Professional Documents
Culture Documents
GBR Lanjt Rabat Beton GKT U2K.350
GBR Lanjt Rabat Beton GKT U2K.350
Sema
GAMBAR BESTEK
k Be
luk
ar
STA
0+150
ar
luk
k Be luk
ar
Sema k Be
STA Sema
0+200
STA
3.94 0+30
0
STA
4.10 8 0
0+10
3.44
4.10 88 STA
8
4.76 0+25
0
4.80 1
5.03 8
4.90 81
4.55
STA
5.12 3
5.08 8
4.03
6
4.72
5.04 8
3 0+35
4.88 8
4.98 7
4.94
0
4.65
4.70 86
4.22 7 0
8
3.66
3.46 6
4.80
4.93 7
PEKERJAAN :
4.41 8 4
4.31 0 4.75
0 5.02 4.85 5
4.99 9 4.09 5
4.93 5 STA
5.01 9 4.34
5
luk
ar
4.67 7 4.49 9 4.96 0+400
3.93 9 3.92 9 5.05 0 k Be
4.64
4.54 99 4.57 9
5.02 4 5.10 0 4.82 Sema
9 4.95 1 0 4.93 5
4.17
5.06 8
4.90
4.95 0 4.92 55
ar 5.12 5 5.65 0 5
4.51 0 STA
Beluk 4.56 9 0 5.06
k 3.92 9 4.19 0 0+45
Sema ar 4.46 1
STA
4.86
0
5.34
4.75 8
4.31
0
8
5.05 0
4.93 8
4.92 8
5.00
5.16 8
4.75 8
3.99 8
3
4.32 8
5.18 0
8
4.38
5.13 0 5.00
4.25 0 5.11 0 STA
STA
7
4.8150 5.16 0
5.23 0
0 5.55 8 6
5.34 8 ar
4.46 3
luk
2
5.31 0
4.31
k Be
4.69 8
5.02 2
3.86
5.27 0
4.92 4
Sema
6
3.99 95
2
4.43 3
4.95
4.93
3
5.19
4.21
4.91 58
4.77 5
5
STA
0
5.18
0+00
5.39 0
5.8 2
6
5.11
wit
4.8938
5.1830 an
4.91
4.4 1
n Sa
erja
4.0355
4.81
0
5.03 6
4.94 8
Kebu
8
Pek
hir
luk
ar Ak 89525 9
k Be
n Sema X=1 5871
aa Y=4
kerj
l Pe
A wa 7
8909 0
X=1 5893
Y=4
ar
luk
k Be
Sema
Sema
k Be
luk
ar
Sema
k Be
luk
ar
LOKASI :
8896
3
Sema
k Be
luk
ar
KAMPUS UNIVERSITAS TEUKU UMAR Sema
k Be
luk
ar
X=1 58786
Y=4 luk
ar
k Be
Sema
ar
luk
k Be
Sema
lam
SUMBR DANA :
Ko
lam
Ko
ar
t lam luk
Sawi Ko k Be
n Sema
Kebu luk
ar
Ko
lam k Be
Sema
Ko
lam
Ko
Ko
lam
lam
Ko
lam
Lapa
ngan
Baske
t
Ko
lam
Sema
k Be
luk
ar APBN-PNBP ar
luk
k Be
Sema
lam
Ko
ar ar
luk luk
k Be k Be
Sema Sema
lly
Vo
an
La pang
ar
luk
k Be luk
ar
Sema k Be
Sema ar
luk
k Be ar
Sema luk
k Be
Sema
Sema
k Be
luk
ar
k Be
luk
ar
Konsultan Perencana :
Sema
ar
luk
k Be
Sema
ar ar
luk luk
k Be k Be
Sema Sema
ar
luk
k Be
Sema
ar
luk
k Be
Sema
ar
luk
k Be
Sema
Kebun Sawit
Semak Belukar
Semak Belukar
0+ TA
0
S
10
S
0+ TA
15
0
51
01 8
4.5
4.84.03 6
03
U
4.9
2
5.1 .948 8
4 .04
Semak Belukar 6068
80
5
4 3.4.1
48 8
4
4
0+ TA
0
4.75.03 83
S
05
68 8
5.0 .65668 0
S
4 3.4.41 10
0+ TA
4 .3
20
4
0
18
Awal Segmen B
0+ TA
4.3 68 8
18
3
4.5
3.8.75
S
02
4 X=189112
08
5.0 28 8
38
4.9
4.9 .75 88
4 4.2.9
27 7
0+ TA
93
4 .3 28
4
3.9
0+ & 0
4 .3
S
00
4
5.0 .99 17 9
4 .0 7 9
0
13 2
29 9
10
5 .6 3 9
4.3.46 68
Semak Belukar S
4 3.9 4 49
0+ TA
4 .8 2
Akhir Segmen A
4.64.5
3 .69 25
4
24
26 0
Akhir Segmen C
5.0
4.9 X=189112
4.4.99 5
39 S
3 .95
0+ TA
33 3
4.9
4
X=189097 16 Y=458945 30
5.1 .996 8 0 Semak Belukar
4 .91
Y=458930
4.34.49 29 4
4
93
11
49 9
4.8
3.94.5.07 2158
4.8 .45536
5 .9 65
4 .0 29
4 4.0
48 8
4.9.03
5 .1 69 1
5
0+ TA
Awal Segmen A
5 .5 2 1
55 5
4 3.9.46 61
S
05
4
4 .3
4
X=189097
4.9 .05 00
5 .1
60 0
5 0050 0
Y=458930 S
4.94.9.65 10
0+ TA
5 .5
35
4
16 0
5.1
4.9 .996
18
4
9 3
4.8
11
55 6
4.8
4.44.03 48
38
4.84.93 7525
