ARABIAN FAL LIMITED COMPANY

FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 40 REPORTING DATE 12-Jul-20

SERVICE ORDER NO. 6510932388 Service Line Item# 1017801 TIME REACHED CONTROL ROOM 18:50:00 PM
TANK NUMBER NJBP TANK 116 (NIGHT) Direct / Part of PART OF PERMIT START 19:00:00 PM
L.I. Description REMOVING DUST TANK INSIDE PERMIT CLOSED 3:30:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 8 - TAKEN PERMIT 116 & HELPING LABOURS
2 23121 IMTHIYAZ SAFETY 8 - SAFETY AT SITE
3
4 23925 DIPENDRA HELPER 8 - S.NO 4 TO 9 WORKING TOGETHER
5 21090 YUWAK SING HELPER 8 - CLEANING BOTTOM PLATE BY COTTON RAGS 700 700 Sq.m
6 20780 KUMAR KAMI HELPER 8 - (COMPLETELY CLEANED TANK 2nd HALF ) READY FOR INTERMEDIATE COAT
7 23844 BIR K C HELPER 8 -
8 21051 HIRA HELPER 8 -
9 21358 TAN BAHADUR HELPER 8 -
10
11 23206 KHUSHI RAM HELPER 8 - CLEANING DUST ON BOTTOM PLATE USING VACUUM CLEANER 700 700 Sq.m
12 20882 MAN BAHATHUR S/F 8 -
13
14
15 23210 BAL KUMAR HELPER 8 - EQUIPMENT STANDBY
16 22962 PREM HELPER 8 - D DOOR STANDBY
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC 1617 AIR COMPRESSOR 8 6176 1 40 COTTON RAGS 3/4 KG


2 GR1865 GENERATOR 8 2827 2 HAND TOOLS
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 70 / 80 REPORTING DATE 12-Jul-20

SERVICE ORDER NO. 6510932388 Service Line Item# '1081190 / '1054480 TIME REACHED CONTROL ROOM 18:50:00 PM
TANK NUMBER NJBP TANK 116 (NIGHT) Direct / Part of DIRECT / PART OF PERMIT START 19:00:00 PM
L.I. Description WELDING OF DRIP PLATE PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 20988 MANAN WELDER 8 2 WELDING DRIP PLATE (2 pass) 12 3 15 Meter
2 WELDING DRIP PLATE BUTT JOINT(2 PASS) 2 2 Meter
3
4 20485 ALAM WELDER 8 2 WELDING DRIP PLATE (2 pass) 10 2 12 Meter
5 WELDING DRIP PLATE BUTT JOINT(2 PASS) 1.6 1.6 Meter
6
7 22494 ABDUL QADIR WELDER 8 - WELDING DRIP PLATE (2 pass) 6 6 Meter
8 WELDING DRIP PLATE BUTT JOINT(2 PASS) 1.6 1.6 Meter
9
10 25248 THAHIR HUSSAIN WELDER 8 - WELDING DRIP PLATE (2 pass) 6 6 Meter
11 WELDING DRIP PLATE BUTT JOINT(2 PASS) 1.6 1.6 Meter
12
13 23208 NASIM HELPER 8 2 ASSIST WELDER & GRIDNING DRIP PLATE (2 pass) 12 3 15 Meter
14 BUTT JOINT GRINDING 1.2 1.2 Meter
15 25203 JORGE FAB 8 2 ASSIST WELDER & GRIDNING DRIP PLATE (2 pass) 10 2 12 Meter
16 BUTT JOINT GRINDING 1.6 1.6 Meter
17 24681 SUNIL FAB 8 - ASSIST WELDER & GRIDNING DRIP PLATE (2 pass) & BUTT JOINT 7.6 7.6 Meter
18 18753 RABINDRA HELPER 8 - ASSIST WELDER & GRIDNING DRIP PLATE (2 pass) & BUTT JOINT 7.6 7.6 Meter
19 19470 NUR ALAM FAB 8 - REMOVING DRIP PLATE WELD SUPPORT RODS BY GRINDING MACHINE 30 30 EA
20 20487 KHURSHID HELPER 8 - FIRE WATCH
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 WM1714 WELDING MACHINE 7 6391.8 1 60 4" CUTTING WHEEL 5 EA


2 WM1696 WELDING MACHINE 7 5009.5 2 60 DIA 2.5 WELDING ROD 8 KG
3 WM1192 WELDING MACHINE 7 8262.8 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 60 / 70 REPORTING DATE 11-Jul-20

SERVICE ORDER NO. 6510932388 Service Line Item# 1055131 / '1081190 TIME REACHED CONTROL ROOM 18:50:00 PM
TANK NUMBER NJBP TANK 116 (NIGHT) Direct / Part of PART OF / DIRECT PERMIT START 19:00:00 PM
L.I. Description DRIP PLATE FITUP & WELDING PERMIT CLOSED 3:30:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 20988 MANAN WELDER 8 TACK WELDING DRIP PLATE 18 18 Meter
2
3 24681 SUNIL FAB 8 S.NO 3 & 4 WORKING TOGETHER
4 19470 NUR ALAM FAB 8 MAKING DRIP PLATE FITUP (size width 200 mm x length 3 Meter) 6 6 Plates
5 GAS CUTTING DRIP PLATE 18 18 Meter
6 GRINDING DRIP PLATE 18 18 Meter
7
8 20485 ALAM WELDER 8 WELDING DRIP PLATE (2 pass) 6 6 Meter
9
NOTE
10 25248 THAHIR HUSSAIN WELDER 8 WELDING DRIP PLATE (2 pass) 6 6 Meter OXYGEN CYLINDER GAS
11 FINISHED AT 3.00A.M SPARE
NOT AVAILABLE IN TANK
12 22494 ABDUL QADIR WELDER 8 WELDING DRIP PLATE (2 pass) 6 6 Meter
13
14 25203 JORGE FAB 8 ASSIST WELDER & GRIDNING DRIP PLATE (2 pass) 6 6 Meter
15
16 23208 NASIM HELPER 8 ASSIST WELDER & GRIDNING DRIP PLATE (2 pass) 6 6 Meter
17
18 20487 KHURSHID HELPER 8 ASSIST WELDER & GRIDNING DRIP PLATE (2 pass) & FIRE WATCH 6 6 Meter
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 WM1714 WELDING MACHINE 7 6379.1 1 60 4" CUTTING WHEEL 3 EA


2 WM1696 WELDING MACHINE 7 5003.2 2 60 OXYGEN 0.7 %
3 WM1192 WELDING MACHINE 7 8256.4 3 60 ACETYLENE 0.7 %
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 40 REPORTING DATE 11-Jul-20

SERVICE ORDER NO. 6510932388 Service Line Item# 1017801 TIME REACHED CONTROL ROOM 18:50:00 PM
TANK NUMBER NJBP TANK 116 (NIGHT) Direct / Part of PART OF PERMIT START 19:00:00 PM
L.I. Description REMOVING WATER PERMIT CLOSED 3:40:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 8 - TAKEN PERMIT 116 & HELPING LABOURS
2 23121 IMTHIYAZ SAFETY 8 - SAFETY AT SITE
3
4 23925 DIPENDRA HELPER 8 - S.NO 4 TO 12 WORKING TOGETHER
5 21090 YUWAK SING HELPER 8 - WIPING WATER ON BOTTOM PLATE UPTO SUMPIT 550 550 Sq.m
6 20780 KUMAR KAMI HELPER 8 - FROM SUMPIT REMOVING WATER TO OUTSIDE BY SMALL BUCKETS 350 350 Litres
7 23844 BIR K C HELPER 8 - BRUSH CLEANING DUST ON BOTTOM PLATE 48 48 Sq.m
8 18753 RABINDRA HELPER 8 - SUMPIT INSIDE CLEANING BY COTTON RAGS 12 12 Sq.m
9 21358 TAN BAHADUR HELPER 8 -
10 20882 MAN BAHATHUR S/F 8 -
11 23206 KHUSHI RAM HELPER 8 -
12 21051 HIRA HELPER 8 -
13
14 22962 PREM HELPER 8 - D DOOR STANDBY
15 23210 BAL KUMAR HELPER 8 - EQUIPMENT STANDBY
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC 1673 AIR COMPRESSOR 8 6162.2 1 COTTON RAGS 1/4' KG


2 GR1865 GENERATOR 8 2815 2 HAND TOOLS
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 40 REPORTING DATE 10-Jul-20

SERVICE ORDER NO. 6510932388 Service Line Item# 1017801 TIME REACHED CONTROL ROOM 18:50:00 PM
TANK NUMBER NJBP TANK 116 (NIGHT) Direct / Part of PART OF PERMIT START 19:00:00 PM
L.I. Description REMOVAL OF GRIT SAND PERMIT CLOSED 2:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 6 TAKEN PERMIT 116 & HELPING LABOURS
2
3
4 23925 DIPENDRA HELPER 6 S.NO 4 TO 12 WORKING TOGETHER
5 21090 YUWAK SING HELPER 6 REMOVING GRIT SAND FROM TANK INSIDE TO OUTSIDE USING WHEEL BARROW 4.5 4.5 TON
6 23210 LALLU RAM HELPER 6
7 23844 BIR K C HELPER 6
8 20779 LAXMAN HELPER 6
9 21358 TAN BAHADUR HELPER 6
10 20882 MAN BAHATHUR S/F 6
11 20719 MAN BAHATHUR HELPER 6
12 20597 GILBERT FO . OP 6
13
14 22962 PREM HELPER 6 D DOOR STANDBY
15 23210 BAL KUMAR HELPER 6 EQUIPMENT STANDBY
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC 1673 AIR COMPRESSOR 6 6146.3 1 HAND TOOLS


2 GR1865 GENERATOR 6 2800 2
3 AC 1618 AIR COMPRESSOR IDLE 3874.4 3
4 AC 1612 AIR COMPRESSOR IDLE 4124 4
5 AC 1682 AIR COMPRESSOR IDLE 4890.3 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 70 REPORTING DATE 10-Jul-20

SERVICE ORDER NO. 6510932388 Service Line Item# 1081190 TIME REACHED CONTROL ROOM 18:50:00 PM
TANK NUMBER NJBP TANK 116 (NIGHT) Direct / Part of PART OF / DIRECT PERMIT START 19:00:00 PM
L.I. Description DRIP PLATE WELDING PERMIT CLOSED 2:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 20988 MANAN WELDER 6 WELDING DRIP PLATE (2 PASS) 6 6 Meter
2
3 25203 JORGE FAB 6 ASSIST WELDER & FROMING FIRE BLANKET
4 GRINDING DRIP PLATE 6 6 Meter
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 WM1714 WELDING MACHINE 6 6365.5 1 60 4" CUTTING WHEEL 1 EA


2 WM1696 WELDING MACHINE IDLE 4990 2 60 DIA 2.5 WELDING ROD 3 KG
3 WM1194 WELDING MACHINE IDLE 10180.7 3
4 WM1192 WELDING MACHINE IDLE 8249.7 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 60 / 70 REPORTING DATE 9-Jul-20

SERVICE ORDER NO. 6510932388 Service Line Item# 1055131 / '1081190 TIME REACHED CONTROL ROOM 18:50:00 PM
TANK NUMBER NJBP TANK 116 (NIGHT) Direct / Part of PART OF / DIRECT PERMIT START 19:00:00 PM
L.I. Description DRIP PLATE FITUP & WELDING PERMIT CLOSED 3:30:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 20988 MANAN WELDER 8 TAKA WELDING DRIP PLATE 18 18 Meter
2
3 25203 JORGE FAB 8 S.NO 3 TO 5 WORKING TOGETHER
4 19470 NUR ALAM FAB 8 MAKING DRIP PLATE FITUP (size width 200 mm x length 3 Meter) 6 6 Plates
5 24681 SUNIL FAB 8 GAS CUTTING DRIP PLATE 18 18 Meter
6 GRINDING DRIP PLATE 18 18 Meter
7
8 20485 ALAM WELDER 8 WELDING DRIP PLATE (2 pass) 10 10 MeterNOTE 1)
ACETYLENE CYLINDER GAS
9 FINISHED AT 2.00A.M AFTER
10 25248 THAHIR HUSSAIN WELDER 8 WELDING DRIP PLATE (2 pass) 9 9 Meter SHIFTED FROM YARD AND
STARTED FITUP WORK
11 02.45A.M 2) OXYGEN
12 22494 ABDUL QADIR WELDER 8 WELDING DRIP PLATE (2 pass) 4.5 4.5 Meter CYLINDER GAS FINISHED AT
03.30 SPARE NOT AVAILABLE
13 IN TANK
14 23206 KHUSHI RAM HELPER 8 ASSIST WELDER & GRIDNING DRIP PLATE (2 pass) 10 10 Meter
15
16 21051 HIRA HELPER 8 ASSIST WELDER & GRIDNING DRIP PLATE (2 pass) 9 9 Meter
17
18 23208 NASIM HELPER 8 ASSIST WELDER & GRIDNING DRIP PLATE (2 pass) 4.5 4.5 Meter
19
20 20487 KHURSHID HELPER 8 FIRE WATCH
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 WM1714 WELDING MACHINE 8 6360.7 1 60 4" CUTTING WHEEL 3 EA


2 WM1696 WELDING MACHINE 6 4986 2 60 OXYGEN 1 %
3 WM1194 WELDING MACHINE 6 10179.5 3 60 ACETYLENE 1 %
4 WM1192 WELDING MACHINE IDLE 8249.5 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 20 / 60 / 70 REPORTING DATE 9-Jul-20

SERVICE ORDER NO. 6510932388 Service Line Item# 1052024 / 1055131 / '1081190 TIME REACHED CONTROL ROOM 18:50:00 PM
TANK NUMBER NJBP TANK 116 (NIGHT) Direct / Part of PART OF PERMIT START 19:00:00 PM
L.I. Description REMOVAL OF GRIT SAND / SHIFITNG MATERIALS PERMIT CLOSED 4:20:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 8 2 TAKEN PERMIT 116 & TANK 110 (FOR TAKING LIGHT & WELDING CABLE OUTSIDE)
2 23121 IMTHIYAZ SAFETY 8 - SAFETY AT SITE
3
4 23925 DIPENDRA HELPER 8 2 S.NO 4 TO 13 WORKING TOGETHER
5 21090 YUWAK SING HELPER 8 2 REMOVING GRIT SAND FROM TANK INSIDE TO OUTSIDE USING WHEEL BARROW 4.1 0.4 4.5 TON
6 20780 KUMAR KAMI HELPER 8 -
7 23844 BIR K C HELPER 8 2 FROM 19.00 TO 21.00 SHITING WELDING CABLE FROM TANK 110 TO TANK 116 5 5 EA
8 18753 RABINDRA HELPER 8 - ARRANGING WELDING CABLE FROM WELDING MACHINE TO DRIP PLATE AREA
NOTE
9 21358 TAN BAHADUR HELPER 8 2 TAKEN LIGHT FROM TANK 110 LOADING IN FORK LIFT 2 2 EA STARTED REMOVING SAND AT
10 20882 MAN BAHATHUR S/F 8 2 UNLOADING LIGHT IN TANK 116 2 2 EA 21:00 BECAUSE PREVIOUS
SHIFT PAINTED INSIDE TANK ,
11 20719 MAN BAHATHUR HELPER 8 2 LOADING ACETYLENE CYLINDER IN YARD 2 2 EA SO FROM 19.10 TO 21.00
12 23210 LALLU RAM HELPER 8 2 UNLOADING ACETYLENE CYLINER IN TANK 116 2 2 EA SHFITNG WELDING CABLE &
LIGHT
13 20779 LAXMAN HELPER 8 2 ASSIST FORK LIFT OPERATOR & FLAGMAN
14
15 20597 GILBERT FO . OP 8 - SHIFITNG LIGHT WITH STAND FROM TANK 110 TO TANK 116 BY FORKLIFT 2 2 EA
16 SHIFITNG WELDING CABLE FROM TANK 110 TO TANK 116 BY FORKLIFT 5 5 EA
17 SHIFITNG ACETYLENE CYLINDER FROM YARDTO TANK 116 BY FORKLIFT 2 2 EA
18
19 22962 PREM HELPER 8 2 D DOOR STANDBY
20 23210 BAL KUMAR HELPER 8 2 EQUIPMENT STANDBY
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC 1673 AIR COMPRESSOR 8 6138 1 HAND TOOLS


2 GR1865 GENERATOR 8 2791 2
3 FL909 FORKLIFT 4 714 3
4 AC 1612 AIR COMPRESSOR IDLE 4124.2 4
5 AC 1682 AIR COMPRESSOR IDLE 4890.3 5
6 AC 1618 AIR COMPRESSOR IDLE 3874.2 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 20 / 480 REPORTING DATE 8-Jul-20

SERVICE ORDER NO. 6510932388 Service Line Item# 1052024 / 1054915 TIME REACHED CONTROL ROOM 18:50:00 PM
TANK NUMBER NJBP TANK 116 (NIGHT) Direct / Part of PART OF PERMIT START 19:00:00 PM
L.I. Description REMOVAL OF GRIT SAND / TANK HYDROTEST PERMIT CLOSED 3:30:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 8 - TAKEN PERMIT & HELPING LABOURS
2 23121 IMTHIYAZ SAFETY 8 - SAFETY AT SITE
3
4 23925 DIPENDRA HELPER 8 - S.NO 4 TO 10 WORKING TOGETHER
5 21090 YUWAK SING HELPER 8 - REMOVING GRIT SAND FROM TANK INSIDE TO OUTSIDE USING WHEEL BARROW 2.8 2.8 TON
6 20780 KUMAR KAMI HELPER 8 -
7 23844 BIR K C HELPER 8 -
8 18753 RABINDRA HELPER 8 -
NOTE
9 21358 TAN BAHADUR HELPER 8 - STARTED REMOVING SAND AT
10 20882 MAN BAHATHUR HELPER 8 - 21:30 BECAUSE PREVIOUS
SHIFT PAINTED INSIDE TANK ,
11 SO FROM 07.10 TO 09.30
12 20597 GILBERT FO . OP 8 - SHIFITNG WELDING MATERIALS FROM TANK 110 TO TANK 116 SHFITNG WELDING
MATERIALS
13 GFC CABLE 4 4 EA
14 WELDING OVEN 1 1 EA
15 FIRE BLANKET 1 1 EA
16 SMALL GRINDING MACHINE 2 2 EA
17 SHIFTING MARINE HOSE NEAR TANK TO DIKE WALL 24" (6 Meter hose) 2 2 EA
18 ALONE REMOVED STUD & NUT IN MARINE HOSE 10 10 SETS
19 22962 PREM HELPER 8 - D DOOR STANDBY
20 23210 BAL KUMAR HELPER 8 - EQUIPMENT STANDBY
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC 1673 AIR COMPRESSOR 5 6121 1 HAND TOOLS


2 AC 1669 AIR COMPRESSOR 3 4950.8 2
3 GR1865 GENERATOR 8 2775 3
4 FL909 FORKLIFT 3 711.5 4
5 SL2066 BOBCAT 2 197.1 5
6 AC 1618 AIR COMPRESSOR IDLE 3868.5 6
7 AC 1612 AIR COMPRESSOR IDLE 4114 7
8 AC 1682 AIR COMPRESSOR IDLE 4882.1 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 60 / 70 REPORTING DATE 8-Jul-20

SERVICE ORDER NO. 6510932388 Service Line Item# 1055131 / '1081190 TIME REACHED CONTROL ROOM 18:50:00 PM
TANK NUMBER NJBP TANK 116 (NIGHT) Direct / Part of PART OF / DIRECT PERMIT START 19:00:00 PM
L.I. Description DRIP PLATE FITUP & WELDING PERMIT CLOSED 3:30:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 20988 MANAN WELDER 8 TAKA WELDING DRIP PLATE 15 15 Meter
2
3 25203 JORGE FAB 8 S.NO 3 TO 5 WORKING TOGETHER
4 19470 NUR ALAM FAB 8 MAKING DRIP PLATE FITUP (size width 200 mm x length 3 Meter) 4 4 Plates
5 24681 SUNIL FAB 8 GAS CUTTING DRIP PLATE 12 12 Meter
6 GRINDING DRIP PLATE 12 12 Meter
7 NOTE 1)
8 20485 ALAM WELDER 8 WELDING DRIP PLATE (2 pass) 5 5 Meter OXYGEN CYLINDER EMPTY AT
02.20 SPARE FULL CYLINDER
9 NOT AVAILABLE 2) WELDING
10 25248 THAHIR HUSSAIN WELDER 8 WELDING DRIP PLATE (2 pass) 5 5 Meter MACHINE 1192 NOT HAVE
BATTERY 3)CORD GFC
11 CABLE , GRINDING MACHINE ,
12 21051 HIRA HELPER 8 ASSIST WELDER & GRIDNING DRIP PLATE (2 pass) 5 5 Meter FIRE BLANKET , WELDING
OVEN SHIFTED FROM TANK
13 110 TO TANK 116 FROM 07.10
14 23206 KHUSHI RAM HELPER 8 ASSIST WELDER & GRIDNING DRIP PLATE (2 pass) 5 5 Meter TO 09.20
15
16 20487 KHURSHID HELPER 8 FIRE WATCH
17
18 22494 ABDUL QADIR WELDER 8 ASSIST WELDER
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 WM1714 WELDING MACHINE 8 6346.1 1 60 4" CUTTING WHEEL 3 EA


2 WM1696 WELDING MACHINE 6 4972 2 60 OXYGEN 0.9 %
3 WM1194 WELDING MACHINE 6 10172.3 3 60 ACETYLENE 0.9 %
4 WM1192 WELDING MACHINE IDLE 8249.5 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# IDLE TIMESHEET REPORTING DATE 7-Jul-20

SERVICE ORDER NO. 6510932388 Service Line Item# TIME REACHED CONTROL ROOM 18:50:00 PM
TANK NUMBER NJBP TANK 116 (NIGHT) Direct / Part of PERMIT START 19:00:00 PM
L.I. Description PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 22494 ABDUL QADIR WELDER 8 THOSE PEOPLE ARE IDLE
2 20485 ALAM WELDER 8 NOT HELPING FABRICATORS
3 25248 THAHIR HUSSAIN WELDER 8
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 60 REPORTING DATE 7-Jul-20

SERVICE ORDER NO. 6510932388 Service Line Item# 1055131 TIME REACHED CONTROL ROOM 18:50:00 PM
TANK NUMBER NJBP TANK 116 (NIGHT) Direct / Part of PART OF PERMIT START 19:00:00 PM
L.I. Description DRIP PLATE FITUP PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 20988 MANAN WELDER 8 TAKA WELDING DRIP PLATE 15 15 Meter
2
3 25203 JORGE FAB 8 S.NO 3 TO 5 WORKING TOGETHER
4 19470 NUR ALAM FAB 8 MAKING DRIP PLATE FITUP (size width 200 mm x length 3 Meter) 5 5 Plates
5 24681 SUNIL FAB 8 GAS CUTTING DRIP PLATE 15 15 Meter
6 GRINDING DRIP PLATE 15 15 Meter
7
8 20487 KHURSHID HELPER 8 FIRE WATCH
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 60 7" GRINDING WHEEL 1 EA


2 2 60 OXYGEN 0.9 %
3 3 60 ACETYLENE 0.9 %
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 20 / 480 REPORTING DATE 7-Jul-20

SERVICE ORDER NO. 6510932388 Service Line Item# 1052024 / 1054915 TIME REACHED CONTROL ROOM 18:50:00 PM
TANK NUMBER NJBP TANK 116 (NIGHT) Direct / Part of PART OF PERMIT START 19:00:00 PM
L.I. Description REMOVAL OF GRIT SAND / TANK HYDROTEST PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 8 - TAKEN PERMIT & HELPING LABOURS
2 23121 IMTHIYAZ SAFETY 8 - SAFETY AT SITE
3
4 23925 DIPENDRA HELPER 8 - S.NO 4 TO 12 WORKING TOGETHER
5 21090 YUWAK SING HELPER 8 - REMOVING GRIT SAND FROM TANK INSIDE TO OUTSIDE USING WHEEL BARROW 3.5 3.5 TON
6 20780 KUMAR KAMI HELPER 8 -
7 23844 BIR K C HELPER 8 -
8 23206 KHUSHI RAM HELPER 8 -
9 21358 TAN BAHADUR HELPER 8 -
NOTE
10 20882 MAN BAHATHUR HELPER 8 - STARTED REMOVING SAND AT
11 18753 RABINDRA HELPER 8 - 21:00 BECAUSE PREVIOUS
SHIFT PAINTED INSIDE TANK
12 21051 HIRA HELPER 8 2 REMOVING SAND & ASSIST FORKLIFT OPERATOR TO SHIFT MARINE HOSE
13 VALVE & FIXING / CONNCETING FIRE MONITOR HOSE
14
15 20597 GILBERT FO . OP 8 - SHIFTING MARINE HOSE NEAR TANK TO DIKE WALL 24" (6 Meter hose) 5 5 EA
16 SHIFTING 20" VALVE NEAR TANK TO DIKE WALL (USED FOR HYDROTEST) 1 1 EA
17 SHIFTING FIRE MONITOR HOSE FROMTANK 110 TO TANK 116 3 3 ROLLS
18
19 22962 PREM HELPER 8 D DOOR STANDBY
20 23210 BAL KUMAR HELPER 8 EQUIPMENT STANDBY
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC 1618 AIR COMPRESSOR 6 3858.3 1 HAND TOOLS


2 AC 1669 AIR COMPRESSOR 2 4937.1 2
3 WM1714 WELDING MACHINE 8 6332 3
4 GR1865 GENERATOR 8 2758 4
5 AC 1682 AIR COMPRESSOR IDLE 4874.1 5
6 AC 1673 AIR COMPRESSOR IDLE 6105.3 6
7 AC 1612 AIR COMPRESSOR IDLE 4103.2 7
8 FL909 FORKLIFT 6 709.2 8
9 SL2066 BOBCAT 1 196.2 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# IDLE TIMESHEET REPORTING DATE 6-Jul-20

SERVICE ORDER NO. 6510948963 Service Line Item# TIME REACHED CONTROL ROOM 18:50:00 PM
TANK NUMBER NJBP TANK 110 (NIGHT) Direct / Part of PERMIT START 19:00:00 PM
L.I. Description PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 22494 ABDUL QADIR WELDER 8 THOSE PEOPLE ARE IDLE
2 20485 ALAM WELDER 8
3 25248 THAHIR HUSSAIN WELDER 8 FABRICATORS AND WELDERS NOT EVEN ARRANGING PERPARATION OF
4 20597 GILBERT FO . OP 8 RE INSTALLING DRIP PLATE ALWAYS EXPECTING HELPERS
5 20988 MANAN WELDER 8
6 25203 JORGE FAB 8
7 19470 NUR ALAM FAB 8
8 24681 SUNIL FAB 8
9
10 NOTE
OXYGEN & ACETYLENE
11 CYLINDER NOT AVAILABLE
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 20 REPORTING DATE 6-Jul-20

SERVICE ORDER NO. 6510932388 Service Line Item# 1052024 TIME REACHED CONTROL ROOM 18:50:00 PM
TANK NUMBER NJBP TANK 116 (NIGHT) Direct / Part of PART OF PERMIT START 19:00:00 PM
L.I. Description REMOVAL OF GRIT SAND PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 8 - TAKEN PERMIT & HELPING LABOURS
2 23121 IMTHIYAZ SAFETY 8 - SAFETY AT SITE
3
4 23925 DIPENDRA HELPER 8 - S.NO 4 TO 12 WORKING TOGETHER
5 21090 YUWAK SING HELPER 8 - REMOVING GRIT SAND FROM TANK INSIDE TO OUTSIDE USING WHEEL BARROW 4 4 TON
6 21051 HIRA HELPER 8 -
7 23844 BIR K C HELPER 8 -
8 23206 KHUSHI RAM HELPER 8 -
9 21358 TAN BAHADUR HELPER 8 -
10 20882 MAN BAHATHUR HELPER 8 -
11 18753 RABINDRA HELPER 8 -
12 20780 KUMAR KAMI HELPER 8 -
13
14
15
16
17
18
19 22962 PREM HELPER 8 D DOOR STANDBY
20 23210 BAL KUMAR HELPER 8 EQUIPMENT STANDBY
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC 1618 AIR COMPRESSOR 6 3844 1 HAND TOOLS


2 AC 1669 AIR COMPRESSOR 2 4924 2
3 AC 1682 AIR COMPRESSOR 8 4867.8 3
4 GR1865 GENERATOR 8 2742 4
5 WM1714 WELDING MACHINE IDLE 6318.1 5
6 AC 1673 AIR COMPRESSOR IDLE 6094.1 6
7 AC 1612 AIR COMPRESSOR IDLE 4092.3 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 80 REPORTING DATE 5-Jul-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1055131 TIME REACHED CONTROL ROOM 18:50:00 PM
TANK NUMBER NJBP TANK 110 (NIGHT) Direct / Part of DIRECT PERMIT START 19:00:00 PM
L.I. Description GAS CUTTTING , FITUP & TACK WELDING PERMIT CLOSED 4:30:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 20988 MANAN WELDER 8 2 TACK WELDING BOTTOM PLATE 65 15 80 Meter
2
3 19470 NUR ALAM FAB 8 2 S.NO 3 & 4 TOGETHER MAKING FITUP
4 24681 SUNIL FAB 8 2 MAKING FITUP BOTTOM PLATE (5 PLATES ARE CUT PLATE ON COLUMN ) 5.7 0.5 6.2 TON
5
6 25203 JORGE FAB 8 2 ASSIST FABRICATOR & WELDER FOR FITUP
7 GAS CUTTING EXISTING PLATE WELDING ON COLUMN BASE ( 3 COLUMN)
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 80 / 60 REPORTING DATE 5-Jul-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1055131 / '1057483 TIME REACHED CONTROL ROOM 18:50:00 PM
TANK NUMBER NJBP TANK 110 (NIGHT) Direct / Part of PART OF PERMIT START 19:00:00 PM
L.I. Description BOTTOM PLATE PULLING & SHIFTING / SAND SHIFTING ,SPREADING & LEVELLING PERMIT CLOSED 4:30:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 8 2 TAKEN PERMIT & HELPING LABOURS
2 23121 IMTHIYAZ SAFETY 8 2 SAFETY AT SITE
3
4 23925 DIPENDRA HELPER 8 2 S.NO 4 TO 11 WORKING TOGETHER
5 21090 YUWAK SING HELPER 8 2 PULLING PLATES FROM 'D' DOOR TO INSIDE TANK 5.7 0.5 6.2 TON
6 21051 HIRA HELPER 8 2 ASSIST FABRICATOR & WELDER
7 23844 BIR K C HELPER 8 2 TANK INTERNAL SUPPORT LIFTED FOR PLATE FITUP 6 6 EA
8 23206 KHUSHI RAM HELPER 8 2 DRY MIX SAND SPREADING 1.7 1.7 Cu.m
9 21358 TAN BAHADUR HELPER 8 2 DRY MIX SAND LEVELLING 1.7 1.7 Cu.m
10 24492 MUHAMMAD GUL HELPER 8 2 SHIFTING DRY MIX SAND FROM D DOOR TO TANK INSIDE BY WHEEL BARROW
11 20882 MAN BAHATHUR HELPER 8 2 FIBRE CHIPPING ON COLUMN BASE BY HAND TOOLS ( 4 COLUMNS) FOR FITUP 2.4 2.4 Sq.m
12
13
14
15 20597 GILBERT FO . OP 8 2 SHIFTED DRY MIX SAND FROM DIKE WALL TO NEAR INSIDE 'D' DOOR 1.7 1.7 Cu.m
16 SHIFTED BOTTOM PLATE FROM OUTSIDE TO INSIDE NEAR 'D' DOOR 13 13 Plates
17 ALSO HELPING TO SPREAD SAND & PULLING PLATES
18
19 22962 PREM HELPER 8 2 D DOOR STANDBY
20 23210 BAL KUMAR HELPER 8 2 EQUIPMENT STANDBY
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC 1115 AIR COMPRESSOR 8 7133.4 1 80 OXYGEN 0.8 %


2 GR1816 GENERATOR 8 4868 2 80 ACETYLENE 0.8 %
3 SL2066 BOBCAT 2 192.7 3 80 HAND TOOLS
4 FL909 FORK LIFT 2 704.3 4
5 GR1765 GENERATOR IDLE 4094 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 90 / 100 REPORTING DATE 5-Jul-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1081190 / '1054480 TIME REACHED CONTROL ROOM 18:50:00 PM
TANK NUMBER NJBP TANK 110 (NIGHT) Direct / Part of DIRECT / PART OF PERMIT START 19:00:00 PM
L.I. Description WELDING BOTTOM PLATE PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 22494 ABDUL QADIR WELDER 8 - WELDING EXTERNAL ANNULAR TO SHELL PLATE (6 PASS) 2.5 2.5 Meter
2
3 20485 ALAM WELDER 8 - WELDING EXTERNAL ANNULAR TO SHELL PLATE (5 PASS) 3.75 3.75 Meter
4
5 25248 THAHIR HUSSAIN WELDER 8 - WELDING EXTERNAL ANNULAR TO SHELL PLATE (5 PASS) 3.75 3.75 Meter
6
7 18753 RABINDRA HELPER 8 - ASSIST WELDER & GRINDING PLATE (5 PASS) 2.5 2.5 Meter
8
9 20780 KUMAR KAMI HELPER 8 - ASSIST WELDER & GRINDING PLATE (5 PASS) 3.75 3.75 Meter
10
11 20487 KHURSHID HELPER 8 2 FIRE WATCH & ARRANGING CORD WIRE & LIGHT
12 ASSIST WELDER & GRINDING PLATE (5 PASS) 3.75 3.75 Meter
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 WM1606 WELDING MACHINE 8 6917.7 1 100 7 " CUTTING WHEEL 1 EA


2 WM1693 WELDING MACHINE 8 7575.4 2 100 7 " CUTTING WHEEL 1 EA
3 WM2094 WELDING MACHINE 8 2676.2 3 90 WELDING ROD DIA 3.2 7 KG
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# IDLE TIMESHEET REPORTING DATE 4-Jul-20

SERVICE ORDER NO. 6510948963 Service Line Item# TIME REACHED CONTROL ROOM 18:50:00 PM
TANK NUMBER NJBP TANK 110 (NIGHT) Direct / Part of PERMIT START 19:00:00 PM
L.I. Description PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 22494 ABDUL QADIR WELDER 8 THOSE WELDERS ARE IDLE DUE TO UNAVAILABLE OF FIREWATCH
2 25248 THAHIR HUSSAIN WELDER 8 FIRE WATCH NEEDED TO START WELDING EXTERNAL
3 20485 ALAM WELDER 8
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 80 / 60 REPORTING DATE 4-Jul-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1055131 / '1057483 TIME REACHED CONTROL ROOM 18:50:00 PM
TANK NUMBER NJBP TANK 110 (NIGHT) Direct / Part of DIRECT / PART OF PERMIT START 19:00:00 PM
L.I. Description BOTTOM PLATE PULLING , GAS CUTTTING , FITUP & TAKA WELDING / SAND SHIFTING PERMIT CLOSED 4:30:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 8 2 TAKEN PERMIT & HELPING LABOURS
2 23121 IMTHIYAZ SAFETY 8 2 SAFETY AT SITE
3 TO SUPERVISE SITE AREA
4 20988 MANAN WELDER 8 2 TAKA WELDING BOTTOM PLATE 5 0.652 5.652 TON
5 24681 SUNIL FAB 8 2 MAKING FITUP BOTTOM PLATE (5 PLATES ARE CUT PLATE UNDER COLUMN ) 5 0.652 5.652 TON
6 25203 JORGE FAB 8 2 ASSIST FABRICATOR , WELDER FOR FITUP & GRINDING PLATE & COLUMN 18 2 16 Meter
7 23925 DIPENDRA HELPER 8 2 S.NO 7 TO 14 WORKING TOGETHER
8 21090 YUWAK SING HELPER 8 2 PULLING PLATES FROM 'D' DOOR TO INSIDE TANK 5 0.652 5.652 TON
9 21051 HIRA HELPER 8 2 ASSIST FABRICATOR & WELDER
10 23844 BIR K C HELPER 8 2 TANK INTERNAL SUPPORT LIFTED FOR PLATE FITUP 10 3 12 EA
11 23206 KHUSHI RAM HELPER 8 2 SPREADING DRY MIX SAND 40 40 Sq.m
12 21358 TAN BAHADUR HELPER 8 2 SPREADING DRY MIX SAND 40 40 Sq.m
13 21051 HIRA HELPER 8 2
14 18753 RABINDRA HELPER 8 - FIRE WATCH
15 20597 GILBERT FO . OP 8 - SHIFTED DRY MIX SAND DIKE WALL TO NEAR 'D' DOOR 1.6 1.6 Cu.m
16 20780 KUMAR KAMI HELPER 8 - FLAG MAN & SPREADING SAND MIX
17
18
19 22962 PREM HELPER 8 2 D DOOR STANDBY
20 23210 BAL KUMAR HELPER 8 2 EQUIPMENT STANDBY
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC 1115 AIR COMPRESSOR 8 7133.4 1 80 OXYGEN 0.8 %


2 GR1816 GENERATOR 8 4868 2 80 ACETYLENE 0.8 %
3 WM1606 WELDING MACHINE IDLE 6903.6 3 80 HAND TOOLS
4 WM1693 WELDING MACHINE 8 7561.3 4
5 GR1765 GENERATOR IDLE 4094 5
6 SL2066 BOBCAT 2 191 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 80 / 60 REPORTING DATE 2-Jul-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1055131 / '1057483 TIME REACHED CONTROL ROOM 18:50:00 PM
TANK NUMBER NJBP TANK 110 (NIGHT) Direct / Part of DIRECT / PART OF PERMIT START 19:00:00 PM
L.I. Description BOTTOM PLATE PULLING , GAS CUTTTING , FITUP & TAKA WELDING / SAND SHIFTING PERMIT CLOSED 4:30:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 8 2 TAKEN PERMIT & HELPING LABOURS
2 23121 IMTHIYAZ SAFETY 8 - SAFETY AT SITE
3 TO SUPERVISE SITE AREA
4 20988 MANAN WELDER 8 2 TAKA WELDING BOTTOM PLATE
5 24681 SUNIL FAB 8 2 MAKING FITUP BOTTOM PLATE (5 PLATES ARE CUT PLATE UNDER COLUMN ) 4 0.5 4.5 TON
6 25203 JORGE FAB 8 2 ASSIST FABRICATOR & WELDER GRINDING 20 20 Meter
7 23925 DIPENDRA HELPER 8 2 S.NO 7 TO 13 WORKING TOGETHER
8 21090 YUWAK SING HELPER 8 2 PULLING PLATES FROM 'D' DOOR TO INSIDE TANK 4 0.5 4.5 TON
9 20719 MAN BAHATHUR HELPER 8 2 ASSIST FABRICATOR & WELDER
10 23844 BIR K C HELPER 8 2 TANK INTERNAL SUPPORT LIFTED FOR PLATE FITUP 9 3 12 TON
11 23206 KHUSHI RAM HELPER 8 2 SHIFTED WATER IGLOO FROM TANK 116 TO TANK 110 BY WHEEL BARROW 2 2 EA
12 21358 TAN BAHADUR HELPER 8 2 SHIFTED ACETYLENE FULL CYLINDER FROM YARD TO TANK 110 BY TROLLEY 1 1 EA
13 21051 HIRA HELPER 8 2 LEVELLING DRY MIX SAND 24 24 Sq.m
14 23921 JOMON JOSE WPR 8 - TAKEN PERMIT FOR FORKLIFT & BOBCAT
15 20597 GILBERT FO . OP 8 - SHIFTED BOTTOM PLATES FROM DIKE WALL TO NEAR 'D' DOOR 7 7 Plates
16 SHIFTED DRY MIX SAND DIKE WALL TO NEAR 'D' DOOR 1.1 1.1 Cu.m
17 20780 KUMAR KAMI HELPER 8 - FLAG MAN
18 18753 RABINDRA HELPER 8 - ASSIST FORKLIFT OPERATOR
19 22962 PREM HELPER 8 2 D DOOR STANDBY
20 23210 BAL KUMAR HELPER 8 2 EQUIPMENT STANDBY
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC 1115 AIR COMPRESSOR 8 7119 1 80 OXYGEN 0.8 %


