VIDHARBHA INDUSTRIES POWER LIMITED

BUTIBORI GCTPP (2 X 300 MW)

STABILITY TEST REPORT


Transformer Name: GT Date:

1. REF STABILITY

CIRCUIT DAIGRAM:

CALCULATION:

Io = 1/Z0 = 1/0.145=6.89 PU

FLC in HV side = 929 A

Io in HV side = 929*6.89 = 6399.5

When 220 kV applied in HV side, Zero sequence current in HV side is 6399.5 A.

When 230 V is applied in HV side,

230/ (220/√3)*6399.5 = 11.58 A

3 Io = 34.74 A

Reliance Reliance
VIPL (ELECTRICAL) TICB
Infrastructure Engineering
Signature
Name

Page 1 of 7
VIDHARBHA INDUSTRIES POWER LIMITED
BUTIBORI GCTPP (2 X 300 MW)

STABILITY TEST REPORT


Transformer Name: GT Date:

Test Reading:

A. STABLE CONDITION

Panel Side-

S.NO. TERMINAL / RELAY A


X122-17 0
1
X122-19 0
2 7UT613 (IX3) 0
3 7SJ804 (IE) 32
X123-1 0.03
4
X123-3 0.03

Transformer MB side-

S.NO. PHASE TERMINAL A


T116
1 R
T117
T118
2 Y
T119
T120
3 B
T121
T122
4 1NCT1
T123
T124
5 1NCT2
T125

B. UNSTABLE CONDITION

Reliance Reliance
VIPL (ELECTRICAL) TICB
Infrastructure Engineering
Signature
Name

Page 2 of 7
VIDHARBHA INDUSTRIES POWER LIMITED
BUTIBORI GCTPP (2 X 300 MW)

STABILITY TEST REPORT


Transformer Name: GT Date:

When R Phase CT terminal link open then short S1 & S2. (T116 & T117 Short)

S.NO. TERMINAL / RELAY A


X122-17 0.01
1
X122-19 0.01
2 7UT613 (IX3) 12
3 7SJ804 (IE) 32
X122-1 0.03
4
X122-3 0.03

When Y Phase CT terminal link open then short S1 & S2. (T118 & T119 Short)

S.NO. TERMINAL / RELAY A


X122-17 0.01
1
X122-19 0.01
2 7UT613 (IX3) 12
3 7SJ804 (IE) 32
X122-1 0.03
4
X122-3 0.03

When B Phase CT terminal link open then short S1 & S2. (T120 & T121 Short)

S.NO. TERMINAL / RELAY A


X122-17 0.01
1
X122-19 0.01
2 7UT613 (IX3) 12
3 7SJ804 (IE) 32
X122-1 0.03
4
X122-3 0.03

When N Phase CT sec. terminal short i.e. S1 & S2 short.

S.NO. TERMINAL / RELAY A


X122-17 0.03
1
X122-19 0.03
2 7UT613 (IX3) 32

Reliance Reliance
VIPL (ELECTRICAL) TICB
Infrastructure Engineering
Signature
Name

Page 3 of 7
VIDHARBHA INDUSTRIES POWER LIMITED
BUTIBORI GCTPP (2 X 300 MW)

STABILITY TEST REPORT


Transformer Name: GT Date:

3 7SJ804 (IE) 32
X122-1 0.03
4
X122-3 0.03

2. DIFFERENTIAL STABILITY
CIRCUIT DAIGRAM-

Reliance Reliance
VIPL (ELECTRICAL) TICB
Infrastructure Engineering
Signature
Name

Page 4 of 7
VIDHARBHA INDUSTRIES POWER LIMITED
BUTIBORI GCTPP (2 X 300 MW)

STABILITY TEST REPORT


Transformer Name: GT Date:

Note- 415 V feed from SWYD 205 bay & LV side Shorted at LV bushing.
TEST READING:
A. STABLE CONDITION
87GT RELAY
RELAY DISPLAY RELAY TERMINAL DIFFERENTIAL
SIDE-1 SIDE-2 SIDE-1 SIDE-2 IDiff IRest
12 A 0.1 kA X122-1 10.8 mA X122-10 51.8 mA 0 0.02
12 A 0.1 kA X122-3 10.8 mA X122-12 51.9 mA 0 0.02
12 A 0.1 kA X122-5 10.8 mA X122-14 51.1 mA 0 0.02
X122-7 0 X122-16 0
7SJ804 RELAY
RELAY DISPLAY RELAY TERMINAL
L1 - 13 A X76-9 10.8 mA
L2 - 13 A X76-10 10.5 mA
L3 – 13 A X76-11 10.4 mA
E–0A X76-12 0

87OA RELAY
RELAY DISPLAY RELAY TERMINAL
IL1M1 – 12 A X121-1 10.5 mA
IL2M1 – 12 A X121-3 10.5 mA
IL3M1 – 12 A X121-5 10.5 mA
3I0M1 - 0 X121-7 0

Transformer MB side-

S.NO. PHASE TERMINAL mA


T126
1 R
T127
T128
2 Y
T129
T130
3 B
T131

B. OUTZONE FAULT (R & Y Phase SHORT)

87GT RELAY

Reliance Reliance
VIPL (ELECTRICAL) TICB
Infrastructure Engineering
Signature
Name

Page 5 of 7
VIDHARBHA INDUSTRIES POWER LIMITED
BUTIBORI GCTPP (2 X 300 MW)

STABILITY TEST REPORT


Transformer Name: GT Date:

RELAY DISPLAY RELAY TERMINAL DIFFERENTIAL


SIDE-1 SIDE-2 SIDE-1 SIDE-2 IDiff IRest
12 A 0.1 kA X122-1 10.6 mA X122-10 44.4 mA 0 0.02
5A 0.1 kA X122-3 5.3 mA X122-12 44.5 mA 0 0.01
5A 0.1 kA X122-5 5.4 mA X122-14 0 0 0.01
X122-7 0 X122-16 0

7SJ804 RELAY
RELAY DISPLAY RELAY TERMINAL
L1 - 13 A X76-9 10.7 mA
L2 - 0 X76-10 5.3 mA
L3 – 0 X76-11 5.3 mA
E- 0 X76-12 0

87OA RELAY
RELAY DISPLAY RELAY TERMINAL
IL1M1 - 12 A X121-1 10.4 mA
IL2M1 - 5 A X121-3 5.1 mA
IL3M1 - 5 A X121-5 5.2 mA
3I0M1 - 2 X121-7 0

Transformer MB side-

S.NO. PHASE TERMINAL mA


T126
1 R
T127
T128
2 Y
T129
T130
3 B
T131

C. OUTZONE FAULT (R & B Phase SHORT)

87GT RELAY
RELAY DISPLAY RELAY TERMINAL DIFFERENTIAL
SIDE-1 SIDE-2 SIDE-1 SIDE-2 IDiff IRest

Reliance Reliance
VIPL (ELECTRICAL) TICB
Infrastructure Engineering
Signature
Name

Page 6 of 7
VIDHARBHA INDUSTRIES POWER LIMITED
BUTIBORI GCTPP (2 X 300 MW)

STABILITY TEST REPORT


Transformer Name: GT Date:

5A 0.1 kA X122-1 5.3 mA X122-10 44.2 mA 0 0.01


5A 0 X122-3 5.3 mA X122-12 0 0 0.01
12 A 0.1 kA X122-5 10.4 mA X122-14 44.0 mA 0 0.02
X122-7 0 X122-16 0

7SJ804 RELAY
RELAY DISPLAY RELAY TERMINAL
L1 0 X76-9 5.2 mA
L2 0 X76-10 5.2 mA
L3 0 X76-11 10.4 mA
E 0 X76-12 0

87OA RELAY
RELAY DISPLAY RELAY TERMINAL
IL1M1 - 5A X121-1 5.3 mA
IL2M1 - 5 A X121-3 5.3 mA
IL3M1 - 12 A X121-5 10.5 mA
3I0M1 - 0 X121-7 0

Transformer MB side-

S.NO. PHASE TERMINAL mA


T126
1 R
T127
T128
2 Y
T129
T130
3 B
T131

Reliance Reliance
VIPL (ELECTRICAL) TICB
Infrastructure Engineering
Signature
Name

Page 7 of 7