5.0
4.9
25 5
0+ TA
4.14.9
0
S
00
5.0 .19 30
4 .2 75
60 9
5 .0 00 0
S
5 4.8.50 60
Semak Belukar 0+ TA
4 .3
4
40
0
16
5.1
Awal Segmen C
96
18
4.9
Kebun Sawit 4.9 .893
4
4.0 11
X=189036
4.8
4 4.2.8 60
4.4 .038 8
60 0
36
4 4.8 40
Y=458862 5 .94
4
5.3 .058 0
5 .16 80 0
5 5.1 3 0
Semak Belukar
5.14.2.95 5010
4 .8
4
ST 450
0+
A
5.0 .11 90 0
5 .6 6 8
00 0
4 5.1.23 58
5 .5 40
5 .3 0
5 .31 2
5 .27 8
5 .19 15 5
Semak Belukar
5 4.2.91 5
4 .77
Semak Belukar
4
0+
ST 516
X=188963
A
Y=458786
Kolam
Kolam
5.1 .390 0
Semak Belukar
5 .43 2
80
5 .41 0
5 .83 80
5 .1
5
Kolam Kolam
Semak Belukar
Kolam
Kolam
Akhir Segmen B
Semak Belukar Lapangan Volly X=189525 Semak Belukar
Kolam
Kolam Y=458719
Semak Belukar
Kolam
Kolam
Lapangan Basket
Semak Belukar
Semak Belukar
Semak Belukar
Semak Belukar
Semak Belukar
Semak Belukar
Semak Belukar
Semak Belukar
Semak Belukar
Semak Belukar
Semak Belukar
Semak Belukar
Semak Belukar
Semak Belukar
Semak Belukar
Semak Belukar
Semak Belukar
SEGMEN C & A
Se
STA
m
ak
0+000
Be
U
&
lu
STA STA STA
ka
r
0+000 0+050 0+100 0+023
Akhir Segmen C
Awal Segmen C
X=189036
X=189097 Akhir Segmen A
Y=458930 X=189112
Y=458862
Y=458945
4.313
4.156 3.983 5.116 4.462
Se
4.426 4.303 4.996 3.868
m
ak
4.836 4.871 4.918 4.692
Be
4.831 4.897 4.893 5.024
lu
ka
4.864 4.911 4.811 4.926
r
4.455 4.955
5.046 4.538 4.036 4.939
3.926 5.038 3.993
5.028 4.422 4.948 4.433
4.372
Awal Segmen A
X=189097
Se
Y=458930
m
ak
Be
lu
ka
Se
r
m
ak
Be
lu
ka
r
9.000
8.000
7.000
6.000
LAPISAN PONDASI AGREGAT KELAS B (t = 12 cm) LAPISAN PONDASI AGREGAT KELAS B (t = 12 cm)
BESI WIRE MESH M-6 BESI WIRE MESH M-6
BETON COR K-300 (t = 15 cm) BETON COR K-300 (t = 15 cm)
BETON KURUS (t = 5 cm) BETON KURUS (t = 5 cm)
5.000
4.000
3.000
REFERENCE
LEVEL
+2.000 m
4.831
4.897
4.893
4.763
4.826
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
50.000 50.000 23.000
DISTANCE (m)
5.000
5.000
5.000
5.000
5.000
ELEVASI RENCANA
PLAN ELEVATION
PATOK
0+000 0+050 0+100 0+000 0+023
STATION
SEGMEN A
10.000
9.000
8.000
7.000
0+000 15.00
12.00
6.000 Besi Wire Mesh M-6
Beton Cor K-350 (t = 15 cm)
Beton Kurus (t = 5 cm)
Lapisan Pondasi Agregat
C Kelas B (t = 14 cm)
L
2% 2%
5.000 1 1
2 2
REFERENCE
4.000
LEVEL
+3.000 m
5.116
4.918
4.800
4.763
4.782
4.455
4.036
5.038
4.948
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
3.000 3.000 3.000 3.000 3.000 1.500 1.500 2.000
DISTANCE (m)
4.900
5.000
4.900
ELEVASI RENCANA
PLANE LEVEL
10.000
9.000
8.000
7.000
0+023 12.50
12.00
6.000 Besi Wire Mesh M-6
Beton Cor K-350 (t = 15 cm)
Beton Kurus (t = 5 cm)
Lapisan Pondasi Agregat
C Kelas B (t = 14 cm)
L
2% 2%
5.000 1 1
2 2
REFERENCE
4.000
LEVEL
+3.000 m
4.313
4.462
3.868
4.692
5.024
4.926
4.955
4.939
3.993
4.433
4.364
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
2.000 1.500 2.000 6.000 2.000 2.000 2.000 1.500 1.500 2.000
DISTANCE (m)
5.000
4.900
4.900
ELEVASI RENCANA
