Shift Handover & Movement Plan

Date: 02.02.2021
Crusher/Screen Machine Location No of trucks Next Location
CS2A / CS01 EX 918 180L 4
EX910 130L 4

CR16 FL961 145L 6

Wasia_RMC Ex 915 385L 5

MS04 EX919 145L 5


B grade / CR22 FL 951 A5 3

MS02 EX910 265L 4

Development EX519 230L bund 2


Shift Notes:-
> 195L some material left for safety purpose at slide zone - Ex918 was shifted to 180L for Cs02A
> Ex618 was used at 410L grab production , Ms02 bin & 180L loading point
> Ex616 continued at 30L floor work along the face. Later shifted to CR16 hopper for shutdown work
> 385/365L pushing done in break time.
> A4 spillages loading contiued for CR22 - 992K used for Cs02A feed during Ex918 shifting.
> 230L - bund side material loading with Ex519 it may completed by 06:00am
> CR16 stopped for shutdown @ 05:00am - Ex616 arranged for hopper cleaning.
nt Plan
Shift: Night
Remarks

80L for Cs02A

for shutdown work

8 shifting.