CS2A / Cr16 FL 993K @ 65m cs2b side H/g FL 993K@180m and then to 280m After Saturday blast FL 993K go back to 165m step /145m side.
Pc1250 @ 65m for Cs2b with 2 trucks Pc1250 @ 65m for Cs2b with 2 trucks Can stop this once area is ready for drilling and push trucks for MS05
Note: No machine should move to next location unless material completed or permission from Superintendents/ Supervisor.
Prepared By: AGA
Date : 24.12.2020 Q2 - Equipment movement plan for Weekend
Present Next Then
Plant Remarks
Machine Level Qty Sio2 Mgo Level Qty Sio2 Mgo Level Qty Sio2 Mgo
180 L Sunday
EX 918 195 L 15,000 0.30 0.47 180 L main face 70000 0.55 0.69 blast
CS002A
PC 1250 265-250L 15,000 0.18 0.57 Shall start from 250L once 65L clear
EX 715 500 L 15,000 Day time - MS02 / Night - CS02A
CR 16 FL 961 145 L 3000 0.82 1.14 75 L 15,000 0.87 0.62 85 L 15000 0.54 0.66 Clear 145L free face first
Wasia 420 L
> Wasia loading and Ex 916 stopped due to shortage of drivers. Once drivers returns in midnight can restart them .
> BD 907 is breakdown need to chase to get it ready by midnight - Hill dump need pushing
> Need to arrange one flat bucket shovel from stock under MS02 bin , at present managing with cleaning shovel and a grill bucket.
> FL 951 and Fl 961 need to plan tomorrow morning one by one for Al bahar at Workshop.
Date : 04.02.2021 Q2 - Equipment movement plan for Weekend
Present Next Then
Plant Remarks
Machine Level Qty Sio2 Mgo Level Qty Sio2 Mgo Level Qty Sio2 Mgo
Pulling
Pulling EX EX EX
EX 919 130L 15,000 0L 15,000 45 L 18,000 75L 2000 901 913 906
MS04
Cr 22- 992K A5 spillages -- --- Now 75 L -15 L 45 L
Ex 715 Ex 715 shall progress at 480L in night shift , In day shift shall be pulling 410L slipl ine.
Date : 21.01.2021 Q2 - Equipment movement plan for Weekend
Present Next Then
Plant Remarks
Machine Level Qty Sio2 Mgo Level Qty Sio2 Mgo Level Qty Sio2 Mgo
EX 918 180 L RRC side 10,000 0.58 0.62 195L RRC side 33,000 0.27 0.45 180 L MF 45,000 0.52 0.49
EX715 250 L 5,000 0.18 0.6 180L sea side 8000 0.46 0.41 265 L wadi 15000 0.21 0.41
MS02
Ex 519 195L wadi -- -- -- ### 165 L --- -- --
EX 918 180 L RRC side 10,000 0.58 0.62 195L RRC side 33,000 0.27 0.45 180 L MF 45,000 0.52 0.49
EX715 250 L 5,000 0.18 0.6 180L sea side 8000 0.46 0.41 265 L wadi 15000 0.21 0.41 180L sea side shall start after 145L
MS02
Ex 519 195L wadi -- -- -- ### 165 L --- -- --
CR 16 FL 961 145 L 8,000 0.57 0.96 230L 15000 0.20 1.70 85 L 15000 0.72 0.67 230L shall start tomorrow morning
EX 918 180 L 8,000 0.30 0.61 180L Mountain 25,000 0.56 0.60 250 L - Inside 25,000 0.18 0.60
CS002A
Ex 913 250L 36,000 0.25 0.58 165L sea side Ramp 30,000 0.28 1.12 145-130 Ramp 30,000 0.47 0.44
EX906 250 WADI 13,000 180 SEA SIDE WADI reffer whatsapp
MS02
Ex 519 195 L
CR 16 FL 961 85L 3,000 0.82 0.8 145 SEA SIDE 28000 0.57 0.96
410L sat
Wasia EX 915 400L 15,000 blast
> EX918 loading at 180L to clear the spillage then shift to 250L main face.
> Temporary Ex915 engaged for pulling at 470L once Ex715 got ready replace it and engage EX915 for wasia loading when the available of manpower.
Date : 08.01.2021 Q2 - Equipment movement plan for Weekend
Present Next Then
Plant Remarks
Machine Level Qty Sio2 Mgo Level Qty Sio2 Mgo Level Qty Sio2 Mgo
EX 918 195 L 195 L 38000 0.29 0.52 180 L MF 15,000 0.60 0.50
CS002A
Ex 913 265 L 0.37 0.38 Shall stop once MS02 restarts
Ex 910 480 L 13,000 1.27 0.45 265L 4000 0.37 0.38 165L - sea
CR 16 FL 961 75 L 0.72 0.79 85 L 10000 0.74 0.7 265 L 11000 0.12 1.40
CR 16 FL 961 145 L 20,000 85 L 18000 0.56 0.65 Need to change to 85L if chemistry issue