PLANE LEVEL
SEGMEN A
9.000
8.000
7.000
0+000 15.00
6.000
Tanah Galian
5.000 CL
REFERENCE
4.000
LEVEL
+3.000 m
5.116
4.918
4.800
4.763
4.782
4.455
4.036
5.038
4.948
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
3.000 3.000 3.000 3.000 3.000 1.500 1.500 2.000
DISTANCE (m)
4.557
ELEVASI RENCANA
PLANE LEVEL
10.000
9.000
8.000
7.000
0+023 12.50
6.000
Tanah Galian
CL
5.000
REFERENCE
4.000
LEVEL
+3.000 m
4.313
4.462
3.868
4.692
5.024
4.926
4.955
3.993
4.433
4.364
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
2.000 1.500 2.000 6.000 2.000 2.000 2.000 1.500 1.500 2.000
DISTANCE (m)
4.557
ELEVASI RENCANA
PLANE LEVEL
SEGMEN B
STA
STA
STA 0+250
0+200
0+150
4.349
4.727 4.499
3.948 4.987 3.929
4.227 4.574
4.108 4.934 5.021
3.448 4.958
4.108
5.029 5.065
4.768 4.999 5.129
5.038
5.083
4.656
3.468
5.017
4.679
3.939
4.649
4.569
3.921
4.461
4.361
U
4.410 4.549
4.310
0+100
STA
4.551
4.801
4.038
4.903
5.126
4.948
5.048
4.880
3.666
4.808
4.708
r
ka
elu
B
ak
m
Se
0+050
STA
4.318
4.518
3.868
4.758
5.008
4.938
4.928
4.758
3.993
4.388
4.328
9.000
8.000
7.000
0+023
STA
4.313
4.462
3.868
4.692
5.024
4.926
4.955
4.939
3.993
4.433
5.000
4.000
3.000
Awal Segmen B REFERENCE
X=189097 LEVEL
+2.000 m
Y=458930
4.826
4.938
4.948
5.083
4.999
5.065
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
27.000 50.000 50.000 50.000 50.000
DISTANCE (m)
5.000
5.000
5.000
5.000
5.000
5.000
ELEVASI RENCANA
PLAN ELEVATION
PATOK
0+023 0+050 0+100 0+150 0+200 0+250
STATION
9.000
8.000
7.000
LAPISAN PONDASI AGREGAT KELAS B (t = 12 cm)
BESI WIRE MESH M10
BETON COR K-300 (t = 15 cm)
BETON KURUS (t = 5 cm)
TANAH GALIAN
6.000
LAPISAN PONDASI AGREGAT KELAS B (t = 12 cm)
BESI WIRE MESH M10
BETON COR K-300 (t = 15 cm)
BETON KURUS (t = 5 cm)
5.000
4.000
3.000
REFERENCE
LEVEL
+2.000 m
5.065
5.050
4.989
5.160
5.310
5.430
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
50.000 50.000 50.000 50.000 66.000
DISTANCE (m)
5.000
5.000
5.000
5.000
5.000
5.000
ELEVASI RENCANA
PLAN ELEVATION
PATOK
0+250 0+300 0+350 0+400 0+450 0+516
STATION
4.349
4.727 4.499
3.948 4.987 3.929
4.227 4.574
4.108 4.934 5.021
3.448 4.958
4.108
5.029 5.065
4.768 4.999 5.129
5.038
5.083
4.656
3.468
5.017
4.679
3.939
4.649
4.569
3.921
4.461
4.361
U
4.410 4.549
4.310
0+100
STA
4.551
4.801
4.038
4.903
5.126
4.948
5.048
4.880
3.666
4.808
4.708
r
ka
elu
B
ak
m
Se
0+050
STA
4.318
4.518
3.868
4.758
5.008
4.938
4.928
4.758
3.993
4.388
4.328
9.000
8.000
7.000
0+023
STA
4.313
4.462
3.868
4.692
5.024
4.926
4.955
4.939
3.993
4.433
5.000
0+000
STA
5.116
4.996
4.918
4.893
4.811
4.455
4.036
5.038
4.948
4.000
3.000
4.826
4.938
4.948
5.083
4.999
5.065
ELEVASI TANAH ASLI
5.000
5.000
5.000
5.000
5.000
5.000
ELEVASI RENCANA
PLAN ELEVATION
PATOK
0+000 0+023 0+050 0+100 0+150 0+200 0+250
STATION
9.000
8.000
7.000
LAPISAN PONDASI AGREGAT KELAS B (t = 12 cm)
BESI WIRE MESH M-6
