You are on page 1of 1

PILE DRIVING RECORD

PEMBANGUNAN For 25.00 m


GUDANG BAHAN BAKU KAPASITAS ± 45.000 TON
PT PUPUK KALIMANTAN TIMUR PDR No.

Structure CONVEYOR Driving Data


Pile Position Vertical : 0 NO : Pile Blow Total Pile Blow Total
Sketch
Concrete Spun Pile Marking Count Blow Marking Count Blow
Pile Type
Pre Pilling Data

DIA : 400 mm t = 70 mm 0,00 19,50


Driving Barge PT. BJL 1,00 20,00
Top Pile Elv.
Length of Pile 13 + 12 M 2,00 20,50
North / Y 3,00 21,00
Coordinate
East / X 4,00 21,50
Design Cut off Level LWS 5,00 22,00
Hammer Type Cut Pile Elv. 6,00 22,50
Crane Data

Weight of Ram Ton 7,00 23,00


8,00 23,50
Bottom Middle 9,00 24,00
Date 10,00 24,50
Driving Data ( Time Cycle)

Sea Bed Elv.


Launcing Start 10,50 25,00
& Handling Finish 11,00
Start 11,50
Positioning
Finish 12,00
Start 12,50
Driving
Finish 13,00
Total Time 13,50
Welding sheet No. 14,00
Welding

Start Time 14,50


Finish Time 15,00
Total Time 15,50
Survey Point Elevation LWS 16,00
Welding Result

Sea Bed Elevation LWS 16,50


Pile Top Elevation LWS 17,00
Penetration Depth M Tip Pile Elv. 17,50
Total Blows Blows 18,00
Final Penetration cm/blow 18,50
Driving Results (Pile Displacement ) 19,00
PN./Y
PE./X
PN Hor.Angle ( b )
Ver. Angle ( a )
Prepared &Checked :
PE
β
α
NK BJL
Witness :

PKT PKT