Week end Machines Movement Plan with Loading areas Date & Time: 10.10.

2019

1 2

Plants Machine @ Loading area Machine @ Loading area Remarks

Ex918 @ 265 m Ex918 @ 250 m and then to 265m outer edge

CS2A / Cr16 FL 993K @ 65m cs2b side H/g FL 993K@180m and then to 280m After Saturday blast FL 993K go back to 165m step /145m side.

FL 992K @ 145m and then use pc1250 at 145m step


CR22 FL 992 K @ 145m (Continue)
down ramp pushed over material
MS05 U/S to CS2b

Pc1250 @ 65m for Cs2b with 2 trucks Pc1250 @ 65m for Cs2b with 2 trucks Can stop this once area is ready for drilling and push trucks for MS05

PC1250 @ 145 m (Continue) PC1250 @ 145 m


MS05
PC1250 @ 130 m sea side box Pc 1250 @ 75m /65 m from RRC side Asist armour pulling also when ever required

PC 1250 @ 115 m PC 1250 @ 115m

MS 02 PC 1250 @ 250m (Continue) PC 1250 @ 180 m


EX820 @ 180 m (Continue) Ex 820 @ 165 m

Breaker works: 280m , 265m, blasting free


face works 420m slice Saturday blast, 5 to 6m width of blasted material have
Others Dozer works: 45m, 145m sea side, 180 sea to side cast or pull back subject to inspection done by shift
side engineer/superindent and decide for safe loading.

Note: No machine should move to next location unless material completed or permission from Superintendents/ Supervisor.
Prepared By: AGA
Date : 24.12.2020 Q2 - Equipment movement plan for Weekend
Present Next Then
Plant Remarks
Machine Level Qty Sio2 Mgo Level Qty Sio2 Mgo Level Qty Sio2 Mgo

180 L Sunday
EX 918 195 L 15,000 0.30 0.47 180 L main face 70000 0.55 0.69 blast
CS002A
PC 1250 265-250L 15,000 0.18 0.57 Shall start from 250L once 65L clear
EX 715 500 L 15,000 Day time - MS02 / Night - CS02A

Ex 906 265 L 30000 0.17 0.69 265 L 9,000 0.31 0.33


MS02
Ex519 180 L Keep developing 180L

CR 16 FL 961 145 L 3000 0.82 1.14 75 L 15,000 0.87 0.62 85 L 15000 0.54 0.66 Clear 145L free face first

MS04 FL 951 115 L 0L 130 L 115 L

Wasia 420 L

> Wasia loading and Ex 916 stopped due to shortage of drivers. Once drivers returns in midnight can restart them .
> BD 907 is breakdown need to chase to get it ready by midnight - Hill dump need pushing
> Need to arrange one flat bucket shovel from stock under MS02 bin , at present managing with cleaning shovel and a grill bucket.
> FL 951 and Fl 961 need to plan tomorrow morning one by one for Al bahar at Workshop.
Date : 04.02.2021 Q2 - Equipment movement plan for Weekend
Present Next Then
Plant Remarks
Machine Level Qty Sio2 Mgo Level Qty Sio2 Mgo Level Qty Sio2 Mgo

EX 918 165 L 15,000 0.19 0.84 180 L 65,000 0.55 0.54


CS002A
Ex 910 130 L 18,000 0.63 0.45 410 L 33,000 0.85 0.35

Ex 616 180 L ramp 3000 -- --

EX916 310 L 15,000 0.26 0.35 265L 20000 0.41 0.37


MS02
Ex 519 200 L

CR 16 FL 961 195 L 50,000 0.37 1.02 85 L 30000 0.87 0.72 .--15 L

Pulling
Pulling EX EX EX
EX 919 130L 15,000 0L 15,000 45 L 18,000 75L 2000 901 913 906
MS04
Cr 22- 992K A5 spillages -- --- Now 75 L -15 L 45 L

Next 115L 145 L


1 trucks from 470L to
Wasia EX 915 385 L 470 L 420 L CS02A

Ex 715 Ex 715 shall progress at 480L in night shift , In day shift shall be pulling 410L slipl ine.
Date : 21.01.2021 Q2 - Equipment movement plan for Weekend
Present Next Then
Plant Remarks
Machine Level Qty Sio2 Mgo Level Qty Sio2 Mgo Level Qty Sio2 Mgo

EX 918 180 L RRC side 10,000 0.58 0.62 195L RRC side 33,000 0.27 0.45 180 L MF 45,000 0.52 0.49

CS002A 165L RRC side


Ex 913 165 L 30,000 0.58 1.12 ramp -- -- --

EX715 250 L 5,000 0.18 0.6 180L sea side 8000 0.46 0.41 265 L wadi 15000 0.21 0.41
MS02
Ex 519 195L wadi -- -- -- ### 165 L --- -- --