BETON COR K-300 (t = 15 cm)
BETON KURUS (t = 5 cm)
TANAH GALIAN
6.000
LAPISAN PONDASI AGREGAT KELAS B (t = 12 cm)
BESI WIRE MESH M-6
BETON COR K-300 (t = 15 cm)
BETON KURUS (t = 5 cm)
5.000
4.000
3.000
REFERENCE
LEVEL
+2.000 m
5.065
5.050
4.989
5.160
5.310
5.430
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
50.000 50.000 50.000 50.000 66.000
DISTANCE (m)
5.000
5.000
5.000
5.000
5.000
5.000
ELEVASI RENCANA
PLAN ELEVATION
PATOK
0+250 0+300 0+350 0+400 0+450 0+516
STATION
4.349
4.727 4.499
3.948 4.987 3.929
4.227 4.574
4.108 4.934 5.021
3.448 4.958
4.108
5.029 5.065
4.768 4.999 5.129
5.038
5.083
4.656
3.468
5.017
4.679
3.939
4.649
4.569
3.921
4.461
4.361
U
4.410 4.549
4.310
0+100
STA
4.551
4.801
4.038
4.903
5.126
4.948
5.048
4.880
3.666
4.808
4.708
r
ka
elu
B
ak
m
Se
0+050
STA
4.318
4.518
3.868
4.758
5.008
4.938
4.928
4.758
3.993
4.388
4.328
9.000
8.000
7.000
0+023
STA
4.313
4.462
3.868
4.692
5.024
4.926
4.955
4.939
3.993
4.433
6.000
5.116
4.996
4.918
4.893
4.811
4.455
4.036
5.038
4.948
4.000
3.000
4.826
4.938
4.948
5.083
4.999
5.065
ELEVASI TANAH ASLI
4.557
4.557
4.557
4.557
4.557
4.557
ELEVASI RENCANA
PLAN ELEVATION
PATOK
0+000 0+023 0+050 0+100 0+150 0+200 0+250
STATION
4.860 5.000
STA 4.825
4.960
4.200
5.110
4.850 4.690
0+250 4.755 4.935 4.860 5.160
4.855 4.175 5.238
4.095 4.925 5.340 5.558 5.180
4.935 5.340
5.058 5.390
5.060 5.160 5.310 5.430
4.960 4.199 5.180
5.050 5.230 5.130 5.272 5.412
5.100 5.075 4.250 5.198 5.830
4.800 4.950 4.215
4.900 4.500 4.810 4.915 5.180
4.349 4.950 4.360 4.775 5.040
5.650
4.499 4.510
3.929
4.574
5.021
4.958
5.065
5.129
4.569
3.921
4.461
4.361
Akhir Pekerjaan
X=189525
Y=458719
9.000
8.000
7.000
6.000
TANAH GALIAN
5.000
4.000
3.000
REFERENCE
LEVEL
+2.000 m
5.065
5.050
4.989
5.160
5.310
5.430
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
50.000 50.000 50.000 50.000 66.000
DISTANCE (m)
4.557
4.557
4.557
4.557
4.557
4.557
ELEVASI RENCANA
PLAN ELEVATION
PATOK
0+250 0+300 0+350 0+400 0+450 0+516
STATION
SEGMEN B
10.000 10.000
9.000
8.000
7.000
0+023 12.50
6.000
Tanah Galian
CL
5.000
REFERENCE
4.000
LEVEL
+3.000 m
4.313
4.462
3.868
4.692
5.024
4.926
4.955
4.939
3.993
4.433
4.364
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
2.000 1.500 2.000 6.000 2.000 2.000 2.000 1.500 1.500 2.000
DISTANCE (m)
4.557
ELEVASI RENCANA
PLANE LEVEL
10.000
9.000
8.000
7.000
0+050 12.50
6.000
Tanah Galian
CL
5.000
REFERENCE
4.000
LEVEL
+3.000 m
4.318
4.518
3.868
4.758
5.008
4.938
4.928
4.758
3.993
4.388
4.328
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
2.000 1.500 2.000 6.000 2.000 2.000 2.000 1.500 1.500 2.000
DISTANCE (m)
4.557
ELEVASI RENCANA
PLANE LEVEL
9.000
8.000
7.000
0+100 11.50
6.000
Tanah Galian
CL
5.000
REFERENCE
4.000
LEVEL
+3.000 m
4.551
4.801
4.038
4.903
5.126
4.948
5.048
4.880
3.686
4.808
4.708
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
