You are on page 1of 1

GOVERNMENT OF THE REPUBLIC OF INDONESIA

MINISTRY OF PUBLIC WORKS AND HOUSING


THE DIRECTORATE GENERAL OF WATER RESOURCES
DIRECTORATE OF RIVER AND COASTAL

LAND ACQUISITION AND RESETTLEMENT


FRAMEWORK

PREPARATION OF SELUNA RIVER BASIN FLOOD MANAGEMENT


PROJECTS IN CENTRAL JAVA PROVINCE,
ACCELERATING INFRASTRUCTURE DELIVERY TROUGH BETTER
ENGINEERING SERVICE PROJECT (ESP),
ADB Loan No. 3455 – INO

CONTRACT NO.: 16/KTR/PPK-Ad Satker/V/2019, dated May 02, 2019


AMENDMENT NO. 1: 16/KTR/PPK – Ad SatkerAmd.1/IX/2019, dated Sept.16, 2019
ADDENDUM NO. 1: 16/KTR/PPK – Ad SatkerAdd.1/XI/2019, dated Nov.15, 2019

PT. Indra Karya (Persero)


In Joint Venture with
Sinotech Engineering Consultants, Ltd,
WAPCOS, Ltd
PT. Ciriajasa Engineering Consultants
CV. Rona Lestari
PT. Bina Karya (Persero)

NOVEMBER 2020

You might also like