2 GR1816 GENERATOR 8 4858 2 80 ACETYLENE 0.8 %
3 WM1606 WELDING MACHINE IDLE 6897.3 3 80 HAND TOOLS
4 WM1693 WELDING MACHINE 8 7547.1 4
5 GR1765 GENERATOR IDLE 4091 5
6 SL2066 BOBCAT 2 188.7 6
7 FL909 FORKLIFT 2 697.6 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# IDLE TIMESHEET REPORTING DATE 2-Jul-20

SERVICE ORDER NO. 6510948963 Service Line Item# TIME REACHED CONTROL ROOM 18:50:00 PM
TANK NUMBER NJBP TANK 110 (NIGHT) Direct / Part of PERMIT START 19:00:00 PM
L.I. Description PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 22494 ABDUL QADIR WELDER 8 NOTE - ARAMCO ISSUER WARNED TODAY NOT TO WORK WITH 1 FIRE WATCH
2 25248 THAHIR HUSSAIN WELDER 8 BOTH TANK INTERNAL & EXTERNAL HOT WORKS
3 20485 ALAM WELDER 8
4 FIRE WATCH NEEDED TO START WELDING EXTERNAL
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# IDLE TIMESHEET REPORTING DATE 1-Jul-20

SERVICE ORDER NO. 6510948963 Service Line Item# TIME REACHED CONTROL ROOM 18:50:00 PM
TANK NUMBER NJBP TANK 110 (NIGHT) Direct / Part of PERMIT START 19:00:00 PM
L.I. Description PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 22494 ABDUL QADIR WELDER 8 - ASSIST FABRICATORS
2
3
4 25248 THAHIR HUSSAIN WELDER 8 FIRE WATCH NEEDED TO START WELDING EXTERNAL
5 20485 ALAM WELDER 8
6
7 NOTE - ARAMCO ISSUER WARNED TODAY NOT TO WORK WITH 1 FIRE WATCH
8 BOTH TANK INTERNAL & EXTERNAL HOT WORKS
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 80 REPORTING DATE 1-Jul-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1055131 TIME REACHED CONTROL ROOM 18:50:00 PM
TANK NUMBER NJBP TANK 110 (NIGHT) Direct / Part of DIRECT / PART OF PERMIT START 19:00:00 PM
L.I. Description BOTTOM PLATE PULLING , GAS CUTTTING & FITUP PERMIT CLOSED 4:30:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 8 2 TAKEN PERMIT & HELPING LABOURS
2 23121 IMTHIYAZ SAFETY 8 2 SAFETY AT SITE
3 23921 JOMON JOSE WPR 8 2 TO SUPERVISE SITE AREA
4 20988 MANAN WELDER 8 2 TAKA WELDING BOTTOM PLATE
5 24681 SUNIL FAB 8 2 MAKING FITUP BOTTOM PLATE (3 PLATES ARE CUT PLATE UNDER COLUMN ) 4.58 0.5 5.08 TON
6 25203 JORGE FAB 8 2 ASSIST FABRICATOR & WELDER
7 23925 DIPENDRA HELPER 8 2 S.NO 7 TO 12 WORKING TOGETHER
8 21090 YUWAK SING HELPER 8 2 PULLING PLATES FROM 'D' DOOR TO INSIDE TANK 4.58 0.5 5.08 TON
9 20719 MAN BAHATHUR HELPER 8 2 ASSIST FABRICATOR & WELDER
10 23844 BIR K C HELPER 8 2 TANK INTERNAL SUPPORT LIFTED FOR PLATE FITUP 3.4 0.58 3.98 TON
11 23206 KHUSHI RAM HELPER 8 2
12 21358 TAN BAHADUR HELPER 8 2
13 21051 HIRA HELPER 8 2
14 20597 GILBERT FO . OP 8 -
15 20780 KUMAR KAMI HELPER 8 -
16 18753 RABINDRA HELPER 8 -
17
18
19 22962 PREM HELPER 8 2 D DOOR STANDBY
20 23210 BAL KUMAR HELPER 8 2 EQUIPMENT STANDBY
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC 1115 AIR COMPRESSOR 8 7104.6 1 80 OXYGEN 0.2 %


2 GR1816 GENERATOR 8 4844 2 80 ACETYLENE 0.25 %
3 WM1606 WELDING MACHINE 8 6889.7 3 80 HAND TOOLS
4 WM1693 WELDING MACHINE 4 7532.7 4
5 GR1765 GENERATOR IDLE 4091 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 80 REPORTING DATE 30-Jun-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1055131 TIME REACHED CONTROL ROOM 18:50:00 PM
TANK NUMBER NJBP TANK 110 (NIGHT) Direct / Part of DIRECT / PART OF PERMIT START 19:00:00 PM
L.I. Description BOTTOM PLATE PULLING & FITUP PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 8 - TAKEN PERMIT & HELPING LABOURS
2 23121 IMTHIYAZ SAFETY 8 - SAFETY AT SITE
3
4 20988 MANAN WELDER 8 - TAKA WELDING BOTTOM PLATE
5 24681 SUNIL FAB 8 - MAKING FITUP BOTTOM PLATE 60 60 Sq.m
6 EXISTING PLATE END BIT GAS CUTTING ON COLUMN BASE 0.2 0.2 Sq.m
7 23925 DIPENDRA HELPER 8 - S.NO 7 TO 12 WORKING TOGETHER
8 21090 YUWAK SING HELPER 8 - PULLING PLATES FROM 'D' DOOR TO INSIDE TANK 84 84 Sq.m
9 20719 MAN BAHATHUR HELPER 8 - ASSIST FABRICATOR & WELDER
NOTE
10 23844 BIR K C HELPER 8 - FIBRE CHIPPING IN 3 COLUMNS 2 2 Sq.m FOR FIBRE CHIPPING EXISTING
11 23206 KHUSHI RAM HELPER 8 - PLATE GAS CUTTING LINE
ITEM NOT AVAILABLE
12 21358 TAN BAHADUR HELPER 8 -
13 23921 JOMON JOSE WPR 8 - TAKEN PERMIT FOR EXTERNAL WORK BOBCAT & FORKLIFT
14 20597 GILBERT FO . OP 8 - SHIFTED 15 BOTTOM PLATES OUTSIDE TO NEAR 'D' DOOR 180 180 Sq.m
15 PULLING PLATE INSIDE UPTO 10 METERS BY BOBCAT 36 36 Sq.m
16 20780 KUMAR KAMI HELPER 8 - ASSIST FORK LIFT OPERATOR
17 18753 RABINDRA HELPER 8 - FLAG MAN
18
19 22962 PREM HELPER 8 - D DOOR STANDBY
20 23210 BAL KUMAR HELPER 8 - EQUIPMENT STANDBY
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC 1115 AIR COMPRESSOR 8 7091.3 1 OXYGEN 0.1 %


2 GR1816 GENERATOR 8 4832 2 ACETYLENE 0.1 %
3 FL909 FORK LIFT 3 690.4 3 HAND TOOLS
4 SL2066 BOBCAT 2 186.6 4
5 GR1765 GENERATOR IDLE 4091 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 150 REPORTING DATE 30-Jun-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1091342 TIME REACHED CONTROL ROOM 18:50:00 PM
TANK NUMBER NJBP TANK 110 (NIGHT) Direct / Part of DIRECT / PART OF PERMIT START 19:00:00 PM
L.I. Description WELDING OF BOTTOM PLATE PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 25248 THAHIR HUSSAIN WELDER 8 - WELDED SHELL TO ANNULAR PLATE (5 PASS) 3.75 3.75 Meter
2
3 22494 ABDUL QADIR WELDER 8 - WELDED SHELL TO ANNULAR PLATE (5 PASS) 3.75 3.75 Meter
4
5 20485 ALAM WELDER 8 - WELDED SHELL TO ANNULAR PLATE (5 PASS) 3.75 3.75 Meter
6
7 25203 JORGE FAB 8 - ASSIST WELDER & GRINDING ( 5 PASS) 3.75 3.75 Meter
8
9 21051 HIRA HELPER 8 2 ASSIST 2 WELDERS & GRINDING (5 PASS) 7 0.5 7.5
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 WM1606 WELDING MACHINE 8 6889.7 1 90 WELDING ROD DIA 3.2 1.3 KG


2 WM1693 WELDING MACHINE 4 7532.7 2 HAND TOOLS
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 10 REPORTING DATE 29-Jun-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1081808 TIME REACHED CONTROL ROOM 18:50:00 PM
TANK NUMBER NJBP 116 Direct / Part of DIRECT / PART OF PERMIT START 19:00:00 PM
L.I. Description CLEANING TANK PERMIT CLOSED 4:30:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 8 - TAKEN PERMIT & HELPING LABOURS
2
3 20719 MAN BAHATHUR HELPER 8 2 S.NO 3 TO 8 WORKING TOGETHER
4 23844 BIR K C HELPER 8 2 SHIFTING WIPER WITH STICK MANUALLY FROM YARD TO TANK 116 4 4 EA
5 18753 RABINDRA HELPER 8 - ARRANGING AIR HOSE FOR VENTILATION
6 21358 TAN BAHADUR HELPER 8 - INSTALLING AIR BLOWER 1 1 EA
7 23925 DIPENDRA HELPER 8 - CLEANED TANK INSIDE WITH WIPER BRUSH 75 5 80 %
8 20780 KUMAR KAMI HELPER 8 -
9
10
11
12
13
14
15
16
17 20597 GILBERT FO . OP 8 - D DOOR STANDBY
18 23210 BAL KUMAR HELPER 8 2 EQUIPMENT STANDBY
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC 1669 AIR COMPRESSOR 7 6878 1 HAND TOOLS


2 GR1865 GENERATOR 7 2684 2
3 3
4 AC 1612 AIR COMPRESSOR IDLE 4056.7 4
5 WM1714 WELDING MACHINE IDLE 6314 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# IDLE TIMESHEET REPORTING DATE 29-Jun-20

SERVICE ORDER NO. 6510948963 Service Line Item# TIME REACHED CONTROL ROOM

TANK NUMBER NJBP TANK 110 (NIGHT) Direct / Part of PERMIT START
L.I. Description PERMIT CLOSED

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 23121 IMTHIYAZ SAFETY 8 TRAVELLING TO JEDDAH FROM YANBU
2 21090 YUWAK SING HELPER 8 WENT ARAMCO ID OFFICE YANBU
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# IDLE TIMESHEET REPORTING DATE 28-Jun-20

SERVICE ORDER NO. 6510948963 Service Line Item# TIME REACHED CONTROL ROOM

TANK NUMBER NJBP TANK 110 (NIGHT) Direct / Part of PERMIT START
L.I. Description PERMIT CLOSED

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 23121 IMTHIYAZ SAFETY 8 WENT YANBU ARAMCO ID OFFICE
2 21090 YUWAK SING HELPER 8
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 60 REPORTING DATE 28-Jun-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1057483 TIME REACHED CONTROL ROOM 18:50:00 PM
TANK NUMBER NJBP TANK 110 (NIGHT) Direct / Part of PART OF PERMIT START 19:00:00 PM
L.I. Description SAND BACK FILLING , SPREADING & LEVELLING PERMIT CLOSED 4:30:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 8 2 TAKEN PERMIT & HELPING LABOURS
2 21923 MURUGAN SAFETY 8 2 SAFETY AT SITE
3 20597 GILBERT FO . OP 8 2 SHIFITNG DRY MIX CEMENT SAND FROM TANK OUTSIDE TO INSIDE 2.2 2.2 Cu.m
4 HELPING TO SPREAD DRY MIX SAND & LEVELLING
5 REMOVING PLATFORM INSIDE TANK
6 23844 BIR K C HELPER 8 2 S.NO 6 TO 9 TOGETHER WORKING
7 23925 DIPENDRA HELPER 8 2 ASSIST BOBCAT OPERATOR AND SPREADING SAND 780 - 780 Sq.m
8 20780 KUMAR KAMI HELPER 8 - LEVELLING SAND 500 180 780 Sq.m
9 18753 RABINDRA HELPER 8 -
10
11
12
13
14
15
16
17 22962 PREM HELPER 8 2 D DOOR STANDBY
18 23210 BAL KUMAR HELPER 8 2 EQUIPMENT STANDBY
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC 1115 AIR COMPRESSOR 8 7062.3 1 HAND TOOLS


2 GR1816 GENERATOR 8 4804 2
3 SL2066 BOBCAT 3 186 3
4 AC 1669 AIR COMPRESSOR IDLE 48972.1 4
5 GR1765 GENERATOR IDLE 4084 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 150 REPORTING DATE 28-Jun-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1091342 TIME REACHED CONTROL ROOM 18:50:00 PM
TANK NUMBER NJBP TANK 110 (NIGHT) Direct / Part of DIRECT / PART OF PERMIT START 19:00:00 PM
L.I. Description WELDING OF BOTTOM PLATE PERMIT CLOSED 4:30:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 20988 MANAN WELDER 8 3 WELDED SHELL TO ANNULAR PLATE (5 PASS) 6 1.5 7.5 Meter
2
3 22494 ABDUL QADIR WELDER 8 3 WELDED SHELL TO ANNULAR PLATE (5 PASS) 6 1.5 7.5 Meter
4
5 20485 ALAM WELDER 8 3 WELDED SHELL TO ANNULAR PLATE (5 PASS) 6 1.5 7.5 Meter
6
7 25248 THAHIR HUSSAIN WELDER 8 3 WELDED SHELL TO ANNULAR PLATE (5 PASS) 6 1.5 7.5 Meter
8
9
10 8 2 ASSIST S.NO 5 WELDER & GRINDING BOTTOM PLATE 6 1.5 7.5 Meter
11
12 24681 SUNIL FAB 8 2 ASSIST S.NO 1 WELDER & GRINDING BOTTOM PLATE 6 1.5 7.5 Meter
13
14 25203 JORGE FAB 8 2 ASSIST S.NO 7 WELDER & GRINDING BOTTOM PLATE 6 1.5 7.5 Meter
15
16 21051 HIRA HELPER 8 2 ASSIST S.NO 3 WELDER & GRINDING BOTTOM PLATE 6 1.5 7.5 Meter
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 WM1606 WELDING MACHINE 8 6853.6 1 90 7" GRINDING WHEEL 2 EA


2 WM1693 WELDING MACHINE 8 7494.3 2 90 4" CUTTING WHEEL 2 EA
3 WM2094 WELDING MACHINE 8 2609.1 3 90 WELDING ROD DIA 3.2 25 KG
4 4 HAND TOOLS
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# LINE NOT PROVIED / AVAILABLE REPORTING DATE 27-Jun-20

SERVICE ORDER NO. 6510932388 Service Line Item# TIME REACHED CONTROL ROOM 18:50:00 PM
TANK NUMBER NJBP 116 Direct / Part of PART OF PERMIT START 19:00:00 PM
L.I. Description HYDROTEST PERMIT CLOSED 7:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 8 4 TAKEN PERMIT FOR TANK 110 & TANK 116 (HANDLING BOTH TANK)
2 TRANSFERRING WATER FROM TANK 116 TO TANK 106 WATER TANK
3
4 23121 IMTHIYAZ SAFETY 8 - SAFETY AT SITE
5
6 20719 MAN BAHATHUR HELPER 8 4 STANDBY
7
8 23213 LALLU HELPER 8 4 STANDBY
9 NOTE
10.30 WATER PUMP 701
10 BREAKDOWN , SO 10.30 TO
11 2CLK CHANGING HOSES ,
REDUCER TO DRAIN PUMP
12 2337
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 WP701 WATER PUMP 4 HRS 1 HAND TOOLS


2 DP2337 DRAIN PUMP 5 58.7 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 150 REPORTING DATE 27-Jun-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1091342 TIME REACHED CONTROL ROOM 18:50:00 PM
TANK NUMBER NJBP TANK 110 (NIGHT) Direct / Part of PART OF PERMIT START 19:00:00 PM
L.I. Description FABRICATION OF ANNULAR PLATE PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 25203 JORGE FAB 8 - FABRICATING ANNUALR PLATE (GAS CUTTING 2.5 x 0.8Meter) 2 2 Plates
2
3 24681 SUNIL FAB 8 - FABRICATING ANNUALR PLATE (GAS CUTTING 2.5 x 0.8Meter) 2 2 Plates
4
5 20988 MANAN WELDER 8 ASSIST FABRICATOR
6
7 22494 ABDUL QADIR WELDER 8 ASSIST FABRICATOR
8
9 20485 ALAM WELDER 8 IDLE
10
11 25248 THAHIR HUSSAIN WELDER 8 IDLE
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 150 OXYGEN 0.6 %


2 2 150 ACETYLENE 0.7 %
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 60 REPORTING DATE 27-Jun-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1057483 TIME REACHED CONTROL ROOM 18:50:00 PM
TANK NUMBER NJBP TANK 110 (NIGHT) Direct / Part of PART OF PERMIT START 19:00:00 PM
L.I. Description SAND BACK FILLING , SPREADING & LEVELLING PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 21923 MURUGAN SAFETY 8 - SAFETY AT SITE
2
3 20597 GILBERT FO . OP 8 - SHIFITNG SWEET SAND FROM TANK OUTSIDE TO INSIDE 1.1 1.1 Cu.m
4 SHIFITNG DRY MIX CEMENT SAND FROM TANK OUTSIDE TO INSIDE 2.1 2.1 Cu.m
5
6 21358 TAN BAHADUR HELPER 8 - S.NO 6 TO 9 TOGETHER WORKING
7 20780 KUMAR KAMI HELPER 8 - ASSIST BOBCAT OPERATOR AND LEVELLING SAND 400 400 Sq.m
8 21090 YUWAK SING HELPER 8
9 18753 RABINDRA HELPER 8 -
10 21051 HIRA HELPER 8 - S.NO 10 TO 13 TOGETHER WORKING
11 23844 BIR K C HELPER 8 - SPREADING SAND 400 400 Cu.m
12 23206 KHUSHI RAM HELPER 8 -
13 23925 DIPENDRA HELPER 8 -
14 22962 PREM HELPER 8 - D DOOR STANDBY
15 23210 BAL KUMAR HELPER 8 - EQUIPMENT STANDBY
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC 1669 AIR COMPRESSOR 8 1 HAND TOOLS


2 GR1816 GENERATOR 8 2
3 SL2066 BOBCAT 4 181.7 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 60 REPORTING DATE 26-Jun-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1057483 TIME REACHED CONTROL ROOM 18:50:00 PM
TANK NUMBER NJBP TANK 110 (NIGHT) Direct / Part of PART OF PERMIT START 19:00:00 PM
L.I. Description SAND BACK FILLING , SPREADING & LEVELLING PERMIT CLOSED 2:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 6 TAKEN PERMIT & HELPING LABOURS
2
3 20597 GILBERT FO . OP 6 SHIFITNG SAND FROM TANK OUTSIDE TO INSIDE 13 13 Cu.m
4
5
6 21358 TAN BAHADUR HELPER 6 S.NO 6 TO 9 TOGETHER WORKING
7 20719 MAN BAHATHUR HELPER 6 ASSIST BOBCAT OPERATOR & LEVELLING SAND 13 13 Cu.m
8 21090 YUWAK SING HELPER 6
9 23213 LALLU HELPER 6
10 21051 HIRA HELPER 6 S.NO 10 TO 12 TOGETHER WORKING
11 23844 BIR K C HELPER 6 SPREADING SAND 13 13 Cu.m
12 23206 KHUSHI RAM HELPER 6
13
14 22962 PREM HELPER 6 D DOOR STANDBY
15 23210 BAL KUMAR HELPER 6 EQUIPMENT STANDBY
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC 1669 AIR COMPRESSOR 6 4854.6 1 HAND TOOLS


2 GR1816 GENERATOR 6 4779 2
3 SL2066 BOBCAT 6 176.3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# IDLE TIMESHEET REPORTING DATE 25-Jun-20

SERVICE ORDER NO. 6510948963 Service Line Item# TIME REACHED CONTROL ROOM

TANK NUMBER NJBP TANK 110 (NIGHT) Direct / Part of PERMIT START
L.I. Description PERMIT CLOSED

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 23216 BASHIR HELPER 8 TRANSFERRING TO MADINA
2 23594 SAJID HELPER 8
3 23520 KHALID HELPER 8
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 90 REPORTING DATE 25-Jun-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1081190 TIME REACHED CONTROL ROOM 18:50:00 PM
TANK NUMBER NJBP TANK 110 (NIGHT) Direct / Part of DIRECT / PART OF PERMIT START 19:00:00 PM
L.I. Description WELDING REPAIR PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 20988 MANAN WELDER 8 - WELDING ON REPAIRING (DIESEL TEST FAILED AREA)SHELL TO ANNULAR PLATE 0.2 0.2 Meter
2
3 22494 ABDUL QADIR WELDER 8 - WELDING ON REPAIRING (DIESEL TEST FAILED AREA)SHELL TO ANNULAR PLATE 0.2 0.2 Meter
4
5 20485 ALAM WELDER 8 - WELDING ON REPAIRING (DIESEL TEST FAILED AREA)SHELL TO ANNULAR PLATE 0.2 0.2 Meter
6
7 25248 THAHIR HUSSAIN WELDER 8 - WELDING ON REPAIRING (DIESEL TEST FAILED AREA)SHELL TO ANNULAR PLATE 0.2 0.2 Meter
8
9 25203 JORGE FAB 8 - ASSIST WELDER
10
11 24681 SUNIL FAB 8 - ASSIST WELDER
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 WM1606 WELDING MACHINE 4 6846.2 1 90 WELDING ROD DIA 3.2 1.2 KG


2 WM1693 WELDING MACHINE 4 7487 2 90 4" CUTTING WHEEL 2 EA
3 WM2094 WELDING MACHINE 4 2601.8 3 HAND TOOLS
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 60 REPORTING DATE 25-Jun-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1057483 TIME REACHED CONTROL ROOM 18:50:00 PM
TANK NUMBER NJBP TANK 110 (NIGHT) Direct / Part of PART OF PERMIT START 19:00:00 PM
L.I. Description SAND BACK FILLING , SPREADING & LEVELLING PERMIT CLOSED 4:30:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 8 2 TAKEN PERMIT & HELPING LABOURS
2 21923 MURUGAN SAFETY 8 2 SAFETY AT SITE
3 20597 GILBERT FO . OP 8 2 SHIFITNG SAND FROM TANK OUTSIDE TO INSIDE 14.5 2 16.5 Cu.m
4
5
6 21358 TAN BAHADUR HELPER 8 2 S.NO 6 TO 10 TOGETHER WORKING
7 20719 MAN BAHATHUR HELPER 8 2 ASSIST BOBCAT OPERATOR & LEVELLING SAND 14.5 2 16.5 Cu.m
8 21090 YUWAK SING HELPER 8 2
9 23844 BIR K C HELPER 8 2
10 23206 KHUSHI RAM HELPER 8 2
11
12
13 21051 HIRA HELPER 8 2 S.NO 13 TO 16 TOGETHER WORKING 14.5 2 16.5 Cu.m
14 23925 DIPENDRA HELPER 8 2 ASSIST BOBCAT OPERATOR AND SPREADING SAND
15 18753 RABINDRA HELPER 8 -
16 20780 KUMAR KAMI HELPER 8 - FLAG MAN
17
18
19 22962 PREM HELPER 8 2 D DOOR STANDBY
20 23210 BAL KUMAR HELPER 8 2 EQUIPMENT STANDBY
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC 1669 AIR COMPRESSOR IDLE 4849.4 1 HAND TOOLS


2 AC 1115 AIR COMPRESSOR 8 7048.6 2
3 GR1816 GENERATOR 8 4771 3
4 GR 1765 GENERATOR IDLE 4084 4
5 SL2066 BOBCAT 8 171 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# IDLE TIMESHEET REPORTING DATE 24-Jun-20

SERVICE ORDER NO. 6510948963 Service Line Item# TIME REACHED CONTROL ROOM

TANK NUMBER NJBP TANK 110 (NIGHT) Direct / Part of PERMIT START
L.I. Description PERMIT CLOSED

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 25248 THAHIR HUSSAIN WELDER 8 TRAVELLING FROM YANBU TO JEDDAH
2 21923 MURUGAN SAFETY 8 WENT ARAMCO ID OFFICE
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 60 REPORTING DATE 24-Jun-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1057483 TIME REACHED CONTROL ROOM 18:50:00 PM
TANK NUMBER NJBP TANK 110 (NIGHT) Direct / Part of PART OF PERMIT START 19:00:00 PM
L.I. Description SAND BACK FILLING , SPREADING & LEVELLING PERMIT CLOSED 4:30:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 8 2 TAKEN PERMIT & HELPING LABOURS
2
3 20597 GILBERT FO . OP 8 2 SHIFITNG SAND FROM TANK OUTSIDE TO INSIDE 14.8 1.8 16.6 Cu.m
4
5
6 21358 TAN BAHADUR HELPER 8 2 S.NO 6 TO 10 TOGETHER WORKING
7 20719 MAN BAHATHUR HELPER 8 2 ASSIST BOBCAT OPERATOR & LEVELLING SAND 14.8 1.8 16.6 Cu.m
8 21090 YUWAK SING HELPER 8 2
9 23844 BIR K C HELPER 8 2
10 23925 DIPENDRA HELPER 8 2
11
12
13 21051 HIRA HELPER 8 2 S.NO 13 TO 17 TOGETHER WORKING 14.8 1.8 16.6 Cu.m
14 23213 LALLU HELPER 8 2 ASSIST BOBCAT OPERATOR AND SPREADING SAND
15 23216 BASHIR HELPER 8 2
16 18753 RABINDRA HELPER 8 -
17 20780 KUMAR KAMI HELPER 8 - FLAG MAN
18
19 22962 PREM HELPER 8 2 D DOOR STANDBY
20 23210 BAL KUMAR HELPER 8 2 EQUIPMENT STANDBY
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC 1669 AIR COMPRESSOR IDLE 4849.4 1 HAND TOOLS


2 AC 1115 AIR COMPRESSOR 8 7043.3 2
3 GR1816 GENERATOR 8 4758 3
4 GR 1765 GENERATOR IDLE 4084 4
5 SL2066 BOBCAT 8 162.5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 90 REPORTING DATE 24-Jun-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1081190 TIME REACHED CONTROL ROOM 18:50:00 PM
TANK NUMBER NJBP TANK 110 (NIGHT) Direct / Part of DIRECT / PART OF PERMIT START 19:00:00 PM
L.I. Description WELDING OF BOTTOM PLATE PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 20988 MANAN WELDER 8 2 WELDED BOTTOM PLATE TEE JOINT (4 PASS) 26 26 Joint
2 WELDED BOTTOM PLATE (2 PASS) (HOT AND FINAL PASS) 3 3 Meter
3
4 22494 ABDUL QADIR WELDER 8 - WELDED BOTTOM PLATE TEE JOINT (4 PASS) 27 27 Joint
5
6
7 20485 ALAM WELDER 8 - WELDED BOTTOM PLATE TEE JOINT (4 PASS) 26 26 Joint
8
9
10 23206 KHUSHI RAM HELPER 8 2 ASSIST S.NO 1 WELDER & GRINDING BOTTOM PLATE
11
12 24681 SUNIL FAB 8 - ASSIST S.NO 4 WELDER & GRINDING BOTTOM PLATE
13
14 25203 JORGE FAB 8 - ASSIST S.NO 7 WELDER & GRINDING BOTTOM PLATE
15
16 23594 SAJID HELPER 8 - FIRE WATCH
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 WM1606 WELDING MACHINE 8 6842.7 1 90 7" GRINDING WHEEL 2 EA


2 WM1693 WELDING MACHINE 8 7483.5 2 90 4" CUTTING WHEEL 2 EA
3 WM2094 WELDING MACHINE 8 2598.3 3 90 WELDING ROD DIA 3.2 15 KG
4 4 HAND TOOLS
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# IDLE TIMESHEET REPORTING DATE 23-Jun-20

SERVICE ORDER NO. 6510948963 Service Line Item# TIME REACHED CONTROL ROOM

TANK NUMBER NJBP TANK 110 (NIGHT) Direct / Part of PERMIT START
L.I. Description PERMIT CLOSED

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 25248 THAHIR HUSSAIN WELDER 8 WENT YANBU ARAMCO ID OFFICE
2 21923 MURUGAN SAFETY 8
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 60 REPORTING DATE 23-Jun-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1057483 TIME REACHED CONTROL ROOM 18:50:00 PM
TANK NUMBER NJBP TANK 110 (NIGHT) Direct / Part of PART OF PERMIT START 19:00:00 PM
L.I. Description SAND BACK FILLING PERMIT CLOSED 4:30:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 8 2 TAKEN PERMIT & HELPING LABOURS
2 21923 MURUGAN SAFETY 8 2 SAFETY AT SITE
3
4 20597 GILBERT FO . OP 8 2 SHIFITNG SAND FROM TANK OUTSIDE TO INSIDE 14.5 1.6 16.6 Cu.m
5
6 21358 TAN BAHADUR HELPER 8 2 S.NO 6 TO 10 TOGETHER WORKING
7 20719 MAN BAHATHUR HELPER 8 2 LEVELLING SAND 14.5 1.6 16.6 Cu.m
8 21090 YUWAK SING HELPER 8 2
9 23844 BIR K C HELPER 8 2
10 23925 DIPENDRA HELPER 8 2
11
12
13 21051 HIRA HELPER 8 2 S.NO 13 TO 15 TOGETHER WORKING 14.5 1.6 16.6 Cu.m
14 23213 LALLU HELPER 8 2 ASSIST BOBCAT OPERATOR AND SPREADING SAND
15 18753 RABINDRA HELPER 8 -
16
17 20780 KUMAR KAMI HELPER 8 - FLAG MAN
18
19 22962 PREM HELPER 8 2 D DOOR STANDBY
20 23210 BAL KUMAR HELPER 8 2 EQUIPMENT STANDBY
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC 1669 AIR COMPRESSOR IDLE 4849.4 1 HAND TOOLS


2 AC 1115 AIR COMPRESSOR 8 7021.6 2
3 GR1816 GENERATOR 8 4746 3
4 GR 1765 GENERATOR IDLE 4084 4
5 SL2066 BOBCAT 8 152.6 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 90 REPORTING DATE 23-Jun-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1081190 TIME REACHED CONTROL ROOM 18:50:00 PM
TANK NUMBER NJBP TANK 110 (NIGHT) Direct / Part of DIRECT / PART OF PERMIT START 19:00:00 PM
L.I. Description WELDING OF BOTTOM PLATE PERMIT CLOSED 4:30:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 20988 MANAN WELDER 8 2 WELDED BOTTOM PLATE TEE JOINT (4 PASS) 28 28 Joint
2 WELDED BOTTOM PLATE (3 PASS) 1 1 Meter
3
4 22494 ABDUL QADIR WELDER 8 2 WELDED BOTTOM PLATE TEE JOINT (4 PASS) 28 2 30 Joint
5
6
7 20485 ALAM WELDER 8 2 WELDED BOTTOM PLATE TEE JOINT (4 PASS) 27 27 Joint
8 WELDED BOTTOM PLATE (3 PASS) 1 1 Meter
9
10 23206 KHUSHI RAM HELPER 8 2 ASSIST S.NO 7 WELDER & GRINDING BOTTOM PLATE
11
12 24681 SUNIL FAB 8 2 ASSIST S.NO 4 WELDER & GRINDING BOTTOM PLATE
13
14 23216 BASHIR HELPER 8 2 ASSIST S.NO 1 WELDER & GRINDING BOTTOM PLATE
15
16 23594 SAJID HELPER 8 - FIRE WATCH
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 WM1606 WELDING MACHINE 8 6835.7 1 90 7" GRINDING WHEEL 2 EA


2 WM1693 WELDING MACHINE 8 7476.5 2 90 4" CUTTING WHEEL 2 EA
3 WM2094 WELDING MACHINE 8 2591.2 3 90 WELDING ROD DIA 3.2 17 KG
4 4 HAND TOOLS
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 60 REPORTING DATE 22-Jun-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1057483 TIME REACHED CONTROL ROOM 18:50:00 PM
TANK NUMBER NJBP TANK 110 (NIGHT) Direct / Part of PART OF PERMIT START 19:00:00 PM
L.I. Description SAND BACK FILLING PERMIT CLOSED 4:40:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 8 2 TAKEN PERMIT & HELPING LABOURS
2 21923 MURUGAN SAFETY 8 2 SAFETY AT SITE
3
4 20597 GILBERT FO . OP 8 2 SHIFITNG SAND FROM TANK OUTSIDE TO INSIDE 13.8 1.2 15 Cu.m
5
6 21358 TAN BAHADUR HELPER 8 2 S.NO 6 TO 10 TOGETHER WORKING
7 20719 MAN BAHATHUR HELPER 8 2 SHIFTING DAMAGED HDPE LINER SHEET FROM TANK 116 TO 110 MANUALLY (1roll) 40 40 Sq.m
8 21090 YUWAK SING HELPER 8 2 TO FORM PLATFORM FOR BOBCAT TO RUN INSIDE TANK ABOVE SAND
9 23844 BIR K C HELPER 8 2 LEVELLING SAND 13.8 1.2 15 Cu.m NOTE
STARTED SAND SHIFTING AT
10 23925 DIPENDRA HELPER 8 2 08.30 BEFORE SHIFITNG
11 MATERIALS FROM TANK 116
TO TANK 110 TO MAKE
12 PLATFORM
13 21051 HIRA HELPER 8 2 S.NO 13 TO 17 TOGETHER WORKING 13.8 1.2 15 Cu.m
14 23206 KHUSHI RAM HELPER 8 2 ASSIST BOBCAT OPERATOR AND SPREADING SAND
15 18753 RABINDRA HELPER 8 -
16 20780 KUMAR KAMI HELPER 8 -
17 23213 LALLU HELPER 8 - FLAG MAN
18
19 22962 PREM HELPER 8 2 D DOOR STANDBY
20 23210 BAL KUMAR HELPER 8 2 EQUIPMENT STANDBY
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC 1669 AIR COMPRESSOR IDLE 4849.4 1 HAND TOOLS


2 AC 1115 AIR COMPRESSOR 8 7008.7 2
3 GR1816 GENERATOR 8 4734 3
4 GR 1765 GENERATOR IDLE 4084 4
5 WM1606 WELDING MACHINE IDLE 6828.9 5
6 WM1693 WELDING MACHINE IDLE 7469.7 6
7 WM2094 WELDING MACHINE IDLE 2584.4 7
8 SL2066 BOBCAT 7 142.7 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# IDLE TIMESHEET REPORTING DATE 22-Jun-20

SERVICE ORDER NO. 6510948963 Service Line Item# TIME REACHED CONTROL ROOM 18:50:00 PM
TANK NUMBER NJBP TANK 110 (NIGHT) Direct / Part of PERMIT START 19:00:00 PM
L.I. Description PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 20988 MANAN WELDER 8 THOSE LABOURS ARE IDLE DUE TO UNAVAILBLE OF MASK
2 25248 THAHIR HUSSAIN WELDER 8
3 20485 ALAM WELDER 8
4 24681 SUNIL FAB 8
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 20 / 60 REPORTING DATE 21-Jun-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1074566 / '1057483 TIME REACHED CONTROL ROOM 18:50:00 PM
TANK NUMBER NJBP TANK 110 (NIGHT) Direct / Part of PART OF PERMIT START 19:00:00 PM
L.I. Description BACK FILLING SAND & REMOVING MARL OF LEAK DETECTION PIPE PERMIT CLOSED 4:30:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 8 2 TAKEN PERMIT & HELPING LABOURS
2 21923 MURUGAN SAFETY 8 2 SAFETY AT SITE
3
4 20597 GILBERT FO . OP 8 - MARL SHIFTING USING BOBCAT NEAR DIKE WALL 2 2 Cu.m
5
6 21358 TAN BAHADUR HELPER 8 2 S.NO 6 TO 13 TOGETHER WORKING
7 20719 MAN BAHATHUR HELPER 8 2 BACK FILLING LEAK DETECTION PIPE INSTALLED AREA TANK EXTERNAL ( 2 AREA) 6 6 Cu.m
8 21090 YUWAK SING HELPER 8 2 REMOVING EXCAVATED MARL / SAND NEAR DIKE WALL USING WHEEL BARROW 4 1.7 5.7 Cu.m
9 23844 BIR K C HELPER 8 2 CANNOT USE BOB CAT DUE TO INBETWEEN PIPE LINES PRESENT
10 23925 DIPENDRA HELPER 8 2
11 23213 LALLU HELPER 8 2
12 20780 KUMAR KAMI HELPER 8 -
13 18753 RABINDRA HELPER 8 -
14
15
16
17
18 22962 PREM HELPER 8 2 D DOOR STANDBY
19 23210 BAL KUMAR HELPER 8 2 EQUIPMENT STANDBY
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 SL2066 BOBCAT 2 136.7 1 HAND TOOLS


2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 90 REPORTING DATE 21-Jun-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1081190 TIME REACHED CONTROL ROOM 18:50:00 PM
TANK NUMBER NJBP TANK 110 (NIGHT) Direct / Part of DIRECT / PART OF PERMIT START 19:00:00 PM
L.I. Description WELDING OF BOTTOM PLATE PERMIT CLOSED 4:30:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 20988 MANAN WELDER 8 2 WELDING BUTT JOINT (7 PASS) (4 JOINTS) 1.6 1.6 Meter
2 TEE JOINT 4 4 Joint
3 22494 ABDUL QADIR WELDER 8 2 WELDING ANNULAR TO SKETCH PLATE (6 PASS) 5 5 Meter
4 WELDING TEE JOINT 7 7 Joint
5 WELDING BUTT JOINT FINAL PASS (3PASS) 0.4 0.4 Meter
6 25248 THAHIR HUSSAIN WELDER 8 2 WELDING ANNULAR TO SKETCH PLATE (6 PASS) 5 5 Meter
7 WELDING TEE JOINT 7 7 Joint
8 20485 ALAM WELDER 8 2 WELDING BUTT JOINT (7 PASS) (4 JOINTS) 1.6 1.6 Meter
9 WELDING TEE JOINT 4 4 Joint
10 23206 KHUSHI RAM HELPER 8 2 ASSIST WELDER AND GRINDING PLATE(7 PASS) 1.6 1.6 Meter
11 GRINDING TEE JOINT 4 4 Joint
12 24681 SUNIL FAB 8 2 ASSIST WELDER AND GRINDING PLATE(6 PASS) 5 5 Meter
13 GRINDING TEE JOINT 7 7 Joint
14 25203 JORGE FAB 8 2 ASSIST WELDER AND GRINDING PLATE(6 PASS) 5 5 Meter
15 GRINDING TEE JOINT 7 7 Joint
16 GRINDING BUTT JOINT FINAL PASS (3PASS) 0.4 0.4 Meter
17 21051 HIRA HELPER 8 2 ASSIST WELDER AND GRINDING PLATE(7 PASS) 1.6 1.6 Meter
18 GRINDING TEE JOINT 4 4 Joint
19 23594 SAJID HELPER 8 2 FIRE WATCH & BRUSH CLEANING1ST HALF PLATES
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC 1669 AIR COMPRESSOR 8 4844.8 1 90 7" GRINDING WHEEL 1 EA