2.000 1.500 1.500 3.000 3.000 3.000 2.500 1.500 1.000 2.000
DISTANCE (m)
4.557
ELEVASI RENCANA
PLANE LEVEL
10.000
9.000
8.000
7.000
0+150 12.20
6.000
Tanah Galian
CL
5.000
REFERENCE
4.000
LEVEL
+3.000 m
3.948
4.108
3.448
4.108
4.768
5.038
5.083
4.656
3.468
4.410
4.310
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
2.000 1.500 1.500 5.000 1.700 2.500 3.000 1.500 1.500 2.000
DISTANCE (m)
9.000
8.000
7.000
0+200 12.00
6.000
Tanah Galian
CL
5.000
REFERENCE
4.000
LEVEL
+3.000 m
4.727
4.987
4.227
4.934
5.029
4.999
5.017
4.679
3.939
4.649
4.549
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
2.000 1.500 1.500 5.500 2.000 2.500 2.000 1.500 1.500 2.000
DISTANCE (m)
4.557
ELEVASI RENCANA
PLANE LEVEL
10.000
9.000
8.000
7.000
0+250 12.00
6.000
Tanah Galian
CL
5.000
REFERENCE
4.000
LEVEL
+3.000 m
4.349
4.499
3.929
4.574
5.021
4.958
5.065
5.129
4.569
3.921
4.461
4.361
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
2.000 1.500 1.500 2.000 3.000 2.000 2.000 3.000 1.500 1.500 2.000
DISTANCE (m)
9.000
8.000
7.000
0+300 13.50
6.000
Tanah Galian
CL
5.000
REFERENCE
4.000
LEVEL
+3.000 m
4.755
4.855
4.095
4.935
4.960
5.050
5.100
4.900
4.950
5.650
4.510
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
2.000 1.500 1.500 5.000 2.000 3.000 3.500 1.500 1.500 2.000
DISTANCE (m)
4.557
ELEVASI RENCANA
PLANE LEVEL
10.000
9.000
8.000
7.000
0+350 13.50
6.000
Tanah Galian
CL
5.000
REFERENCE
4.000
LEVEL
+3.000 m
4.825
4.935
3.805
4.925
5.060
4.199
5.230
5.075
4.800
4.500
4.360
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
2.000 1.500 1.500 6.000 2.000 2.000 3.000 1.500 1.500 2.000
DISTANCE (m)
4.557
ELEVASI RENCANA
PLANE LEVEL
9.000
8.000
7.000
0+400 14.00
6.000
Tanah Galian
CL
5.000
REFERENCE
4.000
LEVEL
+3.000 m
4.860
4.960
4.200
4.850
4.860
5.340
5.058
5.160
5.180
5.130
4.250
4.950
4.810
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
2.000 1.500 1.500 1.750 3.000 3.000 2.250 2.000 2.000 1.500 1.500 2.000
DISTANCE (m)
4.557
ELEVASI RENCANA
PLANE LEVEL
10.000
9.000
8.000
7.000
0+450 16.00
6.000
Tanah Galian
CL
5.000
REFERENCE
4.000
LEVEL
+3.000 m
5.000
5.110
4.210
5.160
5.238
5.558
5.340
5.310
5.272
5.198
4.215
4.915
4.775
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
2.000 1.500 1.500 2.000 2.000 3.000 3.000 3.000 3.000 1.500 1.500 2.000
DISTANCE (m)
4.557
ELEVASI RENCANA
PLANE LEVEL
9.000
8.000
12.00
7.000
0+516
5.000
REFERENCE
4.000
LEVEL
+3.000 m
5.180
5.390
5.430
5.412
5.830
5.180
5.040
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
3.000 3.000 3.000 3.000 2.000 3.000
DISTANCE (m)
4.557
ELEVASI RENCANA
PLANE LEVEL
SEGMEN B
10.000
9.000
8.000
7.000
0+023 12.50
7.00
Lapisan Pondasi Agregat Kelas B (t = 12 cm)
6.000 Besi Wire Mesh M-6
Beton Cor K-350 (t = 15 cm)
Beton Kurus (t = 5 cm)
CL
2% 2%
5.000 1 1
2 2
REFERENCE
4.000
LEVEL
+3.000 m
4.313
4.462
3.868
4.692
