Dos. No.
GUJARAT STATE PETRONET LTD
Gas Gri Pj
WORK PROCEDURE FOR
(CHANGEOVER OF FML SKID
PURPOSE/SCOPE:
The Scope of this procedure is to conduct Changeover of Filter, Metering, Letdown (FML) Skid
in combination or as an individual ease(s) during Routine or Non-Routine activity so as to ensure
continued smooth & safe execution of wos, Steam in this documents refered to FML Skid in
combination o¢ a8 an individual east).
EQUIPMENTS:
‘+ Tool Box, Key, Cotton Waste
MATERIALS:
‘+ Mandutory PPEs: Safety Shoes, Helmet & Hand Gloves.
procepure:
1. Changeover of FML. skid is to be done during Planned / Breakdown Maintenance
\WorkiEmergeney cases. EIC shall be responsible for execution ofthis work
Oban Work permit from Base/Sub-Base
Invimation to be pass to SIC (MCR) by Site EIC,
[MCR stall pas the information to customer about ming dation of works,
MCR shall confirm t Site EIC
After Confirmation ffom MCR, Site EIC can start steam changeover activity, it shall be
cated out step by step as mentioned below
1, Slowly Open Upstream valve of Standby steam.
Ti, Slowly Open Downstream Valve of Standby stream,
Ii, Wait fOr a moment, Ensure and Verify that flow has been established through standby
stream and check FC and observe any leaks
iv. After verifying thatthe flow has been established from standby stream, gradually close
the upstream valve of Existing / Running seam,
¥. Meanwhile observe fr gas lo though the standby steam asa conformation
vi. Gradually Close the downsteam valve of Existing / Running stream
7. ter sucessful changeover aetvityof steam inform to MCR.
8, Puttag on team for is working status.
RESPONSE ACTIONS IN CASE OF OCCURRENCE:
‘Injury: Give fists. IF quired, give medical supervision.
Page Tobos. Nas GSPLSOPPL AUDA *
eT
GUJARAT STATE PETRONET LTD
Gas Grid Pipeline
WORK PROCEDURE FOR
(CHANGEOVER OF FML SKID
‘+ Wound due to sharp edge using tols & tackles: Give irs: ald treatment & shi
hospital nearby i required