Project:- Gulmohar trade centre, plot no. 8-F, Main markeet, Gulberg, Lahore
Age Load
Testing
Description of Casting Date
Date
Cylinder (Days) (lbs)
Column A-2
(level Up to 07-01-2019. 04-02-2019. 28 days 148000
-19',8'')
Column B-1
(level Up to 07-01-2019. 04-02-2019. 28 days 144000
-19',8'')
Column D-3
(level Up to 07-01-2019. 04-02-2019. 28 days 146000
-19',8'')
Avg
Note:-
1- The responsibility of concrete cylinder making curing etc. rests, with client.
2- The results may be compared with the project specification relevant standards as the case may be.
Deputy Director
Soil & Foundation Engineering
Services
SS/Result/
Date:-
Compressive Strength
(Psi)
5232
5090
5161
5161