 4.500 M3 Rp36,900 Rp166,050 2.250 M3
Pasir urug M3 0.2142 1.00 unit 0.214 M3 Rp50,000 Rp10,710 0.107 M3
Lantai kerja t = 10 cm M2 2.2500 1.00 unit 2.250 M2 Rp57,085 Rp128,440 1.125 M2
Pas. Bata 1 PC : 2 PS + plesteran M2 15.0000 1.00 unit 15.000 M2 Rp71,656 Rp1,074,840 7.500 M2
Plat beton penutup dan balok M3 0.3000 1.00 unit 0.300 M3 Rp8,591,413 Rp2,577,424 0.150 M3
Pipa PVC 4" jenis AW + sambungan M1 5.4000 1.00 unit 5.400 M1 Rp40,000 Rp216,000 2.700 M1
0.50 unit
Pipa GIP 1 1/2" btg 1.2000 1.00 unit 1.200 btg Rp294,000 Rp352,800 2 0.600 btg
Galian tanah untuk rembesan M3 3.3750 1.00 unit 3.375 M3 Rp36,900 Rp124,538 1.688 M3
Pas.ijuk Kg 5.4000 1.00 unit 5.400 Kg Rp7,000 Rp37,800 2.700 Kg
Urugan kerikil 3,5 cm M3 1.0500 1.00 unit 1.050 M3 Rp36,500 Rp38,325 0.525 M3
Pipa PVC 4" berlobang jenis AW M1 9.0000 1.00 unit 9.000 M1 Rp58,750 Rp528,750 4.500 M1
Urugan kembali perataan tanah M3 1.1250 1.00 unit 1.125 M3 Rp9,998 Rp11,248 0.563 M3
Jumlah Rp5,266,924
XII.10 Pompa Zet Pump
Pompa zetpump 250 watt sanyo bh 1.0000 1.00 bh 1.000 unit Rp4,850,000 Rp4,850,000 1.000 unit 1.00 unit
1
Jumlah Rp4,850,000

You might also like