Dos. No. GUJARAT STATE PETRONET LTD Gas Gri Pj WORK PROCEDURE FOR (CHANGEOVER OF FML SKID PURPOSE/SCOPE: The Scope of this procedure is to conduct Changeover of Filter, Metering, Letdown (FML) Skid in combination or as an individual ease(s) during Routine or Non-Routine activity so as to ensure continued smooth & safe execution of wos, Steam in this documents refered to FML Skid in combination o¢ a8 an individual east). EQUIPMENTS: ‘+ Tool Box, Key, Cotton Waste MATERIALS: ‘+ Mandutory PPEs: Safety Shoes, Helmet & Hand Gloves. procepure: 1. Changeover of FML. skid is to be done during Planned / Breakdown Maintenance \WorkiEmergeney cases. EIC shall be responsible for execution ofthis work Oban Work permit from Base/Sub-Base Invimation to be pass to SIC (MCR) by Site EIC, [MCR stall pas the information to customer about ming dation of works, MCR shall confirm t Site EIC After Confirmation ffom MCR, Site EIC can start steam changeover activity, it shall be cated out step by step as mentioned below 1, Slowly Open Upstream valve of Standby steam. Ti, Slowly Open Downstream Valve of Standby stream, Ii, Wait fOr a moment, Ensure and Verify that flow has been established through standby stream and check FC and observe any leaks iv. After verifying thatthe flow has been established from standby stream, gradually close the upstream valve of Existing / Running seam, ¥. Meanwhile observe fr gas lo though the standby steam asa conformation vi. Gradually Close the downsteam valve of Existing / Running stream 7. ter sucessful changeover aetvityof steam inform to MCR. 8, Puttag on team for is working status. RESPONSE ACTIONS IN CASE OF OCCURRENCE: ‘Injury: Give fists. IF quired, give medical supervision. Page To bos. Nas GSPLSOPPL AUDA * eT GUJARAT STATE PETRONET LTD Gas Grid Pipeline WORK PROCEDURE FOR (CHANGEOVER OF FML SKID ‘+ Wound due to sharp edge using tols & tackles: Give irs: ald treatment & shi hospital nearby i required

You might also like