2 AC 1115 AIR COMPRESSOR IDLE 6999.1 2 90 4" CUTTING WHEEL 3 EA
3 GR1816 GENERATOR 8 4720 3 90 7" CUTTING WHEEL 1 EA
4 GR 1765 GENERATOR IDLE 4079 4 90 WELDING ROD DIA 3.2 20 KG
5 WM1606 WELDING MACHINE 8 6821.7 5 HAND TOOLS
6 WM1693 WELDING MACHINE 8 7462.1 6
7 WM2094 WELDING MACHINE 8 2582.8 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 90 REPORTING DATE 20-Jun-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1081190 TIME REACHED CONTROL ROOM 18:50:00 PM
TANK NUMBER NJBP TANK 110 (NIGHT) Direct / Part of DIRECT / PART OF PERMIT START 19:00:00 PM
L.I. Description WELDING OF BOTTOM PLATE PERMIT CLOSED 4:40:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 20988 MANAN WELDER 8 3 WELDING ANNULAR TO SKETCH PLATE (5PASS) 6 1.5 7.5 Meter
2 TEE JOINT 2 2 Joint
3 22494 ABDUL QADIR WELDER 8 3 WELDING ANNULAR TO SKETCH PLATE (5PASS) 6 1.5 7.5 Meter
4 TEE JOINT 2 2 Joint
5 25248 THAHIR HUSSAIN WELDER 8 3 WELDING ANNULAR TO SKETCH PLATE (5PASS) 6 1.5 7.5 Meter
6 TEE JOINT 2 2 Joint
7 20485 ALAM WELDER 8 3 WELDING ANNULAR TO SKETCH PLATE (5PASS) 6 1.5 7.5 Meter
8 TEE JOINT 2 2 Joint
9
10 23206 KHUSHI RAM HELPER 8 3 ASSIST WELDER AND GRINDING PLATE(5PASS) 6 1.5 7.5 Meter
11 2 2 Joint
12 24681 SUNIL FAB 8 3 ASSIST WELDER AND GRINDING PLATE(5PASS) 6 1.5 7.5 Meter
13 2 2 Joint
14 25203 JORGE FAB 8 3 ASSIST WELDER AND GRINDING PLATE(5PASS) 6 1.5 7.5 Meter
15 2 2 Joint
16 21051 HIRA HELPER 8 3 ASSIST WELDER AND GRINDING PLATE(5PASS) 6 1.5 7.5 Meter
17 2 2 Joint
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 WM2094 WELDING MACHINE 8 2569.1 1 90 7" GRINDING WHEEL 1 EA


2 WM1606 WELDING MACHINE 8 6808.4 2 90 4" CUTTING WHEEL 2 EA
3 WM1693 WELDING MACHINE 8 7448.8 3 90 7" CUTTING WHEEL 1 EA
4 4 HAND TOOLS
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 60 REPORTING DATE 20-Jun-20

SERVICE ORDER NO. 6510948963 Service Line Item# '1057483 TIME REACHED CONTROL ROOM 18:50:00 PM
TANK NUMBER NJBP TANK 110 (NIGHT) Direct / Part of PART OF PERMIT START 19:00:00 PM
L.I. Description SAND SHIFTING , SPREADING , LEVELLING PERMIT CLOSED 4:40:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 8 2 TAKEN PERMIT & HELPING LABOURS
2 21923 MURUGAN SAFETY 8 2 SAFETY AT SITE
3
4 20597 GILBERT FO . OP 8 2 SAND SHIFTING USING BOBCAT FROM OUTSIDE TO TANK INSIDE 17 4 17 Cu.m
5 SHIFITNG WELDING MACHINE 2094 FROM TANK 116 TO TANK 110 1 1 EA
6 21358 TAN BAHADUR HELPER 8 2 S.NO 6 TO 9 TOGETHER WORKING
7 20719 MAN BAHATHUR HELPER 8 2 SAND SPREADING 17 4 17 Cu.m
8 21090 YUWAK SING HELPER 8 2 SAND LEVELLING 17 4 17 Cu.m
9 23844 BIR K C HELPER 8 2
10 23925 DIPENDRA HELPER 8 2
11 18753 RABINDRA HELPER 8 - ASSIST FORKLIFT OPERATOR TO SHIFTING WELDING MACHINE & SAND LEVELLING
12 20780 KUMAR KAMI HELPER 8 - ASSIST FORKLIFT OPERATOR TO SHIFTING WELDING MACHINE & SAND LEVELLING
13
14
15
16
17
18 22962 PREM HELPER 8 2 D DOOR STANDBY
19 23210 BAL KUMAR HELPER 8 2 EQUIPMENT STANDBY
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1669 AIR COMPRESSOR 8 4831 1 HAND TOOLS


2 GR 1816 GENERATOR 8 4707 2
3 SL2066 BOBCAT 8 135.3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 90 / 60 REPORTING DATE 19-Jun-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1081190 / '1057483 TIME REACHED CONTROL ROOM 18:50:00 PM
TANK NUMBER NJBP TANK 110 (NIGHT) Direct / Part of DIRECT / PART OF PERMIT START 19:00:00 PM
L.I. Description WELDING OF BOTTOM PLATE & SAND SHIFTING , SPREADING , LEVELLING PERMIT CLOSED 2:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 8 TAKEN PERMIT & HELPING LABOURS
2 21923 MURUGAN SAFETY 8 SAFETY AT SITE
3
4 20597 GILBERT FO . OP 8 SAND SHIFTING USING BOBCAT FROM OUTSIDE TO TANK INSIDE 18.5 18.5 Cu.m
5
6 21358 TAN BAHADUR HELPER 8 S.NO 6 TO 9 TOGETHER WORKING
7 20719 MAN BAHATHUR HELPER 8 SAND SPREADING 18.5 18.5 Cu.m
8 23206 KHUSHI RAM HELPER 8 SAND LEVELLING 18.5 18.5 Cu.m
9 23844 BIR K C HELPER 8
10
11
12 20988 MANAN WELDER 8 WELDING ANNULAR TO SKETCH PLATE (5PASS) 6 6 Meter
13 21090 YUWAK SING HELPER 8 ASSIST & GRINDING (5PASS) 6 6 Meter
14
15
16
17
18 22962 PREM HELPER 8 D DOOR STANDBY
19 23210 BAL KUMAR HELPER 8 EQUIPMENT STANDBY
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1669 AIR COMPRESSOR 6 4816 1 HAND TOOLS


2 GR 1816 GENERATOR 6 4693 2
3 WM1693 WELDING MACHINE 6 7434.6 3
4 SL2066 BOBCAT 6 126.4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 90 / 60 REPORTING DATE 18-Jun-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1081190 / '1057483 TIME REACHED CONTROL ROOM 18:50:00 PM
TANK NUMBER NJBP TANK 110 (NIGHT) Direct / Part of DIRECT / PART OF PERMIT START 19:00:00 PM
L.I. Description WELDING & ASSIST HDPE LINER SHEET INSTALLING PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 8 - TAKEN PERMIT & HELPING LABOURS
2 21923 MURUGAN SAFETY 8 - SAFETY AT SITE
3 22494 ABDUL QADIR WELDER 8 - WELDING ANNULAR TO SKETCH PLATE (5PASS) 6 6 Meter
4 20485 ALAM WELDER 8 - WELDING ANNULAR TO SKETCH PLATE (5PASS) 6 6 Meter
5 25248 THAHIR HUSSAIN WELDER 8 - WELDING ANNULAR TO SKETCH PLATE (5PASS) 6 6 Meter
6 21090 YUWAK SING HELPER 8 2 ASSIST & GRINDING (5PASS) & ARRANGING WELDING CABLE 6 6 Meter
7 20719 MAN BAHATHUR HELPER 8 2 ASSIST & GRINDING (5PASS) & ARRANGING WELDING CABLE 6 6 Meter
8 23206 KHUSHI RAM HELPER 8 2 ASSIST & GRINDING (5PASS) & ARRANGING WELDING CABLE 6 6 Meter
NOTE
9 S.NO 13 & 14 SHIFTING
10 GRINDING WHEEL , WELDING
OVEN , GRINDING MACHINE
11 FROM TANK 116 TO TANK 110
12 21358 TAN BAHADUR HELPER 8 - ASSIST SOGEC COMPANY WORKERS TO INSTALL HDPE LINER SHEET MANUALLY BY WHEEL
BARROW
13 23925 DIPENDRA HELPER 8 2 PULLING HDPE ROLL FROM DIKE AREA TO INSIDE TANK 4Meter x 31.25Meter 1 1 roll
14 23844 BIR K C HELPER 8 2
15 18753 RABINDRA HELPER 8 -
16 20780 KUMAR KAMI HELPER 8 -
17
18 22962 PREM HELPER 8 - D DOOR STANDBY
19 23210 BAL KUMAR HELPER 8 - EQUIPMENT STANDBY
20 20597 GILBERT FO . OP 8 - ASSIST SAFETY TO FORM HARD BARRICATION FOR SUMPIT
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1669 AIR COMPRESSOR 8 4806.6 1 HAND TOOLS


2 GR 1816 GENERATOR 8 4684 2
3 GR 1765 GENERATOR 8 4074 3
4 WM1606 WELDING MACHINE 8 6789 4
5 WM1693 WELDING MACHINE 8 7425.6 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 60 REPORTING DATE 17-Jun-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1057483 TIME REACHED CONTROL ROOM 18:50:00 PM
TANK NUMBER NJBP TANK 110 (NIGHT) Direct / Part of PART OF PERMIT START 19:00:00 PM
L.I. Description HDPE LINER INSTALLING PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 8 - TAKEN PERMIT & HELPING LABOURS
2 21923 MURUGAN SAFETY 8 - SAFETY AT SITE
3 20597 GILBERT FO . OP 8 - CLEANING BOB CAT
4
5
6 20780 KUMAR KAMI HELPER 8 - ASSIST SOGEC COMPANY WORKERS TO INSTALL HDPE LINER
7 20719 MAN BAHATHUR HELPER 8 - LIFTING SUPPORT TANK INSIDE TO SPREAD HDPE LINER SHEET 45 45 EA
8 21358 TAN BAHADUR HELPER 8 -
9 21090 YUWAK SING HELPER 8 -
10
11
12 23206 KHUSHI RAM HELPER 8 - ASSIST SOGEC COMPANY WORKERS TO INSTALL HDPE LINER
13 23925 DIPENDRA HELPER 8 - PULLING HDPE ROLL FROM DIKE AREA TO INSIDE TANK 4Meter x 31.25Meter 3 3 rolls
14 23844 BIR K C HELPER 8 - ASSIST SPREADING HDPE LINER SHEET 780 780 Sq.m
15 18753 RABINDRA HELPER 8 -
16
17
18 22962 PREM HELPER 8 - D DOOR STANDBY
19 23210 BAL KUMAR HELPER 8 - EQUIPMENT STANDBY
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1669 AIR COMPRESSOR 8 4790.5 1 HAND TOOLS


2 GR 1816 GENERATOR 8 4669 2
3 GR 1765 GENERATOR 7 4060 3
4 SL2066 BOB CAT IDLE 121.2 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 30 & 60 REPORTING DATE 16-Jun-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1000302 & '1057483 TIME REACHED CONTROL ROOM 18:50:00 PM
TANK NUMBER NJBP TANK 110 (NIGHT) Direct / Part of PART OF / DIRECT PERMIT START 19:00:00 PM
L.I. Description JACK HAMMERING & REMOVING MARL & SAND SHIFTING , SPREADING PERMIT CLOSED 4:30:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 8 2 TAKEN PERMIT & HELPING LABOURS
2 21923 MURUGAN SAFETY 8 2 SAFETY AT SITE
3 20597 GILBERT FO . OP 8 - REMOVING MARL FROM INSIDE TO OUTSIDE TANK BY BOBCAT 7 7 Cu.m
4 SHIFTING SAND FROM OUTSIDE TO INSIDE TANK & SPREADING 17 2.5 19.5 Cu.m
5
6
7 20719 MAN BAHATHUR HELPER 8 2 S.NO 7 TO 15 COMBINED TOGETHER WORKING
8 21358 TAN BAHADUR HELPER 8 2 ASSIST BOBCAT OPERATOR TO REMOVE MARL INSIDE TANK USING SHOWEL 7 7 Cu.m
9 21090 YUWAK SING HELPER 8 2 SAND LEVELLING & SPREADING 17 2.5 19.5 Cu.m
10 23206 KHUSHI RAM HELPER 8 2 JACK HAMMERING MARL & COLUMN DOWN SIDES 6 6 Cu.m NOTE
SAND SPREADING &
11 23925 DIPENDRA HELPER 8 2 LEVELLING COMPLETED
12 23844 BIR K C HELPER 8 2
13 20780 KUMAR KAMI HELPER 8 -
14 23210 BAL KUMAR HELPER 8 -
15 18753 RABINDRA HELPER 8 - FLAG MAN
16
17
18 22962 PREM HELPER 8 2 D DOOR STANDBY
19 23213 LALLU HELPER 8 2 EQUIPMENT STANDBY
20 20947 SHYAM HELPER 8 - CAMP CLEANING
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1669 AIR COMPRESSOR 8 4776.5 1 HAND TOOLS


2 GR 1816 GENERATOR 8 4657 2
3 SL2066 BOB CAT 8 120.7 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 80 REPORTING DATE 15-Jun-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1055131 TIME REACHED CONTROL ROOM 18:50:00 PM
TANK NUMBER NJBP TANK 110 (NIGHT) Direct / Part of PART OF PERMIT START 19:00:00 PM
L.I. Description GAS CUTTING EXISTING PLATE PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24681 SUNIL FAB 8 - GAS CUTTING EXISTING BOTTOM PLATE 5.3 5.3 Meter
2 25203 JORGE FAB 8 - GAS CUTTING EXISTING BOTTOM PLATE 5.4 5.4 Meter
3 18753 RABINDRA HELPER 8 - REMOVING EXISTING PLATE FROM INSIDE TO OUTSIDE TANK BY TROLLEY 24 24 Sq.m
4 20780 KUMAR KAMI HELPER 8 - REMOVING EXISTING PLATE FROM INSIDE TO OUTSIDE TANK BY TROLLEY 24 24 Sq.m
5
6 NOTE - 100% REMOVED EXISTING BOTTOM PLATE
7
8
9
NOTE
10 S.NO 20 ARAMCO ID NOT
11 ACCESSING TO ENTER PLANT
SO WORKING IN CAMP
12
13
14
15
16
17
18
19
20 20947 SHYAM HELPER 8 - CAMP CLEANING
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 OXYGEN 0.1 %
2 2 ACETYLENE 0.1 %
3 3 HAND TOOLS
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 30 & 60 REPORTING DATE 15-Jun-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1000302 & '1057483 TIME REACHED CONTROL ROOM 18:50:00 PM
TANK NUMBER NJBP TANK 110 (NIGHT) Direct / Part of PART OF / DIRECT PERMIT START 19:00:00 PM
L.I. Description JACK HAMMERING & REMOVING MARL & SAND SHIFTING , SPREADING PERMIT CLOSED 4:30:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 8 2 TAKEN PERMIT & HELPING LABOURS
2 21923 MURUGAN SAFETY 8 2 SAFETY AT SITE
3 20597 GILBERT FO . OP 8 - REMOVING MARL FROM INSIDE TO OUTSIDE TANK BY BOBCAT 11 11 Cu.m
4 SHIFTING SAND FROM OUTSIDE TO INSIDE TANK & SPREADING 2.5 2.5 Cu.m
5 BACK FILLING LEAK DETECTION PIPE LINE 6 6 Cu.m
6 REMOVING ASPHALT FROM INSIDE TO OUTSIDE TANK BY BOBCAT 1.8 1.8 Cu.m
7 20719 MAN BAHATHUR HELPER 8 2 S.NO 7 TO 13 COMBINED TOGETHER WORKING
8 21358 TAN BAHADUR HELPER 8 2 ASSIST BOBCAT OPERATOR TO REMOVE MARL INSIDE TANK USING SHOWEL 11 11 Cu.m
9 21090 YUWAK SING HELPER 8 2 SAND LEVELLING 2 2 Cu.m
10 21051 HIRA HELPER 8 2 JACK HAMMERING MARL FOR INSTALL LEAK DETECTION PIPE 0.5 0.5 Cu.m
11 23216 BASHIR HELPER 8 2 SAND EXCAVATING TO INSTALL LEAK DETECTION PIPE 0.5 0.5 Cu.m
12 23210 BAL KUMAR HELPER 8 2 INSTALLING LEAK DETECTION PIPE 30 30 Meter
13 23206 KHUSHI RAM HELPER 8 -
14
15 23844 BIR K C HELPER 8 - JACK HAMMERING ASPHALT 1.8 1.8 Cu.m
16 23925 DIPENDRA HELPER 8 - JACK HAMMERING MARL 1.8 1.8 Cu.m
17
18 22962 PREM HELPER 8 2 D DOOR STANDBY
19 23213 LALLU HELPER 8 2 EQUIPMENT STANDBY
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1669 AIR COMPRESSOR 8 4762.3 1 HAND TOOLS


2 GR 1816 GENERATOR 8 4644 2
3 SL2066 BOB CAT 8 1149 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 30 & 60 REPORTING DATE 14-Jun-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1000302 & '1057483 TIME REACHED CONTROL ROOM 18:50:00 PM
TANK NUMBER NJBP TANK 110 (NIGHT) Direct / Part of PART OF / DIRECT PERMIT START 19:00:00 PM
L.I. Description JACK HAMMERING & REMOVING MARL & SAND SHIFTING , SPREADING PERMIT CLOSED 4:30:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 8 2 TAKEN PERMIT & HELPING LABOURS
2 21923 MURUGAN SAFETY 8 2 SAFETY AT SITE
3 20597 GILBERT FO . OP 8 2 REMOVING MARL FROM INSIDE TO OUTSIDE TANK BY BOBCAT 5 5 Cu.m
4 SHIFTING SAND FROM OUTSIDE TO INSIDE TANK & SPREADING 14 2 16 Cu.m
5 BACK FILLING LEAK DETECTION PIPE LINE (6METERS) 3 3 Cu.m
6 REMOVING ASPHALT FROM INSIDE TO OUTSIDE TANK BY BOBCAT 2 2 Cu.m
7 20719 MAN BAHATHUR HELPER 8 2 S.NO 7 TO 11 COMBINED TOGETHER LEVELLING SAND 14 2 16 Cu.m
8 21358 TAN BAHADUR HELPER 8 2 ASSIST BOBCAT OPERATOR TO REMOVE MARL INSIDE TANK USING SHOWEL 5 5 Cu.m
9 23210 BAL KUMAR HELPER 8 2 GAS CUTTING EXISTING BOTTOM PLATE 5 5 Meter
NOTE
10 REMOVING EXISTING PLATE FROM INSIDE TO OUTSIDE TANK BY TROLLEY 12 12 Sq.m S.NO 20 ARAMCO ID NOT
11 20780 KUMAR KAMI HELPER 8 - FLAG MAN ACCESSING TO ENTER PLANT
SO WORKING IN CAMP
12
13
14 23925 DIPENDRA HELPER 8 2 S.NO 14 TO 16 COMBINED TOGETHER JACK HAMMERING MARL 2 2 Cu.m
15 23844 BIR K C HELPER 8 2 JACK HAMMERING ASPHALT 2 2 Cu.m
16 18753 RABINDRA HELPER 8 - ASSIST BOBCAT OPERATOR TO REMOVE ASPHALT & MARL INSIDE TO OUTSIDE 4 4 Cu.m
17 LEVELLING SAND
18 22962 PREM HELPER 8 2 D DOOR STANDBY
19 15066 BAIJANATH HELPER 8 2 EQUIPMENT STANDBY
20 20947 SHYAM HELPER 8 - CAMP CLEANING
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1669 AIR COMPRESSOR 8 4747.4 1 OXYGEN 0.1 %


2 GR 1816 GENERATOR 8 4629 2 ACETYLENE 0.1 %
3 SL2066 BOB CAT 8 1083 3 HAND TOOLS
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 30 REPORTING DATE 13-Jun-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1000302 TIME REACHED CONTROL ROOM 18:50:00 PM
TANK NUMBER NJBP TANK 110 (NIGHT) Direct / Part of PART OF PERMIT START 19:00:00 PM
L.I. Description ACK HAMMERING & REMOVING MARL & SAND SHIFTING , SPREADING PERMIT CLOSED 2:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 8 2 TAKEN PERMIT & HELPING LABOURS
2 21923 MURUGAN SAFETY 8 2 SAFETY AT SITE
3 20597 GILBERT FO . OP 8 2 REMOVING MARL FROM INSIDE TO OUTSIDE TANK BY BOBCAT 7 1 8 Cu.m
4 SHIFTING & SPREADING SAND FROM OUTSIDE TO INSIDE TANK 12.5 1.5 14 Cu.m
5 20719 MAN BAHATHUR HELPER 8 2 S.NO 5 TO 7 COMBINED TOGETHER LEVELLING SAND 12.5 1.5 8 Cu.m
6 21358 TAN BAHADUR HELPER 8 2 ASSIST BOBCAT OPERATOR TO REMOVE MARL INSIDE TANK USING SHOWEL 7 1 14 Cu.m
7 23210 BAL KUMAR HELPER 8 2
8 20780 KUMAR KAMI HELPER 8 - FLAG MAN
9
NOTE
10 23925 DIPENDRA HELPER 8 2 S.NO 10 TO 12 COMBINED TOGETHER JACK HAMMERING MARL 8.2 1 9.2 Cu.m S.NO 20 ARAMCO ID NOT
11 23844 BIR K C HELPER 8 2 ACCESSING TO ENTER PLANT
SO WORKING IN CAMP
12 18753 RABINDRA HELPER 8 -
13
14
15
16 22962 PREM HELPER 8 2 D DOOR STANDBY
17 15066 BAIJANATH HELPER 8 2 EQUIPMENT STANDBY
18
19
20 20947 SHYAM HELPER 8 - CAMP CLEANING
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1669 AIR COMPRESSOR 8 4732 1 HAND TOOLS


2 GR 1816 GENERATOR 8 4614 2
3 SL2066 BOB CAT 8 999 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 30 REPORTING DATE 12-Jun-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1000302 TIME REACHED CONTROL ROOM 18:50:00 PM
TANK NUMBER NJBP TANK 110 (NIGHT) Direct / Part of PART OF PERMIT START 19:00:00 PM
L.I. Description REMOVING & JACK HAMMERING MARL & ASPHALT PERMIT CLOSED 2:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 6 TAKEN PERMIT & HELPING LABOURS
2 21923 MURUGAN SAFETY 6 SAFETY AT SITE
3 20597 GILBERT FO . OP 6 SHIFTING MARL FROM INSIDE TO OUTSIDE TANK BY BOBCAT 10 10 Cu.m
4 SHIFTING ASPHALT FROM INSIDE TO OUTSIDE TANK BY BOBCAT 5 5 Cu.m
5 20719 MAN BAHATHUR HELPER 6 S.NO 5 TO 7 COMBINED TOGETHER BREAKING ASPHALT & MARL
6 21090 YUWAK HELPER 6 BREAKING ASPHALT USING JACK HAMMER & TOPPLING IT
7 23206 KUSHI RAM HELPER 6 BREAKING MARL USING JACK HAMMER
8 23210 BAL KUMAR HELPER 6 FIRE WATCH & FLAG MAN
9
10 21358 TAN BAHADUR HELPER 6 ASSIST BOBCAT OPERATOR TO LOAD MARL INSIDE TANK USING SHOWEL
11
12
13
14
15
16 23844 BIR K C HELPER 6 D DOOR STANDBY
17 15066 BAIJANATH HELPER 6 EQUIPMENT STANDBY
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1669 AIR COMPRESSOR 6 4717 1 HAND TOOLS


2 GR 1816 GENERATOR 6 4600 2
3 SL2066 BOB CAT 6 906 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 30 REPORTING DATE 11-Jun-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1000302 TIME REACHED CONTROL ROOM 18:50:00 PM
TANK NUMBER NJBP TANK 110 (NIGHT) Direct / Part of PART OF PERMIT START 19:00:00 PM
L.I. Description REMOVING MARL & ASPHALT PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 8 2 TAKEN PERMIT & HELPING LABOURS
2 21923 MURUGAN SAFETY 8 2 SAFETY AT SITE
3 20597 GILBERT FO . OP 8 2 SHIFTING MARL FROM INSIDE TO OUTSIDE TANK BY BOBCAT 15 1.4 16.4 Cu.m
4
5 20719 MAN BAHATHUR HELPER 8 2 ASSIST BOBCAT OPERATOR TO LOAD INSIDE TANK USING SHOWEL
6 21358 TAN BAHADUR HELPER 8 2 ASSIST BOBCAT OPERATOR TO LOAD INSIDE TANK USING SHOWEL
7 23210 BAL KUMAR HELPER 8 2 FIRE WATCH & FLAG MAN
8 20780 KUMAR KAMI HELPER 8 - ASSIST OPERATOR
9 18753 RABINDRA HELPER 8 - ASSIST OPERATOR
NOTE
10 1) S.NO 20 ARAMCO ID NOT
11 22962 PREM HELPER 8 2 D DOOR STANDBY ACCESSING TO ENTER PLANT
SO WORKING IN CAMP
12 15066 BAIJANATH HELPER 8 2 EQUIPMENT STANDBY
13
14
15
16
17
18
19
20 20947 SHYAM HELPER 8 - CAMP CLEANING
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1669 AIR COMPRESSOR 8 4708 1 HAND TOOLS


2 GR 1816 GENERATOR 8 4591 2
3 SL2066 BOB CAT 8 857 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 30 REPORTING DATE 10-Jun-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1000302 TIME REACHED CONTROL ROOM 18:50:00 PM
TANK NUMBER NJBP TANK 110 (NIGHT) Direct / Part of PART OF PERMIT START 19:00:00 PM
L.I. Description REMOVING MARL & ASPHALT PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 8 2 TAKEN PERMIT & HELPING LABOURS
2 21923 MURUGAN SAFETY 8 2 SAFETY AT SITE
3 20597 GILBERT FO . OP 8 2 SHIFTING MARL FROM INSIDE TO OUTSIDE TANK BY BOBCAT 12 1.5 13.5 Cu.m
4 SHIFTING ASPHALT FROM INSIDE TO OUTSIDE TANK BY BOBCAT 2.4 - 2.4 Cu.m
5 20719 MAN BAHATHUR HELPER 8 2 ASSIST BOBCAT OPERATOR TO LOAD INSIDE TANK
6 21358 TAN BAHADUR HELPER 8 2 ASSIST BOBCAT OPERATOR TO LOAD INSIDE TANK
7 23210 BAL KUMAR HELPER 8 2 FIRE WATCH & FLAG MAN
NOTE
8 20780 KUMAR KAMI HELPER 8 - ASSIST OPERATOR 1) 40MINUTES TAKEN FOR
9 18753 RABINDRA HELPER 8 - ASSIST OPERATOR *CLEANING BOB CAT AIR
FILTER
10 * DIESEL FILLING
11 22962 PREM HELPER 8 2 D DOOR STANDBY * HYDRAULIC OIL FILLING
TAKEN FROM YARD 2)
12 15066 BAIJANATH HELPER 8 2 EQUIPMENT STANDBY S.NO 20 ARAMCO ID NOT
13 ACCESSING TO ENTER PLANT
14
SO WORKING IN CAMP
15
16
17
18
19
20 20947 SHYAM HELPER 8 - CAMP CLEANING
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1669 AIR COMPRESSOR 8 4693 1 HAND TOOLS


2 GR 1816 GENERATOR 8 4576 2
3 SL1407 BOB CAT 8 3112.2 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 30 REPORTING DATE 9-Jun-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1000302 TIME REACHED CONTROL ROOM 18:50:00 PM
TANK NUMBER NJBP TANK 110 (NIGHT) Direct / Part of PART OF PERMIT START 19:00:00 PM
L.I. Description REMOVING MARL & ASPHALT PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 8 2 TAKEN PERMIT & HELPING LABOURS
2 21923 MURUGAN SAFETY 8 2 SAFETY AT SITE
3 20597 GILBERT FO . OP 8 2 SHIFTING MARL FROM INSIDE TO OUTSIDE TANK BY BOBCAT 2 2 Cu.m
4 SHIFTING ASPHALT FROM INSIDE TO OUTSIDE TANK BY BOBCAT 8 2 10 Cu.m
5 20719 MAN BAHATHUR HELPER 8 2 ASSIST BOBCAT OPERATOR TO LOAD INSIDE TANK
6 21358 TAN BAHADUR HELPER 8 2 ASSIST BOBCAT OPERATOR TO LOAD INSIDE TANK
7 23210 BAL KUMAR HELPER 8 2 FIRE WATCH & FLAG MAN
8 20780 KUMAR KAMI HELPER 8 - ASSIST OPERATOR
9 18753 RABINDRA HELPER 8 - ASSIST OPERATOR
10 S.NO 20 ARAMCO ID NOT
ACCESSING TO ENTER PLANT
11 22962 PREM HELPER 8 2 D DOOR STANDBY SO WORKING IN CAMP
12 15066 BAIJANATH HELPER 8 2 EQUIPMENT STANDBY
13
14
15
16
17
18
19
20 20947 SHYAM HELPER 8 - CAMP CLEANING
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1669 AIR COMPRESSOR 8 4681 1 HAND TOOLS


2 GR 1816 GENERATOR 8 4565 2
3 SL1407 BOB CAT 8 3106 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 30 REPORTING DATE 8-Jun-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1000302 TIME REACHED CONTROL ROOM 18:50:00 PM
TANK NUMBER NJBP TANK 110 (NIGHT) Direct / Part of PART OF PERMIT START 19:00:00 PM
L.I. Description REMOVING MARL PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 8
2 21923 MURUGAN SAFETY 8 2 SAFETY AT SITE
3 20597 GILBERT FO . OP 8 2 SHIFTING MARL FROM INSIDE TO OUTSIDE TANK BY BOBCAT 16 16 Cu.m
4 23210 BAL KUMAR HELPER 8 2 FIRE WATCH & FLAG MAN
5 20719 MAN BAHATHUR HELPER 8 2 ASSIST BOBCAT OPERATOR TO LOAD INSIDE TANK
6 22962 PREM HELPER 8 2 D DOOR STANDBY
7 15066 BAIJANATH HELPER 8 2 EQUIPMENT STANDBY
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1669 AIR COMPRESSOR 8 4667.4 1 HAND TOOLS


2 GR 1816 GENERATOR 8 4552 2
3 SL1407 BOB CAT 8 3100 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 30 REPORTING DATE 8-Jun-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1000302 TIME REACHED CONTROL ROOM 18:50:00 PM
TANK NUMBER NJBP TANK 110 (NIGHT) Direct / Part of PART OF PERMIT START 19:00:00 PM
L.I. Description REMOVING MARL PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 8
2 21923 MURUGAN SAFETY 8 2 SAFETY AT SITE
3 20597 GILBERT FO . OP 8 2 SHIFTING MARL FROM INSIDE TO OUTSIDE TANK BY BOBCAT 16 16 Cu.m
4 23210 BAL KUMAR HELPER 8 2 FIRE WATCH & FLAG MAN
5 20719 MAN BAHATHUR HELPER 8 2 ASSIST BOBCAT OPERATOR TO LOAD INSIDE TANK
6 22962 PREM HELPER 8 2 D DOOR STANDBY
7 15066 BAIJANATH HELPER 8 2 EQUIPMENT STANDBY
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1669 AIR COMPRESSOR 8 4667.4 1 HAND TOOLS


2 GR 1816 GENERATOR 8 4552 2
3 SL1407 BOB CAT 8 3100 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 30 / 50 / 20 REPORTING DATE 8-Jun-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1000302 / '1001016 / '1074566 TIME REACHED CONTROL ROOM 6:50:00
TANK NUMBER NJBP TANK 110 (DAY) Direct / Part of PART OF PERMIT START 7:00:00
L.I. Description LOADING ASPAHLT & SHIFITNG SAND PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 8 2 TAKEN PERMIT FOR TANK 110 , 116 , 101 EXTERNAL WORKS
2
3 13936 JIMMY LOAD . OP 8 - UNLOADING SAND FROM DUMP TRUCK 2 2 LOAD
4
5 SHIFTING SAND FROM ROAD TO INSIDE DIKE WALL FULL LOAD 2 2 LOAD
6
7 LOADING BROKEN ASPHALT ON DUMP TRUCK FULLY LOADED 2 2 LOAD
8
9 SHIFTING PLATE FROM YARD TO TANK 116 NEAR "D DOOR" BY FORKLIFT 48 48 Sq.m
NOTE
10 1) S.NO 20 ARAMCO ID NOT
11 21358 TAN BAHADUR HELPER 8 2 ASSIST FORK LIFT OPERATOR ACCESSING TO ENTER PLANT
SO WORKING IN CAMP
12 20780 KUMAR KAMI HELPER 8 - ASSIST FORK LIFT OPERATOR
13 18753 RABINDRA HELPER 8 - FLAG MAN
14
15
16
17
18
19
20 20947 SHYAM HELPER 8 - CAMP CLEANING
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 FL909 FORK LIFT 2 621 1 HAND TOOLS


2 WL 022 RENTAL LOADER 6 HRS 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 30 / 50 / 20 REPORTING DATE 7-Jun-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1000302 / '1001016 / '1074566 TIME REACHED CONTROL ROOM 6:50:00
TANK NUMBER NJBP TANK 110 (DAY) Direct / Part of PART OF PERMIT START 7:00:00
L.I. Description LOADING ASPAHLT & SHIFITNG SAND PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1
2
3 13936 JIMMY LOAD . OP 8 - UNLOADING SAND FROM DUMP TRUCK 1 1 LOAD
4
5 SHIFTING SAND FROM ROAD TO INSIDE DIKE WALL FULL LOAD 1 1 LOAD
6
7 LOADING BROKEN ASPHALT ON DUMP TRUCK FULLY LOADED 1 1 LOAD
8
9 SHIFTING PLATE FROM YARD TO TANK 116 36 36 Sq.m
10
11 21358 TAN BAHADUR HELPER 8 - ASSIST FORK LIFT OPERATOR
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 FL909 FORK LIFT 2 620.5 1 HAND TOOLS


2 WL 022 RENTAL LOADER 4 HRS 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# REPORTING DATE 7-Jun-20

SERVICE ORDER NO. 6510949239 Service Line Item# TIME REACHED CONTROL ROOM 6:50:00
TANK NUMBER NJBP TANK 116 & 101(DAY) Direct / Part of PART OF PERMIT START 7:00:00
L.I. Description REMOVING SCAFF HOLDING PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 ALL TOGETHER
2 21258 RAJ KUMAR S/F 8 - DISMANDLING SHELTER SCAFF HOLDING
3 24592 DINESH S/F 8 - LOADING SCAFF HOLDING BOARD ON BOOM TRUCK 842 60 60 EA
4 LOADING SCAFF HOLDING PIPE ON BOOM TRUCK 842 30 30 EA
5 LOADING SCAFF HOLDING SUPPORT CLAMPS ON BOOM TRUCK 842 25 25 EA
6
7 UNLOADING SCAFF HOLDING SUPPORT CLAMPS IN TANK 116 25 25 EA
8 UNLOADING SCAFF HOLDING BOARD IN TANK 116 60 60 EA
9 UNLOADING SCAFF HOLDING PIPE IN TANK 116 30 30 EA
10
11
12
13
14
15
16
17
18
19
20 20947 SHYAM HELPER 8 - CAMP CLEANING
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 TH1021 TRAILER 8 217397 1


2 CR1756 CRANE 8 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# REPORTING DATE 7-Jun-20

SERVICE ORDER NO. 6510949239 Service Line Item# TIME REACHED CONTROL ROOM 6:50:00
TANK NUMBER NJBP TANK 116 (DAY) Direct / Part of PART OF PERMIT START 7:00:00
L.I. Description SHIFTING MARINE HOSE PERMIT CLOSED 17:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 8 2 TAKEN PERMIT FOR TANK 110 , 116 , 101 EXTERNAL WORKS
2 SHIFTING MARINE HOSE FROM YARD TO TANK 116 BY TAILER & CRANE 5 5 EA
3 20595 REYNARD CR.OP 8 - OPERATING CRANE
4 21208 SALVADOR RIGGER 8 - ASSIST CRANE OPERATOR
5 23778 DOMINGU TR.DRIVER 8 2 SHIFTING MARINE HOSE FROM YARD TO TANK 116
6 ALSO DRIVING BUS EVENING FROM SITE TO CAMP
7
8 NOTE
9 1) FOR SHIFTING MARINE
HOSE FOR HYDROTEST LINE
10 20780 KUMAR KAMI HELPER 8 - ASSIST CRANE OPERATOR LOADING AT YARD & UNLOADING AT TANK 116 5 5 EA ITEM NOT AVAILABLE /
11 18753 RABINDRA HELPER 8 - ASSIST CRANE OPERATOR LOADING AT YARD & UNLOADING AT TANK 116 5 5 EA PROVIDED 2)
S.NO 20 ARAMCO ID NOT
12 ACCESSING TO ENTER PLANT
13 SO WORKING IN CAMP
14
15
16
17
18
19
20 20947 SHYAM HELPER 8 - CAMP CLEANING
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 TH1021 TRAILER 8 217397 1


2 CR1756 CRANE 8 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 40/110/60/50 REPORTING DATE 6-Jun-20

SERVICE ORDER NO. 6510889880 Service Line Item# 1093098/'1018433/1058356/1063713 TIME REACHED CONTROL ROOM 6:50:00
TANK NUMBER NJBP 101(DAY) Direct / Part of PART OF PERMIT START 7:00:00
L.I. Description GAS CUTTING RAMP & SHIFTING TO YARD AREA PERMIT CLOSED 17:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 8 2 TAKEN PERMIT & HELPING LABOURS
2
3
4 21865 NAUSHAD FAB 8 - GAS CUTTING RAMP ( 9.5METER LENGTH x 1.5 METER HEIGHT x 2.5METER WIDTH) 35.62 35.62 Cu.M
5 20780 KUMAR KAMI HELPER 8 - ASSIST FABRICATOR
6 18753 RABINDRA HELPER 8 - FIRE WATCH
7
8 17594 DILLY BLASTER 8 2 SHIFITNG RAMP INTO 6 PART 5 1 6 PART
9 21358 TAN BAHADUR HELPER 8 2 FLAG MAN & ASSIST BOOMTRUCK 842 OPERATOR
10 SHFITING CUTTING SET FROM TANK 116 TO TANK 101 1 1 EA 1) S.NO 20 ARAMCO ID NOT
ACCESSING TO ENTER PLANT
11 SHIFITNG ACETYLENE & OXYGEN CYLINDER FROM TANK 116 TO TANK 101 2 2 EA SO WORKING IN CAMP
12 SHIFITNG BACK CUTTING SET FROM TANK 101 TO TANK 116 1 1 EA
13 SHIFITNG BACK ACETYLENE & OXYGEN CYLINDER FROM TANK 101 TO TANK 116 2 2 EA
14
15 25391 MARWAN ELECTRICIAN 8 - INSTALLED CP CABLE SWITCH BOX & CONNCECTING CABLE WIRES INTO BREAKER 1 1 EA
16
17
18
19
20 20947 SHYAM HELPER 8 - CAMP CLEANING
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 ACETYLENE 0.3 %
2 2 OXYGEN 0.4 %
3 3 HAND TOOLS
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 50 / 20 REPORTING DATE 5-Jun-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1001016 / '1074566 TIME REACHED CONTROL ROOM 6:50:00
TANK NUMBER NJBP TANK 110 (DAY) Direct / Part of PART OF PERMIT START 7:00:00
L.I. Description LOADING MARL & SHIFITNG SAND PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 8 TAKEN PERMIT & HELPING LABOURS
2
3 13936 JIMMY LOAD . OP 8 SHIFTING SAND FROM WAY PATH TO INSIDE DIKE WALL FULL LOAD 2 2 LOAD
4
5 LOADING MARL ON DUMP TRUCK FULLY LOADED 3 3 LOAD
6
7 SHIFTING SHELL PLATE FROM YARD TO TANK 116 1 1 EA
8
9 SHIFTING REDUCER AND HYDROTEST MATERIALS FROM YARD TO TAN 116 4 4 EA NOTE
SHIFTING HYDROTEST
10 MATERIALS FROM YARD TO
11 18753 RABINDRA HELPER 8 ASSIST LOADER & FORKLIFT OPERATOR TANK 116 BY BOOM TRUCK
842 # P.O NO 6510949239
12 LINE ITEM NO NOT AVAILABLE
13 21358 TAN BAHADUR HELPER 8 FLAG MAN
14
15 25331 ROHANATHAS HELPER 8 ASSIST BOOM TRUCK OPERATOR FOR LOADING & UNLOADING
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 FL909 FORK LIFT 2 619 1 HAND TOOLS


