PERT - CPM

TWO STOREY RESIDENTIAL BUILDING

ITEM OF WORK ACTIVITIES (WEEKS) 1 2 3 4


ACTIVITIES (DAYS) 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7

1 EXCAVATION
2 FOUNDATION
3 FOOTING TIE BEAM
4 COLUMN
5 FLOOR SLAB (2nd FLOOR)
6 COLUMN/WALL LAYERING
7 ROOF BEAM
8 STEEL TRUSSES
9 PLASTERING/MOULDING
10 ROOFING
11 CEILING
12 FLOOR TILING
13 PLUMBING
14 ELECTRICAL
15 PAINTING
16
PERT - CPM
TWO STOREY RESIDENTIAL BUILDING

ITEM OF WORK ACTIVITIES (WEEKS) 5 6 7 8


ACTIVITIES (DAYS) 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7

1 EXCAVATION
2 FOUNDATION
3 FOOTING TIE BEAM
4 COLUMN
5 FLOOR SLAB (2nd FLOOR)
6 COLUMN/WALL LAYERING
7 ROOF BEAM
8 STEEL TRUSSES
9 PLASTERING/MOULDING
10 ROOFING
11 CEILING
12 FLOOR TILING
13 PLUMBING
14 ELECTRICAL
15 PAINTING
16