You are on page 1of 2
Bill of Quantity (BOQ) Me cone Jum] ay | raerin [APONTE] Wom T Remar rae Won 11 fercoton mo] rwszeae | anzae | aassane | noxro 12 feaotncx ma] sosece | come | araor2ee | xexio 13 furocamertnenar zen na | rosssr | te500 | wrarests | kero 14 frressonrsscorenicenen |p | aszzs0 | 52 | aos | rasa ] carat 1.8 | Cover plate installation m3] 107.90 16800 1,812,720 Key [Sov recccaal ~ 15 |easconimensconsate |ma|saose | v4s00 | eovoze0 | xexr | Cone wove y 17 [meas eomues | 2] ssenco | 55 | sorzse | sara | Sten sotety 1.8 |Gravel bling ditch ma | 120278 3545 4.263.855 KSAT Grave ersice wr 1.9 |o150HDPE pipe m | 2961.76 245 723,181 Kero | PVE Splenic) 110 bsp cong ma arse | aso | rossasa | xsuro | Petsotecty 1.11 [Bituminous hemp m3 1:96 4925 9.653 KS-KIO a prone O60 1.2 foasitoncovrateintataton | 4g | agsco | as75 | 132246 | Ker | Orerrne povided by 11 Joon ge m | reso | sasoo | aszara | irre | g3OHDPE Poe, 114 Pemesvie cesene na] ssasco | 5s | ses | ker | Costotleproviteaty sure sone srtecon 21 [Grass planting m2 | 2334200 45, 3se4s00 | Koko |S Vpclbaecdl 22 |cossecasttcc maton | mo} sero | 10225 | aoosrsa | xswio | C2eucastlon 23 freatex ma} seeso | cus | aamers | xeKio 24 {sand cushion ma] 50380 900 453150 | «5x10 |Sand provided by occ 5 [Costin concrete mo | sir 128 711250 | Kexio | Conerte provided by 25 [costs 3 | 317690 2500 | 39711260 | Ke-K10 pe 26 |ur.s cement mortar ma | 29060 resco | 441.760 | Ke-K10 Is Viaduct cessor structure Pe f Concrete provides by 31 |oostin-sity concrete ma] 4740 2500 | 562.500 |ondge head} ee 3.2 fore parang ma] anon | 148 | 4060 Jenage nen] Cres ses ovis by ‘Amount Notes: 1.The quantity in “80” only used as total quantity of the whole main road construction, which cannot be the evidence for the contract, settlement and payment. The project will be divided into several sections respectively Carried out by several subcontractors; the final contract BOQ shall be subject to the actual sectional construction BOQ, The final settlement quantiy is calculated in accordance with the actual construction quantity which is ‘approved by Employer and Engineer. CCC will not pay for these quantiy that surpasses the designed quantity of drawings which are approved by Employer and Engineer without CCC's instructions, 2.Please pay attention to the specific construction parts of each sectional construction; adjusting the Rate for decrease of construction quantity is prohibited 3.The comprehensive price in the Appendix of the BOQ includes labor cost (including medical insurance, endowment insurance, occupational safety and health), machinery facilities cost (except the facilites provided by CCC), materials cost (except the materials provided by CCC), materials unload and turnover cost, holiday call- back pay, cost of implementation, environmental protection and civilization construction cost, dispatch cost, safety and insurance, use fee of compact tools, management cost, profits, construction water fee, electricity fee, duties and taxes that local government stipulates. The appendix also includes all the responsibilties, obligations, and general rks that the contract expressed or implied.

You might also like