Poineer Cement Factory SS/Result/

Khushab Date:-

Project:- Poineer Cement Factory Khushab

Subject:- Compressive strength of concrete cubes

Dear Sir,

We received 3 nos. of concrete cubes after 48 days of making and curing them for their testing of compressive
strength.
Please find enclosed here with test results for your information and record.

Detailed of the results are as under:-

Age
Description of Casting Testing Load Compressive Strength
Cubes Date Date (Days) (lbs) (Psi)

O/H/S 24/7/2018. 10/09/2018. 48 days 173000 4806


O/H/S 24/7/2018. 10/09/2018. 48 days 187000 5194
O/H/S 24/7/2018. 10/09/2018. 48 days 221000 6139
Avg 5380
Note:-
1- The responsibility of concrete cubes making curing etc. rests, with client.
2- The results may be compared with the project specification relevant standards as the case may be.

Director
Soil & Foundation Engineering
Services