5.024
4.926
4.955
4.939
3.993
4.433
4.364
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
2.000 1.500 2.000 6.000 2.000 2.000 2.000 1.500 1.500 2.000
DISTANCE (m)
5.000
4.900
4.900
ELEVASI RENCANA
PLANE LEVEL
10.000
9.000
8.000
7.000
0+050 12.50
7.00
Lapisan Pondasi Agregat Kelas B (t = 12 cm)
6.000 Besi Wire Mesh M-6
Beton Cor K-350 (t = 15 cm)
Beton Kurus (t = 5 cm)
CL
2% 2%
5.000 1 1
2 2
REFERENCE
4.000
LEVEL
+3.000 m
4.318
4.518
3.868
4.758
5.008
4.938
4.928
4.758
3.993
4.388
4.328
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
2.000 1.500 2.000 6.000 2.000 2.000 2.000 1.500 1.500 2.000
DISTANCE (m)
5.000
4.900
4.900
ELEVASI RENCANA
PLANE LEVEL
9.000
8.000
7.000
0+100 11.50
7.00
Lapisan Pondasi Agregat Kelas B (t = 12 cm)
6.000 Besi Wire Mesh M-6
Beton Cor K-350 (t = 15 cm)
Beton Kurus (t = 5 cm)
CL
2% 2%
5.000 1 1
2 2
REFERENCE
4.000
LEVEL
+3.000 m
4.551
4.801
4.038
4.903
5.126
4.948
5.048
4.880
3.686
4.808
4.708
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
2.000 1.500 1.500 3.000 3.000 3.000 2.500 1.500 1.000 2.000
DISTANCE (m)
4.900
5.000
4.900
ELEVASI RENCANA
PLANE LEVEL
10.000
9.000
8.000
7.000
0+150 12.20
7.00
Lapisan Pondasi Agregat Kelas B (t = 12 cm)
6.000 Besi Wire Mesh M-6
Beton Cor K-350 (t = 15 cm)
Beton Kurus (t = 5 cm)
CL
2% 2%
5.000 1 1
2 2
REFERENCE
4.000
LEVEL
+3.000 m
3.948
4.108
3.448
4.108
4.768
5.038
5.083
4.656
3.468
4.410
4.310
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
2.000 1.500 1.500 5.000 1.700 2.500 3.000 1.500 1.500 2.000
DISTANCE (m)
4.930
5.000
4.930
ELEVASI RENCANA
PLANE LEVEL
9.000
8.000
7.000
0+200 12.00
7.00
Lapisan Pondasi Agregat Kelas B (t = 12 cm)
6.000 Besi Wire Mesh M-6
Beton Cor K-350 (t = 15 cm)
Beton Kurus (t = 5 cm)
CL
2% 2%
5.000 1 1
2 2
REFERENCE
4.000
LEVEL
+3.000 m
4.727
4.987
4.227
4.934
5.029
4.999
5.017
4.679
3.939
4.649
4.549
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
2.000 1.500 1.500 5.500 2.000 2.500 2.000 1.500 1.500 2.000
DISTANCE (m)
4.930
5.000
4.930
ELEVASI RENCANA
PLANE LEVEL
10.000
9.000
8.000
7.000
0+250 12.00
7.00
Lapisan Pondasi Agregat Kelas B (t = 12 cm)
6.000 Besi Wire Mesh M-6
Beton Cor K-350 (t = 15 cm)
Beton Kurus (t = 5 cm)
CL
2% 2%
5.000 1 1
2 2
REFERENCE
4.000
LEVEL
+3.000 m
4.349
4.499
3.929
4.574
5.021
4.958
5.065
5.129
4.569
3.921
4.461
4.361
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
2.000 1.500 1.500 2.000 3.000 2.000 2.000 3.000 1.500 1.500 2.000
DISTANCE (m)
4.930
5.000
4.930
ELEVASI RENCANA
PLANE LEVEL
9.000
8.000
7.000
0+300 13.50
7.00
Lapisan Pondasi Agregat Kelas B (t = 12 cm)
6.000 Besi Wire Mesh M-6
Beton Cor K-350 (t = 15 cm)
Beton Kurus (t = 5 cm)
CL
2% 2%
5.000 1 1
2 2
REFERENCE
4.000
LEVEL
+3.000 m
4.755
4.855
4.095
4.935
4.960
5.050
5.100
4.900
4.950
5.650
4.510
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