2 WL 022 RENTAL LOADER 6 HRS 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 30 / 50 / 20 REPORTING DATE 4-Jun-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1000302 / '1001016 / '1074566 TIME REACHED CONTROL ROOM 6:50:00
TANK NUMBER NJBP TANK 110 (DAY) Direct / Part of PART OF PERMIT START 7:00:00
L.I. Description LOADING ASPAHLT , SHIFTING MARL & SAND PERMIT CLOSED 17:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 8 2 TAKEN PERMIT & HELPING LABOURS
2
3 13936 JIMMY LOAD . OP 8 2 SHIFTING SAND FROM WAY PATH TO INSIDE DIKE WALL FULL LOAD 2 2 LOAD
4
5 ARRANGING SCRAP PLATES USING FORKLIFT FOR CRANE LOADING 72 72 Plates
6
7 REMOVING MARL INSIDE TO OUTSIDE TANK USING BOBCAT SL 1407 12 12 Cu.m
8
9 LOADING BROKEN ASPHALT ON DUMP TRUCK FULLY LOADED 2 1 3 LOAD
10 1) S.NO 20 ARAMCO ID NOT
ACCESSING TO ENTER PLANT
11 SHIFTING WELDING MACHINE FROM YARD TO TANK 116 1 1 EA SO WORKING IN CAMP
12 18753 RABINDRA HELPER 8 2 ASSIST OPERATOR
13 21358 TAN BAHADUR HELPER 8 2 ASSIST OPERATOR
14 25330 SANTHURU HELPER 8 - FLAG MAN
15
16 25331 ROHANATHAS HELPER 8 - ASSIST OPERATOR
17 20780 KUMAR KAMI HELPER 8 - ASSIST OPERATOR
18
19
20 20947 SHYAM HELPER 8 - CAMP CLEANING
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 FL909 FORK LIFT 1 618.2 1 HAND TOOLS


2 SL1407 BOB CAT 4 3062.4 2
3 WL 022 RENTAL LOADER 6 HRS 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 30 / 50 / 20 REPORTING DATE 3-Jun-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1000302 / '1001016 / '1074566 TIME REACHED CONTROL ROOM 6:50:00
TANK NUMBER NJBP TANK 110 (DAY) Direct / Part of PART OF PERMIT START 7:00:00
L.I. Description LOADING ASPAHLT , SHIFTING MARL & SAND PERMIT CLOSED 17:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 8 2 TAKEN PERMIT & HELPING LABOURS
2
3 13936 JIMMY LOAD . OP 8 2 SHIFTING SAND FROM WAY PATH TO INSIDE DIKE WALL FULL LOAD 1 1 2 LOAD
4
5 ARRANGING SCRAP PLATES USING FORKLIFT FOR CRANE LOADING 72 72 Plates
6
7 REMOVING MARL INSIDE TO OUTSIDE TANK USING BOBCAT SL 1407 8 8 Cu.m
8
9 LOADING BROKEN ASPHALT ON DUMP TRUCK FULLY LOADED 2 2 LOAD
10 1) S.NO 20 ARAMCO ID NOT
ACCESSING TO ENTER PLANT
11 SO WORKING IN CAMP
12 18753 RABINDRA HELPER 8 2 ASSIST OPERATOR
13 25330 SANTHURU HELPER 8 2 FLAG MAN
14 21358 TAN BAHADUR HELPER 8 2 ASSIST OPERATOR
15
16 25331 ROHANATHAS HELPER 8 - ASSIST OPERATOR
17 20780 KUMAR KAMI HELPER 8 - ASSIST OPERATOR
18
19
20 20947 SHYAM HELPER 8 - CAMP CLEANING
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 FL909 FORK LIFT 1 617.9 1 HAND TOOLS


2 SL1407 BOB CAT 4 3059.4 2
3 WL 022 RENTAL LOADER 6 HRS 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 30 / 50 / 20 REPORTING DATE 2-Jun-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1000302 / '1001016 / '1074566 TIME REACHED CONTROL ROOM 6:50:00
TANK NUMBER NJBP TANK 110 (DAY) Direct / Part of PART OF PERMIT START 7:00:00
L.I. Description LOADING ASPAHLT , SHIFTING MARL & SAND PERMIT CLOSED 17:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 8 2 TAKEN PERMIT & HELPING LABOURS
2
3 13936 JIMMY LOAD . OP 8 2 SHIFTING SAND FROM WAY PATH TO INSIDE DIKE WALL FULL LOAD 1 1 LOAD
4
5 ARRANGING BOTTOM & ANNULAR PLATES INSIDE USING FORKLIFT 24 24 Plates
6
7 REMOVING MARL INSIDE TO OUTSIDE TANK USING BOBCAT SL 1407 10 2 12 Cu.m
8
9 LOADING BROKEN ASPHALT ON DUMP TRUCK FULLY LOADED 2 1 3 LOAD
10 1) S.NO 20 ARAMCO ID NOT
ACCESSING TO ENTER PLANT
11 21358 TAN BAHADUR HELPER 8 2 ASSIST OPERATOR SO WORKING IN CAMP
12 18753 RABINDRA HELPER 8 2 ASSIST OPERATOR
13 25330 SANTHURU HELPER 8 2 FLAG MAN
14
15
16 25331 ROHANATHAS HELPER 8 - ASSIST OPERATOR
17 20780 KUMAR KAMI HELPER 8 - ASSIST OPERATOR
18
19
20 20947 SHYAM HELPER 8 - CAMP CLEANING
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 FL909 FORK LIFT 1 617.4 1 HAND TOOLS


2 SL1407 BOB CAT 4 3057.1 2
3 WL 022 RENTAL LOADER 6 HRS 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 30 / 50 REPORTING DATE 1-Jun-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1000302 / '1001016 TIME REACHED CONTROL ROOM 6:50:00
TANK NUMBER NJBP TANK 110 (DAY) Direct / Part of PART OF PERMIT START 7:00:00
L.I. Description LOADING ASPAHLT PERMIT CLOSED 17:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 13936 JIMMY FO.OP 8 2 LOADING ASPHALT ON DUMP TRUCK FULLY LOADED 3 3 LOAD
2 REMOVING SAND FROM WAY PATH TO INSIDE DIKE WALL 0.8 0.8 Cu.m
3 ARRANGING BOTTOM & ANNULAR PLATES INSIDE USING FORKLIFT 30 30 Plates
4
5
6 18753 RABINDRA HELPER 8 2 ASSIST OPERATOR
7 1623 MOHAMMED PAINTER 8 - ASSIST OPERATOR
8 20780 KUMAR KAMI HELPER 8 - FLAG MAN
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 FL909 FORK LIFT 3 617 1 HAND TOOLS


2 WL 022 RENTAL LOADER 6 HRS 2
3 SL1407 BOB CAT 2 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# REPORTING DATE 1-Jun-20

SERVICE ORDER NO. 6510949239 Service Line Item# TIME REACHED CONTROL ROOM 6:50:00
TANK NUMBER NJBP TANK 116 (DAY) Direct / Part of DIRECT PERMIT START 7:00:00
L.I. Description 16" VALVE HYDROTEST PERMIT CLOSED 17:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 8 2 TAKEN PERMIT & HELPING LABOURS
2
3 17594 DILLY BLASTER 8 2 MADE HYDROTEST OF 16" # 300 INLET VALVE SEATINGTEST (PASSED)
4 21358 TAN BAHADUR HELPER 8 2 HOT BOLTING STUD & NUT 36 36 EA
5
6
7 WAITING FOR INSPECTOR
8
NOTE
9 1) S.NO 19 & 20 ARAMCO ID
10 NOT ACCESSING TO ENTER
PLANT SO WORKING IN CAMP
11 2) FOR
12 HYDROTEST LINE ITEM NOT
AVAILABLE
13
14
15
16
17
18
19 11448 CHITHRA HELPER 8 - CAMP CLEANING
20 20947 SHYAM HELPER 8 - CAMP CLEANING
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 HYDROTEST PUMP
2 2 HAND TOOLS
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# REPORTING DATE 31-May-20

SERVICE ORDER NO. 6510949239 Service Line Item# TIME REACHED CONTROL ROOM 6:50:00
TANK NUMBER NJBP TANK 116 (DAY) Direct / Part of DIRECT PERMIT START 7:00:00
L.I. Description 20" VALVE HYDROTEST PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 8 TAKEN PERMIT & HELPING LABOURS
2 1623 MOHAMMED PAINTER 8
3 17594 DILLY BLASTER 8 MADE HYDROTEST OF 20" # 150 OUTLET VALVE BODY TEST (PASSED)
4 21358 TAN BAHADUR HELPER 8 2 MADE HYDROTEST OF 20" # 150 OUTLET VALVE SEATING TEST (PASSED)
5 18753 RABINDRA HELPER 8 2 HOT BOLTING TIGHTENING STUD WITH NUT 40 40 EA
6 20780 KUMAR KAMI HELPER 8 HOT BOLTING REMOVING STUD WITH NUT 40 40 EA
7
8
NOTE
9 HYDROTEST WITNESSED BY ARAMCO INSPECTOR HASSAN AHADI 1) S.NO 19 & 20 ARAMCO ID
10 NOT ACCESSING TO ENTER
PLANT SO WORKING IN CAMP
11 2) FOR
12 HYDROTEST LINE ITEM NOT
AVAILABLE
13
14
15
16
17
18
19 11448 CHITHRA HELPER 8 - CAMP CLEANING
20 20947 SHYAM HELPER 8 - CAMP CLEANING
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 HYDROTEST PUMP
2 2 HAND TOOLS
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 60 REPORTING DATE 30-May-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1055131 TIME REACHED CONTROL ROOM 6:50:00
TANK NUMBER NJBP TANK 116 (DAY) Direct / Part of PART OF PERMIT START 7:00:00
L.I. Description SHIFTING BOTTOM PLATE PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 18753 RABINDRA HELPER 8 ASSIST FORKLIFT & BOOM TRUCK OPERATOR (3 TRIP)
2 20780 KUMAR KAMI HELPER 8 SHIFITNG BOTTOM PLATE FROM YARD TO TANK 116(6x2.5Meter) 315 315 Sq.m
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 FL909 FORKLIFT 4 615 1 HAND TOOLS


2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 60/80 REPORTING DATE 30-May-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1057483/'1055131 TIME REACHED CONTROL ROOM 6:50:00
TANK NUMBER NJBP TANK 110 (DAY) Direct / Part of PART OF PERMIT START 7:00:00
L.I. Description SHIFTING , LOADING & UNLOADING MATERIALS PERMIT CLOSED 17:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 8 2 TAKEN PERMIT & HELPING LABOURS
2
3 17594 DILLY BLASTER 8 2 S.NO 3 TO 4 TOGETHER ASSIST BOOM TRUCK OPERATOR
4 21358 TAN BAHADUR HELPER 8 2 LOADING HDPE LINER SHEET ROLE OUTSIDE PLANT 4 4 ROLLS
5 UNLOADING HDPE LINER SHEET ROLE IN TANK 110 INSIDE DIKEWALL 4 4 ROLLS
6
7 SHIFTING FULL CYLINDER ACETYLENE AND OXYGEN FROM YARD TO TANK 110 8 8 EA
8 SHIFTING EMPTY CYLINDER ACETYLENE AND OXYGEN FROM TANK 110 TO YARD 12 12 EA
9
10 LOADING EMPTY CYLINDER ACETYLENE IN BOOM TRUCK 842 5 5 10 EA
11 LOADING EMPTY CYLINDER OXYGEN IN BOOM TRUCK 842 10 14 24 EA
12 LOADING EQUIPMENT BATTERY 5 5 EA
13 LOADING SMALL TOOL BOX WITH TOOL ACCESSORIES 1 1 EA
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 20 / 40 REPORTING DATE 29-May-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1052024 / '1017801 TIME REACHED CONTROL ROOM 6:50:00
TANK NUMBER NJBP TANK 116 (DAY) Direct / Part of DIRECT PERMIT START 7:00:00
L.I. Description GRIT BLASTING & SPRAY PAINTING PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 8 TAKEN PERMIT & HELPING LABOURS
2
3 17594 DILLY BLASTER 8 BLASTED BOTTOM PLATE (6x2.5Meter) (10Plates) 150 150 Sq.m
4 13219 DINESH BLASTER 8 BLASTED BOTTOM PLATE (6x2.5Meter) (11Plates) 165 165 Sq.m
5 1623 MOHAMMED PAINTER 8 SPRAY PAINTING TOP COAT BOTTOM PLATE (6x2.5Meter,21Plates) APCS 3 BLACK 315 315 Sq.m
6
7 25329 RUBEN HELPER 8 FILLING GRIT IN SAND BOARD 1.2 1.2 TON
8 MIXING PAINT 120 120 Litres
9
10 25330 SANTHURU HELPER 8 FILLING GRIT IN SAND BOARD 1.3 1.3 TON
11 ASSIST PAINTER & HOLDING PAINT HOSE WHEN PAINTING
12
13 21358 TAN BAHADUR HELPER 8 EQUIPMENT STAND BY
14 ASSIST BLASTER & PAINTER
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1612 AIR COMPRSSOR 6 4057 1 40 APCS 3 SIGMA C200a CT EPOXY BLACK 120 Litres
2 2 40 THINNER 21-06 20 Litres
3 3 20 GRIT COAL SLAG 2.5 TON
4 4 HAND TOOLS
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 20/120/140 REPORTING DATE 29-May-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1052024/ '1091341 / '1000302 TIME REACHED CONTROL ROOM 6:50:00
TANK NUMBER NJBP TANK 116 (DAY) Direct / Part of PART OF PERMIT START 7:00:00
L.I. Description SHIFTING & CIVIL WORK PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 8 2 TAKEN PERMIT & HELPING LABOURS
2
3 18753 RABINDRA HELPER 8 2 S.NO 3 TO 5 WORKING TOGETHER
4 19344 RAJ KUMAR HELPER 8 2 SPREADING BOTTOM PLATE (6x2.5Meter) FOR BLASTING 21 21 Plates
5 20780 KUMAR KAMI HELPER 8 - ASSIST FORK LIFT OPERATOR
6 ARRANGING MATERILAS IN YARD & MAKING SHELTER FOR C-GAS CYLINDERS
7 SHIFTING CYLINDER CAGE FROM YARD TO TANK 116 BY BOOM TRUCK 842 1 1 EA
8 SHIFTING ANNUALR PLATE FROM DIKE WALL TO NEAR D DOOR TANK 116 1 1 Plate NOTE
9 1) FOR LEAK
DETECTION PIPE INSTALL LINE
10 ITEM NOT PROVIDED /
11 16678 SELVARAJ MASON 8 2 MAKING LEVEL TO INSTALL LEAK DETECTION PIPE 14" PVC 0.125 0.125 Cu.m RECOMMENDATION 2)
S.NO 19 & 20 ARAMCO ID NOT
12 SHIFTING MANUALLY 14" PIPE FROM DIKE WALL TO TANK FOR CUTTING 6 6 Meter ACCESSING TO ENTER PLANT
13 SHIFTING SAND, CEMENT ,GRAVEL BY WHEEL BARROW 110 110 KG SO WORKING IN CAMP
14 POURING CONCRETE MIX & LEVELLING TO INSTALL LEAK DETECTION PIPE 14"
15 REMOVING BROKEN ASPHALT FROM INSIDE TO OUTSIDE TANK BY WHEEL BARROW 65 65 KG
16
17 25318 PASKARAN HELPER 8 2 ASSIST MASON
18
19 11448 CHITHRA HELPER 8 - CAMP CLEANING
20 20947 SHYAM HELPER 8 - CAMP CLEANING
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 FL909 FOR KLIFT 2 610.1 1


2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 60 REPORTING DATE 27-May-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1055131 TIME REACHED CONTROL ROOM 6:50:00
TANK NUMBER NJBP TANK 116 Direct / Part of PART OF PERMIT START 7:00:00
L.I. Description SHIFTING PLATE & CYLINDERS PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 8 TAKEN PERMIT & HELPING LABOURS
2 ASSIST BOOM TRUCK 842 & FORK LIFT OPERATOR
3 18753 RABINDRA HELPER 8 SHIFTING BOTTOM PLATE (6x2.5Meter) FROM YARD TO TANK 116 12 12 Plates
4 19344 RAJ KUMAR HELPER 8 SHIFTING OXYGEN & ACETYLENE CYLINDER FROM YARD TO TANK 116 12 12 EA
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 FL909 FOR KLIFT 2 608 1


2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 60 / 80 REPORTING DATE 26-May-20

SERVICE ORDER NO. 6510949239 & Service Line Item# 1055131 / '1055131 TIME REACHED CONTROL ROOM 6:50:00
TANK NUMBER NJBP TANK 116/110(DAY) Direct / Part of PART OF PERMIT START 7:00:00
L.I. Description SHIFTING PLATE & CYLINDERS PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 8 TAKEN PERMIT & HELPING LABOURS
2
3 18753 RABINDRA HELPER 8 ASSIST BOOM TRUCK & FORK LIFT OPERATOR
4 TOPPLING BOTTOM PLATE (6x2.5Meter) 180 180 Sq.m
5
6 SHIFTING OXYGEN CYLINDER TO TANK 110 5 5 EA
7
8 SHIFTING EMPTY CYLINDERS OXYGEN & ACETYLENE 20 20 EA
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 FL909 FOR KLIFT 4 607.4 1


2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 60 REPORTING DATE 25-May-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1055131 TIME REACHED CONTROL ROOM 6:50:00
TANK NUMBER NJBP TANK 116(DAY) Direct / Part of PART OF PERMIT START 7:00:00
L.I. Description SHIFTING PLATE PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 8 TAKEN PERMIT & HELPING LABOURS
2
3 13936 JIMMY FO.OP 8 LOADING BOTTOM PLATE ON BOOM TRUCK 2196 IN YARD AREA(3 TRIP) 360 360 Sq.m
4 UNLOADING BOTTOM PLATE ON BOOM TRUCK 2196 IN TANK 116 360 360 Sq.m
5 SHIFTING PLATES DIKE WALL TO NEAR 'D' DOOR (6x2.5Meter)(TOTAL 24PLATES) 360 360 Sq.m
6
7 18753 RABINDRA HELPER 8 ASSIST BOOM TRUCK & FORK LIFT OPERATOR
8 23210 BAL KUMAR HELPER 8 ASSIST BOOM TRUCK & FORK LIFT OPERATOR
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 FL909 FOR KLIFT 8 605.4 1


2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# REPORTING DATE 28-May-20

SERVICE ORDER NO. Service Line Item# TIME REACHED CONTROL ROOM

TANK NUMBER NJBP Direct / Part of PERMIT START 7:00:00


L.I. Description PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 21358 TAN BAHADUR HELPER 12
2 22326 SABIRE KAMI HELPER 12
3 20947 SHYAM HELPER 8
4 17147 GAYASUDDIN H.DRIVER 8
5 22236 ASLAM H.DRIVER 8
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 70 / 90 REPORTING DATE 23-May-20

SERVICE ORDER NO. 6510949239 & 6510948963 Service Line Item# 1081190/'1081190 TIME REACHED CONTROL ROOM 6:50:00
TANK NUMBER NJBP 116(DAY) & 110 Direct / Part of PART OF PERMIT START 7:00:00
L.I. Description SHIFTING MATERIAL PERMIT CLOSED 16:40:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 6 2 TAKEN PERMIT & HELPING LABOURS
2 ALL TOGETHER ASSIST BOOM TRUCK OPERATOR
3 19344 RAJ KUMAR HELPER 8 2 SHIFTING GRIT BAG FROM OUTSIDE PLANT TO BLASTING YARD 2 2 BAG
4 21358 TAN BAHADUR HELPER 8 2 SHIFTING WELDING MACHINE FROM OUTSIDE PLANT TO TANK 110 2 2 EA
5 18753 RABINDRA HELPER 8 2 SHIFTING WELDING MACHINE FROM TANK 110 TO YARD 1 1 EA
6 20780 KUMAR KAMI HELPER 8 - SHIFTING WELDING MACHINE FROM YARD TO TANK 116 1 1 EA
7 SHIFTING WELDING ROD TO TANK 116 & 110 80 80 KG
8 LOADING ARAMCO MATERIALS ON BOOM TRUCK
9 ANODE GAL VANIC 3/4" X 18" 6 6 EA NOTE
10 GASKET SPIRAL WOUND, 6" NPS,CL150 SUPPLY,4.4MM 2 2 EA 1) S.NO 19 & 20
ARAMCO ID NOT ACCESSING
11 GASKET SPIRAL 12" 2 2 EA TO ENTER PLANT SO
12 BOLT STUD 7/8-9" X 5-1/2" 24 24 EA WORKING IN CAMP
13 PACKING SHEET 1520MM 3 3 EA
14 STUD ASSEMBLY CONTINUOUS THREAD 3/4-10 X 5" 24 24 EA
15 VALVE GATE WEDGE 8" IN ANSI CL150 SUPPLY 1 1 EA
16 VALVE GATE WEDGE 12" IN ANSI CL150 SUPPLY 1 1 EA
17 VALVE GATE WEDGE 6" 1 1 EA
18 25391 MARWAN ELECTRICIAN 8 ARRANGING WELDING CABLE FROM OUTSIDE DIKE WALL TO TK 116 FOR WELDING
19 20947 SHYAM 8 CAMP CLEANING
20 11448 CHITHRA 8 CAMP CLEANING
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 60 REPORTING DATE 22-May-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1055131 TIME REACHED CONTROL ROOM 6:50:00
TANK NUMBER NJBP 116(DAY) Direct / Part of PART OF PERMIT START 7:00:00
L.I. Description SHIFTING MATERIALS PERMIT CLOSED 14:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 6 TAKEN PERMIT & HELPING LABOURS
2 ALL TOGETHER ASSIST BOOM TRUCK OPERATOR 4 4 EA
3 19344 RAJ KUMAR HELPER 6 SHIFTING BOTTOM PLATE (6x2.5Meter) FROM YARD TO TANK 116 4 4 EA
4 21358 TAN BAHADUR HELPER 6 SHIFTING SCAFF HOLDING MATERIALS FROM 101 TO YARD
5 18753 RABINDRA HELPER 6
6
7
8 NOTE
9 1) ISSUER NOT
ALLOWED TO SHIFT PLATE
10 MORE THAN 1 DUE TO SAFETY
11 CONCERN 2) S.NO 13 & 14
ARAMCO ID NOT ACCESSING
12 TO ENTER PLANT SO
13 20947 SHYAM 8 CAMP CLEANING WORKING IN CAMP
14 11448 CHITHRA 8 CAMP CLEANING
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 160 REPORTING DATE 21-May-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1057483 TIME REACHED CONTROL ROOM 6:50:00
TANK NUMBER NJBP 116(DAY) Direct / Part of PART OF PERMIT START 7:00:00
L.I. Description SHIFTING MATERIALS PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 6 2 TAKEN PERMIT & HELPING LABOURS
2 S.NO 4 TO 6 ASSIST BOOM TRUCK OPERATOR FOR LOADING & UNLOADING
3
4 21358 TAN BAHADUR HELPER 8 2 ALL TOGETHER SHIFTING PLY WOOD FROM TANK 101 TO TANK 116 30 30 EA
5 18753 RABINDRA HELPER 8 2 ALL TOGETHER SHIFTING MATERIALS FROM TANK 101 TO YARD
6 20780 KUMAR KAMI HELPER 8 - 8" VALVE,LIGHT STAND ,PALLETS , 1mm Thick plate(6x2Meter),OLD DRIP PLATE
7
8 REMOVING SHELTER SCAFF HOLDING AT TANK 101
9 NOTE
10 1) S.NO 13 & 14
ARAMCO ID NOT ACCESSING
11 TO ENTER PLANT SO
12 WORKING IN CAMP
13 20947 SHYAM 8 CAMP CLEANING
14 11448 CHITHRA 8 CAMP CLEANING
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 80 REPORTING DATE 20-May-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1055131 TIME REACHED CONTROL ROOM 6:50:00
TANK NUMBER NJBP 110(DAY) Direct / Part of PART OF PERMIT START 7:00:00
L.I. Description SHIFTING MATERIALS PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 6 2 TAKEN PERMIT & HELPING LABOURS
2 S.NO 4 TO 6 ASSIST BOOM TRUCK OPERATOR FOR LOADING & UNLOADING
3 25391 MARWAN ELECTRICIAN 8 - REPAIRING GFCI CORD WIRE CABLE 3 3 EA
4 18753 RABINDRA HELPER 8 - SHIFTING OXYGEN CYLINDER FROM TANK 116 TO YARD 2 2 EA
5 21358 TAN BAHADUR HELPER 8 - SHIFTING FIRE BLANKET FROM TANK 116 TO TANK 110 6 6 EA
6 20780 KUMAR KAMI HELPER 8 - SHIFTING ANNULAR PLATE FROM YARD TO TANK 110 62.5 62.5 Sq.m
7
8
9 20947 SHYAM 8 CAMP CLEANING NOTE
10 11448 CHITHRA 8 CAMP CLEANING 1) S.NO 9 & 10
ARAMCO ID NOT ACCESSING
11 TO ENTER PLANT SO
12 WORKING IN CAMP
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 50 REPORTING DATE 19-May-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1056028 TIME REACHED CONTROL ROOM 6:50:00
TANK NUMBER NJBP 116(DAY) Direct / Part of DIRECT / PART OF PERMIT START 7:00:00
L.I. Description 16"INLET & 20" OUTLET VALVE HYDROTEST PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 6 2 TAKEN PERMIT & HELPING LABOURS
2 ALL TOGETHER CONDUCTED HYDROTEST
3 25391 MARWAN ELECTRICIAN 8 2 HYDROTESTING 16" INLET VALVE SEATING (LEAK FOUND ) 1 1 EA
4 18753 RABINDRA HELPER 8 2 HYDROTESTING 20" OUTLET VALVE SEATING (PASSED ) 1 1 EA
5 21358 TAN BAHADUR HELPER 8 2 MADE PREPARATION 20"OUTLET VALVE BODY TEST
6 20780 KUMAR KAMI HELPER 8 - BLINDING 20" OUTLET VALVE WITH NUT & BOLD 14 14 SETS
7
8
9 21197 GUNJA HELPER 8 - ASSIST BOOM TRUCK OPERATOR FILLING C- GAS NOTE 1)
FOR HYDROTEST LINE NOT
10 LOADING & UNLOADING IN YARD AVAILABLE 2)
11 OXYGEN 11 11 EA S.NO 15 & 16 ARAMCO ID NOT
ACCESSING TO ENTER PLANT
12 ACETYLENE 11 11 EA SO WORKING IN CAMP
13
14
15 20947 SHYAM 8 CAMP CLEANING
16 11448 CHITHRA 8 CAMP CLEANING
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# REPORTING DATE 18-May-20

SERVICE ORDER NO. 6510949239 Service Line Item# TIME REACHED CONTROL ROOM 6:50:00
TANK NUMBER NJBP 116(DAY) Direct / Part of DIRECT / PART OF PERMIT START 7:00:00
L.I. Description 16"INLET & 20" OUTLET VALVE HYDROTEST PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 6 2 TAKEN PERMIT & HELPING LABOURS
2 23329 NITIN BLASTER 8 S.NO 2 TO 5 MADE HYDROTEST 16" INLET VALVE (LEAK FOUND) 1 1 EA
3 15575 BUDAN BLASTER 8
4 5233 RAJENDRAN PAINTER 8
5 23326 SURESH PAINTER 8
6
7 21358 TAN BAHADUR HELPER 8 S.NO 7 TO 10 MADE HYDROTEST 20" OUTLET VALVE (LEAK NOT FOUND) 1 1 EA
8 20780 KUMAR KAMI HELPER 8 WAITING FOR INSPECTION
9 12875 MAHARA HELPER 8 BLINDING (HOT BOLTING) WITH STUD & NUT 14 14 EA NOTE 1)
FOR HYDROTEST LINE NOT
10 18753 RABINDRA HELPER 8 AVAILABLE 2)
11 S.NO 15 & 16 ARAMCO ID NOT
ACCESSING TO ENTER PLANT
12 SO WORKING IN CAMP
13 25391 MARWAN ELECTRICIAN 8 ASSIST ARAMCO ELECTRICIAN TO TIGHT VALVE AUTOMATIC CONTROL 2 2 EA
14
15 20947 SHYAM 8 CAMP CLEANING
16 11448 CHITHRA 8 CAMP CLEANING
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 130 REPORTING DATE 17-May-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1074566 TIME REACHED CONTROL ROOM 6:50:00
TANK NUMBER NJBP 116(DAY) Direct / Part of PART OF PERMIT START 7:00:00
L.I. Description SHIFITNG VALVE & LOADING MARL PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 21358 TAN BAHADUR HELPER 8 2 ASSIST BOOM TRUCK 2196
2 20780 KUMAR KAMI HELPER 8 SHIFTING 20" VALVE FROM NORTH EAST TO WEST SIDE TO CONDUCT HYDRO TEST 1 1 EA
3 12875 MAHARA HELPER 8 INSTALLING RAMP FOR VEHICLE PASS ABOVE 6" FOAM LINE 4 4 EA
4 18753 RABINDRA HELPER 8 LOADING OLD MARL ON DUMP TRUCK BY RENTAL LOADER 4 4 LOAD
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# REPORTING DATE 17-May-20

SERVICE ORDER NO. 6510949239 Service Line Item# TIME REACHED CONTROL ROOM 6:50:00
TANK NUMBER NJBP 116(DAY) Direct / Part of PERMIT START 7:00:00
L.I. Description SHIFTING VALVE & PREPARATION FOR HYDROTEST PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 6 2 TAKEN PERMIT & HELPING LABOURS
2 ALL TOGETHER
3 15575 BUDAN BLASTER 8 MAKING SCAFF HOLDING SUPPORT TO CONDUCT HYDROTEST FOR 20" VALVE 1 1 EA
4 BLINDING 20" VALVE FOR HYDROTEST
5 23329 NITIN BLASTER 8 CLEANING VALVE INSIDE BY FIRE MONITOR HOSE 20" VALVE 1 1 EA
6
7 5233 RAJENDRAN PAINTER 8
8
9 23326 SURESH PAINTER 8
10
11 25391 MARWAN ELECTRICIAN 8 MAKING 20"#300 VALVE ELECTRICAL CONNECTION TO CLOSE NUMERICALLY
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 130 REPORTING DATE 16-May-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1074566 TIME REACHED CONTROL ROOM 6:50:00
TANK NUMBER NJBP 116(DAY) Direct / Part of PART OF PERMIT START 7:00:00
L.I. Description SHIFTING MATERIALS ALL OVER TANK PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 12875 MAHARA HELPER 8 ASSIST BOOM TRUCK OPERATOR TO SHIFT MATERIALS
2 SHIFTED RAMP FROM YARD TO TANK 116
3 REPLACING WELDING MACHINE 1194 & 1192 FROM YARD TO TANK 110
4 INSTALLING PIPE & ELBOW ON CONCRETE SUPPORT
5
6 20947 SHYAM 8 CAMP CLEANING
7 11448 CHITHRA 8 CAMP CLEANING
8
9
NOTE
10 S.NO 6 & 7 ARAMCO ID NOT
11 ACCESSING TO ENTER PLANT
SO WORKING IN CAMP
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 100/110 REPORTING DATE 16-May-20

SERVICE ORDER NO. 6510959373 Service Line Item# 1052090/'1064503 TIME REACHED CONTROL ROOM 6:50:00
TANK NUMBER NJBP 106(DAY) Direct / Part of DIRECT / PART OF PERMIT START 7:00:00
L.I. Description BLASTING OF 8" PIPE PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 15575 BUDAN BLASTER 8 BLASTED 8" NEW WATER LINE PIPE (6 PIPES EACH PIPE 12Meter) 36 36 Meter
2
3 23329 NITIN BLASTER 8 BLASTED 8" NEW WATER LINE PIPE (6 PIPES EACH PIPE 12Meter) 36 36 Meter
4
5
6 5233 RAJENDRAN PAINTER 8 2 PAINTED 8" NEW WATER LINE PIPE PRIMER APCS 4 YELLOW (6 PIPES ) 72 72 Meter
7
8 23326 SURESH PAINTER 8 MIXING PAINT 11 11 Litres
9 AIR CLEANING 8 " PIPE ID & OD 72 72 Meter
10
11 18753 RABINDRA HELPER 8 2 EQUIPMENT STAND BY & FILLING GRIT IN SAND BOARD 1.1 1.1 TON
12
13 20780 KUMAR KAMI HELPER 8 FILLING GRIT IN SAND BOARD 1.1 1.1 TON
14 HOLDING PAINTING HOSE WHEN PAINTING
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1612 AIR COMPRESSOR 8 4033 1 100 COPPER SLAG GRIT 2.2 TON
2 2 110 APCS 4 YELLOW 8 Litres
3 3 110 THINNER 08450 3 Litres
4 4 HAND TOOLS
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 40/50/60/70 REPORTING DATE 16-May-20

SERVICE ORDER NO. 6510959373 Service Line Item# 1057023/'1065659/1049136/1059843 TIME REACHED CONTROL ROOM 6:50:00
TANK NUMBER NJBP 106(DAY) Direct / Part of DIRECT / PART OF PERMIT START 7:00:00
L.I. Description WELDING OF 8" PIPE TO ELBOW PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 6 2 TAKEN PERMIT & HELPING LABOURS
2
3 20991 CHAUAN HELPER 8 2 BUTT WELDING(4PASS) OF 8" PIPE TO ELBOW (2 JOINTS) 5.4 0.2 5.6 Meter
4 GRINDING EACH PASS
5
6 25042 BUDAN HELPER 8 2 ASSIST WELDER & STANDBY
7
8 21358 TAN BAHADUR HELPER 8 2 FIRE WATCH
9 INSTALLED PIPE ON CONCRETE SUPPORT BY BOOM TRUCK 6 6 Meter NOTE
10 INSTALLED ELBOW ON CONCRETE SUPPORT BY BOOM TRUCK 1 1 EA FROM 07.20 TO 07.50
REPLACING WELDING
11 MACHINE FROM TANK 110 TO
12 YARD
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 GR1765 GENERATOR IDLE 4045 1 HAND TOOLS


2 WM1192 WELDING MACHINE 8 8024 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 50/60/70 REPORTING DATE 15-May-20

SERVICE ORDER NO. 6510959373 Service Line Item# 1065659/1049136/1059843 TIME REACHED CONTROL ROOM 6:50:00
TANK NUMBER NJBP 106(DAY) Direct / Part of PART OF PERMIT START 7:00:00
L.I. Description SHIFTING PIPE PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 8 TAKEN PERMIT & HELPING LABOURS
2 SHIFTING 8" PIPE FROM ARAMCO OVER LEFT HOUSE TO BLASTING YARD
3
4 21262 LIMBU BT. OP 8 LOADING 8" PIPE ON LOW BED ARAMCO TRAILER (EACH PIPE 12.2METERS) 73.2 73.2 Meter
5 18753 RABINDRA HELPER 8 UNLOADING 8" PIPE FROM TRAILER AT BLASTING YARD (EACH PIPE 12.2METERS) 73.2 73.2 Meter
6 21358 TAN BAHADUR HELPER 8
7 20780 KUMAR KAMI HELPER 8
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 GR1765 GENERATOR IDLE 4045 1 HAND TOOLS


2 WM1194 WELDING MACHINE IDLE 10053 2
3 AC1612 AIR COMPRESSOR IDLE 4026.1 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 80 REPORTING DATE 14-May-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1055131 TIME REACHED CONTROL ROOM 6:50:00
TANK NUMBER NJBP 110(DAY) Direct / Part of PART OF PERMIT START 7:00:00
L.I. Description SHIFTING PLATES PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 6 2 TAKEN PERMIT & HELPING LABOURS 288 288 Sq.m
2 15575 BUDAN BLASTER 8 - ALL TOGETHER SHIFTING PLATE FROM YARD TO TK 110 BY BOOM TRUCK
3 23326 SURESH PAINTER 8 - LOADING PLATES AT YARD (6x2Meter)
4 5233 RAJENDRAN PAINTER 8 -
5 23329 NITIN BLASTER 8 -
6
7 12875 MEHRA HELPER 8 - UNLOADING AT TANK 110 INSIDE DIKE WALL (6x2Meter)
8 18753 RABINDRA HELPER 8 - FORMING BARRICATION & FLAG MAN
9 19344 RAJ KUMAR HELPER 8 2 NOTE
10 21358 TAN BAHADUR HELPER 8 2 BOOM TRUCK HAS 5TON
CAPACITY SO ARAMCO
11 20780 KUMAR KAMI HELPER 8 - ALLOWED TO SHIFT EACH TRIP
12 6 PLATES TOTAL 4 TRIPS
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 GR1765 GENERATOR IDLE 4045 1 HAND TOOLS


2 WM1194 WELDING MACHINE IDLE 10053 2
3 AC1612 AIR COMPRESSOR IDLE 4026.1 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# ARAMCO ID NOT ACCESSED REPORTING DATE 14-May-20

SERVICE ORDER NO. Service Line Item# TIME REACHED CONTROL ROOM

TANK NUMBER Direct / Part of IDLE PERMIT START 7:00:00


L.I. Description WAITING FOR NJBP ID APPROVAL PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 20947 SHYAM LABOUR 8 ASSIST ELECTRICIAN AT CAMP TO FIX CCTV CAMERA
2 11448 CHITHRA LABOUR 8
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# ARAMCO ID NOT ACCESSED REPORTING DATE 13-May-20

SERVICE ORDER NO. Service Line Item# TIME REACHED CONTROL ROOM

TANK NUMBER Direct / Part of IDLE PERMIT START 7:00:00


L.I. Description WAITING FOR NJBP ID APPROVAL PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 20947 SHYAM LABOUR 8 ASSIST ELECTRICIAN AT CAMP TO FIX CCTV CAMERA
2 11448 CHITHRA LABOUR 8
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 110 REPORTING DATE 13-May-20

