WORK EXPERIENCED
AUG,. 08,2016 TO AUG. 08, 2017 PIPING SUPERVISOR
PROJECT; JRTP
SEJONG
JIZAN SAUDI ARABIA
- Line checking of every test package and request all erection materials balance.
- Request for inspection for fit-up,,air blowing and Oriface flange.
- Supervision of piping installatrion of above ground piping
- Plan and schedule 3 weeks ahead all tools,materials and equipment needed.
- Supervision of 4 piping foreman
- Request all pipe spool and valve.
- Request all materials and equipment needed 3 weeks ahead to avoid delayed and to
update construction schedule.
- Ensure that all manpower needed within the right quantity as per project schedule.
- Check and review specification of the project.
- Direct supervision of all manpower at the project.
Apr. 03, 2008 –MAY. 10, 2009 PROJECT SITE ENGINEER
PROJECT; MECHANICAL INSTALLATION OF
FIRST PHILEC , PHIL.
Mecel, Construction & Electrical Inc.
Mayondon, Los banos, Laguna (049)536-6158
- Request all materials and equipment needed 3 weeks ahead to avoid delayed and to update
construction schedule
- Ensure that the latest drawing are in latest revision and approval for fabrication
and construction.
- Report to the project manager to any technical problem.
- Water analysis of h2o contaminant of chilled water, cooling tower and boiler.
- Supervised Chemical treatment and Mechanical cleaning of cooling tower and
water line.
EDUCATIONAL BACKGROUND:
PERSONAL:
Born on the 17tn day of June 1975 at Calamba City, single, male, stands 5’7”
135 lbs.
SKILLS:
- Computer literate ( MS Word, Excel , Auto Cad 2000,2d and 3d)
- Good drafting skills and technical manual and cad.
- Interpersonal ,communicate, people management and leader ship skills.
- Knowledge of materials selection substitution in conformity of piping installation.