Shift Handover & Movement Plan

Date: 01.02.2021 Shift: Night


Crusher/Screen Machine Location No of trucks Next Location Remarks
CS2A / CS01 EX 918 165L 4 195L
Ex 715 410L 3 145L hopper side.

CR16 FL961 165L 6

Wasia_RMC Ex 915 470L 5 1truck goes to CS02A.

MS04 EX919 115L sea side 4


B grade / CR22 FL 951 65L 4

MS02 EX910 265L wadi 4

Development EX519 200L 2


Shift Notes:-
> 6 drivers absent last night - After completion of 165L ramp material drivers allocated to other locations Ex519 kept idle at 200L.
> 230L material was completed , CR16 feed going from 165L - oversize reported frequently
> 410L loading stopped for face scaling and armour breaking at loading point - temporary feed given from 165L.
> Ex616 engaged for 30L floor cutting work - b/d from 03:00am track chain broken.
> Ex916 got ready around 12:00am - engaged for Ms02 loading.
> Ex901, Ex913, Ex906 used for pulling works