Project Manager

Gulmohar Trade Centre

Project:- Gulmohar trade centre, plot no. 8-F, Main markeet, Gulberg, Lahore

Subject:- Compressive strength of concrete cylinders


Dear Sir,
We received 3 Nos. of concrete cylinder after 28 days making and curing them for their testing of compressive
strength.
Please find enclosed herewith test results for your information and record.

Detailed of the results are as under:-

Age Load
Testing
Description of Casting Date
Date
Cylinder (Days) (lbs)

Column A-2
(level Up to 07-01-2019. 04-02-2019. 28 days 148000
-19',8'')
Column B-1
(level Up to 07-01-2019. 04-02-2019. 28 days 144000
-19',8'')

Column D-3
(level Up to 07-01-2019. 04-02-2019. 28 days 146000
-19',8'')

Avg
Note:-
1- The responsibility of concrete cylinder making curing etc. rests, with client.
2- The results may be compared with the project specification relevant standards as the case may be.

Deputy Director
Soil & Foundation Engineering
Services
SS/Result/
Date:-

eet, Gulberg, Lahore

g them for their testing of compressive

Compressive Strength
(Psi)

5232

5090

5161

5161