2.000 1.500 1.500 5.000 2.000 3.000 3.500 1.500 1.500 2.000
DISTANCE (m)
4.930
5.000
4.930
ELEVASI RENCANA
PLANE LEVEL
10.000
9.000
8.000
7.000
0+350 13.50
7.00
Lapisan Pondasi Agregat Kelas B (t = 12 cm)
6.000 Besi Wire Mesh M-6
Beton Cor K-350 (t = 15 cm)
Beton Kurus (t = 5 cm)
CL
2% 2%
5.000 1 1
2 2
REFERENCE
4.000
LEVEL
+3.000 m
4.825
4.935
3.805
4.925
5.060
4.199
5.230
5.075
4.800
4.500
4.360
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
2.000 1.500 1.500 6.000 2.000 2.000 3.000 1.500 1.500 2.000
DISTANCE (m)
4.930
5.000
4.930
ELEVASI RENCANA
PLANE LEVEL
9.000
8.000
7.000
0+400 14.00
7.00
Lapisan Pondasi Agregat Kelas B (t = 12 cm)
6.000 Besi Wire Mesh M-6
Beton Cor K-350 (t = 15 cm)
Beton Kurus (t = 5 cm)
CL
2% 2%
5.000 1 1
2 2
REFERENCE
4.000
LEVEL
+3.000 m
4.860
4.960
4.200
4.850
4.860
5.340
5.058
5.160
5.180
5.130
4.250
4.950
4.810
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
2.000 1.500 1.500 1.750 3.000 3.000 2.250 2.000 2.000 1.500 1.500 2.000
DISTANCE (m)
4.930
5.000
4.930
ELEVASI RENCANA
PLANE LEVEL
10.000
9.000
8.000
7.000
0+450 16.00
7.00
Lapisan Pondasi Agregat Kelas B (t = 12 cm)
6.000 Besi Wire Mesh M-6
Beton Cor K-350 (t = 15 cm)
Beton Kurus (t = 5 cm)
CL
2% 2%
5.000 1 1
2 2
REFERENCE
4.000
LEVEL
+3.000 m
5.000
5.110
4.210
5.160
5.238
5.558
5.340
5.310
5.272
5.198
4.215
4.915
4.775
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
2.000 1.500 1.500 2.000 2.000 3.000 3.000 3.000 3.000 1.500 1.500 2.000
DISTANCE (m)
4.930
5.000
4.930
ELEVASI RENCANA
PLANE LEVEL
9.000
8.000
12.00
7.000
0+516 7.00
Lapisan Pondasi Agregat Kelas B (t = 12 cm)
6.000 Besi Wire Mesh M-6
Beton Cor K-350 (t = 15 cm)
Beton Kurus (t = 5 cm)
CL
2% 2%
5.000 1 1
2 2
REFERENCE
4.000
LEVEL
+3.000 m
5.180
5.390
5.430
5.412
5.830
5.180
5.040
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
3.000 3.000 3.000 3.000 2.000 3.000
DISTANCE (m)
4.930
5.000
4.930
ELEVASI RENCANA
PLANE LEVEL
SEGMEN C
Se
STA
m
ak
0+000
Be
U
STA STA &
l
STA
uk
ar
0+000 0+050 0+100 0+023
Akhir Segmen C
Awal Segmen C
X=189036
X=189097 Akhir Segmen A
Y=458930 X=189112
Y=458862
Y=458945
4.313
4.156 3.983 5.116 4.462
Se
4.426 4.303 4.996 3.868
m
ak
4.836 4.871 4.918 4.692
Be
4.831 4.897 4.893 5.024
lu
k
4.864 4.911 4.811 4.926
ar
4.455 4.955
5.046 4.538 4.036 4.939
3.926 5.038 3.993
5.028 4.422 4.948 4.433
4.372
Awal Segmen A
X=189097
Se
Y=458930
m
ak
Be
lu
ka
Se
r
m
ak
Be
lu
ka
r
9.000
8.000
7.000
6.000
5.000
4.000
3.000
REFERENCE
LEVEL
+2.000 m
4.831
4.897
4.893
4.763
4.826
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
50.000 50.000 23.000
DISTANCE (m)
5.000
5.000
5.000
5.000
5.000
ELEVASI RENCANA
PLAN ELEVATION
PATOK
0+000 0+050 0+100 0+000 0+023
STATION
SEGMEN C
10.000
9.000
8.000
7.000 13.50
0+000
6.000
CL
5.000
REFERENCE
4.000
LEVEL
+3.000 m
4.156
4.426
4.836
4.831
4.864
5.046
5.028
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
