WELD INSPECTION REPORT/ SENTENCE SHEET
PRINT FULL NAME
‘SPECIMEN NUMBER
Face Defects
EXTERNAL DEFECTS: Defecis Noted | EXTERNAL DEFECTS Defects Noted
Defect Type ‘Accumulative | Maximum ‘Section! | Accept
Total Allowance Table N’ | Reject
1 2 3 4 5
Reinforcement(Helght) ‘3mm 15
Reinforcement (Appearance) ‘Smooth toe blend | 18
Theompee Filing! Incomplete Na porated A
Slag Inclusions: mm a
Undercut 1mm i
Surface Porosity, immo 2
Cracks Not permitted 1
Lack of fusion Not permitted 5
Arc strikes ‘Test with MPI 12
‘Mechanical damage -
Misalignment O2t=2mm 2
Root defects.
Misalignment (0.21 =2 mm 3
Penetration (Height) 2mm 16
Incomplete Root Penetration Not permitted
Lack of Root Fusion: Not permitted 5
Root Concavity mm max 19
Root Undercut =
Cracks : 5
Mechanical damage Not permitted 4
Porosity - :
Burn-through Not permitted 16
Misalignment (0.2t= 2mm 8
‘This“pipe/ plate has been examined to the requirements of code/ specification TWH 09-09-06
And is *accepted/ rejected accordingly.
SIgMALUFE. sone Date.
*Delete which is not applicable. Use the other side for any comments,
‘Comments
+ Request Penetrant NDT testing to confirm crack and true length,
++ Large amount of spatter on weld face. Recommend cleaning, then re-inspection.
+++ recommend arc strikes are ground flush prior to MPI testing for crack detection.
‘Seek advice on repair upon test results.
‘This completes the practical Butt Plate Joint Inspection Assessment
1641
a
i
a
1
i
1
x
¥
a
x
a (GOVE CTEM) TVANTN NY nad v
‘uyue | veid yeqay uep Guelveg feduuibuayy ueynpnpay
™ tebunqueg siuop jeduury sasaig Lueyeundip Buek poy
‘uebueyepue |
Zep | Jeans exnW
Zuenduey
(vesag jruny)) eweN
TWNSIA NV¥SMINaWad NVI NYYORYT
1651¥OdTY FLV Id NOILIIASNI TYNSIA dIMSO
l
Looe TEA
Zuep z yeuns exnWW
166Lampiran 3
DYE PENETRANT TEST REPORT
COMPANY
TOENG:
‘COMPANY LOGO TEST COUPON PLATE NO:
5 DATE
PENETRANTTESTINGREPORT Boze os
m3 eae
Traitor No Tseatan
Waters rexreat See
face eat Teainert
Tecess Tapraste hea
apecton Sided ASUE V Sesion Maced RecepianceSinodad AGVEVAncoo, ABS
Taroorent
Manufacturing Process: MILD STEEL WELDED PLATE.
wm | Penetration
5 | wateraasn PostEmulfy Sovent Remove
3 | FerevantTy5=
& | Veoe Fourscent
| oece pesca Eels peace
Tevebper toe
Dy: Wet aqueous: Non-aqueous:
7 [Sutacacaarea Tesi Tae T
4 (So
2 [ReroverApoeaton raster ae Tan
GQ [Batace Drying Method: Max Teroerature: c
e032" Appieaton Sudace Dy bev Roa en
Renova of Yealaiera Freitag
AYR
ConearentorWied] C | E
Idenifeaton [C4 | DelectDeserpton, LocatonandRemans
E &
P c
T 1
[Teanean Wanager
sae alr
Ta Date
167Bret Gescrpion of technique used with any appicable Penetrant Tesnng Equpment
1
2
3
=
: WELDFACE
mas
168Lampiran 4
NA
Wagnetic Particle Inspection Report
CUENT LOCATION INSPECTION DATE
Talisman Energy (UK) Montrose 19/03/2008
Limited ‘CAN JOB NO. REPORT NO.
6B4433 MON 4428
CLIENT ORDER NO. SHEET OF
1
COMPONENT/DESCRIPTIONDRAWINGNO.
11090 — Second Stage Separator Train2
MATERIAL
Carbon Steel
FROCEDURENVORK INSTRUCTION TECHNIQUE
Wpo01g
‘SURFACE CONDITION
Bare & Clean
“ACCEPTANCE STANDARD
B313
before remedial welding.
No surface breaking defects were identified.
EQUIPMENT FOWERICURRENT WATERIAL THICKNESS,
CAN SB E52 Y6 Yok 110v NA
WETHOD MEDIUM BACKGROUND
Continuous Flow Neoastra Water Based NA
Fluorescent
RESULTS
Wet Fluorescent MPI was carried out between the § and 7 o'clock position on the internal vessel shell
This report reales excusnely to the work ordered andlor the Rema) mspected. Ishak not De
reproduced except in full without the approval ofthe inspection body and the cient
CAN INSPECTOR TSSUING AUTHORITY
SIGN SIGN
NAME. Bruce McKenzie NAME
QUALS PCNLevel 2 DATE
CLIENT
SIGN
NAME
DATE
169ULTRASONIC INSPECTION REPORT
Lampiran 5
4
‘SPECIMEN DESCRIPTION:
‘SPECIMEN NUMBER:
PURPOSE OF INSPECTION:
‘AREA OF INSPECTION:
EQUIPMENT USED
FLAWDETECTOR PROBES
Wake Serial No.
Model: Frequency
Seria No Angie
REPORT:
NAME: SIGNATURE:
170