SERVICE ORDER NO. 6510894318 Service Line Item# 1018433 TIME REACHED CONTROL ROOM 6:50:00
TANK NUMBER NJBP 101(DAY) Direct / Part of PART OF PERMIT START 7:00:00
L.I. Description SHIFTING MATERIALS PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 23329 NITIN BLASTER 8 - ALL TOGETHER SHIFTING MATERIALS FROM TANK 101 TO YARD BY BOOM TRUCK
2 15575 BUDAN BLASTER 8 - ASSIST BOOM TRUCK OPERATOR LOADING & UNLOADING
3 23326 SURESH PAINTER 8 -
4 20780 KUMAR KAMI HELPER 8 -
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 HAND TOOLS
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# REPORTING DATE 13-May-20

SERVICE ORDER NO. 6510948963 Service Line Item# TIME REACHED CONTROL ROOM 6:50:00
TANK NUMBER NJBP YARD Direct / Part of PART OF PERMIT START 7:00:00
L.I. Description FORMING PAINT SHED PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 5233 RAJENDRAN PAINTER 8 - ALL TOGETHER EXTENDING PAINT YARD
2 18753 RABINDAR HELPER 8 - MAKING SCAFF HOLDING TO FORM SHED & COVERING WITH POLYETHYLENE SHEET 220 220 Sq.ft
3 21358 TAN BAHADUR HELPER 8 2 ADDITIONALLY SHIFTING SCAFF HOLDING MATERIALS FROM TANK 106 TO YARD
4 19344 RAJ KUMAR HELPER 8 2 DISTANCE 90Meters BY HAND
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 HAND TOOLS
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 50/60/70 REPORTING DATE 13-May-20

SERVICE ORDER NO. 6510959373 Service Line Item# 1065650/'1049136/'1059843 TIME REACHED CONTROL ROOM 6:50:00
TANK NUMBER NJBP 106(DAY) Direct / Part of PART OF PERMIT START 7:00:00
L.I. Description SHIFTING 8" PIPE PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 6 2 TAKEN PERMIT & HELPING LABOURS
2
3 20709 HIKAMAT BAHADUR LABOUR 8 TOGETHER SHIFTING 8" WATER LINE PIPE (6 pipes) 72 72 Meter
4 FROM ARAMCO LEFT OVER MATERIALS YARD
5 23042 KHUSILAL LABOUR 8
6
7 12875 MEHRA LABOUR 8
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 GR1765 GENERATOR IDLE 4045 1 HAND TOOLS


2 WM1194 WELDING MACHINE IDLE 10053 2
3 AC1612 AIR COMPRESSOR IDLE 4026.1 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# ARAMCO ID NOT ACCESSED REPORTING DATE 12-May-20

SERVICE ORDER NO. Service Line Item# TIME REACHED CONTROL ROOM

TANK NUMBER Direct / Part of IDLE PERMIT START 7:00:00


L.I. Description WAITING FOR NJBP ID APPROVAL PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 20666 SATHEESH SAFETY 8
2 20709 HIKAMAT BAHADUR LABOUR 8
3 20752 DEM BAHADUR LABOUR 8
4 21934 RAMASETTI P/F 8
5 22964 DHAN BAHADUR LABOUR 8
6 23042 KHUSILAL LABOUR 8
7 20947 SHYAM LABOUR 8
8 11448 CHITHRA LABOUR 8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 150/'20 REPORTING DATE 12-May-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1091342/'1052024 TIME REACHED CONTROL ROOM 6:50:00
TANK NUMBER NJBP 110(NIGHT) Direct / Part of PART OF PERMIT START 7:00:00
L.I. Description SHIFTING MATERIALS PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 5233 RAJENDRAN PAINTER 8 - SHIFTING ANNULAR PLATE BY BOOM TRUCK 2196 50 50 Sq.m
2 15575 BUDAN BLASTER 8 -
3 23326 SURESH PAINTER 8 -
4
5
6
7
8 18753 RABINDAR HELPER 8 - BOTH ASSIST BOOM TRUCK OPERATOR 2196
9 12785 MEHRA HELPER 8 - FILLING GAS IN OXYGEN & ACETYLENE CYLINDERS OUTSIDE OF PLANT
10 RETURNED & UNLOADING IN YARD AREA
11
12 23329 NITIN BLASTER 8 - COVERING BLASTING YARD WITH POLYETHYLENE COVER FOR BLASTING 105 105 Sq.m
13 20780 KUMAR KAMI HELPER 8 - COVERING BLASTING YARD WITH POLYETHYLENE COVER FOR BLASTING 105 105 Sq.m
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 40/50 REPORTING DATE 12-May-20

SERVICE ORDER NO. 6510959373 Service Line Item# 1057023/'1065659 TIME REACHED CONTROL ROOM 6:50:00
TANK NUMBER NJBP 106(DAY) Direct / Part of PART OF PERMIT START 7:00:00
L.I. Description FITUP OF 8"PIPE & WELDING PERMIT CLOSED 16:30:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 16678 SELVARAJ MASON 8 - ASSIST FABRICATOR & WELDER
2 MAKING SCAFF HOLDING TO COVER FIRE BLANKET FOR FITUP & WELDING JOINT 3 3 EA
3
4 19344 RAJ KUMAR HELPER 8 - FIRE WATCH
5
6 21358 TAN BAHADUR HELPER 8 2 EQUIPMENT STANDBY
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 40/50/160 REPORTING DATE 12-May-20

SERVICE ORDER NO. 6510959373 Service Line Item# 1057023/'1065659/1049136 TIME REACHED CONTROL ROOM 6:50:00
TANK NUMBER NJBP 106(DAY) Direct / Part of DIRECT PERMIT START 7:00:00
L.I. Description FITUP OF 8"PIPE & WELDING PERMIT CLOSED 16:30:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 6 2 TAKEN PERMIT & HELPING LABOURS
2
3 1831 MURALI FAB 8 2 MAKING FITUP OF 8" PIPE TO 8" ELBOW 2 2 Joints
4 GRINDING 8" PIPE BEVELLING & ID ALSO GRINDING 11.2 11.2 Meter
5 GRINDING 8" ELBOW BEVELLING & ID ALSO GRINDING 1.4 1.4 2.8 Meter
6
7 24671 SOMMY FAB 8 2 ASSIST FABRICATOR & GRINDING
8 MARKING & CUTTING 8" PIPE 1 1 Pipe
9
10 21042 BAL KUMAR WELDER 8 2 BUTT WELDING (4PASS) 8" PIPE TO 8" PIPE 2.8 2.8 Meter
11 TAKA WELDING 8" PIPE TO 8" ELBOW 1 1 2 Joints
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 GR1765 GENERATOR 8 4045 1 50 7" GRINDING WHEEL 3 EA


2 WM1194 WELDING MACHINE 8 10053 2 50 7" CUTTING WHEEL 4 EA
3 GRINDING M/C 8 HRS 3 50 4" GRINDING WHEEL 4 EA
4 4 50 4" CUTTING WHEEL 5 EA
5 5 50 GEKA WELDING ELECTRODE DIA 2.5 30 EA
6 6 50 GEKA WELDING ELECTRODE DIA 3.2 1.2 KG
7 7 HAND TOOLS
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 110 & T & I RECOMMENDATION REPORTING DATE 11-May-20

SERVICE ORDER NO. 6510889880 Service Line Item# 1018433 TIME REACHED CONTROL ROOM 6:50:00
TANK NUMBER NJBP 101(DAY) Direct / Part of PART OF PERMIT START 7:00:00
L.I. Description SAND PAPERING & EARTHING CABLE RETURNING TO ORIGINAL POSITION PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 15575 BUDAN BLASTER 8 - STRAPPING EARTHING CABLE FROM TOP ROOF TO DOWNSIDE OF TANK 20 20 Meter
2 FOR EVERY 1 METER
3
4 20780 KUMAR KAMI HELPER 8 - SHIFTING UNWANTED MATERIALS FROM TANK TO YARD
5 REMOVING GARBAGED FULL WASTES 4 4 EA
6
7 18753 RABINDAR HELPER 8 - SAND PAPERING 8" FOAM LINE PIPE 7 7 Meter
8 COTTON RAG CLEANING 8" FOAM LINE PIPE 7 7 Meter
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 HAND TOOLS
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 110 REPORTING DATE 11-May-20

SERVICE ORDER NO. 6510889880 Service Line Item# 1018433 TIME REACHED CONTROL ROOM 6:50:00
TANK NUMBER NJBP 101(DAY) Direct / Part of DIRECT PERMIT START 7:00:00
L.I. Description STENCILING OF PIPE & BRUSH PAINTING PERMIT CLOSED 16:45:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 5233 RAJENDRAN PAINTER 8 - STENCILING 16" INLET PIPE & PAINTING APCS 6 BLACK 4 4 EA
2 STENCILING LETTER NOT PROVIDED MANUALLY MAKING & PAINTING
3
4
5 23326 SURESH PAINTER 8 - TANK RADAR SUPPORT TOP ROOF 2" PIPE PAINTED APCS 6 ALU CORRODED AREA 2 2 Meter
6 8" FOAM LINE COLOUR CODING APCS 6 YELLOW 7 7 Meter
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 HAND TOOLS
2 2 110 HEMPEL'S APCS 6 BLACK 100 ML
3 3 110 HEMPEL'S APCS 6 ALU 250 ML
4 4 110 HEMPEL'S APCS 6 YELLOW 0.5 Litre
5 5 110 ROLLER BRUSH 2 EA
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# T & I RECOMMENDATION REPORTING DATE 11-May-20

SERVICE ORDER NO. 6510889880 Service Line Item# TIME REACHED CONTROL ROOM 6:50:00
TANK NUMBER NJBP 101(DAY) Direct / Part of PART OF PERMIT START 7:00:00
L.I. Description CATHODIC PROTECTION LINE FIXING PERMIT CLOSED 16:45:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 6 2 TAKEN PERMIT & HELPING LABOURS
2
3 25391 MARWIN ELECTRICIAN 8 2 INSTALLING CP CABLE LINE PIPE SWITCH BOX 1 1 EA
4 MANUALLY MAKING HOLE IN DIKE WALL TO FIX SWITCH BOX (BOLT & NUT) 4 4 SET
5 GIVING CONNECTION IN & OUT CABLE FROM SWITCH BOX TO RECTIFIER 2 2 LINE
6
7 23329 NITIN BLASTER 8 2 ASSIST ELECRICIAN
8 SHIFTING MATERIALS BY HAND FROM RECTIFIER TO TANK 101 (220Meter distance)
9 BACK FILLING SAND AFTER INSTALLING CABLE LINE 1.5 1.5 Cu.m NOTE
S.NO 19 & 20 ARAMCO ID NOT
10 ACCESSED SO WORKING IN
11 21358 TAN BAHADUR HELPER 8 2 ASSIST ELECTRICIAN CAMP
12 SHIFTING MATERIALS BY HAND FROM RECTIFIER TO TANK 101 (220Meter distance)
13 BACK FILLING SAND AFTER INSTALLING CABLE LINE 1.5 1.5 Cu.m
14
15 16678 SELVARAJ MASON 8 2 ASSIST ELECTRICIAN MAKING HOLE MANUALLY IN DIKE WALL TO FIX SWITCH BOX
16 APPLYING CEMENT SAND MIX IN BROKEN SUPPORT UNDER 16" INLET PIPE 0.025 0.025 Cu.m
17 APPLYING CEMENT SAND MIX UNDER DRIP PLATE TO ARREST GAP 9 9
18
19 11448 CHITHRA HELPER 8 - CAMP CLEANING FOR INSPECTION
20 20947 SHYAM HELPER 8 - CAMP CLEANING FOR INSPECTION
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 HAND TOOLS
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 110 / T & I RECOMMENDATION REPORTING DATE 10-May-20

SERVICE ORDER NO. 6510889880 Service Line Item# 1018433 TIME REACHED CONTROL ROOM 6:50:00
TANK NUMBER NJBP 101(DAY) Direct / Part of DIRECT / PART OF PERMIT START 7:00:00
L.I. Description STENCILING OF PIPE / CP LINE FIXING PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 6 2 TAKEN PERMIT & HELPING LABOURS
2
3 5233 RAJENDRAN PAINTER 8 - STENCILING 24" OUTLET PIPE 6 6 EA
4 STENCILING LETTER NOT PROVIDED MANUALLY PAINTING
5 23326 SURESH PAINTER 8 - PAINTING GREEN COLOUR ON EARTHING LINES 2.5 2.5 Meter
6 TANK RADAR SUPPORT 3/4" PIPE PAINTED APCS 6 ALU CORRODED AREA 3.4 3.4 Meter
7 25391 MARWIN ELECTRICIAN 8 - INSTALLING CP CABLE LINE PIPE
8 TAKEN 1 1/2" PIPE FROM TK 101 TO TK 116 FOR CUTTING TO INSTALL( 3 3 Meter
9 NOTE
S.NO 19 & 20 ARAMCO ID NOT
10 16678 SELVARAJ MASON 8 - PULL BACKING CP IN AND OUT TERMINAL CABLE INSIDE THROUGH 1 1/2" PIPE 21 21 Meter ACCESSED SO WORKING IN
11 23329 NITIN BLASTER 8 - PULL BACKING CP IN AND OUT TERMINAL CABLE INSIDE THROUGH 1 1/2" PIPE 21 21 Meter CAMP
12 15575 BUDAN BLASTER 8 - PULL BACKING CP IN AND OUT TERMINAL CABLE INSIDE THROUGH 1 1/2" PIPE 21 21 Meter
13 21358 TAN BAHADUR HELPER 8 - EXCAVATING SAND TO INSTALL CP LINE UNDER GROUND 1.2 1.2 Cu.m
14 15575 BUDAN BLASTER 8 - EXCAVATING SAND TO INSTALL CP LINE UNDER GROUND 1.2 1.2 Cu.m
15 20780 KUMAR KAMI HELPER 8 - EXCAVATING SAND TO INSTALL CP LINE UNDER GROUND 1.2 1.2 Cu.m
16
17 18753 RABINDAR HELPER 8 - SAND PAPERING TANK RADAR SUPPORT AND EARTHING CABLE
18
19 11448 CHITHRA HELPER 8 - CAMP CLEANING FOR INSPECTION
20 20947 SHYAM HELPER 8 - CAMP CLEANING FOR INSPECTION
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 HAND TOOLS
2 2 110 HEMPEL'S APCS 6 BLACK 100 ML
3 3 110 HEMPEL'S APCS 6 ALU 300 ML
4 4 110 ROLLER BRUSH 2 EA
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 1052024 REPORTING DATE 9-May-20

SERVICE ORDER NO. 6510889880 Service Line Item# 20 TIME REACHED CONTROL ROOM 6:50:00
TANK NUMBER NJBP 116(DAY) Direct / Part of PART OF PERMIT START 7:00:00
L.I. Description MAKING COVER PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 5233 RAJENDRAN PAINTER 8 - COVERING BLASTING YARD WITH POLYETHYLENE COVER 720 720 Sq.ft
2 23329 NITIN BLASTER 8 -
3 20780 KUMAR KAMI HELPER 8 -
4 23326 SURESH PAINTER 8 -
5 15575 BUDAN BLASTER 8 -
6 18753 RABINDAR HELPER 8 -
7
8
9
NOTE
10 S.NO 10 & 11 ARAMCO ID NOT
11 ACCESSED SO WORKING IN
CAMP
12
13
14
15
16
17
18
19 11448 CHITHRA HELPER 8 - CAMP CLEANING FOR INSPECTION
20 20947 SHYAM HELPER 8 - CAMP CLEANING FOR INSPECTION
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1115 AIR COMPRESSOR IDLE 6736 1 HAND TOOLS


2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 50/60/70/160 REPORTING DATE 9-May-20

SERVICE ORDER NO. 6510959373 Service Line Item# 1065659/1049136/'1059843/ TIME REACHED CONTROL ROOM 6:50:00
TANK NUMBER NJBP 106(DAY) Direct / Part of DIRECT / PART OF PERMIT START 7:00:00
L.I. Description FITUP OF 8"PIPE & WELDING PERMIT CLOSED 16:30:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 6 2 TAKEN PERMIT & HELPING LABOURS
2
3 1831 MURALI FAB 8 2 MAKING FITUP OF 8" PIPE TO 8" PIPE ( EACH PIPE 12.2 Meters) 3 3 Joint
4 GRINDING 8" PIPE BEVELLING & ID ALSO GRINDING (ON SUPPORT CONNECTION) 1 1 EA
5 REDUCING PIPE THICKNESS FROM SCH 120 TO SCH 40 BY GRINDING
6
7 24671 SOMMY FAB 8 2 ASSIST FABRICATOR & GRINDING
8 MARKING & CUTTING 8" PIPE (300MM) 1 1 EA
9
10 21042 BAL KUMAR WELDER 8 3 BUTT WELDING (4PASS) 8" PIPE TO 8" ELBOW 1 1 Joint
11 TAKA WELDING 8" PIPE TO 8" PIPE 3 3 Joints
12 BUTT WELDING (4PASS) 8" PIPE TO 8" PIPE 1 1 Joint
13 BUTT WELDING (2PASS) 8" PIPE TO 8" PIPE 1 1 Joint
14 EACH PASS GRINDING 8" PIPE
15
16 16678 SELVARAJ MASON 8 2 ASSIST FABRICATORS & BOOM TRUCK OPERATOR TO ADJUST PIPE FOR FITUP
17 MAKING SCAFF HOLDING TO COVER WITH FIRE BLANKET FOR WELDING & FITUP 3 3 Joints
18 SHIFTING WELDING MACHINE MANUALLY NEAR WELDING JOINTS
19 INSTALLED 8" PIPE ON CONCRETE SUPPORT(12.2Meter) 1 1 EA
20 21358 TAN BAHADUR HELPER 8 2 EQUIPMENT STAND BY & HELPING FABRICATORS
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 GR1765 GENERATOR 8 4039 1 50 7" GRINDING WHEEL 3 EA


2 WM1194 WELDING MACHINE 8 10037.2 2 50 7" CUTTING WHEEL 3 EA
3 GRINDING M/C 8 HRS 3 50 4" GRINDING WHEEL 2 EA
4 4 50 4" CUTTING WHEEL 4 EA
5 5 50 GEKA WELDING ELECTRODE DIA 2.5 30 EA
6 6 50 GEKA WELDING ELECTRODE DIA 3.2 2 KG
7 7 HAND TOOLS
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 40 REPORTING DATE 8-May-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1017801 TIME REACHED CONTROL ROOM 6:50:00
TANK NUMBER NJBP 110(DAY) Direct / Part of DIRECT / PART OF PERMIT START 7:00:00
L.I. Description PAINTING TOP COAT PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 5233 RAJENDRAN PAINTER 8 PAINTED ANNULAR PLATE (2.5 x 1.25 Meter) TOP COAT BLACK APCS 3 14 14 Plate
2 SAND PAPERING PLATE (2.5 x 1.25 Meter) 4 4 Plate
3
4 25324 SIVARANJAN HELPER 8 SAND PAPERING PLATE (2.5 x 1.25 Meter) 5 5 Plate
5 PAINT MIXING Plate
6
7 25323 KUNATHEEPAN HELPER 8 SAND PAPERING PLATE (2.5 x 1.25 Meter) 5 5 Plate
8 HOLDING PAITING HOSE WHEN PAINTING
9 AIR CLEANING PLATES AFTER SAND PAPERING 14 14 Plate
10
11
12 18753 RABINDAR HELPER 8 EQUIPMENT STANDBY
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1115 AIR COMPRESSOR 6 6736 1 SIGMA APCS 3 BLACK 20 Litre


2 2 THINNER 3 Litre
3 3 SAND PAPER 20 EA
4 4 HAND TOOLS
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 50/60/70/160 REPORTING DATE 8-May-20

SERVICE ORDER NO. 6510959373 Service Line Item# 1065659/1049136/'1059843/ TIME REACHED CONTROL ROOM 6:50:00
TANK NUMBER NJBP 106(DAY) Direct / Part of DIRECT / PART OF PERMIT START 7:00:00
L.I. Description FITUP OF 8"PIPE & WELDING PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 8 TAKEN PERMIT & HELPING LABOURS
2
3 1831 MURALI FAB 8 MAKING FITUP OF 8" PIPE TO 8" PIPE ( EACH PIPE 12.2 Meters) 1 1 EA
4 GRINDING 8" PIPE BEVELLING & ID ALSO GRINDING (ON SUPPORT CONNECTION) 1 1 EA
5
6 24671 SOMMY FAB 8 ASSIST FABRICATOR & GRINDING
7 MAKING TEMPORARY SUPPORT FOR 8" PIPE FOR FITUP 4 4 EA
8
9 21042 BAL KUMAR WELDER 8 BUTT WELDING (3PASS) 8" PIPE TO 8" ELBOW 2 2 Joint
10 TAKA WELDING 8" PIPE TO 8" PIPE 1 1 Joint
11
12 16678 SELVARAJ MASON 8 ASSIST FABRICATORS & SHIFTING SCAFF HOLDING MATERIALS BY BOOM TRUCK
13 MAKING SCAFF HOLDING TO COVER WITH FIRE BLANKET FOR WELDING 3 3 Joint
14
15 21358 TAN BAHADUR HELPER 8 EQUIPMENT STAND BY & HELPING FABRICATORS
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 GR1765 GENERATOR 6 4032 1 50 7" GRINDING WHEEL 1 EA


2 WM1194 WELDING MACHINE 6 10030.8 2 50 7" CUTTING WHEEL 1 EA
3 GRINDING M/C 6 HRS 3 50 4" GRINDING WHEEL 3 EA
4 4 50 4" CUTTING WHEEL 3 EA
5 5 50 GEKA WELDING ELECTRODE DIA 2.5 10 EA
6 6 50 GEKA WELDING ELECTRODE DIA 3.2 1 KG
7 7 HAND TOOLS
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 20/'30 REPORTING DATE 7-May-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1052024/'1064505 TIME REACHED CONTROL ROOM 6:50:00
TANK NUMBER NJBP 110(DAY) Direct / Part of DIRECT / PART OF PERMIT START 7:00:00
L.I. Description GRIT BLATING OF ANNULAR PLATE & SPRAY PAINTING PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 23329 NITIN BLASTER 8 - GRIT BLASTING ANNULAR PLATE (1.25 x 2.5 Meter) 8 8 EA
2
3 15575 BUDAN BLASTER 8 - GRIT BLASTING ANNULAR PLATE (1.25 x 2.5 Meter) 8 8 EA
4
5 23326 SURESH PAINTER 8 - SPRAY PAINTING ANNULAR PLATE (1.25 x 2.5 Meter) 16 16 EA
6
7 5233 RAJENDRAN PAINTER 8 - BOTH SHIFTING PAINT CAN FROM YARD TO BLASTING AREA
8 23327 NEELAKANTH PAINTER 8 - PAINT MIXING
9
NOTE
10 18753 RABINDAR HELPER 8 - FILLING GIRT IN SAND BOARD S.NO 17 & 18 ARAMCO ID NOT
11 HOLDING PAINTING HOSE WHEN PAINTING ACCESSED SO WORKING IN
CAMP
12
13 20780 KUMAR KAMI HELPER 8 - EQUIPMENT STANDBY
14
15
16
17 11448 CHITHRA HELPER 8 - CAMP CLEANING FOR INSPECTION
18 20947 SHYAM HELPER 8 - CAMP CLEANING FOR INSPECTION
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1115 AIR COMPRESSOR 7 6730.5 1 20 COPPER SLAG 1 TON


2 2 30 SIGMA APCS 3 BROWN 20 Litre
3 3 30 THINNER 3 Litre
4 4 HAND TOOLS
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 50/60/70/160 REPORTING DATE 7-May-20

SERVICE ORDER NO. 6510959373 Service Line Item# 1065659/1049136/'1059843/ TIME REACHED CONTROL ROOM 6:50:00
TANK NUMBER NJBP 106(DAY) Direct / Part of DIRECT / PART OF PERMIT START 7:00:00
L.I. Description FITUP OF 8"PIPE WITH ELBOW PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 6 2 TAKEN PERMIT & HELPING LABOURS
2
3 1831 MURALI FAB 8 2 MAKING FITUP OF 8" ELBOW TO 8" PIPE 1 1 EA
4 MAKING FITUP OF 8" PIPE TO 8" ELBOW ( ON LINE SUPPORT CONNECTION) 1 1 EA
5 GRINDING 8" PIPE BEVELLING ( ON LINE SUPPORT CONNECTION) 2 2 EA
6 GRINDING 8" ELBOW BEVELLING & ID ALSO GRINDING CEMENT PIPE 2 2 EA
7 HELPING TO FORM SCAFFHOLDING
8
9 24671 SOMMY FAB 8 2 ASSIST FABRICATOR & GRINDING
FOR MAKING SCAFF HOLDING
10 HELPING TO FORM SCAFFHOLDING LINE ITEM NOT PROVIDED
11
12 21042 BAL KUMAR WELDER 8 2 TAKA WELDING 8" PIPE WITH 8" ELBOW 2 2 EA
13 BUTT WELDING (4PASS) 8" FALNGE WITH 8" ELBOW 1 1 EA
14 ROOT PASS 8" ELBOW WITH 8" PIPE ( ON LINE SUPPORT CONNECTION) 2 2 EA
15
16 16678 SELVARAJ MASON 8 2 ASSIST FABRICATORS & SHIFTING SCAFF HOLDING MATERIALS BY BOOM TRUCK
17 MAKING SCAFF HOLDING & COVERING FIRE BLANKET WELDING JOINTS
18 MAKING SCAFF HOLDING SIZE (6meter deep under ground x 4 Meter width) 24 24 Meter
19
20 21358 TAN BAHADUR HELPER 8 2 EQUIPMENT STAND BY & HELPING FABRICATORS
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 GR1765 GENERATOR 8 4027 1 50 7" GRINDING WHEEL 1 EA


2 WM1194 WELDING MACHINE 8 10026.8 2 50 7" CUTTING WHEEL 2 EA
3 GRINDING M/C 8 HRS 3 50 4" GRINDING WHEEL 3 EA
4 4 50 4" CUTTING WHEEL 3 EA
5 5 50 GEKA WELDING ELECTRODE DIA 2.5 20 EA
6 6 50 GEKA WELDING ELECTRODE DIA 2.5 1.5 KG
7 7 HAND TOOLS
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 1052024 REPORTING DATE 6-May-20

SERVICE ORDER NO. 6510889880 Service Line Item# 20 TIME REACHED CONTROL ROOM 6:50:00
TANK NUMBER NJBP 116(DAY) Direct / Part of PART OF PERMIT START 7:00:00
L.I. Description MAKING COVER PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 21358 TAN BAHADUR HELPER 8 - COVERING BLASTING YARD WITH POLYETHYLENE COVER 520 520 Sq.ft
2 23329 NITIN BLASTER 8 -
3 23327 NEELAKANTH PAINTER 8 -
4 23326 SURESH PAINTER 8 -
5 15575 BUDAN BLASTER 8 -
6 18753 RABINDAR HELPER 8 -
7 20780 KUMAR KAMI HELPER 8 -
8 5233 RAJENDRAN PAINTER 8 -
9
NOTE
10 11448 CHITHRA HELPER 8 - CAMP CLEANING FOR INSPECTION S.NO 10 & 11 ARAMCO ID NOT
11 20947 SHYAM HELPER 8 - CAMP CLEANING FOR INSPECTION ACCESSED SO WORKING IN
CAMP
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 HAND TOOLS
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 50/40/80/160 REPORTING DATE 6-May-20

SERVICE ORDER NO. 6510889880 Service Line Item# 1065659/'1057023/'1070890 TIME REACHED CONTROL ROOM 6:50:00
TANK NUMBER NJBP 106(DAY) Direct / Part of DIRECT / PART OF PERMIT START 7:00:00
L.I. Description FITUP OF 8"FLANGE WITH ELBOW PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 6 2 TAKEN PERMIT & HELPING LABOURS
2 13936 JIMMY FO.OP 8 2 UNLOADING PLATE (6x2.5Meter) FROM ARAMCO TRAILER 26 26 EA
3 INSTALLING 8" INLET WATER LINE PIPE (12 Meter) (TANK 106) 7 7 EA
4 SHIFTING SAND FROM PATH WAY TO INSIDE DIKE WALL BY RENT LOADER(T116) 1 1 LOAD
5 REMOVING BROKEN ASPHALT FROM INSIDE TO OUTSIDE TANK(TANK 116) 3 3 6 Cu.m
6
7 1831 MURALI FAB 8 2 MAKING FITUP OF 8" WNRF FLANGE WITH 8" ELBOW
8 GRINDING 8" WNRF FLANGE BEVELLING 1 1 EA
9 GRINDING 8" PIPE BEVELLING FOR TANK 116 REMOVING
ASPHALT & SHIFTING SAND
10 LINE ITEM 140/1000302
11 24671 SOMMY FAB 8 2 ASSIST FABRICATOR 150/1001016
12 GRINDING 8" ELBOW BEVELLING 1 1 EA
13
14 21042 BAL KUMAR WELDER 8 2 TAKA WELDING 8" WNRF FLANGE WITH 8" ELBOW
15
16 16678 SELVARAJ MASON 8 2 EQUIPMENT STANDBY
17 ASSIST FABRICATORS & SHIFTING FABRICATION MATERIALS FROM TK TO YARD
18 MAKING SCAFF HOLDING TO FORM FABRICATION SHED
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 FL909 FORKLIFT 4 590.5 1 40 7" GRINDING WHEEL 1 EA


2 GR1765 GENERATOR 6 4019 2 HAND TOOLS
3 WM1194 WELDING MACHINE 2 10020.6 3
4 GRINDING M/C 6 HRS 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 10/20/'80/60/70/170 REPORTING DATE 5-May-20

SERVICE ORDER NO. 6510889880 Service Line Item# 1074566/1004451/'1070890/'1049136/1059843 TIME REACHED CONTROL ROOM 6:50:00
TANK NUMBER NJBP 106(DAY) Direct / Part of DIRECT / PART OF PERMIT START 7:05:00
L.I. Description INSTALLING 8" WATER LINE PIPE SUPPORT PERMIT CLOSED 16:30:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 6 2 TAKEN PERMIT & HELPING LABOURS
2 13936 JIMMY FO.OP 8 3 LOADING MATERIALS ON TRAILER
3 SAND BOARD,AIR RECEIVER,CUTTING HOSE,VACUUM BOX,BLASING HOSE 22 22 EA
4 AIR COMPRSSOR 1519,AIR BLOWER,JACK HAMMER 7 7 EA
5 UNLOADING PLATE (6x2.5Meter) FROM ARAMCO TRAILER(FOR TANK 116) 36 36 EA
6 INSTALLING 8" INLET WATER LINE SUPPORT BLOCK(1.2x0.5Meter) (TANK 106) 2 2 EA
7 REMOVING BROKEN ASPHALT FROM INSIDE TO OUTSIDE TANK(TANK 116) 4 4 8 Cu.m
8 SHIFTING SAND FROM PATH WAY TO INSIDE DIKE WALL BY RENT LOADER(T116) 2 2 LOAD
9 16678 SELVARAJ MASON 8 2 SAND EXACAVATE FOR INSTALLING PIPE SUPPORT BLOCK(TANK 106) 1.8 1.8 Cu.m FOR TANK 116 REMOVING
ASPHALT & SHIFTING SAND
10 INSTALLING SUPPORT BLOCK & BACK FILLING SAND 1.1 0.7 1.8 Cu.m LINE ITEM 140/1000302
11 19344 RAJ KUMAR HELPER 8 2 ASSIST MASON 150/1001016
12 21358 TAN BAHADUR HELPER 8 2 ASSIST MASON
13 23329 NITIN BLASTER 8 - ASSIST FORK LIFT OPERATOR TO LOAD & UNLOAD MATERIALS
14 23327 NEELAKANTH PAINTER 8 - ASSIST FORK LIFT OPERATOR TO LOAD & UNLOAD MATERIALS
15 23326 SURESH PAINTER 8 - ASSIST FORK LIFT OPERATOR TO LOAD & UNLOAD MATERIALS
16 15575 BUDAN BLASTER 8 - ASSIST FORK LIFT OPERATOR TO LOAD & UNLOAD MATERIALS
17 18753 RABINDAR HELPER 8 - ASSIST BOOM TRUCK OPERATOR TO SHIFT SUPPORT BLOCK
18 20780 KUMAR KAMI HELPER 8 - ASSIST BOOM TRUCK OPERATOR TO SHIFT SUPPORT BLOCK
19 5233 RAJENDRAN PAINTER 8 - FLAG MAN
20 12875 BISESWAR HELPER 8 - FIRE WATCH
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 FL909 FORKLIFT 8 588.3 1 HAND TOOLS


2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 110 REPORTING DATE 4-May-20

SERVICE ORDER NO. 6510889880 Service Line Item# 1018433 TIME REACHED CONTROL ROOM 5:50:00
TANK NUMBER NJBP 101(DAY) Direct / Part of DIRECT / PART OF PERMIT START 6:00:00
L.I. Description BRUSH PAINTING PERMIT CLOSED 15:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 6 2 TAKEN PERMIT & HELPING LABOURS
2
3 5233 RAJENDRAN PAINTER 8 - STENCILING OF 8" FIRE WATER LINE PIPE 20 20 EA
4 16678 SELVARAJ MASON 8 2 APPLYING CONCRETE MIX UNDER D DOOR BOTTOM 1 1 Cu.m
5 APPLYING CONCRETE MIX ON DEFECTED SLOPE AREA BOTTOM OF TANK 2 2 Cu.m
6 SHIFTING SAND & GRAVEL FROM TANK 116 TO TANK 101 BY WHEEL BARROW
7 ASSIST BOOM TRUCK & FORK LIFT TO SHIFT RAMPFROM TANK TO YARD 4 4 EA
8 REMOVED BOLD & NUT IN RAMP 4 4 4 EA
9 25391 MARWIN ELECTRICIAN 8 - THREADNING 2" POWER CABLE PIPE 1 1 EA
10 CUTTING 2" POWER CABLE PIPE USING GRINDING MACHINE AT TANK 116 2 2 EA
11 23329 NITIN BLASTER 8 2 HOUSE KEEPING
12 ASSIST BOOM TRUCK & FORK LIFT LOADING & UNLOADING RAMP
13 21358 TAN BAHADUR HELPER 8 - ASSIST ELECTRICIAN
14 23327 NEELAKANTH PAINTER 8 HOUSE KEEPING
15 23326 SURESH PAINTER 8 HOUSE KEEPING
16 15575 BUDAN BLASTER 8 - HOUSE KEEPING
17 18753 RABINDAR HELPER 8 - HOUSE KEEPING
18 20780 KUMAR KAMI HELPER 8 - HOUSE KEEPING
19 11448 CHITHRA HELPER 8 - CAMP CLEANING FOR INSPECTION
20 20947 SHYAM HELPER 8 - CAMP CLEANING FOR INSPECTION
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 HAND TOOLS
2 2 110 HEMPEL'S APCS 6 WHITE 1 Litres
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# REPORTING DATE 3-May-20

SERVICE ORDER NO. 6510889880 Service Line Item# TIME REACHED CONTROL ROOM 5:50:00
TANK NUMBER NJBP 101(DAY) Direct / Part of PERMIT START 6:00:00
L.I. Description LOADING & CP CABLE INSTALLATION PERMIT CLOSED 15:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 23921 JOMON JOSE WPR 8 2 TAKEN PERMIT
2 BRINING DRINKING FROM BAKALA & DELIVERING EVERY TANK
3 13936 JIMMY FO.OP 8 2 LOADING OLD PLATE/SCRAP PLATES ON ARAMCO TRAILER FULL LOAD 2 2 LOAD
4
5 15575 BUDAN BLASTER 8 FLAG MAN
6
7 21358 TAN BAHADUR HELPER 8 2 ASSIST FORK LIFT OPERATOR
8
9 25391 MARWIN ELECTRICIAN 8 THREADENEING 2" POWER CABLE PIPE NOTE
10 POWER CABLE BACK PULLING TO CONNECT FOR
CATHODIC PROTECTECTION
11 CP WORK LINE ITEM NOT
12 PROVIDED / T &I
RECOMMENDATION
13 23329 NITIN BALSTER 8 2 ASSIST ELECTRICIAN & EXCAVATING TO INSTALL POWER CABLE 1 1 1 Cu.m
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 110 REPORTING DATE 3-May-20

SERVICE ORDER NO. 6510889880 Service Line Item# 1018433 TIME REACHED CONTROL ROOM 5:50:00
TANK NUMBER NJBP 101(DAY) Direct / Part of DIRECT / PART OF PERMIT START 6:00:00
L.I. Description BRUSH PAINTING PERMIT CLOSED 15:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 6 2 TAKEN PERMIT & HELPING LABOURS
2 23421 SURFUDDIN SAFETY 6 2 SAFETY AT SITE(HANDLING TANK 116,110, 101)
3 5233 RAJENDRAN PAINTER 8 - STENCILING OF 8" FIRE WATER LINE PIPE
4
5 23326 SURESH PAINTER 8 - BRUSH PAINTING OF 24" MOV BRIDGE WITH SUPPORT APCS 6 BLACK 1 1 EA
6 DIA 8" SEWAGE COVER APCS 6 BLACK 9 9 EA
7
8 23327 NEELAKANTH PAINTER 8 - BRUSH PAINTING OF 8" FIRE WATER LINE PIPE CONCRETE SUPPORT APCS 6 BLACK NOTE
1)S.NO 19 & 20 ARAMCO ID
9 1 SUPPORT 0.090 Cu.m 12 12 EA NOT ACCESSED SO CLEANING
10 BRUSH PAINTING SAMPLE LINE 1" APCS L ALUMINIUM 20 20 Meter CAMP 2) FOR APPLYING
CEMENT SAND MIX LINE ITEM
11 BRUSH PAINTING RTG SUPPORT STAND DIA 2" 1.5 1.5 Meter NOT AVAILABLE / T & I
12 BRUSH PAINTING 2" SAMPLE LINE VALVE APCS 6 ALUMINIUM 6 6 EA RECOMMENDATION
13
14 16678 SELVARAJ MASON 8 - APPLYING CEMENT SAND MIX ON 2" LEAK DETECTION PIPE AREA(0.025Cu.m) 7 7 EA
15 UNDER DRIP PLATE ARRESTING GAP BY APPLYING CONCRETE MIX 0.02 0.02 Cu.m
16 12875 BISESWAR HELPER 8 - ASSIST MASON AND SHIFTING CEMENT SAND MATERIALS FROM YARD
17 18753 RABINDAR HELPER 8 - SAND PAPERING & COTTON RAG CLEANING 24" MOV BRIDGE 1 1 EA
18 20780 KUMAR KAMI HELPER 8 - HOUSE KEEPING
19 11448 CHITHRA HELPER 8 - CAMP CLEANING FOR INSPECTION
20 20947 SHYAM HELPER 8 - CAMP CLEANING FOR INSPECTION
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 HAND TOOLS
2 2 110 HEMPEL'S APCS 6 BLACK 5 Litres
3 3 110 HEMPEL'S APCS 6 ALU 3 Litres
4 4 110 ROLLER BRUSH 4 EA
5 5 CEMENT 7 KG
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 110 REPORTING DATE 2-May-20