3.000 2.500 3.000 3.000 5.000 3.000
DISTANCE (m)
4.557
ELEVASI RENCANA
PLANE LEVEL
10.000
9.000
8.000
7.000 12.50
0+050
6.000
CL
5.000
REFERENCE
4.000
LEVEL
+3.000 m
3.983
4.303
4.871
4.897
4.911
4.538
3.926
4.422
4.372
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
3.000 3.000 3.000 3.000 3.500 1.500 1.500 2.000
DISTANCE (m)
4.557
ELEVASI RENCANA
PLANE LEVEL
9.000
8.000
7.000
0+100 12.00
6.000
5.000 CL
REFERENCE
4.000
LEVEL
+3.000 m
5.116
4.918
4.800
4.763
4.782
4.455
4.036
5.038
4.948
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
3.000 3.000 3.000 3.000 3.000 1.500 1.500 2.000
DISTANCE (m)
4.557
ELEVASI RENCANA
PLANE LEVEL
SEGMEN C
9.000
8.000
7.000 13.50
0+000 7.00
Lapisan Pondasi Agregat Kelas B (t = 12 cm)
6.000 Besi Wire Mesh M-6
Beton Cor K-350 (t = 15 cm)
Beton Kurus (t = 5 cm)
CL 2% 2%
5.000 1 1
2 2
REFERENCE
4.000
LEVEL
+3.000 m
4.156
4.426
4.836
4.831
4.864
5.046
5.028
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
3.000 2.500 3.000 3.000 5.000 3.000
DISTANCE (m)
4.900
5.000
4.900
ELEVASI RENCANA
PLANE LEVEL
10.000
9.000
8.000
7.000 12.50
0+050 7.00
Lapisan Pondasi Agregat Kelas B (t = 12 cm)
6.000 Besi Wire Mesh M-6
Beton Cor K-350 (t = 15 cm)
Beton Kurus (t = 5 cm)
CL 2% 2%
5.000 1 1
2 2
REFERENCE
4.000
LEVEL
+3.000 m
3.983
4.303
4.871
4.897
4.911
4.538
3.926
4.422
4.372
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
3.000 3.000 3.000 3.000 3.500 1.500 1.500 2.000
DISTANCE (m)
4.900
5.000
4.900
ELEVASI RENCANA
PLANE LEVEL
9.000
8.000
7.000
0+100 12.00
7.00
Lapisan Pondasi Agregat Kelas B (t = 12 cm)
6.000 Besi Wire Mesh M-6
Beton Cor K-350 (t = 15 cm)
Beton Kurus (t = 5 cm)
CL
2% 2%
5.000 1 1
2 2
REFERENCE
4.000
LEVEL
+3.000 m
5.116
4.918
4.800
4.763
4.782
4.455
4.036
5.038
4.948
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
3.000 3.000 3.000 3.000 3.000 1.500 1.500 2.000
DISTANCE (m)
4.900
5.000
4.900
ELEVASI RENCANA
PLANE LEVEL
4.00
4.00 12.00
4.00
23.00
0.10
0.75
0.60
4.00
4.00 12.00
0.30
0.45
Beton Cor K-350 Besi Dowel P=45 cm, Beton Cor K-350
Dia. Ø 13-30 Cm
4.00
23.00
Besi Wiremesh M-6 Besi Wiremesh M-6 Besi Wiremesh M-6 4.00
4.00
23.00
3.50
7.00
3.50
Besi Dowel P=60 cm, Dia. Ø 13-75 Cm Besi Dowel P=60 cm, Dia. Ø 13-75 Cm
0.10
0.75
0.30
0.45 7.00
Base B
Besi Dowel, Ø 13-75 Cm (dilapisi besi galvanis 12")
Base Existing
Besi Dowel, Ø 13-75 Cm
Pot. Melintang
Skala 1:80
1.70
Besi Wiremesh M-6 Besi Wiremesh M-6
3.50
Sambungan 10 Cm
7.00 7.00
5.40
Besi Wiremesh M-6 Besi Wiremesh M-6
3.50
3.50
7.00
3.50
Besi Dowel P=60 cm, Dia. Ø 13-75 Cm Besi Dowel P=60 cm, Dia. Ø 13-75 Cm
0.10
0.75
0.30
0.45 7.00
Base B
Besi Dowel, Ø 13-75 Cm (dilapisi besi galvanis 12")
Base Existing
Besi Dowel, Ø 13-75 Cm
Pot. Melintang
Skala 1:80
1.70
Besi Wiremesh M-6 Besi Wiremesh M-6
3.50
Sambungan 10 Cm
7.00 7.00
5.40
Besi Wiremesh M-6 Besi Wiremesh M-6
3.50