Multiple choice questions based on week one lecture

21. _____ 31. A local retailer has hired Anne and Jack to develop her new information system. She is not sure what
type of system she wants, but it must be completed in four months and she needs to know regularly that the project
is on schedule. What development methodology would you recommend to Anne and Jack?

parallel

phased

prototyping

throwaway prototyping

waterfall

32. The primary advantage of the Waterfall Development methodology is _.

a.a version of the system is quickly delivered into the users' hands

b.requirements evolve through users' feedback about the system

c.features and functionality of the system are explored through simple models

d.requirements are completely specified and held relatively constant prior to programming

e.none of the above

33. Which category of development methodologies is better suited to projects with short time schedules?

a.parallel methodologies

b.RAD methodologies

c.scheduled methodologies

d.structured methodologies

e.waterfall methodologies

34. Which of the following methodologies attempts to balance the emphasis between data and problems?

RAD

SDLC

Object-oriented analysis and design


Prototyping

Waterfall

35. An early problem with object-oriented analysis and design was

no standard methodology.

emphasis on data first.

emphasis on processes first.

the OMG standard was different than the UML standard.

the RAD methodology was not mature enough