CR 16 FL 961 145 L 8,000 0.57 0.96 230L 15000 0.20 1.70

EX 919 115 MOUNTAIN 15,000 0L 25,000 130 L 35000


MS04
Cr 22- 992K 75 L 4,000 .--15L 5,000 0L 3,000 65L ---

Wasia EX 915 470L 385 L 410 L


Date : 21.01.2021 Q2 - Equipment movement plan for Weekend
Present Next Then
Plant Remarks
Machine Level Qty Sio2 Mgo Level Qty Sio2 Mgo Level Qty Sio2 Mgo

EX 918 180 L RRC side 10,000 0.58 0.62 195L RRC side 33,000 0.27 0.45 180 L MF 45,000 0.52 0.49

CS002A 165L RRC side


Ex 913 165 L 30,000 0.58 1.12 ramp -- -- --

EX715 250 L 5,000 0.18 0.6 180L sea side 8000 0.46 0.41 265 L wadi 15000 0.21 0.41 180L sea side shall start after 145L
MS02
Ex 519 195L wadi -- -- -- ### 165 L --- -- --

CR 16 FL 961 145 L 8,000 0.57 0.96 230L 15000 0.20 1.70 85 L 15000 0.72 0.67 230L shall start tomorrow morning

EX 919 115 MOUNTAIN 15,000 0L 15,000 130 L 35000


MS04
Cr 22- 992K 75 L 4,000 .--15L 5,000 0L 3,000 65L ---

Wasia EX 915 470L 2,000 385 L 410 L


Date : 15.01.2021 Q2 - Equipment movement plan for Weekend
Present Next Then
Plant Remarks
Machine Level Qty Sio2 Mgo Level Qty Sio2 Mgo Level Qty Sio2 Mgo

EX 918 180 L 8,000 0.30 0.61 180L Mountain 25,000 0.56 0.60 250 L - Inside 25,000 0.18 0.60

CS002A
Ex 913 250L 36,000 0.25 0.58 165L sea side Ramp 30,000 0.28 1.12 145-130 Ramp 30,000 0.47 0.44

EX906 250 WADI 13,000 180 SEA SIDE WADI reffer whatsapp
MS02
Ex 519 195 L

CR 16 FL 961 85L 3,000 0.82 0.8 145 SEA SIDE 28000 0.57 0.96

EX 919 115 MOUNTAIN 25,000 0L 15,000 45 L 12000 65L 20000


MS04
Cr 22- 992K 230 L 25,000 145L sea side 8,000

410L sat
Wasia EX 915 400L 15,000 blast

> EX918 loading at 180L to clear the spillage then shift to 250L main face.
> Temporary Ex915 engaged for pulling at 470L once Ex715 got ready replace it and engage EX915 for wasia loading when the available of manpower.
Date : 08.01.2021 Q2 - Equipment movement plan for Weekend
Present Next Then
Plant Remarks
Machine Level Qty Sio2 Mgo Level Qty Sio2 Mgo Level Qty Sio2 Mgo

EX 918 195 L 195 L 38000 0.29 0.52 180 L MF 15,000 0.60 0.50

CS002A
Ex 913 265 L 0.37 0.38 Shall stop once MS02 restarts
Ex 910 480 L 13,000 1.27 0.45 265L 4000 0.37 0.38 165L - sea

Ex 906 145L 5,000 0.84 1.06 265L


MS02
Ex 519 195 L -- -- -- 180L

CR 16 FL 961 75 L 0.72 0.79 85 L 10000 0.74 0.7 265 L 11000 0.12 1.40

FL 919 75 L 10,000 100 L MF 65 L 40,000


MS04
230 L 15,000 130 L MF 3,000 130L sea side

Wasia EX 915 400 L 25,000 410 L sat --


blast
Date : 01.01.2020 Q2 - Equipment movement plan for Weekend
Present Next Then
Plant Remarks
Machine Level Qty Sio2 Mgo Level Qty Sio2 Mgo Level Qty Sio2 Mgo

EX 918 180 L MF 40,000 0.60 0.50 180 L RRC 50000


CS002A
Ex 910 165 L MF- 28/12 35,000 0.23 0.80 165 L -30/12 25,000 0.10 0.65

Ex 910 180 L 3,000


MS02
Ex 913 230 L 2,000 265 L wadi 40,000 0.30 0.5 Need to take care of clay at 130L

CR 16 FL 961 145 L 20,000 85 L 18000 0.56 0.65 Need to change to 85L if chemistry issue

MS04 FL 919 45 L 20,000 130 L 20000 115 L moutain 20,000

Wasia EX 915 420 L


400 -Sat
blast