SERVICE ORDER NO. 6510889880 Service Line Item# 1018433 TIME REACHED CONTROL ROOM 5:50:00
TANK NUMBER NJBP 101(DAY) Direct / Part of DIRECT / PART OF PERMIT START 6:00:00
L.I. Description BRUSH PAINTING OF FIRE WATER LINE PERMIT CLOSED 15:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 6 2 TAKEN PERMIT & HELPING LABOURS
2 23421 SURFUDDIN SAFETY 6 2 SAFETY AT SITE(HANDLING TANK 116 .110, 101)
3 5233 RAJENDRAN PAINTER 8 - BRUSH PAINTING OF 8" FIRE WATER LINE PIPE CONCRETE SUPPORT
4 1 SUPPORT 0.064 Cu.m 42 42 EA
5 BRUSH PAINTING 8" FIRE WATER LINE PIPE WALL SUPPORT ANGLE(75x75x1000mm) 4 4 EA
6 23326 SURESH PAINTER 8 - BRUSH PAINTING OF 16 " VALVE LADDER WITH SUPPORT APCS 6 BLACK 1 1 EA
7 BRUSH PAINTING OF 24 " VALVE LADDER WITH SUPPORT APCS 6 BLACK 1 1 EA
8
9 23327 NEELAKANTH PAINTER 8 - BRUSH PAITING OF CP CABLE SUPPORT APCS 6 BLACK(1 SUPPORT 0.2 Sq.m) 70 70 EA
10
11 23329 NITIN BLASTER 8 - BRUSH CLEANING AROUND TANK TO REMOVE FALLEN GRIT & SAND
12
13 15575 BUDAN BLASTER 8 - BRUSH CLEANING AROUND TANK TO REMOVE FALLEN GRIT & SAND
14
15 21358 TAN BAHADUR HELPER 8 - SAND PAPERING AND COOTON RAG CLEANING OF 16" & 24" VALVE LADDER
16
17 20780 KUMAR KAMI HELPER 8 - SHIFTING GRIT SAND DISTANCE 50Meters BY WHEEL BARROW
18
19 18753 RABINDAR HELPER 8 - SHIFTING GRIT SAND DISTANCE 50Meters BY WHEEL BARROW
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 HAND TOOLS
2 2 110 HEMPEL'S APCS 6 BLACK 15 Litres
3 3 110 HEMPEL'S APCS 6 ALU 0.2 Litres
4 4 110 ROLLER BRUSH 4 EA
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 140 REPORTING DATE 1-May-20

SERVICE ORDER NO. 6510889880 Service Line Item# 1000302 TIME REACHED CONTROL ROOM 5:50:00
TANK NUMBER NJBP 116(DAY) Direct / Part of DIRECT PERMIT START 6:00:00
L.I. Description REMOVING BROKEN ASPHALT INISDE TO OUTSIDE TANK PERMIT CLOSED 15:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 8 TAKEN PERMIT & HELPING LABOURS
2 13936 JIMMY FO.OP 8 REMOVING BROKEN ASPHALT INSIDE TO OUTSIDE TANK USING BOBCAT
3 25326 CHATHURA HELPER 8 ASSIST OPERATOR
4 25323 KUNATHEEPAN HELPER 8 ASSIST OPERATOR
5 20780 KUMAR KAMI HELPER 8 ASSIST OPERATOR
6 18753 RABINDAR HELPER 8 ASSIST OPERATOR
7 25324 SIVARANJAN HELPER 8 ASSIST OPERATOR
8 21358 TAN BAHADUR HELPER 8 FLAG MAN
9 19344 RAJ KUMAR HELPER 8 FIREWATCH
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 SL1407 BOBCAT 8 2803.4 1 HAND TOOLS


2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 110 REPORTING DATE 30-Apr-20

SERVICE ORDER NO. 6510889880 Service Line Item# 1018433 TIME REACHED CONTROL ROOM 5:50:00
TANK NUMBER NJBP 101(DAY) Direct / Part of DIRECT / PART OF PERMIT START 6:00:00
L.I. Description BRUSH PAINTING OF FIRE WATER LINE PERMIT CLOSED 15:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 6 2 TAKEN PERMIT & HELPING LABOURS
2 23421 SURFUDDIN SAFETY 6 2 SAFETY AT SITE(HANDLING BOTH TANK 116 & 101)
3 5233 RAJENDRAN PAINTER 8 - BRUSH PAINTING OF 8" FIRE WATER LINE PIPE APCS 6 RED 70 70 Meter
4 19344 RAJ KUMAR HELPER 8 2 BRUSH PAINTING OF 8" FIRE WATER LINE PIPE APCS 6 RED 80 10 80 Meter
5 16678 SELVARAJ MASON 8 2 CHIPPING OUT CONCRETE FOR 2" LEAK PIPE CATHODIC TEST BY HANDTOOLS 5 5 sq.m
6 BRUSH PAINTING OF CP CABLE JUNCTION BOX SUPPORT STAND APCS 6 BLACK
7 2" PIPE (2METERS) 2 2 EA
8 FLAT (100mmWIDTH x 400mm LENGTH) 3 3 EA NOTE
FOR PAINTING CP CABLE
9 BRUSH PAINTING 6" LEAK DETECTION PIPE CLOSING PLATE DIA15CM APCS 6 BLACK 2 2 4 EA SUPPORT STAND & BREAKING
10 23326 SURESH PAINTER 8 - BRUSH PAINTING OF 8" FIRE WATER LINE PIPE APCS 6 RED 60 60 Meter CONCRETE FOR 2" LEAK
DETECTION PIPE LINE ITEM
11 BRUSH PAINTING OF 8" FIRE WATER LINE PIPE NUT & BOLD APCS 6 RED 24 24 EA NOT AVAILABLE / T&I
12 BRUSH PAINTING OF 8"FIRE WATER LINE SUPPORT STAND APCS 6 RED 6 6 sq.m RECOMMENDATION
13 21358 TAN BAHADUR HELPER 8 2 HOUSE KEEPING
14 25326 CHATHURA HELPER 8 2 SAND PAPERING 8" FIRE WATER LINE PIPE & COTTON RAG CLEANING 90 15 105 Meter
15 25324 SIVARANJAN HELPER 8 2 SAND PAPERING 8" FIRE WATER LINE PIPE & COTTON RAG CLEANING 90 15 105 Meter
16 SHIFTING MATERIALS FROM TANK TO YARD & OUTISDE TO INSIDE SITE
17 25325 DANISTAN HELPER 8 2 ASSIST BOOM TRUCK DRIVER
18 20780 KUMAR KAMI HELPER 8 - ASSIST BOOM TRUCK DRIVER
19 18753 RABINDAR HELPER 8 - ASSIST BOOM TRUCK DRIVER
20 25391 MARWIN ELECTRICIAN 8 - MAKING THREADNING OF 1 1/2" CP CABLE LINE PIPE 2 2 EA
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1115 AIR COMPRESSOR IDLE 6721.7 1 HAND TOOLS


2 2 110 HEMPEL'S APCS 6 BLACK 0.3 Litres
3 3 110 HEMPEL'S APCS 6 RED 13 Litres
4 4 110 HEMPEL'S APCS 6 BROWN 2 Litres
5 5 110 ROLLER BRUSH 4 EA
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 110 REPORTING DATE 29-Apr-20

SERVICE ORDER NO. 6510889880 Service Line Item# 1018433 TIME REACHED CONTROL ROOM 5:50:00
TANK NUMBER NJBP 101(DAY) Direct / Part of DIRECT / PART OF PERMIT START 6:00:00
L.I. Description BRUSH PAINTING OF FIRE WATER LINE & VALVE PERMIT CLOSED 15:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 6 2 TAKEN PERMIT & HELPING LABOURS
2 23421 SURFUDDIN SAFETY 6 2 SAFETY AT SITE(HANDLING BOTH TANK 116 & 101)
3 5233 RAJENDRAN PAINTER 8 - BRUSH PAINTING OF 8" FIRE WATER LINE PIPE APCS 6 RED 70 70 Meter
4 19344 RAJ KUMAR HELPER 8 - BRUSH PAINTING OF 8" FIRE WATER LINE PIPE APCS 6 RED 70 70 Meter
5 16678 SELVARAJ MASON 8 - APPLIED SEALENT ON DAMAGED SLOPE AREAS ONTANK BOTTOM 12 12 sq.m
6 BRUSH PAINTING OF 8" FIRE WATER LINE PIPE APCS 6 RED 8 8 Meter
7 23326 SURESH PAINTER 8 - BRUSH PAINTING OF 24" OUTLET VALVE APCS 6 ALUMINIUM 1 1 EA
8 BRUSH PAINTING OF 6" OUTLET DRAIN VALVE APCS 6 ALUMINIUM 1 1 EA
NOTE
9 WIRE BRUSH CLEANING OF 24" OUTLET VALVE 1 1 EA FOR SEALENT APPLY & CP
10 WIRE BRUSH CLEANING OF 6" OUTLET DRAIN VALVE 1 1 EA CABLE LINE ITEM NOT
AVAILABLE/ ARAMCO
11 BRUSH PAINTING OF 24" & 16"OUT/INLET VALVE APCS 6 BROWN(COLOUR CODE) 12 12 Sq.m RECOMMENDATION
12 BRUSH PAINTING OF 24" & 16 OUT/INLET VALVE APCS 6 WHITE(COLOUR CODE) 3 3 sq.m
13 25324 SIVARANJAN HELPER 8 2 SAND PAPERING 8" FIRE WATER LINE PIPE 70 10 80 Meter
14 25326 CHATHURA HELPER 8 2 SAND PAPERING 8" FIRE WATER LINE PIPE 70 10 80 Meter
15 25323 KUNATHEEPAN HELPER 8 2 COTTON RAG CLEANING 8" FIRE WATER LINE PIPE 140 20 160 Meter
16 21358 TAN BAHADUR HELPER 8 2 HOUSE KEEPING
17 20780 KUMAR KAMI HELPER 8 - HOUSE KEEPING
18 18753 RABINDAR HELPER 8 - HOUSE KEEPING
19 25391 MARWIN ELECTRICIAN 8 - INSTALLED CP CABLE SWITCH BOX 1 1 EA
20 25325 DANISTAN HELPER 8 - ASSIST ELECTRICIAN
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1115 AIR COMPRESSOR IDLE 6721.7 1 110 HEMPEL'S APCS 6 ALUMINIUM 51570 1 Litres
2 2 110 HEMPEL'S APCS 6 BLACK 0.5 Litres
3 3 110 HEMPEL'S APCS 6 RED 12 Litres
4 4 110 HEMPEL'S APCS 6 BROWN 2 Litres
5 5 110 ROLLER BRUSH 8 EA
6 6 110 ROLLER HANDLE 4 EA
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# REPORTING DATE 2-May-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM 5:50:00
TANK NUMBER NJBP 101(DAY) Direct / Part of PART OF PERMIT START 6:00:00
L.I. Description CAMP CLEANING PERMIT CLOSED 15:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 11448 CHITHRA HELPER 8 CAMP CLEANING
2 20947 SHYAM HELPER 8 CAMP CLEANING
3
4
5
6
7
8
9
10 NOTE
11 S.NO 1 & 2 ARAMCO ID
NOT ACCESSING SO WORKING
12 IN CAMP
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : FAROOK BASHA Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 5445 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# REPORTING DATE 28-Apr-20

SERVICE ORDER NO. 6510889880 Service Line Item# TIME REACHED CONTROL ROOM 5:50:00
TANK NUMBER NJBP 101(DAY) Direct / Part of PART OF PERMIT START 6:00:00
L.I. Description SHIFTING MATERIALS PERMIT CLOSED 15:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 10636 VICTOR WPR 8 TAKEN PERMIT FOR BOOM TRUCK
2 SHIFTING MATERIALS FROM TANK 101 TO YARD
3 13936 JIMMY FO.OP 8 LOADING MATERILAS ON BOOM TRUCK 2196
4
5 25323 KUNATHEEPAN HELPER 8 2 ASSIST FORK LIFT OPERATOR
6 25326 CHATHURA HELPER 8 2 ASSIST FORK LIFT OPERATOR
7 25325 DANISTAN HELPER 8 ASSIST FORK LIFT OPERATOR
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 HAND TOOLS
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : VICTOR Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 10636 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 110 REPORTING DATE 28-Apr-20

SERVICE ORDER NO. 6510889880 Service Line Item# 1018433 TIME REACHED CONTROL ROOM 5:50:00
TANK NUMBER NJBP 101(DAY) Direct / Part of PART OF PERMIT START 6:00:00
L.I. Description INSTALLING TOP ROOF MANWAY 20" DIA PERMIT CLOSED 15:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 20991 CHAUHAN WELDER 8 TOGETHER INSTALLED TOP ROOF MANWAY DIA 20" WITH NUT & BOLD 2 2 EA
2 15575 BUDAN BUDAN 8 TOGETHER REMOVED SCAFF HOLDING FORMED AT 16" PIPELINE ABOVE
3 22620 RAMESH HELPER 8 SHIFTING SCAFF HOLDING MATERIALS FROM 16" PIPELINE TO DIKE WALL AREA
4
5 18753 RABINDAR HELPER 8 COTTON RAG CLANING 16" INLET PIPE 12 12 Meter
6 COTTON RAG CLANING 16" VALVE 1 1 EA
7
8 20780 KUMAR KAMI HELPER 8 COTTON RAG CLANING 24" OUTLET PIPE 60 60 Meter
9 SHIFTING PAINT CANS FROM YARD TO TANK
10 SHIFTING PAINT PUMP FROM DIKE WALL TO PAINTING AREA NOTE
11 FOR INSTALLING TOP
ROOF 20"MANWAY COVER
12 LINE ITEM NOT AVAILABLE
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 COTTON RAGS 1/2 KG


2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 110 REPORTING DATE 28-Apr-20

SERVICE ORDER NO. 6510889880 Service Line Item# 1018433 TIME REACHED CONTROL ROOM 5:50:00
TANK NUMBER NJBP 101(DAY) Direct / Part of DIRECT / PART OF PERMIT START 6:00:00
L.I. Description BRUSH PAINTING OF EXTERNAL SHELL PERMIT CLOSED 15:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 16678 SELVARAJ MASON 8 2 BRUSH PAINTING EXTERNAL SHELL APCS 6 WHITE 15 15 Sq.m
2 SAND PAPERING 24" OUTLET PIPE 50 10 60 Meter
3 COVERING PAINTING AREA WITH MASKING TAPE 30 30 60 Sq.m
4 13520 PANDIT HELPER 8 2 BRUSH PAINTING OF EXTERNAL SHELL APCS 6 WHITE 15 15 Sq.m
5 SAND PAPERING 16" INLET PIPE 10 2 12 Meter
6 SAND PAPERING 16" VALVE 1 1 EA
7 23329 NITIN PAINTER 8 2 AIR CLEANING 4000 4000 sq.ft
8 BRUSH CLEANING TOP ROOF PLATE 4000 4000 sq.ft
9 MIXING PAINT 40 30 70 Litres
10 21358 TAN BAHADUR PAINTER 8 2 AIR CLEANING 3500 3500 sq.ft
11 BRUSH CLEANING TOP ROOF PLATE 3500 3500 sq.ft
12 MIXING PAINT 40 30 70 Litres
13 22322 PREM HELPER 8 2 HOLDING PAINTING HOSE & ASSIST PAINTER
14 SHIFTING PAINTING HOSE , BRUSH , AIR HOSE TO TOP ROOF
15 ASSIST TO CLEAN TOP ROOF
16 INSTALLING TOP ROOF VNTILATION BOX((1x0.4Meter) 8 8 EA
17 25324 SIVARANJAN HELPER 8 2 HOLDING PAINTING HOSE & ASSIST PAINTER
18 SHIFTING PAINTING HOSE , BRUSH , AIR HOSE TO TOP ROOF
19 ASSIST TO CLEAN TOP ROOF
20 INSTALLING TOP ROOF VNTILATION BOX((1x0.4Meter) 8 8 EA
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 110 APCS 6 WHITE 4 Litres


2 2 110 ROLLER HANDLE 2 EA
3 3 110 ROLLER BRUSH 2 EA
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 110 REPORTING DATE 28-Apr-20

SERVICE ORDER NO. 6510889880 Service Line Item# 1018433 TIME REACHED CONTROL ROOM 5:50:00
TANK NUMBER NJBP 101(DAY) Direct / Part of DIRECT / PART OF PERMIT START 6:00:00
L.I. Description SPRAY PAINTING OF TOP ROOF PLATE PERMIT CLOSED 15:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 6 2 TAKEN PERMIT & HELPING LABOURS
2 23421 SURFUDDIN SAFETY 6 2 SAFETY AT SITE(HANDLING BOTH TANK 116 & 101)
3 5233 RAJENDRAN PAINTER 8 - BRUSH PAINTING OF MANWAY COVER DIA 30" APCS 6 BLACK 5 5 EA
4 NUT & BOLD 142 142 EA
5 23327 NEELAKANTH PAINTER 8 3 SPRAY PAINTING OF TOP ROOF PLATE APCS 6 ALUMINIUM 4000 4000 Sq.ft
6 SPRAY PAINTING OF 16" INLET PIPE APCS 6 ALUMINIUM 12 12 Meter
7 SPRAY PAINTING OF 16" VALVE APCS 6 ALUMINIUM 1 1 EA
8 SPRAY PAINTING OF TOP ROOF MANWAY COVER 20" DIA APCS 6 ALUMINIUM 2 2 EA
9 SPRAY PAINTING OF TOP ROOF VENTILATION BOX(1X0.4METER) APCS 6 ALU 8 8 EA
10 SPRAY PAINTING OF TOP ROOF WATER LINE SUPPORT ANGLE(50x50x400mm) 16 16 EA
11 SPRAY PAINTING OF TOP ROOF WATER LINE SUPPORT CHANNEL(100x75x400mm) 16 16 EA
12 23326 SURESH PAINTER 8 3 SPRAY PAINTING OF TOP ROOF PLATE APCS 6 ALUMINIUM 3500 3500 Sq.ft
13 SPRAY PAINTING OF 24" OUTLET PIPE APCS 6 ALUMINIUM 60 60 Meter
14 SPRAY PAINTING OF SAMPLE JAR SET 1 1 SET
15 SPRAY PAINTINGOF 8" GATE VALVE APCS 6 ALUMINIUM 3 3 EA
16 SPRAY PAINTING OF 8" SPOOL 3METER LONG APCS 6 ALUMINIUM 1 1 EA
17 SPRAY PAINTING OF 4" DRAIN PIPE LINE APCS 6 ALUMINIUM 1 1 EA
18 SPRAY PAINTING OF 3/4" DRAIN PIPE LINE 3METER LONG APCS 6 ALUMINIUM 1 1 EA
19 SPRAY PAINTING OF 24" ELBOW 2 2 EA
20 SPRAY PAINTING OF TOP ROOF VENTILATION BOX(1X0.4METER) APCS 6 ALU 8 8 EA
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1115 AIR COMPRESSOR 6 6721.7 1 110 HEMPEL'S APCS 6 ALUMINIUM 51570 130 Litres
2 2 110 HEMPEL'S APCS 6 BLACK 4 Litres
3 3 110 ROLLER BRUSH 1 EA
4 4 110 ROLLER HANDLE 1 EA
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 110 REPORTING DATE 27-Apr-20

SERVICE ORDER NO. 6510889880 Service Line Item# 1018433 TIME REACHED CONTROL ROOM 5:55:00
TANK NUMBER NJBP 101(DAY) Direct / Part of DIRECT PERMIT START 6:10:00
L.I. Description BRUSH PAINTING OF EXTERNAL SHELL PERMIT CLOSED 15:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 5233 RAJENDRAN PAINTER 8 2 BRUSH PAINTING EXTERNAL SHELL COLOUR CODING APCS 6 ENAMEL BROWN 18 18 Sq.m
2 BRUSH PAINTING EXTERNAL SHELL COLOUR CODING APCS 6 ENAMEL WHITE 2 2 Sq.m
3 23327 NEELAKANTH PAINTER 8 BRUSH PAINTING EXTERNAL SHELL COLOUR CODING APCS 6 BROWN 18 Sq.m
4
5 23326 SURESH PAINTER 8 BRUSH PAINTING EXTERNAL SHELL COLOUR CODING APCS 6 BROWN 18 Sq.m
6
7 22620 RAMESH PAINTER 8 ASSIST PAINTERS
8
9 25329 RUBEN HELPER 8 SAND PAPERING ON EXTERNAL SHELL 27 27 Sq.m
10 SAND PAPERING ON WATER LINE PIPE 10 10 Meter
11
12 25318 PASKARAN HELPER 8 SAND PAPERING ON EXTERNAL SHELL 27 27 Sq.m
13 SAND PAPERING ON WATER LINE PIPE 10 10 Meter
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 110 HEMPEL'S APCS 6 BROWN 7 Litres


2 2 110 HEMPEL'S APCS 6 WHITE 0.5 Litres
3 3 110 ROLLER BRUSH 3 EA
4 4 110 ROLLER HANDLE 3 EA
5 5 110 SAND PAPER 30 EA
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# REPORTING DATE 27-Apr-20

SERVICE ORDER NO. 6510889880 Service Line Item# TIME REACHED CONTROL ROOM 5:55:00
TANK NUMBER NJBP 101(DAY) Direct / Part of DIRECT PERMIT START 6:10:00
L.I. Description INSTALLATION OF STAIRWAY LADDER PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 6 4 TAKEN PERMIT & HELPING LABOURS
2 PERMIT FOR INSTALL LADDER ,EXTERNAL SHELL PAINTING , & MAN HOLE TIGHTEN
3 23421 SURFUDDIN SAFETY 6 2 SAFETY AT SITE
4
5 16678 SELVARAJ MASON 8 2 ALL TOGETHER INSTALLING STAIRWAY LADDER (24"OUTLET VALVE SUPPORT) 1 1 EA
6 21914 CHANDRA HELPER 8 2 INSTALLED STAIR WAY LADDER USING CHAIN BLOCK
7 22322 PREM HELPER 8 2 GIVEN SUPPORT FROM TOP ROOF OF TANK USING CHAIN BLOCK
8 25326 CHATHURA HELPER 8 2 AFTER FINISHING REMOVING ALL SUPPORTS FROM TOP ROOF
9
10
11
12 23329 NITIN BLASTER 8 2 RE TIGHTENING MANHOLE NUT & BOLD 110 20 110 EA
13 19344 RAJ KUMAR HELPER 8 2
14
15
16 23210 BAL KUMAR HELPER 8 SHIFTING MATERIALS LIGHT , AIR BLOWER , 24" BLIND ,AIR HOSE,PAINT CANS
17 21197 GUNJA HELPER 8 FROM D DOOR TO DIKE WALL USING TROLLEY
18 20432 MANOJ HELPER 8
19 15575 BUDAN BLASTER 8
20 21855 HARI CHARAN WELDER 8
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1669 AIR COMPRESSOR IDLE 4442 1 HAND TOOLS


2 GR1765 GENERATOR IDLE 4013 2
3 WM2094 WELDING MACHINE IDLE 2181 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# REPORTING DATE 27-Apr-20

SERVICE ORDER NO. 6510889880 Service Line Item# TIME REACHED CONTROL ROOM 5:55:00
TANK NUMBER NJBP 101(DAY) Direct / Part of PART OF PERMIT START 6:10:00
L.I. Description SHIFTING MATERIALS PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 23921 JOMON JOSE WPR 8 2 TAKEN PERMIT FOR BOOM TRUCK TO SHIFT MATERIALS FROM TANK TO YARD
2 SUPPLYING DRINKING WATER TO TANK 116 & 101
3 25323 KUNATHEEPAN HELPER 8 2 ASSIST BOOM TRUCK LOADING & UNLOADING MATERIALS
4 25324 SIVARANJAN HELPER 8 2 ASSIST BOOM TRUCK LOADING & UNLOADING MATERIALS
5 21358 TAN BAHADUR HELPER 8 2 ASSIST BOOM TRUCK LOADING & UNLOADING MATERIALS
6
7 20988 MANNAN WELDER 6 ASSIST BOOM TRUCK LOADING & UNLOADING MATERIALS
8 12875 BISHESHWAR MAN.OP 8 ASSIST BOOM TRUCK LOADING & UNLOADING MATERIALS
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 HAND TOOLS
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : JOMON Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 23921 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# REPORTING DATE 27-Apr-20

SERVICE ORDER NO. 6510889880 Service Line Item# TIME REACHED CONTROL ROOM 5:55:00
TANK NUMBER NJBP 101(DAY) Direct / Part of PART OF PERMIT START 6:10:00
L.I. Description LOADING MATERIALS PERMIT CLOSED 15:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 10636 VICTOR WPR 8 TAKEN PERMIT FOR TRAILER & FORKLIFT
2 TO LOAD COMPRESSOR ,BLASTING SET
3 13936 JIMMY FO.OP 8 2 LOADING MATERILAS ON TRAILER
4 SHIFTING COMPRESSOR FROM TANK 116 TO BLASTING AREA
5 SHIFTING COMPRESSOR FROM YARD TO TANK 116
6
7 25325 DANISTAN HELPER 8 ASSIST FORK LIFT OPERATOR
8 18753 RABINDAR HELPER 8 ASSIST FORK LIFT OPERATOR
9 20780 KUMAR KAMI HELPER 8 ASSIST FORK LIFT OPERATOR
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 HAND TOOLS
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : VICTOR Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 10636 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# REPORTING DATE 30-Apr-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM

TANK NUMBER NJBP 101(DAY) Direct / Part of PART OF PERMIT START 6:00:00
L.I. Description CAMP CLEANING PERMIT CLOSED 15:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 11448 CHITHRA HELPER 8 CAMP CLEANING FOR INSPECTION
2 20947 SHYAM HELPER 8 CAMP CLEANING FOR INSPECTION
3
4
5
6
7
8
9
10 NOTE
11 S.NO 1 TO 3 ARAMCO ID
NOT ACCESSING SO WORKING
12 IN CAMP
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : FAROOK BASHA Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 5445 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# REPORTING DATE 26-Apr-20

SERVICE ORDER NO. 6510889880 Service Line Item# TIME REACHED CONTROL ROOM 5:55:00
TANK NUMBER NJBP 101(DAY) Direct / Part of DIRECT PERMIT START 6:10:00
L.I. Description REINSTALLING MANWAY COVERS PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 23921 JOMON JOSE WPR 8 2 SHIFTING MATERIALS TO YARD FROM TANK 101
2 SUPPLYING DRINKING WATER TO TANK 116 & 101
3 10636 VICTOR WPR 8 TAKEN PERMIT TO LOAD UNWANTED MATERIALS (INCLUDING GRIT SAND)
4 USING HYRING LOADER & DUMP TRUCK 2 2 LOAD
5 19135 AWDESH FAB 8 FABRICATION OF GASKET D DOOR (1.2MTR x 0.90MTR x 38MM) 1 1 EA
6 FABRICATION OF GASKET MANWAYS 30" 4 4 EA
7
8 20776 DHAN BAHADUR HELPER 8 ASSIST FABRICATOR & HELPING TO REINSTALLING MAN WAYS
9
10 25324 SIVARANJAN HELPER 8 2 ALL TOGETHER REINSTALLING & DISCONNETING MAN WAYS
NOTE
11 25318 PASKARAN HELPER 8 LINE ITEM NOT
12 25325 DANISTAN HELPER 8 RE INSTALLING D DOOR COVER (1.2MTRx 0.90MTR x 38mm) 1 1 EA AVAILABLE
13 25323 KUNATHEEPAN HELPER 8 2
14 15562 RAM LAL HELPER 8 DISCONNECT AIR BLOWER 24"AT MANWAY 4 4 EA
15
16 CLOSED TANK VERTICAL MAN WAY 30" DIA 2 2 EA
17
18 SAND PAPERING WATER PIPE LINE AS PER ARAMCO INSPECTOR 20 20 MTRS
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 HAND TOOLS
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 130/160 REPORTING DATE 26-Apr-20

SERVICE ORDER NO. 6510889880 Service Line Item# 1065707/1065693 TIME REACHED CONTROL ROOM 5:55:00
TANK NUMBER NJBP 101(DAY) Direct / Part of DIRECT PERMIT START 6:10:00
L.I. Description REINSTALLING VALVES PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 16678 SELVARAJ MASON 8 2 ALL TOGETHER INSTALLING VALVES
2 22322 PREM HELPER 8 2 RE INSTALLING 8" GATE VALVE 3 3 EA
3 20991 CHAUHAN HELPER 8 2 REINSTALLING 8" SPOOL REINSTALLING 3METER LONG 1 1 EA
4 25326 CHATHURA HELPER 8 2 RE INSTALLING 4" DRAIN PIPE LINE 1 1 EA
5 RE INSTALLING 3/4" DRAIN PIPE LINE 3METER LONG 1 1 EA
6 RE INSTALLING SAMPLE JAR ASSEMBLY 1 1 SET
7
8
9
10 NOTE
11 FOR INSTALLING PIPE
LINE LINE, ITEM NOT
12 AVAILABLE
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 HAND TOOLS
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 40/110/60/50 REPORTING DATE 26-Apr-20

SERVICE ORDER NO. 6510889880 Service Line Item# 1093098/'1018433/1058356/1063713 TIME REACHED CONTROL ROOM 5:55:00
TANK NUMBER NJBP 101(DAY) Direct / Part of DIRECT/PART OF PERMIT START 6:10:00
L.I. Description INSPECTION / PAINTING / ANODE INSTALLING PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 6 4 TAKEN PERMIT & HELPING LABOURS
2 PERMIT FOR CSE , VALVE INSTALLING & MAN WAYS DISCONNECT & REINSTALL
3 23421 SURFUDDIN SAFETY 6 2 SAFETY AT SITE
4 VISUAL INSPECTION CONDUCTED TANK INSIDE
5 OPERATION , MAINTENANCE ENGG , FIRE WORKS, IWC DEPARTMENTS
6 CONDUCTED INSPECTION
7 HOLIDAY TEST CONDUCTED ROW BY ROW (56% RANDOMLY) 25500 25500 Sq.ft
8 DFT CONDUCTED ALL OVER BOTTOM PLATE 100 100 %
9 5233 RAJENDRAN PAINTER 8 BRUSH PAINTED APCS 2A TOP COAT ON ANODE BOLT WELDED JOINT(21 ANODE) 84 84 BOLTS
10 BRUSH PAINTING APCS 6 ALUMINIUM TOP COAT ON EXTERNAL SHELL 6 6 Sq.m
11 25042 BUDAN HELPER 8 ANODE INSTALLING
12 VACUUM CLEANING INSIDE THE TANK 7750 7750 Sq.ft
13 21197 GUNJA HELPER 8 ANODE INSTALLING 10 10 10
14 VACUUM CLEANING INSIDE THE TANK 7750 7750 Sq.ft
15 21914 CHANDRA HELPER 8 2 VACUUM CLEANING INSIDE THE TANK 14500 14500 Sq.ft
16 ASSIST INSPECTORS , QC 11 11 11
17 25329 RUBEN HELPER 8 VACUUM CLANING INSIDE THE TANK 14500 14500 Sq.ft
18
19 20432 MANOJ HELPER 8 2 D DOOR STANDBY & HELPING TO CLOSE MAN HOLE
20 19344 RAJ KUMAR HELPER 8 2 EQUIPMENT STANDBY & HELPING INSTALL VALVE
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1669 AIR COMPRESSOR 4 4442 1 APCS 2A LIGHT RED 2 Litres


2 GR1765 GENERATOR 4 4013 2 APCS 6 ALUMINIUM 2 Litres
3 WM2094 WELDING MACHINE IDLE 2181 3 HAND TOOLS
4 VACUUM CLEANER 4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 140 REPORTING DATE 25-Apr-20

SERVICE ORDER NO. 6510894318 Service Line Item# 1081190 TIME REACHED CONTROL ROOM 5:40:00
TANK NUMBER NJBP 101(DAY) Direct / Part of DIRECT / PART OF PERMIT START 6:00:00
L.I. Description WELDING OF ANODE BOLT PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 21855 HARI CHARAN WELDER 8 2 WELDED ANODE BOLD TANK INSIDE BOTTOM 28 28 EA
2 AFTER 11 CLK HELPING TO LOAD MATERIALS ON BOOM TRUCK
3
4 21197 GUNJA HELPER 8 2 ASSIST WELDER
5 AFTER 11 CLK ASSIST TANK SURVEY OFFICERS (3RD PARTY)
6
7 20776 DHAN BAHADUR HELPER 8 2 ASSIST WELDER
8 AFTER 11 CLK ASSIST TANK SURVEY OFFICERS (3RD PARTY)
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 WM2094 WELDING MACHINE 4 2180 1 140 WELDING ROD DIA 2.5 1 KG


2 2 HAND TOOLS
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 190 REPORTING DATE 25-Apr-20

SERVICE ORDER NO. 6510894318 Service Line Item# 1065696 TIME REACHED CONTROL ROOM 5:40:00
TANK NUMBER NJBP 101(DAY) Direct / Part of DIRECT PERMIT START 6:00:00
L.I. Description INSTALLATION OF 16" VALVE PERMIT CLOSED 15:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR / WPR 8 2 TAKEN PERMIT & HELPING LABOURS
2 23421 SURFUDDIN SAFETY 8 2 SAFETY AT SITE
3
4 16678 SELVARAJ MASON 8 2 ALL TOGETHER INSTALLING 24" VALVE
5 21914 CHANDRA HELPER 8 2
6 22322 PREM HELPER 8 2 HOT BOLTING & REMOVING 24" BLIND 2 2 EA
7 20882 MAN HELPER 8 2 INSTALLED 24" VALVE WITH BLIND 1 1 1 EA
8 25324 SIVARANJAN HELPER 8 2 SAND PAPERING 24" VALVE SERATION SIDE 1 1 EA
9 20991 CHAUHAN WELDER 8 2 HOT BOLTING & TIGHTENING 24" VALVE STUD & NUT (2 SIDES) 1 1 1 EA
10 23807 JERRY FAB 8 2
11
12 15562 RAM LAL HELPER 8 MADE PREPARATION TO INSTALL VALVE ON TOP ROOF
13 25331 ROHANATHAS HELPER 8 MADE PREPARATION TO INSTALL VALVE ON TOP ROOF
14
15 20432 MANOJ HELPER 8 2 D DOOR STANBY
16 19344 RAJ KUMAR HELPER 8 2 EQUIPMENT STANDBY
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 HAND TOOLS
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# REPORTING DATE 25-Apr-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM 5:40:00
TANK NUMBER NJBP 101(DAY) Direct / Part of PART OF PERMIT START 6:00:00
L.I. Description REPAIRING STAIRWAY PERMIT CLOSED 15:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 21537 DASTAGIR ALAM WPR 8 TAKEN PERMIT
2
3 19135 AWDESH FAB 8 REPARING STAIRWAYS 16 16 EA
4
5 20988 MANNAN WELDER 8 ASSIST FABRICATOR
6
7 23520 KHALID HELPER 8 ASSIST FABRICATOR
8
9 25325 DANISTAN HELPER 8 ASSIST FABRICATOR
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 HAND TOOLS
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : DASTAGIR Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 21537 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# REPORTING DATE 25-Apr-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM 5:40:00
TANK NUMBER NJBP 101(DAY) Direct / Part of PART OF PERMIT START 6:00:00
L.I. Description SHIFTING MATERIALS PERMIT CLOSED 15:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 23921 JOMON JOSE WPR 8 2 TAKEN PERMIT
2 LOADING MATERIALS ON BOOM TRUCK
3
4 15575 BUDAN BLASTER 8 2 LOADING MATERIALS ON BOOM TRUCK
5 ASSIST LOADER TO LOAD GRIT SAND ON DUMP TRUCK
6
7 25042 BUDAN HELPER 8 2 LOADING MATERIALS ON BOOM TRUCK
8 ASSIST LOADER TO LOAD GRIT SAND ON DUMP TRUCK
9
10 25326 CHATHURA HELPER 8 2 LOADING MATERIALS ON BOOM TRUCK
11 ASSIST LOADER TO LOAD GRIT SAND ON DUMP TRUCK
12
13 25318 PASKARAN HELPER 8 LOADING MATERIALS ON BOOM TRUCK
14
15 25329 KRISHNA RUBEN HELPER 8 LOADING MATERIALS ON BOOM TRUCK
16
17 5233 RAJENDRAN PAINTER 8 CHECKING DFT INSIDE TANK BOTTOM WIH QC
18 SCRAPING AND AND PAPERING ON BOTTOM PLATE
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 HAND TOOLS
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : JOMON Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 23921 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# REPORTING DATE 25-Apr-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM 5:40:00
TANK NUMBER NJBP 101(DAY) Direct / Part of PART OF PERMIT START 6:00:00
L.I. Description SHIFTING MATERIALS PERMIT CLOSED 15:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 10636 VICTOR WPR 8 TAKEN PERMIT FOR YARD
2 13936 JIMMY BOB.OP 8 UNLOADING MATERIALS FROM BOOM TRUCK
3 UNLOADING GRIT SAND FROM DUMP TRUCK
4 18753 RABINDAR HELPER 8 ASSIST BOOM TRUCK OPERATOR FOR UNLOADING
5 20780 KUMAR KAMI HELPER 8 ASSIST BOOM TRUCK OPERATOR FOR UNLOADING
6 25330 SANTHURU HELPER 8 ASSIST BOOM TRUCK OPERATOR FOR UNLOADING
7 25323 KUNATHEEPAN HELPER 8 ASSIST BOOM TRUCK OPERATOR FOR UNLOADING
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 FL909 FORK LIFT 8 564 1 HAND TOOLS


2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : VICTOR Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 10636 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# REPORTING DATE 25-Apr-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM

TANK NUMBER NJBP 101(DAY) Direct / Part of PART OF PERMIT START 6:00:00
L.I. Description CAMP CLEANING PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 11448 CHITHRA HELPER 8 CAMP CLEANING FOR INSPECTION
2 20947 SHYAM HELPER 8 CAMP CLEANING FOR INSPECTION
3 13520 PANDIT HELPER 8 CAMP CLEANING FOR INSPECTION
4
5
6
7
8
9
10 NOTE
11 S.NO 1 TO 3 ARAMCO ID
NOT ACCESSING SO WORKING
12 IN CAMP
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : FAROOK BASHA Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 5445 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# REPORTING DATE 24-Apr-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM 5:40:00
TANK NUMBER NJBP 101(DAY) Direct / Part of DIRECT PERMIT START 6:00:00
L.I. Description INSTALLATION OF 16" VALVE PERMIT CLOSED 15:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 16678 SELVARAJ MASON 8 INSTALLING 16" VALVE
2 HOT BOLTING (TIGHNTENING STUD WITH BOLD)
3 MADE PREPARATION FOR INSTALLING ON TOP ROOF OF TANK
4
5 20432 MANOJ HELPER 8 INSTALLING 16" VALVE
6 HOT BOLTING (TIGHNTENING STUD WITH BOLD)
7 MADE PREPARATION FOR INSTALLING ON TOP ROOF OF TANK
8
9 23329 NITIN BLASTER 8 INSTALLING 16" VALVE BY CHAIN BLOCK
10 HOT BOLTING (TIGHNTENING STUD WITH BOLD)
11 LINE ITEM NOT
AVAILABLE
12 22322 PREM HELPER 8 INSTALLING 16" VALVE BY CHAIN BLOCK
13 HOT BOLTING (TIGHNTENING STUD WITH BOLD)
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 HAND TOOLS
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : VICTOR Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 10636 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# REPORTING DATE 24-Apr-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM 5:40:00
TANK NUMBER NJBP 101 Direct / Part of PART OF PERMIT START 6:00:00
L.I. Description SHIFTING MATERIALS PERMIT CLOSED 15:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 23921 JOMON JOSE WPR 8 TAKEN PERMIT
2 13936 JIMMY FO.OP 8 LOADING & UNLOADING MATERIALS ON BOOM TRUCK FROM TK 101 TO YARD
3
4 25323 KUNATHEEPAN HELPER 8 SHIFTING MATERIALS BY BOOM TRUCK FROM TANK 101 O YARD AREA
5 LOADING AT TANK 101 AND UNLOADING AT YARD
6
7 25326 CHATHURA HELPER 8 SHIFTING MATERIALS BY BOOM TRUCK FROM TANK 101 O YARD AREA
8 LOADING AT TANK 101 AND UNLOADING AT YARD
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 FL909 FORK LIFT 8 563 1 HAND TOOLS


