19/01/2021
Average NC weldings per OP Average NC weldings per ISOLA % NC WELD SEAMS PER ISOLA & Average of wled seams to
OP120 53 CHASSIS rework per station
OP160 29 ISOLA6 53 44%
OP60 20
41%
OP30 19 78,0
OP150 17 ISOLA2 48
RB20 16
OP40 13 ISOLA7 38
OP70 13 26% 53,0
OP170 9
22% 22% 23% 48,0
OP15 9 ISOLA1 31 44,0
OP110 8
OP100 7
OP140 6 ISOLA4 25 13%
OP50 6 12% 11%
OP80 5 19,0
RB10 3 RB 19
OP90 3
OP10 2 ISOLA3 15
OP135 1
OP130 1
OP75 1 ISOLA5
R2 R 1 /5 R RB OP125 OP175
13
OP20 1 (6) (3/4/7)
GP12 O2C
12
3,5 3,25
Lundi Mardi Mercredi Jeudi Vendredi Samedi Dimanche Lundi Mardi Mercredi Jeudi Vendredi Samedi Dimanche 0% 0% 0% 0% 0%
Total defects Defects per chassis Controled chassis Lundi Mardi Mercredi Jeudi Vendredi Samedi Dimanche
19/01/2021
Holes Finition
Type of defects Top 5 OP with defects Top 5 ISOLA with defects
0% 0%
RB 17 17
11 11
0%
Components 10 15
8% 13
Safety 12
weldings 7 7
36%
Not safety
weldings
56%
OP110 OP150 OP70 OP30 OP170 ISOLA2 ISOLA4 ISOLA1 ISOLA7 ISOLA3