Shift Handover & Movement Plan

Date: 02.02.2021
Crusher/Screen Machine Location No of trucks Next Location
CS2A / CS01 EX 918 165L 4 180 L
EX 910 130L ramp 4

CR16 FL 961 195 L RRC Side 6

Wasia_RMC Ex 915 385L 5

MS04 EX 919 115L 5 130 L


FL 961 65 L 4 30 L
B grade / CR22 FL 950 85 L 3 A5

MS02 EX 910 265L 4

Development EX 519 200L 2


Ex 715 470 L
Shift Notes:-
> Ex 715 shall continue to scratch and progress to prepare core drilling area and side hole at the north side mountain at 480 L ,, bo
access must be closed , Ex 618 breaker shall be there for assistance.
> Ex 919 shall be continuing for MS04 from 115L , next location shall be 130L so need to complete pulling job there.
> After 130L main face pulling , Ex 906 shall go to 145L sea side pulling (Below CS02A)
> FL 961 loading for MS05/ B grade now , before CR 16 restarts , it shall march to 195 L mountain side.
> Once 85L spillages completes ,FL950 shovel shall go to A5 spillages for Cr 22.
> After 0L pulling - Ex 913 shall be pulling -15L. Ex 616 need to push 85-75L once it is free from 65L . Ex 906 - after130Lto pull 145L
nt Plan
Shift: Night
Remarks

Shall stop once Cr 16 restarts

Continue sctraching for side hole area

ide hole at the north side mountain at 480 L ,, bottom

need to complete pulling job there.


02A)
195 L mountain side.

t is free from 65L . Ex 906 - after130Lto pull 145L sea side.