2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : VICTOR Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 10636 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 40 REPORTING DATE 24-Apr-20

SERVICE ORDER NO. 6510894318 Service Line Item# 1093098 TIME REACHED CONTROL ROOM 5:50:00
TANK NUMBER NJBP 101(DAY) Direct / Part of DIRECT / PART OF PERMIT START 6:00:00
L.I. Description SPRAY PAINTING OF DRIP PLATE PERMIT CLOSED 14:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 TAKEN PERMIT & HELPING LABOURS
2 5233 RAJENDRAN PAINTER 8 PAINTED DRIP PLATE APCS 4 TOP COAT BLACK COLOUR
3 PLATE SIZE (250mmWIDTH x 3000mmLENGTH) 85 85 Plates
4
5 PAINTED EXTERNAL SHELL PLATE APCS 6 BLACK COLOUR
6
7 21914 CHANDRA HELPER 8 MIXING PAINTING
8
9 21358 TAN BAHADUR HELPER 8 MIXING PAINTING
10 NOTE
LINE ITEM NOT
11 25324 SIVARANJAN HELPER 8 HOLDING PAINING HOSE WHEN PAINTING & ASSIST PAINTER PROVIDED FOR EXTERNAL
12 PAINTING DRIP PLATE & SHELL
PLATE
13 18753 RABINDAR HELPER 8 SAND PAPERING DRIP PLATE 42 42 Plates
14
15 20780 KUMAR KAMI HELPER 8 SAND PAPERING DRIP PLATE 43 43 Plates
16
17 19344 RAJ KUMAR HELPER 8 EQUIPMENT STANBY
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1669 AIR COMPRESSOR 5 1 APCS 4 BLACK 12090 38 Litres


2 2 APCS 6 BLACK 20 Litres
3 3 THINNER 8080 14 Litres
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 40 REPORTING DATE 23-Apr-20

SERVICE ORDER NO. 6510894318 Service Line Item# 1093098 TIME REACHED CONTROL ROOM 5:40:00
TANK NUMBER NJBP 101(DAY) Direct / Part of PART OF PERMIT START 6:00:00
L.I. Description SAND PAPERING EXTERNAL SHELL PLATE PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 16678 SELVARAJ MASON 8 2 SAND PAPERING SHELL PLATE UPTO 1 METER 60 5 55 Sq.m
2 MADE HOUSE KEEPING FOR LOSS PREVENTION INSPECTION
3
4 21197 GUNJA HELPER 8 2 SAND PAPERING SHELL PLATE UPTO 1 METER 60 5 55 Sq.m
5 MADE HOUSE KEEPING FOR LOSS PREVENTION INSPECTION
6
7 20776 DHAN BAHADUR HELPER 8 2 SAND PAPERING SHELL PLATE UPTO 1 METER 60 5 55 Sq.m
8 MADE HOUSE KEEPING FOR LOSS PREVENTION INSPECTION
9
NOTE
10 LINE
11 ITEM NOT PROVIDED FOR
EXTERNAL SHELL PLATE
12 PAINTING & SAND PAPERING
13 APCS 6
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 SAND PAPER 80 EA
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# REPORTING DATE 23-Apr-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM 5:40:00
TANK NUMBER NJBP 101 Direct / Part of PART OF PERMIT START 6:00:00
L.I. Description SHIFTING MATERIALS PERMIT CLOSED 18:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 10636 VICTOR WPR 8 TAKEN PERMIT
2 13936 JIMMY BOB.OP 8 LOADING & UNLOADING MATERIALS FROM TANK 101 TO YARD AREA
3 18753 RABINDAR HELPER 8 ASSIST FORKLIFT OPERATOR
4 20780 KUMAR KAMI HELPER 8 ASSIST FORKLIFT OPERATOR
5 25324 SIVARANJAN HELPER 8 2 SHIFTING MATERIALS BY BOOM TRUCK FROM TANK 101 O YARD AREA
6 25326 CHATHURA HELPER 8 2 LOADING AT TANK 101 AND UNLOADING AT YARD
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 FL909 FORK LIFT 8 560 1 HAND TOOLS


2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : VICTOR Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 10636 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 40 REPORTING DATE 23-Apr-20

SERVICE ORDER NO. 6510894318 Service Line Item# 1093098 TIME REACHED CONTROL ROOM 5:40:00
TANK NUMBER NJBP 101(DAY) Direct / Part of DIRECT / PART OF PERMIT START 6:00:00
L.I. Description SPRAY PAINTING OF DRIP PLATE PERMIT CLOSED 18:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 2 TAKEN PERMIT & HELPING LABOURS
2 5233 RAJENDRAN PAINTER 8 2 PAINTED DRIP PLATE APCS 4 PRIMER COAT YELLOW COLOUR
3 PLATE SIZE (250mmWIDTH x 3000mmLENGTH) 35 5 40 Plates
4
5 23326 SURESH PAINTER 8 2 PAINTED DRIP PLATE APCS 4 PRIMER COAT YELLOW COLOUR 40 5 45 Plates
6 PLATE SIZE (250mmWIDTH x 3000mmLENGTH)
7
8 23327 NEELAKANTH PAINTER 8 2 MIXING PAINT & BEFORE AIR CLEANING DRIP PLATE
9
10 15562 RAM LAL HELPER 8 2 MIXING PAINT & BEFORE AIR CLEANING DRIP PLATE NOTE
11 FOR DRIP PLATE
PAINTING APCS 4 LINE ITEM
12 22620 RAMESH HELPER 8 2 MIXING PAINT & BEFORE AIR CLEANING DRIP PLATE NOT PROVIDED
13
14 21358 TAN BAHADUR HELPER 8 2 HOLDING PAINTING HOSE & ASSIST PAINTER
15
16 21914 CHANDRA HELPER 8 2 HOLDING PAINTING HOSE & ASSIST PAINTER
17
18 20432 MANOJ HELPER 8 2 HOLDING PAINTING HOSE & ASSIST PAINTER
19
20 19344 RAJ KUMAR HELPER 8 2 EQUIPMENT STANBY UPTO 4 CLK
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 GR1816 GENERATOR 4 4155 1 40 APCS 4 YELLOW 12090 38 Litre


2 AC1670 AIR COMPRESSOR 4 7257.5 2 40 THINNER 08080 10 Litre
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 90 REPORTING DATE 23-Apr-20

SERVICE ORDER NO. 6510894318 Service Line Item# 1052024 TIME REACHED CONTROL ROOM 5:40:00
TANK NUMBER NJBP 101(DAY) Direct / Part of DIRECT / PART OF PERMIT START 6:00:00
L.I. Description SWEEP BLASTING OF DRIP PLATE PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 23921 JOMON JOSE WPR 8 2 TO SUPERVISE SITE AREA
2 23421 SURFUUDIN SAFETY 8 2 SAFETY AT SITE
3
4 15575 BUDAN BLASTER 8 2 SWEEP BLASTING OF DRIP PLATE 35 5 40 Plates
5
6 23329 NITIN BLASTER 8 2 SWEEP BLASTING OF DRIP PLATE 40 5 45 Plates
7
8
9 22322 PREM HELPER 8 2 FILLING GRIT SAND IN SAND BOARD & ASSIST BLASTERS 125 125 KG NOTE
10 HELPED TO PREPARATION FOR BLASTING 1) FROM 6 TO 6.20
SHIFTING COMPRESSOR FROM
11 25042 BUDAN HELPER 8 2 FILLING GRIT SAND IN SAND BOARD & ASSIST BLASTERS 125 125 KG YARD TO TANK 101
12 HELPED TO PREPARATION FOR BLASTING 2) ARAMCO INSPECTOR
INSPECTED BLASTED PLATES
13 21914 CHANDRA HELPER 8 2 FILLING GRIT SAND IN SAND BOARD & ASSIST BLASTERS 125 125 KG FROM 01.40 TO 02.20
14 HELPED TO PREPARATION FOR BLASTING
15 21197 GUNJA HELPER 8 2 FILLING GRIT SAND IN SAND BOARD & ASSIST BLASTERS 125 125 KG
16 HELPED TO PREPARATION FOR BLASTING
17 20882 MAN HELPER 8 2 CLEANING GRIT SAND NEAR DRIP PLATE FOR PAINTING
18 ASSIST BLASTERS
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 90 GRIT COAL SLAG 500 KG


2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# REPORTING DATE 22-Apr-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM

TANK NUMBER NJBP 101 Direct / Part of PART OF PERMIT START 6:00:00
L.I. Description SHIFTING MATERIALS PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 11448 CHITHRA HELPER 8 2 CAMP CLEANING FOR INSPECTION
2 20947 SHYAM HELPER 8 2 CAMP CLEANING FOR INSPECTION
3 13520 PANDIT HELPER 8 2 CAMP CLEANING FOR INSPECTION
4 19344 RAJ KUMAR HELPER 8 2 CAMP CLEANING FOR INSPECTION
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : FAROOK BASHA Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 5445 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 40 REPORTING DATE 22-Apr-20

SERVICE ORDER NO. 6510894318 Service Line Item# 1093098 TIME REACHED CONTROL ROOM 5:40:00
TANK NUMBER NJBP 101(DAY) Direct / Part of PART OF PERMIT START 6:00:00
L.I. Description CLEANING OF BOTTOM PLATE PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 23921 JOMON JOSE WPR 8 TO SUPERVISE SITE AREA
2 23421 SURFUUDIN SAFETY 8 SAFETY AT SITE
3
4 21914 CHANDRA HELPER 8 2 VACUUM CLEANING BOTTOM PLATE & AIR CLEANING 6000 1000 7000 Sq.ft
5 20882 MAN HELPER 8 2 VACUUM CLEANING BOTTOM PLATE & AIR CLEANING 6000 1000 7000 Sq.ft
6 21197 GUNJA HELPER 8 2 VACUUM CLEANING BOTTOM PLATE & AIR CLEANING 6000 1000 7000 Sq.ft
7 15019 NARESH HELPER 8 2 SAND PAPERING 2" DRAIN PIPE 36 36 Meter
8 COTTON RAG CLEANING 3000 500 3500 Sq.ft
9 22322 PREM HELPER 8 2 SAND PAPERING 6" DRAIN PIPE 36 36 Meter
10 COTTON RAG CLEANING 3000 500 3500 Sq.ft
11
12 25042 BUDAN HELPER 8 COTTON RAG CLEANING 2500 2500 Sq.ft
13
14 16678 SELVARAJ HELPER 8 COTTON RAG CLEANING 2500 2500 Sq.ft
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 WM2094 WELDING MACHINE IDLE 2153.3 1


2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 40 REPORTING DATE 22-Apr-20

SERVICE ORDER NO. 6510894318 Service Line Item# 1093098 TIME REACHED CONTROL ROOM 5:40:00
TANK NUMBER NJBP 101(DAY) Direct / Part of DIRECT / PART OF PERMIT START 6:00:00
L.I. Description PAINTING TOP COAT OF BOTTOM PLATE PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 2 TAKEN PERMIT & HELPING LABOURS
2 5233 RAJENDRAN PAINTER 8 2 PAINTED BOTTOM PLATE APCS 2A LIGHT RED 12000 12000 Sq.ft
3 PAINTED SHELL PLATE 45 45 Meter
4 PAINTED 20" COLUMN 1 METER INCLUDING BASE PLATE 12 12 COLM
5 23326 SURESH PAINTER 8 2 PAINTED BOTTOM PLATE APCS 2A LIGHT RED 12000 12000 Sq.ft
6 PAINTED SHELL PLATE 45 45 Meter
7 PAINTED 20" COLUMN 1 METER INCLUDING BASE PLATE 13 13 COLM
8 23327 NEELAKANTH PAINTER 8 2 PAINTED BOTTOM PLATE APCS 2A LIGHT RED 12000 12000 Sq.ft
9 PAINTED SHELL PLATE 45 45 Meter
10 PAINTED 20" COLUMN 1 METER INCLUDING BASE PLATE 12 12 COLM
11 PAINTED 6" DRAIN PIPE 36 36 Meter
12 PAINTED 2" DRAIN PIPE 36 36 Meter
13 15562 RAM LAL HELPER 8 2 MIXING PAINT
14 22620 RAMESH HELPER 8 2 MIXING PAINT
15 23329 NITIN BLASTER 8 2 MIXING PAINT
16 20719 MAN BAHATHUR HELPER 8 2 ASSIST 3 PAINTER INSIDE TANK LIGHT SETTING
17 21358 TAN BAHADUR HELPER 8 2 HOLDING PAINTING HOSE WHEN PAINTING
18 21914 CHANDRA HELPER 8 2 HOLDING PAINTING HOSE WHEN PAINTING
19 20432 MANOJ HELPER 8 2 D DOOR STANDBY
20 20776 DHAN BAHADUR HELPER 8 2 EQUIPMENT STANBY UPTO 4 CLK
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1115 AIR COMPRESSOR 2 6715.7 1 40 APCS 2A LIGHT RED 85671 500 Litre
2 AC1669 AIR COMPRESSOR 4 4411.5 2 40 THINNER 8450 120 Litre
3 GR1816 GENERATOR 8 4151 3 40 COTTON RAGS 1 KG
4 AC1670 AIR COMPRESSOR 4 7253.4 4
5 AC1612 AIR COMPRESSOR IDLE 4008.6 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# REPORTING DATE 22-Apr-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM 5:45:00
TANK NUMBER NJBP 101 Direct / Part of PART OF PERMIT START 6:00:00
L.I. Description SHIFTING MATERIALS PERMIT CLOSED 15:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 10636 VICTOR WPR 8 TAKEN PERMIT
2 13936 JIMMY BOB.OP 8 SHIFTING COMPRESSOR AND MATERIALS FROM TANK 101 TO YARD AREA
3 18753 RABINDAR HELPER 8 ASSIST FORKLIFT OPERATOR
4 20780 KUMAR KAMI HELPER 8 ASSIST FORKLIFT OPERATOR
5 16678 SELVARAJ MASON 8 ASSIST FORKLIFT OPERATOR
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 FL909 FORK LIFT 8 555.1 1 HAND TOOLS


2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : VICTOR Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 10636 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# REPORTING DATE 20-Apr-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM 5:45:00
TANK NUMBER NJBP 101(NIGHT) Direct / Part of PERMIT START 6:00:00
L.I. Description SAFETY ORIENTATION PERMIT CLOSED 14:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 11448 CHITHRA HELPER 8 WENT SAFETY ORIENTATION
2 20947 SHYAM HELPER 8 WENT SAFETY ORIENTATION
3 13520 PANDIT HELPER 8 WENT SAFETY ORIENTATION
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 40 REPORTING DATE 20-Apr-20

SERVICE ORDER NO. 6510894318 Service Line Item# 1093098 TIME REACHED CONTROL ROOM 5:45:00
TANK NUMBER NJBP 101(NIGHT) Direct / Part of PART OF PERMIT START 6:00:00
L.I. Description VACUUM CLEANING & COTTON RAG CLEANING BOTTOM PLATE PERMIT CLOSED 14:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 23921 JOMON JOSE WPR 8 2 TO SUPERVISE SITE AREA & HELPING WORKERS
2 23421 SURFUUDIN SAFETY 8 2 SAFETY AT SITE AREA
3
4 20882 MAN HELPER 8 2 VACUUM CLEANING 14000 1400 15400 Sq.ft
5
6 22322 PREM HELPER 8 2 VACUUM CLEANING 14000 1400 15400 Sq.ft
7
8 25326 CHATHURA HELPER 8 2 VACUUM CLEANING 14000 1400 15400 Sq.ft
9
10 18753 RABINDAR HELPER 8 2 COTTON RAG CLEANING 14000 1400 15400 Sq.ft
11
12 20780 KUMAR KAMI HELPER 8 2 COTTON RAG CLEANING 14000 1400 15400 Sq.ft
13
14 20776 DHAN BAHADUR HELPER 8 2 COTTON RAG CLEANING 14000 1400 15400 Sq.ft
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 40 REPORTING DATE 20-Apr-20

SERVICE ORDER NO. 6510894318 Service Line Item# 1093098 TIME REACHED CONTROL ROOM 5:45:00
TANK NUMBER NJBP 101(NIGHT) Direct / Part of PART OF PERMIT START 6:00:00
L.I. Description SAND PAPERING BOTTOM PLATE PERMIT CLOSED 14:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 25323 KUNATHEEPAN HELPER 8 SAND PAPERING BOTTOM PLATE & SCRAPING 2300 2300 Sq.ft
2 25318 PASKARAN HELPER 8 SAND PAPERING BOTTOM PLATE & SCRAPING 2300 2300 Sq.ft
3 15562 RAM LAL HELPER 8 SAND PAPERING BOTTOM PLATE & SCRAPING 2300 2300 Sq.ft
4 21914 CHANDRA HELPER 8 SAND PAPERING BOTTOM PLATE & SCRAPING 2300 2300 Sq.ft
5 20882 MAN HELPER 8 SAND PAPERING BOTTOM PLATE & SCRAPING 2300 2300 Sq.ft
6 21197 GUNJA HELPER 8 SAND PAPERING BOTTOM PLATE & SCRAPING 2300 2300 Sq.ft
7 15019 NARESH HELPER 8 SAND PAPERING BOTTOM PLATE & SCRAPING 2300 2300 Sq.ft
8 22322 PREM HELPER 8 SAND PAPERING BOTTOM PLATE & SCRAPING 2300 2300 Sq.ft
9 25042 BUDAN HELPER 8 SAND PAPERING BOTTOM PLATE & SCRAPING 2300 2300 Sq.ft
10 22620 RAMESH HELPER 8 SAND PAPERING BOTTOM PLATE & SCRAPING 2300 2300 Sq.ft
11 22962 PREM HELPER 8 SAND PAPERING BOTTOM PLATE & SCRAPING 2300 2300 Sq.ft
12 25330 SANTHURU HELPER 8 SAND PAPERING BOTTOM PLATE & SCRAPING 2300 2300 Sq.ft
13 23205 MEKH BAHADUR HELPER 8 SAND PAPERING BOTTOM PLATE & SCRAPING 2300 2300 Sq.ft
14 25329 KRISHNA RUBEN HELPER 8 SAND PAPERING BOTTOM PLATE & SCRAPING 2300 2300 Sq.ft
15 25324 SIVARANJAN HELPER 8 SAND PAPERING BOTTOM PLATE & SCRAPING 2300 2300 Sq.ft
16 17594 DILLI HELPER 8 SAND PAPERING BOTTOM PLATE & SCRAPING 2300 2300 Sq.ft
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 90/20 REPORTING DATE 20-Apr-20

SERVICE ORDER NO. 6510894318 Service Line Item# 1052024/'1052242 TIME REACHED CONTROL ROOM 5:45:00
TANK NUMBER NJBP 101(NIGHT) Direct / Part of PART OF PERMIT START 6:00:00
L.I. Description SHIFTING USED GRIT SAND PERMIT CLOSED 18:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 10636 VICTOR WPR 8 TAKEN PERMIT
2 13936 JIMMY BOB.OP 8 SHIFTING USED GRIT SAND FROM DDOOR TO DIKE WALL 40METERS DISTANCE 10 10 TON
3 25325 DANISTAN HELPER 8 ASSIST BOB CAT OPERATOR AND CLEANING TANK OUTSIDE GRIT SAND
4 25331 ROHANATHAS HELPER 8 ASSIST BOB CAT OPERATOR AND CLEANING TANK OUTSIDE GRIT SAND
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 SL1407 BOB CAT 8 1 HAND TOOLS


2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 40 REPORTING DATE 20-Apr-20

SERVICE ORDER NO. 6510894318 Service Line Item# 1093098 TIME REACHED CONTROL ROOM 5:45:00
TANK NUMBER NJBP 101(NIGHT) Direct / Part of DIRECT / PART OF PERMIT START 6:00:00
L.I. Description PAINTING TOP COAT OF BOTTOM PLATE PERMIT CLOSED 18:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 4 TAKEN PERMIT & HELPING LABOURS
2 5233 RAJENDRAN PAINTER 8 4 SAND PAPERING BOTTOM PLATE 1650 1650 Sq.ft
3 PAINT MIXING 80 80 Litres
4 23326 SURESH PAINTER 8 4 SAND PAPERING BOTTOM PLATE
5 PAINTED BOTTOM PLATE APCS 2A LIGHT RED 2000 10000 12000 Sq.ft
6 PAINTED SHELL PLATE 45 45 Meter
7 PAINTED 20" COLUMN 1 METER INCLUDING BASE PLATE 12 12 COLM NOTE
8 23327 NEELAKANTH PAINTER 8 2 SAND PAPERING BOTTOM PLATE 1650 1650 Sq.ft 1) SHIFT STARTS 6CLK
9 ASSIST PAINTER 2) ARAMCO
10 16678 SELVARAJ MASON 8 4 SAND PAPERING BOTTOM PLATE 1650 1650 Sq.ft INSPECTOR/QC INPSECTING
PLATES FROM 01.00 TO 03.00
11 HOLDING PAINTING HOSE WHEN PAINTING & COTTON RAG CLEANING 5000 5000 Sq.ft AFTER PAINTING STARTS
12 20719 MAN BAHATHUR HELPER 8 4 SAND PAPERING BOTTOM PLATE 1650 1650 Sq.ft 3) DUE TO THINNER
SHORTAGE PAINTED 1
13 AIR CLEANING BOTTOM PLATE 12000 12000 Sq.ft QUARTER AREA INCLUDING
14 COTTON RAG CLEANING 5000 5000 Sq.ft SHELL ,COLUMN, BOTTOM
15 23329 NITIN BLASTER 8 4 SAND PAPERING BOTTOM PLATE 1650 1650 Sq.ft PLATE
16 ASSIST PAINTER & AIR CLEANING BOTTOM PLATE 12000 12000 Sq.ft
17 21358 TAN BAHADUR HELPER 8 4 SAND PAPERING BOTTOM PLATE 1650 1650 Sq.ft
18 COTTON RAG CLEANING & EQUIPMENT STANBY AFTER 4CLK 5000 5000 Sq.ft
19 20432 MANOJ HELPER 8 4 D DOOR STANDBY
20 19344 RAJ KUMAR HELPER 8 2 EQUIPMENT STANBY UPTO 4 CLK
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1115 AIR COMPRESSOR 5 6713.5 1 40 APCS 2A LIGHT RED 85671 80 Litre


2 AC1669 AIR COMPRESSOR 6 4408 2 40 THINNER 8450 20 Litre
3 GR1816 GENERATOR 11 4146 3 40 COTTON RAGS 3 KG
4 AC1670 AIR COMPRESSOR IDLE 7250.8 4 40 SAND PAPER 425 EA
5 AC1612 AIR COMPRESSOR IDLE 4008.6 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# REPORTING DATE 19-Apr-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM

TANK NUMBER NJBP 101(NIGHT) Direct / Part of PERMIT START


L.I. Description SHIFT CHANGED PERMIT CLOSED

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 SHIFT CHANGED FROM NIGHT TO DAY
2 20719 MAN HELPER 8
3 16678 SELVA RAJ MASON 8
4 22620 RAMESH HELPER 8
5 18753 RABINDAR HELPER 8
6 21358 TAN BAHADUR HELPER 8
7 20780 KUMAR KAMI HELPER 8
8 20822 MAN HELPER 8
9 25042 BUDAN HELPER 8
10 22322 PREM HELPER 8
11 21914 CHANDRA HELPER 8
12 21197 GUNJA HELPER 8
13 15019 NARESH HELPER 8
14 22962 PREM HELPER 8
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 30 REPORTING DATE 18-Apr-20

SERVICE ORDER NO. 6510894318 Service Line Item# 1093105 TIME REACHED CONTROL ROOM 18:20:00
TANK NUMBER NJBP 101(NIGHT) Direct / Part of DIRECT / PART OF PERMIT START 18:30:00 PM
L.I. Description STRIP COATING ON BOTTOM PLATE PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 2 TAKEN PERMIT & HELPING LABOURS
2 20719 MAN HELPER 8 2 PAINTED STRIP COAT ON BOTTOM PLATE 200 25 225 Meter
3 16678 SELVA RAJ MASON 8 2 PAINTED STRIP COAT ON BOTTOM PLATE 200 25 225 Meter
4 22620 RAMESH HELPER 8 2 PAINTED STRIP COAT ON BOTTOM PLATE 200 25 225 Meter
5 11997 GIRI HELPER 8 2 VACUUM CLEANING 2710 200 2910 Sq.ft
6 21358 TAN BAHADUR HELPER 8 2 VACUUM CLEANING 2710 200 2910 Sq.ft
7 23206 KHUSIRAM HELPER 8 2 VACUUM CLEANING 2710 200 2910 Sq.ft
8 20822 MAN HELPER 8 2 VACUUM CLEANING 2710 200 2910 Sq.ft
9 23594 SAJID HELPER 8 2 CLEANING STRIP COAT AREA WITH COTTON RAGS BEFORE PAINTING 200 25 225 Meter
10 22322 PREM HELPER 8 2 CLEANING STRIP COAT AREA WITH COTTON RAGS BEFORE PAINTING 200 25 225 Meter
11 21051 HIRA HELPER 8 2 CLEANING STRIP COAT AREA WITH COTTON RAGS BEFORE PAINTING 200 25 225 Meter
12 21197 GUNJA HELPER 8 BRUSH CLEANING BOTTOM PLATE 1714 Sq.ft
13 15019 NARESH HELPER 8 BRUSH CLEANING BOTTOM PLATE 1714 Sq.ft
14 20680 ZAHID HELPER 8 BRUSH CLEANING BOTTOM PLATE 1714 Sq.ft
15 23213 LALLU HELPER 8 BRUSH CLEANING BOTTOM PLATE 1714 Sq.ft
16 18753 RABINDAR HELPER 8 BRUSH CLEANING BOTTOM PLATE 1714 Sq.ft
17 20780 KUMAR KAMI HELPER 8 BRUSH CLEANING BOTTOM PLATE 1714 Sq.ft
18 25042 BUDAN HELPER 8 BRUSH CLEANING BOTTOM PLATE 1714 Sq.ft
19 21914 CHANDRA HELPER 8 2 EQUIPMET STANDBY
20 22962 PREM HELPER 8 2 D DOOR STANDBY
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1115 AIR COMPRESSOR 3 6710.8 1 30 APCS 2A GREEN 6 Litre


2 AC1669 AIR COMPRESSOR 4 4388.4 2 30 THINNER 8450 0.7 Litre
3 AC1612 AIR COMPRESSOR 4 4008.5 3 30 COTTON RAGS 1/2 KG
4 GR1816 GENERATOR 4 4104 4 30 ANGLE BRUSH 3 EA
5 AC1670 AIR COMPRESSOR IDLE 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 90/20 REPORTING DATE 17-Apr-20

SERVICE ORDER NO. 6510894318 Service Line Item# 1052024/'1052242 TIME REACHED CONTROL ROOM 18:50:00
TANK NUMBER NJBP 101(NIGHT) Direct / Part of PART OF PERMIT START 19:00:00 PM
L.I. Description GRIT SAND REMOVING PERMIT CLOSED 5:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 12875 BISHESWAR MAN OP 8 - HELPING WORKERS
2 23210 BAL KUMAR HELPER 8 2 EQUIPMET STANDBY
3 22962 PREM HELPER 8 2 D DOOR STANDBY
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 HAND TOOLS
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 90/20 REPORTING DATE 17-Apr-20

SERVICE ORDER NO. 6510894318 Service Line Item# 1052024/'1052242 TIME REACHED CONTROL ROOM 18:50:00
TANK NUMBER NJBP 101(NIGHT) Direct / Part of PART OF PERMIT START 19:00:00 PM
L.I. Description GRIT SAND REMOVING PERMIT CLOSED 5:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 2 TAKEN PERMIT & HELPING LABOURS
2 23213 LALLU HELPER 8 2 ALL TOGETHER BRUSH CLEANING & REMOVING GRIT SAND INSIDE TO OUTSIDE
3 21358 TAN BAHADUR HELPER 8 2 BOTTOM PLATE BRUSH CLEANING 18060 3500 21560 Sq.Ft
4 23206 KHUSIRAM HELPER 8 2 REMOVING SAND FROM INSIDE TO OUTSIDE TANK NEARLY 64 METERS 3.6 3.6 TON
5 21197 GUNJA HELPER 8 2 AIR CLEANING BOTTOM PLATE 21560 21560 Sq.Ft
6 15019 NARESH HELPER 8 2
7 22322 PREM HELPER 8 2
8 25042 BUDAN HELPER 8 2
9 20719 MAN HELPER 8 2
10 16678 SELVA RAJ MASON 8 2
11 22620 RAMESH HELPER 8 2
12 18753 RABINDAR HELPER 8 2
13 20780 KUMAR KAMI HELPER 8 2
14 20822 MAN HELPER 8 2
15 21051 HIRA HELPER 8 2
16 20680 ZAHID HELPER 8 2
17 23594 SAJID HELPER 8 2
18 11997 GIRI HELPER 8 2
19 15562 RAMLAL HELPER 8 2
20 21914 CHANDRA HELPER 8 2
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1670 AIR COMPRESSOR 4 7250.8 1 HAND TOOLS


2 AC1669 AIR COMPRESSOR 8 4384.5 2
3 GR1816 GENERATOR 8 4104 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 90/20 REPORTING DATE 16-Apr-20

SERVICE ORDER NO. 6510894318 Service Line Item# 1052024/'1052242 TIME REACHED CONTROL ROOM 18:50:00
TANK NUMBER NJBP 101(NIGHT) Direct / Part of PART OF PERMIT START 19:00:00 PM
L.I. Description GRIT SAND REMOVING PERMIT CLOSED 5:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 2 TAKEN PERMIT & HELPING LABOURS
2 23213 LALLU HELPER 8 2 ALL TOGETHER BRUSH CLEANING & REMOVING INSIDE TO OUTSIDE
3 21358 TAN BAHADUR HELPER 8 2 BOTTOM PLATE BRUSH CLEANING 7546 7546 Sq.Ft
4 23206 KHUSIRAM HELPER 8 2 REMOVING SAND FROM INSIDE TO OUTSIDE TANK NEARLY 48 METERS 1.7 0.6 2.3 TON
5 21197 GUNJA HELPER 8 2
6 15019 NARESH HELPER 8 2
7 22322 PREM HELPER 8 2
8 25042 BUDAN HELPER 8 2
9 20719 MAN HELPER 8 -
10 16678 SELVA RAJ MASON 8 -
11 22620 RAMESH HELPER 8 -
12 18753 RABINDAR HELPER 8 -
13 20780 KUMAR KAMI HELPER 8 -
14 20822 MAN HELPER 8 -
15
16
17 23210 BAL KUMAR HELPER 8 2 EQUIPMET STANDBY
18 22962 PREM HELPER 8 2 D DOOR STANDBY
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1670 AIR COMPRESSOR 8 7233 1 HAND TOOLS


2 GR1816 GENERATOR 8 4078 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 90/20 REPORTING DATE 15-Apr-20

SERVICE ORDER NO. 6510894318 Service Line Item# 1052024/'1052242 TIME REACHED CONTROL ROOM 18:50:00
TANK NUMBER NJBP 101(NIGHT) Direct / Part of PART OF PERMIT START 19:00:00 PM
L.I. Description GRIT SAND REMOVING PERMIT CLOSED 5:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 2 TAKEN PERMIT & HELPING LABOURS
2 18753 RABINDAR HELPER 8 2 ALL TOGETHER BRUSH CLEANING & REMOVING INSIDE TO OUTSIDE
3 21358 TAN BAHADUR HELPER 8 2 BOTTOM PLATE BRUSH CLEANING 1080 1080 Sq.M
4 23206 KHUSIRAM HELPER 8 2 REMOVING SAND FROM INSIDE TO OUTSIDE TANK NEARLY 80METERS 800 500 1.3 TON
5 20780 KUMAR KAMI HELPER 8 2
6 20822 MAN HELPER 8 2
7 22322 PREM HELPER 8 2
8 25042 BUDAN HELPER 8 2
9 16678 SELVA RAJ MASON 8 2
10 22620 RAMESH HELPER 8 2
11 21197 GUNJA HELPER 8 2
12 15019 NARESH HELPER 8 2
13
14
15
16
17 23210 BAL KUMAR HELPER 8 2 EQUIPMET STANDBY
18 22962 PREM HELPER 8 2 D DOOR STANDBY
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1670 AIR COMPRESSOR 8 7204.8 1 HAND TOOLS


2 GR1816 GENERATOR 8 4049 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 30 REPORTING DATE 14-Apr-20

SERVICE ORDER NO. 6510894318 Service Line Item# 1093105 TIME REACHED CONTROL ROOM 18:50:00
TANK NUMBER NJBP 101(NIGHT) Direct / Part of PART OF PERMIT START 19:00:00 PM
L.I. Description GRIT SAND REMOVING PERMIT CLOSED 5:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 2 TAKEN PERMIT & HELPING LABOURS
2 18753 RABINDAR HELPER 8 2 ALL TOGETHER BRUSH CLEANING INSIDE TANK TO REMOVE GRIT SAND
3 21358 TAN BAHADUR HELPER 8 2 BOTTOM PLATE 2000 300 2300 Sq.M
4 23206 KHUSIRAM HELPER 8 2 SUMPIT 4 4 Sq.M
5 20780 KUMAR KAMI HELPER 8 2 4" DRAIN PIPE 20 20 meter
6 20719 MAN HELPER 8 2
7 22322 PREM HELPER 8 2
8 25042 BUDAN HELPER 8 2
9 23213 LALLU HELPER 8 2
10 22620 RAMESH HELPER 8 2
11 21197 GUNJA HELPER 8 2
12 15019 NARESH HELPER 8 2
13 16678 SELVA RAJ MASON 8 2
14 20822 MAN HELPER 8 2
15
16
17 23210 BAL KUMAR HELPER 8 2 EQUIPMET STANDBY
18 22962 PREM HELPER 8 2 D DOOR STANDBY
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1670 AIR COMPRESSOR 8 7204.8 1 HAND TOOLS


2 GR1816 GENERATOR 8 4049 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER RPO Line# REPORTING DATE

SERVICE ORDER NO. Service Line Item# TIME REACHED CONTROL ROOM

TANK NUMBER Direct / Part of PERMIT START


L.I. Description PERMIT CLOSED

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 90/20 REPORTING DATE 13-Apr-20

SERVICE ORDER NO. 6510894318 Service Line Item# 1052024/'1052242 TIME REACHED CONTROL ROOM 18:50:00
TANK NUMBER NJBP 101(NIGHT) Direct / Part of PART OF PERMIT START 19:00:00 PM
L.I. Description SA3 WEEP BLASTING OF BOTTOM & SHELL PLATE PERMIT CLOSED 5:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 16678 SELVA RAJ MASON 8 2 FILLING GRIT IN SAND BOARD & ASSIST BLASTERS 1 0.16 1.16 TON
2 18753 RABINDAR HELPER 8 2 FILLING GRIT IN SAND BOARD & ASSIST BLASTERS 1 0.16 1.16 TON
3 21358 TAN BAHADUR HELPER 8 2 FILLING GRIT IN SAND BOARD & ASSIST BLASTERS 1 0.16 1.16 TON
4 23206 KHUSIRAM HELPER 8 2 FILLING GRIT IN SAND BOARD & ASSIST BLASTERS 1 0.16 1.16 TON
5 20780 KUMAR KAMI HELPER 8 2 FILLING GRIT IN SAND BOARD & ASSIST BLASTERS 1 0.16 1.16 TON
6 20719 MAN HELPER 8 2 FILLING GRIT IN SAND BOARD & ASSIST BLASTERS 1 0.12 1.12 TON
7 22322 PREM HELPER 8 2 SHIFITNG USED GRIT FROM DIKE WALL TO SAND BOARD AREA NEARLY 20MTRS 1 0.12 1.12 TON
8 25042 BUDAN HELPER 8 2 SHIFITNG USED GRIT FROM DIKE WALL TO SAND BOARD AREA NEARLY 20MTRS 1 0.12 1.12 TON
9 23213 LALLU HELPER 8 2 SHIFITNG USED GRIT FROM DIKE WALL TO SAND BOARD AREA NEARLY 20MTRS 1 0.12 1.12 TON
10
11 23210 BAL KUMAR HELPER 8 2 EQUIPMET STANDBY
12 22962 PREM HELPER 8 2 D DOOR STANDBY
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 HAND TOOLS
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 90/20 REPORTING DATE 13-Apr-20

SERVICE ORDER NO. 6510894318 Service Line Item# 1052024/'1052242 TIME REACHED CONTROL ROOM 18:50:00
TANK NUMBER NJBP 101(NIGHT) Direct / Part of DIRECT PERMIT START 19:00:00 PM
L.I. Description SWEEP BLASTING OF BOTTOM & SHELL PLATE PERMIT CLOSED 5:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 2 TAKEN PERMIT
2 24060 KALEESWARAN WPR 8 2 TO SUPEVISE SITE AREA
3 18796 HANIPH BLASTER 8 2 SA3 SWEEP BLASTING OF BOTTOM PLATE 110 110 Sq.m
4 SA 3 SWEEP BLASTING SHELL 8 8 Meter
5 SA SWEEP BLASTING OF 20" COLUMN UPTO 1 METER INCLUDING BASE PLATE 1 1 1 EA
6 15575 BUDAN BLASTER 8 SA3 SWEEP BLASTING OF BOTTOM PLATE 90 90 Sq.m
7 SA 3 SWEEP BLASTING SHELL 8 8 Meter
8 SA SWEEP BLASTING OF 20" COLUMN UPTO 1 METER INCLUDING BASE PLATE 1 1 1 NOTE
EA 1)
S.NO 9 & 15 AIR USED
9 18790 RAMASHRE BLASTER 8 SA3 SWEEP BLASTING OF BOTTOM PLATE 60 60 Sq.m COMPRESSOR 1612 WAS
10 SA 3 SWEEP BLASTING SHELL 5 5 Meter BREAKDOWN FROM 1 TO
2.45 AFTER CLEANING AIR
11 SA SWEEP BLASTING OF 20" COLUMN UPTO 1 METER INCLUDING BASE PLATE 1 1 EA FILTER ITS GET STARTED 2)
12 6170 NOBLE BLASTER 8 2 SA3 SWEEP BLASTING OF BOTTOM PLATE 110 110 Sq.m S.NO 6 BLASTING HOSE AIR
LEAK WASHER CHANGED
13 SA 3 SWEEP BLASTING SHELL 8 8 Meter
14 SA SWEEP BLASTING OF 20" COLUMN UPTO 1 METER INCLUDING BASE PLATE 1 1 1 EA
15 17594 DILLI BLASTER 8 SA3 SWEEP BLASTING OF BOTTOM PLATE 60 60 Sq.m
16 SA 3 SWEEP BLASTING SHELL 5 5 Meter
17 SA SWEEP BLASTING OF 20" COLUMN UPTO 1 METER INCLUDING BASE PLATE 1 1 1 EA
18 18961 UDIM BLASTER 8 2 SA3 SWEEP BLASTING OF BOTTOM PLATE 100 100 Sq.m
19 SA 3 SWEEP BLASTING SHELL 8 8 Meter
20 SA SWEEP BLASTING OF 20" COLUMN UPTO 1 METER INCLUDING BASE PLATE 1 1 1 EA
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1670 AIR COMPRESSOR 8 719.1 1 90 GRIT COAL SLAG SAND SA2.5 1.3 TON
2 AC1612 AIR COMPRESSOR 6 3981.1 2 USED GRIT SAND 4.5 TON
3 AC1669 AIR COMPRESSOR 8 4337.1 3 HAND TOOLS
4 GR1816 GENERATOR 8 4035 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 90/20 REPORTING DATE 12-Apr-20

