GUDANG BAHAN BAKU KAPASITAS ± 45.000 TON PT PUPUK KALIMANTAN TIMUR PDR No.
Structure CONVEYOR Driving Data
Pile Position Vertical : 0 NO : Pile Blow Total Pile Blow Total Sketch Concrete Spun Pile Marking Count Blow Marking Count Blow Pile Type Pre Pilling Data
DIA : 400 mm t = 70 mm 0,00 19,50
Driving Barge PT. BJL 1,00 20,00 Top Pile Elv. Length of Pile 13 + 12 M 2,00 20,50 North / Y 3,00 21,00 Coordinate East / X 4,00 21,50 Design Cut off Level LWS 5,00 22,00 Hammer Type Cut Pile Elv. 6,00 22,50 Crane Data
Weight of Ram Ton 7,00 23,00
8,00 23,50 Bottom Middle 9,00 24,00 Date 10,00 24,50 Driving Data ( Time Cycle)