You are on page 1of 5
sotar backup system —plakiston TET solarGetsi BI LAKISTON JUNIOR SCHOOL SYSTEM OVERVIEW. rid inverters will convert jes, The storage battery ts without causing dam density that Is 3 times w ee power loads primarily from solar PV power (solar panels). Hyb' banks there to w. i panels directly to AC power and also charge the storage batter a i as aber, tis szed so that itcan handle the peak startup curren age to batery cel in on (FP) bates are used since they offer an energy teries and have more than twice the lifespan of lead acid batteries. LOADS 1. COMPUTER ROOM Practical computer lessons are conducted for one week (5 days) out of every fortnight. Lessons 2° held from 8am to 1pm (Shrs). The computer room has the following loads; 6xDesktop computers each with a 40W Samsungmonitor and 720WY Compaq CPU 3xLG allin-one desktop PC rated at 192W each 4xMecer alkin-one desktop PC rated at 264WV each +1xDellalkin-one desktop PC rated at 360W each 2xSamsung all-in-one desktop PC rated at 240W each sxDesktop printer rated at 480W 4xProjector rated at 350W ‘2x4ft. LED double tube light fittings rated at 44W per fitting (22WV per tube) VuuuuouY Peak power for computer room: 12.7KW 2. ADMINISTRATION BLOCK office loads in the administration block run from 7am to 4pm (ghrs) everyday of a work week. a SDC Bursar’s Office = 1xDesktop computer at 257 total = txLaptop PCat 65W = 1xDesktop printer at 600W » raft. LED double tube light fittings rated at 44W per fitting (22W per tube) Peak power: 0,966kW Gvt. Bursar/Reception Office & Head’s Office 2xAlkin-one desktop PC at 288W each 4xLaptop computer at 65W each axDesktop printer at 672W each sxFridge at 250W 2eqft. LED double tube light fittings rated at 44W per fitting (22W per tube) ‘sft. Fluorescent double tube light fittings rated at 116W per fitting (58W per tube) VUUDUUS Peak running power: 2.4kW Peak startup power: 3.02kW ‘TOTAL PEAK POWER: 16.95kW Junior Scho: solarGets! SYSTEM LAYOUT ' a a s a s oe os ‘ sp , o " oe " 1. Inverter 2xSunsynk 8.8kW hybrid inverters connected in parallel for a 17.6kW max. AC output. The inverter has the following specs; => Max, AC output power: 8800W. 8 o° = Max. PVrated power: 10400Wp = MPPT charger: 190A, 2 Battery ig ho 16xPylontech US2000B 2.4kWh lithium ion batteries will be in- S stalled. Each battery has the following specs; sppstimonenchnce = Rated capacity: 2.4kWh (48V-50Ah) ara fantons of aPY inverter, set => Usable capacity: 2.2kWh (290% depth of discharge) wp => Peak charge/discharge current: 100A at 15sec tas anit gramming ent local system m programing A 3. Solar panels the jstem fromany 64x340W Jinko polycrystalline solar modules will be installed. Each hybrid inverter will have 32 panels connected evenly to its dual MPPT inputs. Solar panei wil be rountedon this roof section The Jnko Eagle 340WV PY module has an Improved temperature coefficient which reduces power losses a high temperatures 32 PV modules wil be connected to each Sunsynk hybrid inverter. cee The Pylontech US20008 24H LFePO4 battery The battery banks abe to handle stertup curents of ail ‘motor ioads when the systemis runing from battery backup. The ithum ion battery BMS communicates with the inverter sytem for charge optinzation. solar DIFFERENCES BETWEEN OPTION 1 & OPTION 2 OPTION 1 (Quotation No: QTi001101) . inverter is compatible with battery bank BMS: thus the inverter can communicate with the BMS via RS485 or CANBus. The advantage is that battery if is prolonged and the lithium ion battery bank is Buaranteed to last for more than to years. This is because the inverter adjusts charging parameters accurately to suit the correct conditions that include state of charge and ambient temperature. The system also has remote monitoring where system usage and performance can be monitored in realtime. Through remote monitoring, system errors can also be sent to users and technicians via e mail thus can be addressed urgently. OPTION 2 (Quotation No: QT1001102) Inverter system does not communicate with battery bank BMS. Settings are manually set into the inverter. The system battery bank has a guaranteed life of between 68years.g Quotation Energy saved is energy stored SolarGetsi (Pvt) Lid Banking Details 44463 Tongogara Ave, SolarGetsi (Pvt) Ltd Harare NMB Bank +263776008997 ‘Avondale solargetsi@gm: (0000280847007 12/2/2020 Doc Number_Order Currency Page Number_Account QTI001101 _SkVA-4.76kWp-14.4kWh System USO 1.00 SGI Code Description Quantity Unit Total $S-H-BK Sunsynk 8.8K Hybrid Parity inverter 2,00 3,800.00 7,600.00 US20008 —_Pylontech US20008 2.4kWh LiFePO4 battery 16.00 1,300.00 20,800.00 PY-8C9U —_Pylontech 9U Battery cabinet 4.00 185.00 740.00 4340-1000 340W Jinko poly solar panels 64.00 140,00 8,960.00 ‘A-4200 Aluminium rack 420mm 32.00 35.00 1,120.00 ALCMD Aluminium mid clamps 96.00 200 192.00 ALCED Aluminium end clamps 64.00 2,00 128.00 SG-BOS1 Balance of system 3,734.32 SG-INST Installation 6,404.75 * Balance of system includes all AC/DC; cabling, connectors, DBs, surge arrestor, fuses, breakers and all necessary sundries * Adetalled list ofall balance of system material is available upon request ‘Typical Loads As per Technical Proposal STAMP TOTAL 49,679.07 REF sola Quotation Energy saved is energy stored SolarGets! (Pvt) Ltd Banking Details ‘4463 Tongogara Ave, SolarGetsi (Pvt) Ltd Harare NMB Bank 4263776008997 ‘Avondale solargetsi@gmail.com (0000280547007 12/2/2020 Doc Number_Order Currency Page Number_Account ‘QT1001102 —SkVA-&.76KWp-14-4KWh System USD 1.00 SGI Code Description Quantity Unit Total PH-SK-H _ Phocos SkW hybrid inverter 80A MPPT 4.00 1,200.00 4,800.00 ABNPFC1O0 Narada 48V-100Ah 4.8kWh LiFePO4 battery 10.00 1,500.00 15,000.00 4340-1000 340W Jinko poly solar panels 56.00 140.00 7,840.00 A-4200 Aluminium rack 4200mm 28.00 35.00 980.00 AL-CMD — Aluminium mid clamps 84.00 2.00 168.00 ALCED Aluminium end clamps 56.00 200 112,00 SG-BOS1 Balance of system 3,782.32 SG-INST Installation 4,826.75 + Balance of system includes all AC/DC; cabling, connectors, DBs, surge arrestors, fuses, breakers and all necessary sundries + Adetailed lst of al balance of system material is available upon request Typical Loads ‘As per Technical Proposal [STAMP TOTAL 37,509.07 REF

You might also like