SERVICE ORDER NO. 6510894318 Service Line Item# 1052024/'1052242 TIME REACHED CONTROL ROOM 18:50:00
TANK NUMBER NJBP 101(NIGHT) Direct / Part of PART OF PERMIT START 19:00:00 PM
L.I. Description SA3 WEEP BLASTING OF BOTTOM & SHELL PLATE PERMIT CLOSED 5:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 16678 SELVA RAJ MASON 8 2 FILLING GRIT IN SAND BOARD & ASSIST BLASTERS 0.5 0.05 0.55 TON
2 23210 BAL KUMAR HELPER 8 2 FILLING GRIT IN SAND BOARD & ASSIST BLASTERS 0.5 0.05 0.55 TON
3 21358 TAN BAHADUR HELPER 8 2 FILLING GRIT IN SAND BOARD & ASSIST BLASTERS 0.5 0.05 0.55 TON
4 23206 KHUSIRAM HELPER 8 2 FILLING GRIT IN SAND BOARD & ASSIST BLASTERS 0.5 0.05 0.55 TON
5 20882 MAN HELPER 8 2 FILLING GRIT IN SAND BOARD & ASSIST BLASTERS 0.5 0.05 0.55 TON
6 21914 CHANDRA HELPER 8 2 FILLING GRIT IN SAND BOARD & ASSIST BLASTERS 0.5 0.05 0.55 TON
7 22322 PREM HELPER 8 2 FILLING GRIT IN SAND BOARD & ASSIST BLASTERS 0.5 0.05 0.55 TON
8 25042 BUDAN HELPER 8 2 FILLING GRIT IN SAND BOARD 0.5 0.05 0.55 TON
9 23213 LALLU HELPER 8 2 FILLING GRIT IN SAND BOARD 0.5 0.05 0.55 TON
10 20719 MAN HELPER 8 - S.NO 10 TO 12 REMOVING FALLEN GRIT FROM TANK SURROUNING
11 20780 KUMAR KAMI HELPER 8 - SHIFTING TO SAND BOARD AREA
12 18753 RABINDAR HELPER 8 -
13
14
15
16 20487 QURSHID HELPER 8 2 EQUIPMET STANDBY
17 22962 PREM HELPER 8 2 D DOOR STANDBY
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 HAND TOOLS
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 90/20 REPORTING DATE 12-Apr-20

SERVICE ORDER NO. 6510894318 Service Line Item# 1052024/'1052242 TIME REACHED CONTROL ROOM 18:50:00
TANK NUMBER NJBP 101(NIGHT) Direct / Part of DIRECT PERMIT START 19:00:00 PM
L.I. Description SWEEP BLASTING OF BOTTOM & SHELL PLATE PERMIT CLOSED 5:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 2 TAKEN PERMIT
2 24060 KALEESWARAN WPR 8 CHANGED TO DAY SHIFT
3 18796 HANIPH BLASTER 8 2 SA3 SWEEP BLASTING OF BOTTOM PLATE 110 110 Sq.m
4 SA 3 SWEEP BLASTING SHELL 4 4 Meter
5 SA SWEEP BLASTING OF 20" COLUMN UPTO 1 METER INCLUDING BASE PLATE 1 1 2 EA
6 15575 BUDAN BLASTER 8 SA3 SWEEP BLASTING OF BOTTOM PLATE 90 90 Sq.m
7 SA 3 SWEEP BLASTING SHELL 6 6 Meter
NOTE 1)
S.NO 6 DEAD MAN SWITCH
8 HOSE AIR LEAK CHANGING IT
9 18790 RAMASHRE BLASTER 8 SA3 SWEEP BLASTING OF BOTTOM PLATE 100 100 Sq.m FROM 02.15 TO 02.40
2) S.NO 15 GRIT
10 SA 3 SWEEP BLASTING SHELL 3 3 Meter VALVE 'Y' PLUG AIR LEAK
11 SA SWEEP BLASTING OF 20" COLUMN UPTO 1 METER INCLUDING BASE PLATE 1 1 EA CHANGED IT FROM 08.50 TO
09.40 3) S.NO 18
12 6170 NOBLE BLASTER 8 2 SA3 SWEEP BLASTING OF BOTTOM PLATE 110 110 Sq.m BLASTING HOSE AIR LEAK
13 SA 3 SWEEP BLASTING SHELL 4 4 Meter FIXING IT FROM 02.50 TO
14 SA SWEEP BLASTING OF 20" COLUMN UPTO 1 METER INCLUDING BASE PLATE 1 1 2 EA
03.05
15 17594 DILLI BLASTER 8 2 SA3 SWEEP BLASTING OF BOTTOM PLATE 100 100 Sq.m
16 SA 3 SWEEP BLASTING SHELL 3 3 Meter
17 SA SWEEP BLASTING OF 20" COLUMN UPTO 1 METER INCLUDING BASE PLATE 1 2 3 EA
18 18961 UDIM BLASTER 8 SA3 SWEEP BLASTING OF BOTTOM PLATE 90 90 Sq.m
19 SA 3 SWEEP BLASTING SHELL 3 3 Meter
20 SA SWEEP BLASTING OF 20" COLUMN UPTO 1 METER INCLUDING BASE PLATE 2 2 EA
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1670 AIR COMPRESSOR 8 7180 1 90 GRIT COAL SLAG SAND SA2.5 2 TON
2 AC1612 AIR COMPRESSOR 8 3976.5 2 USED GRIT SAND 3 TON
3 AC1669 AIR COMPRESSOR 8 4326.1 3 HAND TOOLS
4 GR1816 GENERATOR 8 4024 4
5 WM1714 WELDING MACHINE IDLE 5818.5 5
6 WM2094 WELDING MACHINE IDLE 2136 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 90/20 REPORTING DATE 11-Apr-20

SERVICE ORDER NO. 6510894318 Service Line Item# 1052024/'1052242 TIME REACHED CONTROL ROOM 18:50:00
TANK NUMBER NJBP 101(NIGHT) Direct / Part of PART OF PERMIT START 19:00:00 PM
L.I. Description SA3 WEEP BLASTING OF BOTTOM & SHELL PLATE PERMIT CLOSED 5:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 16678 SELVA RAJ MASON 8 2 FILLING GRIT IN SAND BOARD & ASSIST BLASTERS 0.6 0.091 0.69 TON
2 23210 BAL KUMAR HELPER 8 2 FILLING GRIT IN SAND BOARD & ASSIST BLASTERS 0.6 0.091 0.69 TON
3 21358 TAN BAHADUR HELPER 8 2 FILLING GRIT IN SAND BOARD & ASSIST BLASTERS 0.6 0.091 0.69 TON
4 23206 KHUSIRAM HELPER 8 2 FILLING GRIT IN SAND BOARD & ASSIST BLASTERS 0.6 0.091 0.69 TON
5 20882 MAN HELPER 8 2 FILLING GRIT IN SAND BOARD & ASSIST BLASTERS 0.6 0.091 0.69 TON
6 20719 MAN HELPER 8 2 FILLING GRIT IN SAND BOARD & ASSIST BLASTERS 0.6 0.091 0.69 TON
7 22322 PREM HELPER 8 2 FILLING GRIT IN SAND BOARD & ASSIST BLASTERS 0.6 0.091 0.69 TON
8 25042 BUDAN HELPER 8 - FILLING GRIT IN SAND BOARD 0.45 0.45 TON
9 23213 LALLU HELPER 8 - FILLING GRIT IN SAND BOARD 0.45 0.45 TON S.NO 1 TO 7 SHIFTING
10 21914 CHANDRA HELPER 8 - FILLING GRIT IN SAND BOARD 0.45 0.45 TON COMPRESSOR 1612 FROM
YARD TO TANK 101 AND
11 20780 KUMAR KAMI HELPER 8 - FILLING GRIT IN SAND BOARD 0.45 0.45 TON MAKING PREPARATION
12 18753 RABINDAR HELPER 8 - FILLING GRIT IN SAND BOARD 0.45 0.45 TON LIGHT , BLASTING HOSE FOR
BLASTING
13
14
15
16 20487 QURSHID HELPER 8 2 EQUIPMET STANDBY
17 22962 PREM HELPER 8 2 D DOOR STANDBY
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 HAND TOOLS
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 90/20 REPORTING DATE 11-Apr-20

SERVICE ORDER NO. 6510894318 Service Line Item# 1052024/'1052242 TIME REACHED CONTROL ROOM 18:50:00
TANK NUMBER NJBP 101(NIGHT) Direct / Part of DIRECT PERMIT START 19:00:00 PM
L.I. Description SWEEP BLASTING OF BOTTOM & SHELL PLATE PERMIT CLOSED 5:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 2 TAKEN PERMIT
2 24060 KALEESWARAN WPR 8 2 TO SUPERVISE SITE AREA
3 18796 HANIPH BLASTER 8 2 SA3 SWEEP BLASTING OF BOTTOM PLATE 180 180 Sq.m
4 SA 3 SWEEP BLASTING SHELL 10 4 14 Meter
5 SA SWEEP BLASTING OF 20" COLUMN UPTO 1 METER INCLUDING BASE PLATE 1 1 2 EA
6 15575 BUDAN BLASTER 8 SA3 SWEEP BLASTING OF BOTTOM PLATE 120 120 Sq.m
NOTE 1)
7 SA 3 SWEEP BLASTING SHELL 6 6 Meter S.NO 6 BLASTER SAND BOARD
8 CONTROL VALVE CHANGING
FROM 08.20 TO 10.00
9 18790 RAMASHRE BLASTER 8 SA3 SWEEP BLASTING OF BOTTOM PLATE 120 120 Sq.m 2) S.NO 9 & 15
10 SA 3 SWEEP BLASTING SHELL 4 4 Meter STARTED BLASTING 10CLK
DUE TO COMPRESSOR NOT
11 SA SWEEP BLASTING OF 20" COLUMN UPTO 1 METER INCLUDING BASE PLATE 1 1 EA WORKING , AFTER CHANGE
12 6170 NOBLE BLASTER 8 2 SA3 SWEEP BLASTING OF BOTTOM PLATE 120 120 Sq.m THEY STARTED BLASTING 3)
S.NO 12 BLASTING HOSE AIR
13 SA 3 SWEEP BLASTING SHELL 10 4 14 Meter LEAK FIXING IT FROM 01.15
14 SA SWEEP BLASTING OF 20" COLUMN UPTO 1 METER INCLUDING BASE PLATE 1 1 2 EA TO 01.35
15 17594 DILLI BLASTER 8 SA3 SWEEP BLASTING OF BOTTOM PLATE 110 110 Sq.m
16 SA 3 SWEEP BLASTING SHELL 4 4 Meter
17 SA SWEEP BLASTING OF 20" COLUMN UPTO 1 METER INCLUDING BASE PLATE 2 2 EA
18 18961 UDIM BLASTER 8 2 SA3 SWEEP BLASTING OF BOTTOM PLATE 180 180 Sq.m
19 SA 3 SWEEP BLASTING SHELL 10 4 14 Meter
20 SA SWEEP BLASTING OF 20" COLUMN UPTO 1 METER INCLUDING BASE PLATE 1 1 2 EA
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1670 AIR COMPRESSOR 8 7172 1 90 GRIT COAL SLAG SAND SA2.5 5.1 TON
2 AC1612 AIR COMPRESSOR 5 3970.1 2 USED GRIT SAND 2 TON
3 AC1669 AIR COMPRESSOR 8 4313.3 3 HAND TOOLS
4 GR1816 GENERATOR 8 4011 4
5 WM1714 WELDING MACHINE IDLE 5818.5 5
6 WM2094 WELDING MACHINE IDLE 2136 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 90/20 REPORTING DATE 10-Apr-20

SERVICE ORDER NO. 6510894318 Service Line Item# 1052024/'1052242 TIME REACHED CONTROL ROOM 18:50:00
TANK NUMBER NJBP 101(NIGHT) Direct / Part of PART OF PERMIT START 19:00:00 PM
L.I. Description REMOVING GRIT SAND PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 TAKEN PERMIT
2 6170 NOBLE BLASTER 8 REPAIRING SAND BOARD (CHANGING CONTROL VALVE & DEADMAN SWITCH) 2 2 EA
3 21358 TAN BAHADUR HELPER 8 ALL TOGETHER REMOVING SAND GRIT
4 25042 BUDAN HELPER 8 FROM INSIDE TO OUTSIDE TANK 2.3 2.3 TON
5 16678 SELVA RAJ MASON 8 USED GRIT SHIFING TO SAND BOARD 700 700 KG
6 21914 CHANDRA HELPER 8
7 23210 BAL KUMAR HELPER 8
8 20719 MAN HELPER 8
9 23213 LALLU HELPER 8
10 22322 PREM HELPER 8
11 20780 KUMAR KAMI HELPER 8
12 18753 RABINDAR HELPER 8
13
14
15
16 20487 QURSHID HELPER 8 EQUIPMET STANDBY
17 22962 PREM HELPER 8 D DOOR STANDBY
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1670 AIR COMPRESSOR 6 7157.9 1 HAND TOOLS


2 GR1816 GENERATOR 6 3998 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 90/20 REPORTING DATE 9-Apr-20

SERVICE ORDER NO. 6510894318 Service Line Item# 1052024/'1052242 TIME REACHED CONTROL ROOM 18:50:00
TANK NUMBER NJBP 101(NIGHT) Direct / Part of PART OF PERMIT START 19:00:00 PM
L.I. Description SA3 WEEP BLASTING OF BOTTOM & SHELL PLATE PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 16678 SELVA RAJ MASON 8 FILLING GRIT IN SAND BOARD & ASSIST BLASTERS 400 25 425 KG
2 23210 BAL KUMAR HELPER 8 FILLING GRIT IN SAND BOARD & ASSIST BLASTERS 400 25 425 KG
3 21358 TAN BAHADUR HELPER 8 FILLING GRIT IN SAND BOARD & ASSIST BLASTERS 400 25 425 KG
4 25042 BUDAN HELPER 8 FILLING GRIT IN SAND BOARD & ASSIST BLASTERS 400 25 425 KG
5 23206 KHUSIRAM HELPER 8 FILLING GRIT IN SAND BOARD & ASSIST BLASTERS 400 25 425 KG
6 21914 CHANDRA HELPER 8 FILLING GRIT IN SAND BOARD & ASSIST BLASTERS 400 25 425 KG
7 20882 MAN HELPER 8 FILLING GRIT IN SAND BOARD & ASSIST BLASTERS 400 25 425 KG
8 20719 MAN HELPER 8 FILLING GRIT IN SAND BOARD & ASSIST BLASTERS 400 25 425 KG
NOTE
9 23213 LALLU HELPER 8 FILLING GRIT IN SAND BOARD & ASSIST BLASTERS 325 325 KG S.NO 13 BLASTER NOT
10 22322 PREM HELPER 8 FILLING GRIT IN SAND BOARD & ASSIST BLASTERS 325 325 KG BLASTED ..ARAMCO
OPERATION NOT ALLOWED TO
11 20780 KUMAR KAMI HELPER 8 FILLING GRIT IN SAND BOARD & ASSIST BLASTERS 325 325 KG BLAST MORE THAN 4
12 18753 RABINDAR HELPER 8 FILLING GRIT IN SAND BOARD & ASSIST BLASTERS 325 325 KG BLASTERS TANK INSIDE
13 18961 UDIM BLASTER 8 CHANGING GRIT VALVE & FIXING LEAKING BLASTING HOSES
14
15
16 20487 QURSHID HELPER 8 EQUIPMET STANDBY
17 22962 PREM HELPER 8 D DOOR STANDBY
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 90/20 REPORTING DATE 9-Apr-20

SERVICE ORDER NO. 6510894318 Service Line Item# 1052024/'1052242 TIME REACHED CONTROL ROOM 18:50:00
TANK NUMBER NJBP 101(NIGHT) Direct / Part of DIRECT PERMIT START 19:00:00 PM
L.I. Description SWEEP BLASTING OF BOTTOM & SHELL PLATE PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 TAKEN PERMIT
2 24060 KALEESWARAN WPR 8 TO SUPERVISE SITE AREA
3 18796 HANIPH BLASTER 8 SA3 SWEEP BLASTING OF BOTTOM PLATE 132 132 Sq.m
4 SA 3 SWEEP BLASTING SHELL 4 4 Meter
5 SA SWEEP BLASTING OF 20" COLUMN UPTO 1 METER INCLUDING BASE PLATE 3 3 EA
6 15575 BUDAN BLASTER 8 SA3 SWEEP BLASTING OF BOTTOM PLATE 132 132 Sq.m
7 SA 3 SWEEP BLASTING SHELL 4 4 Meter
8 SA SWEEP BLASTING OF 20" COLUMN UPTO 1 METER INCLUDING BASE PLATE 2 2 EA
NOTE S.NO
9 18790 RAMASHRE BLASTER 8 SA3 SWEEP BLASTING OF BOTTOM PLATE 100 100 Sq.m 1) 9 BLASTER SAND BOARD
GRIT VALVE LEAK CHANGING
10 SA 3 SWEEP BLASTING SHELL 4 4 Meter IT FROM 10.00 TO 11.00 2)
11 SA SWEEP BLASTING OF 20" COLUMN UPTO 1 METER INCLUDING BASE PLATE 2 2 EA S.NO 15 BLASTER BLASTING
HOSE AIR LEAK FIXING IT
12 6170 NOBLE BLASTER 8 SA3 SWEEP BLASTING OF BOTTOM PLATE 132 132 Sq.m FROM 01.15 TO 01.35
13 SA 3 SWEEP BLASTING SHELL 4 4 Meter
14 SA SWEEP BLASTING OF 20" COLUMN UPTO 1 METER INCLUDING BASE PLATE 3 3 EA
15 17594 DILLI BLASTER 8 SA3 SWEEP BLASTING OF BOTTOM PLATE 120 120 Sq.m
16 SA 3 SWEEP BLASTING SHELL 4 4 Meter
17 SA SWEEP BLASTING OF 20" COLUMN UPTO 1 METER INCLUDING BASE PLATE 2 2 EA
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1670 AIR COMPRESSOR 8 7148.7 1 90 GRIT COAL SLAG SAND SA2.5 4.7 TON
2 AC1115 AIR COMPRESSOR 8 6677.3 2 HAND TOOLS
3 AC1669 AIR COMPRESSOR 8 4294.6 3
4 GR1816 GENERATOR 8 3987 4
5 WM1714 WELDING MACHINE IDLE 5818.5 5
6 WM2094 WELDING MACHINE IDLE 2136 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 20 REPORTING DATE 8-Apr-20

SERVICE ORDER NO. 6510894318 Service Line Item# 1052242 TIME REACHED CONTROL ROOM 18:50:00
TANK NUMBER NJBP 101(NIGHT) Direct / Part of PART OF PERMIT START 19:00:00 PM
L.I. Description SWEEP BLASTING OF BOTTOM & SHELL PLATE PERMIT CLOSED 5:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 16678 SELVA RAJ MASON 8 2 FILLING GRIT IN SAND BOARD & ASSIST BLASTERS 400 25 425 KG
2 23210 BAL KUMAR HELPER 8 2 FILLING GRIT IN SAND BOARD & ASSIST BLASTERS 400 25 425 KG
3 21358 TAN BAHADUR HELPER 8 2 FILLING GRIT IN SAND BOARD & ASSIST BLASTERS 400 25 425 KG
4 25042 BUDAN HELPER 8 2 FILLING GRIT IN SAND BOARD & ASSIST BLASTERS 400 25 425 KG
5 23206 KHUSIRAM HELPER 8 2 FILLING GRIT IN SAND BOARD & ASSIST BLASTERS 400 25 425 KG
6 21914 CHANDRA HELPER 8 2 FILLING GRIT IN SAND BOARD & ASSIST BLASTERS 400 25 425 KG
7 20882 MAN HELPER 8 2 FILLING GRIT IN SAND BOARD & ASSIST BLASTERS 400 25 425 KG
8 20719 MAN HELPER 8 2 FILLING GRIT IN SAND BOARD & ASSIST BLASTERS 400 25 425 KG
9 23213 LALLU HELPER 8 - FILLING GRIT IN SAND BOARD & ASSIST BLASTERS 325 325 KG
10 22962 PREM HELPER 8 - FILLING GRIT IN SAND BOARD & ASSIST BLASTERS 325 325 KG
11 20780 KUMAR KAMI HELPER 8 - FILLING GRIT IN SAND BOARD & ASSIST BLASTERS 325 325 KG
12 18753 RABINDAR HELPER 8 - FILLING GRIT IN SAND BOARD & ASSIST BLASTERS 325 325 KG
13
14
15
16 20487 QURSHID HELPER 8 2 EQUIPMET STANDBY
17 22322 PREM HELPER 8 2 D DOOR STANDBY
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 90 REPORTING DATE 8-Apr-20

SERVICE ORDER NO. 6510894318 Service Line Item# 1052024 TIME REACHED CONTROL ROOM 18:50:00
TANK NUMBER NJBP 101(NIGHT) Direct / Part of DIRECT PERMIT START 19:00:00 PM
L.I. Description SWEEP BLASTING OF BOTTOM & SHELL PLATE PERMIT CLOSED 5:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 2 TAKEN PERMIT
2 24060 KALEESWARAN WPR 8 2 TO SUPERVISE SITE AREA
3
4 18796 HANIPH BLASTER 8 2 SWEEP BLASTING OF BOTTOM PLATE 120 120 Sq.m
5 SWEEP BLASTING SHELL 6 6 Meter
6 SWEEP BLASTING OF COLUMN UPTO 1 METER INCLUDING BASE PLATE 3 3 EA
7
8 15575 BUDAN BLASTER 8 2 SWEEP BLASTING BOTTOM PLATE 120 120 Sq.m
9 SWEEP BLASTING SHELL 6 6 Meter
10 SWEEP BLASTING OF COLUMN UPTO 1 METER INCLUDING BASE PLATE 3 3 EA
11
12 18961 UDIM BLASTER 8 2 SWEEP BLASTING OF BOTTOM PLATE 120 120 Sq.m
13 SWEEP BLASTING SHELL 6 6 Meter
14 SWEEP BLASTING OF COLUMN UPTO 1 METER INCLUDING BASE PLATE 3 3 EA
15
16
17 6170 NOBLE BLASTER 8 2 SWEEP BLASTING OF BOTTOM PLATE 120 120 Sq.m
18 SWEEP BLASTING SHELL 6 6 Meter
19 SWEEP BLASTING OF COLUMN UPTO 1 METER INCLUDING BASE PLATE 3 3 EA
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1670 AIR COMPRESSOR 8 7142 1 90 GRIT COAL SLAG SAND SA2.5 4.7 TON
2 AC1519 AIR COMPRESSOR 8 3981.2 2 HAND TOOLS
3 AC1669 AIR COMPRESSOR 8 4282 3
4 GR1816 GENERATOR 8 3974 4
5 WM1714 WELDING MACHINE IDLE 5818.5 5
6 WM2094 WELDING MACHINE IDLE 2135.6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 150 REPORTING DATE 7-Apr-20

SERVICE ORDER NO. 6510894318 Service Line Item# 1054480 TIME REACHED CONTROL ROOM 18:45:00
TANK NUMBER NJBP 101(NIGHT) Direct / Part of PART OF PERMIT START 19:05:00 PM
L.I. Description GRINDING WELDING SPATTERS PERMIT CLOSED 5:10:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN WPR 8 2 TAKEN PERMIT & HELPING TO REMOVE GRIT SAND
2 19470 NOOR ALAM FAB 8 - GRINDING WELDING SPATTERS 50 50 Meter
3 21865 NAUSHAD FAB 8 - GRINDING WELDING SPATTERS 50 50 Meter
4 21855 HARICHARAN WELDER 8 - ASSIST FABRICATORS
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 GRINDING MACHINE 8 HRS 1 HAND TOOLS


2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 90 REPORTING DATE 7-Apr-20

SERVICE ORDER NO. 6510894318 Service Line Item# 1052024 TIME REACHED CONTROL ROOM 18:45:00
TANK NUMBER NJBP 101(NIGHT) Direct / Part of DIRECT / PART OF PERMIT START 19:05:00 PM
L.I. Description GRIT RE BLASTING OF BOTTOM & SHELL PLATE PERMIT CLOSED 5:10:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 6170 NOBLE BLASTER 8 2 BLASTED 4"DRAIN PIPE & REMOVING GRIT SAND OUTSIDE 2 2 Meter
2
3 18796 HANIPH BLASTER 8 - BLASTED 4"DRAIN PIPE 2 2 Meter
4
5 15575 BUDAN BLASTER 8 - BLASTED 4"DRAIN PIPE 2 2 Meter
6
7 18961 UDIM BLASTER 8 2 REMOVING GRIT SAND OUTSIDE
8
9 23210 BAL KUMAR HELPER 8 2 FILLING GRIT IN SAND BOARD & ASSIST BLASTERS 75 75 KG
10 REMOVING GRIT SAND OUTSIDE FROM TANK
11
12 20780 KUMAR KAMI HELPER 8 2 FILLING GRIT IN SAND BOARD & ASSIST BLASTERS 75 75 KG
13 REMOVING GRIT SAND OUTSIDE FROM TANK
14
15 14457 KRISHNA P.F 8 2 FILLING GRIT IN SAND BOARD & ASSIST BLASTERS 60 60 KG
16 REMOVING GRIT SAND OUTSIDE FROM TANK
17
18 20487 QURSHID HELPER 8 2 EQUIPMET STANDBY
19 22962 PREM HELPER 8 2 D DOOR STANDBY
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1670 AIR COMPRESSOR 8 7136.4 1 90 GRIT COAL SLAG SAND SA2.5 210 KG
2 AC1519 AIR COMPRESSOR 8 3968.4 2 HAND TOOLS
3 AC1669 AIR COMPRESSOR 8 4269.6 3
4 GR1816 GENERATOR 8 3960 4
5 WM1714 WELDING MACHINE IDLE 5818.5 5
6 WM2094 WELDING MACHINE IDLE 2135.6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 90 REPORTING DATE 7-Apr-20

SERVICE ORDER NO. 6510894318 Service Line Item# 1052024 TIME REACHED CONTROL ROOM 18:45:00
TANK NUMBER NJBP 101(NIGHT) Direct / Part of PART OF PERMIT START 19:05:00 PM
L.I. Description REMOVAL OF GRIT PERMIT CLOSED 5:10:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 2 ALL TOGETHER REMOVING USED GRIT SAND FROM INSIDE TO OUTSIDE TANK 4 3 7 TON
2 13520 PANDIT HELPER 8 2 INSIDE TO OUTSIDE NEARLY 74 METERS DISTANCE
3 25323 KUNATHEPAN HELPER 8 2 BRUSH CLEANING 1500 1500 Sq.m
4 23213 LALLU HELPER 8 2 AIR CLEANING 1000 1000 Sq.m
5 25318 PASKAR HELPER 8 2
6 25330 SANTHURU HELPER 8 2
7 20719 MAN HELPER 8 2
8 16678 SELVA RAJ MASON 8 2
9 25329 RUBEN HELPER 8 2
10 21358 TAN BAHADUR HELPER 8 2
11 25042 BUDAN HELPER 8 2
12 23206 KHUSIRAM HELPER 8 2
13 23213 LALLU HELPER 8 2
14 18753 RABINDAR HELPER 8 2
15 22322 PREM HELPER 8 2
16 21914 CHANDRA HELPER 8 2
17 20882 MAN HELPER 8 2
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 HAND TOOLS
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 90 REPORTING DATE 6-Apr-20

SERVICE ORDER NO. 6510894318 Service Line Item# 1052024 TIME REACHED CONTROL ROOM 18:35:00
TANK NUMBER NJBP 101(NIGHT) Direct / Part of PART OF PERMIT START 18:55:00 PM
L.I. Description REMOVAL OF GRIT PERMIT CLOSED 6:35:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 2 ALL TOGETHER REMOVING USED GRIT SAND FROM INSIDE TO OUTSIDE TANK 7.6 2.2 7.7 TON
2 13520 PANDIT HELPER 8 2 INSIDE TO OUTSIDE NEARLY 74 METERS DISTANCE
3 25323 KUNATHEPAN HELPER 8 2 AIR CLEANING 440 440 Sq.m
4 23213 LALLU HELPER 8 2
5 25318 PASKAR HELPER 8 2
6 25330 SANTHURU HELPER 8 2
7 20719 MAN HELPER 8 2
8 16678 SELVA RAJ MASON 8 2
9 25329 RUBEN HELPER 8 2
10 21358 TAN BAHADUR HELPER 8 2 S.NO 4 WORKED AS
EQUIPMENT STANDBY 4 TO
11 25042 BUDAN HELPER 8 2 6.35
12 23206 KHUSIRAM HELPER 8 2
13 23213 LALLU HELPER 8 2 SHIFITNG GRIT SAND UPTO 4CLK AFTER WORKED AS EQUIPMENT STANDBY
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 HAND TOOLS
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# LINE ITEM N0T PROVIDED / ARAMCO RECOMMENDATION REPORTING DATE 6-Apr-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM 18:35:00
TANK NUMBER NJBP 101(NIGHT) Direct / Part of PERMIT START 18:55:00 PM
L.I. Description INSTALLATION OF NEW PONTOON PERMIT CLOSED 6:35:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN WPR 8 4 TAKEN PERMIT
2 19470 NOOR ALAM FAB 8 - INSTALLING NEW PONTOON (2640+2640+2445MM) WITH SUPPORT NUT & BOLD 2 2 EA
3 21865 NAUSHAD FAB 8 -
4 21395 BHIMAYA WELDER 8 -
5 20925 SOMESHWAR WELDER 8 -
6 21855 HARICHARAN WELDER 8 -
7
8
9
NOTE
10 AFTER 4CLK HELPING
11 WORKERS TO REMOVE RIT
SAND
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 HAND TOOLS
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 90 REPORTING DATE 6-Apr-20

SERVICE ORDER NO. 6510894318 Service Line Item# 1052024 TIME REACHED CONTROL ROOM 18:35:00
TANK NUMBER NJBP 101(NIGHT) Direct / Part of PART OF PERMIT START 18:55:00 PM
L.I. Description REMOVAL OF GRIT PERMIT CLOSED 6:35:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 4 ALL TOGETHER REMOVING USED GRIT SAND FROM INSIDE TO OUTSIDE TANK 5.6 2.1 7.7 TON
2 13520 PANDIT HELPER 8 4 INSIDE TO OUTSIDE NEARLY 78 METERS DISTANCE
3 25323 KUNATHEPAN HELPER 8 4 AIR CLEANING 440 440 Sq.m
4 23213 LALLU HELPER 8 4
5 25318 PASKAR HELPER 8 4
6 25330 SANTHURU HELPER 8 4
7 20719 MAN HELPER 8 4
8 16678 SELVA RAJ MASON 8 4
9 25329 RUBEN HELPER 8 4
10 21358 TAN BAHADUR HELPER 8 4 S.NO 4 WORKED AS
EQUIPMENT STANDBY 4 TO
11 25042 BUDAN HELPER 8 4 6.35
12 23206 KHUSIRAM HELPER 8 4
13 23213 LALLU HELPER 8 4 SHIFITNG GRIT SAND UPTO 4CLK AFTER WORKED AS EQUIPMENT STANDBY
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 HAND TOOLS
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 90/20 REPORTING DATE 6-Apr-20

SERVICE ORDER NO. 6510894318 Service Line Item# 1052024/'1052242 TIME REACHED CONTROL ROOM 18:35:00
TANK NUMBER NJBP 101(NIGHT) Direct / Part of DIRECT / PART OF PERMIT START 18:55:00 PM
L.I. Description GRIT RE BLASTING OF BOTTOM & SHELL PLATE PERMIT CLOSED 6:35:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 6170 NOBLE BLASTER 8 - REBLASTING BOTTOM PLATE(6x2Meter) INSIDE TANK 4 4 Plates
2
3 18796 HANIPH BLASTER 8 - REBLASTING BOTTOM PLATE(6x2Meter) INSIDE TANK 3 3 Plates
4 REBLASTING SKETCH PLATE(3.5x2Meter) INSIDE TANK 3 3 Plates
5 18961 UDIM BLASTER 8 - REBLASTING SKETCH PLATE(4x2Meter) INSIDE TANK 5 5 Plates
6 SHELL PLATE (10x1METER) 10 10 sq.m
7
8 15575 BUDAN BLASTER 8 - REBLASTING BOTTOM PLATE(6x2Meter) INSIDE TANK 2 2 Plates
9 REBLASTING ANNULAR PLATE(5x0.85Meter) INSIDE TANK 5 5 Plates
NOTE 1)
10 REBLASTING SKETCH PLATE(3.5x2Meter) INSIDE TANK 3 3 Plates DIESEL FILLING ON
11 COMPRESSORS 10.00 TO
10.15
12
13 23210 BAL KUMAR HELPER 8 - FILLING GRIT IN SAND BOARD & ASSIST BLASTERS 0.46 0.46 TON
14 20780 KUMAR KAMI HELPER 8 - FILLING GRIT IN SAND BOARD & ASSIST BLASTERS 0.46 0.46 TON
15 14457 KRISHNA P.F 8 - FILLING GRIT IN SAND BOARD & ASSIST BLASTERS 0.46 0.46 TON
16 20882 MAN HELPER 8 - FILLING GRIT IN SAND BOARD & ASSIST BLASTERS 0.46 0.46 TON
17 21914 CHANDRA HELPER 8 - FILLING GRIT IN SAND BOARD & ASSIST BLASTERS 0.46 0.46 TON
18 18753 RABINDAR HELPER 8 - FILLING GRIT IN SAND BOARD & ASSIST BLASTERS 0.46 0.46 TON
19 20487 QURSHID HELPER 8 - EQUIPMET STANDBY
20 22322 PREM HELPER 8 4 D DOOR STANDBY
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1670 AIR COMPRESSOR 10 7127.4 1 90 & 20 GRIT COAL SLAG SAND SA2.5 2.8 TON
2 AC1519 AIR COMPRESSOR 10 3968 2 HAND TOOLS
3 AC1669 AIR COMPRESSOR 10 4254.5 3
4 GR1816 GENERATOR 10 3945 4
5 WM1714 WELDING MACHINE IDLE 5818.5 5
6 WM2094 WELDING MACHINE IDLE 2135.6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# LINE ITEM N0T PROVIDED / ARAMCO RECOMMENDATION REPORTING DATE 5-Apr-20

SERVICE ORDER NO. 6510894318 Service Line Item# W TIME REACHED CONTROL ROOM 18:35:00
TANK NUMBER NJBP 101(NIGHT) Direct / Part of PERMIT START 18:55:00 PM
L.I. Description SHIFTING & INSTALLATION OF PONTOON PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN WPR 8 TAKEN PERMIT 2 2 EA
2 19470 NOOR ALAM FAB 8 JOINING NEW PONTOON (2640+2640+2445MM) WITH SUPPORT NUT & BOLD 2 2 EA
3 21865 NAUSHAD FAB 8 JOINING NEW PONTOON (2640+2640+2445MM) WITH SUPPORT NUT & BOLD 1 1 EA
4 23206 KHUSIRAM HELPER 8 JOINING NEW PONTOON (2640+2640+2445MM) WITH SUPPORT NUT & BOLD 8 8 EA
5 25042 BUDAN HELPER 8 TOGETHER SHIFING NEW PONTOON 2640MM 4 4 EA
6 21395 BHIMAYA WELDER 8 SHIFING NEW PONTOON 2445MM
7 20925 SOMESHWAR WELDER 8 SHIFING NEW PONTOON
8 21855 HARICHARAN WELDER 8 SHIFING NEW PONTOON
9 21914 CHANDRA HELPER 8
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 WM1714 WELDING MACHINE IDLE 5818.5 1 HAND TOOLS


2 WM2094 WELDING MACHINE IDLE 2135.6 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 90 REPORTING DATE 5-Apr-20

SERVICE ORDER NO. 6510894318 Service Line Item# 1052024 TIME REACHED CONTROL ROOM 18:35:00
TANK NUMBER NJBP 101(NIGHT) Direct / Part of PART OF PERMIT START 18:55:00 PM
L.I. Description REMOVAL OF GRIT PERMIT CLOSED 5:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 23210 BAL KUMAR HELPER 8 ALL TOGETHER REMOVING USED GRIT SAND FROM INSIDE TO OUTSIDE TANK 3.6 3.6 TON
2 20780 KUMAR KAMI HELPER 8 INSIDE TO OUTSIDE NEARLY 62 METERS DISTANCE
3 25323 KUNATHEPAN HELPER 8
4 23213 LALLU HELPER 8
5 25318 PASKAR HELPER 8
6 25330 SANTHURU HELPER 8
7 14457 KRISHNA P.F 8
8 16678 SELVA RAJ MASON 8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 HAND TOOLS
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 90/20 REPORTING DATE 5-Apr-20

SERVICE ORDER NO. 6510894318 Service Line Item# 1052024/'1052242 TIME REACHED CONTROL ROOM 18:35:00
TANK NUMBER NJBP 101(NIGHT) Direct / Part of DIRECT / PART OF PERMIT START 18:55:00 PM
L.I. Description GRIT BLASTING OF BOTTOM & SHELL PLATE PERMIT CLOSED 5:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 2 TAKEN PERMIT & HELPING W0RKERS
2 6170 NOBLE BLASTER 8 2 BLASTED BOTTOM PLATE(6x2Meter) INSIDE TANK 4 4 Plates
3 SUMPIT WITH COLUMN INCLUDING BASE PLATE & DRAIN PIPE 4"(1METER) 11 11 sq.m
4 18796 HANIPH BLASTER 8 2 BLASTED BOTTOM PLATE(6x2Meter) INSIDE TANK 5 1 6 Plates
5 BLASTED 20" COLUMN UPTO 1 METER INCLUDING BASE PLATE 1 1 COLM
6 18961 UDIM BLASTER 8 2 BLASTED BOTTOM PLATE(6x2Meter) INSIDE TANK 2 2 Plates
7 BLASTED SKETCH PLATE(4x2Meter) INSIDE TANK 5 5 Plates
8 BLASTED 20" COLUMN UPTO 1 METER INCLUDING BASE PLATE 1 1 2 COLM
NOTE 1)
9 SHELL PLATE (10x1METER) 10 10 sq.m DIESEL FILLING ON
10 15575 BUDAN BLASTER 8 2 BLASTED BOTTOM PLATE(6x2Meter) INSIDE TANK 3 3 sq.m COMPRESSORS 03.00 TO
03.15
11 BLASTED ANNULAR PLATE(5x0.85Meter) INSIDE TANK 4 1 5 Plates 2) S.NO 6 BLASTER BLASTING
12 BLASTED 20" COLUMN UPTO 1 METER INCLUDING BASE PLATE 1 1 COLM HOSE AIR LEAK FIXING IT
FROM 11.05 TO 11.20
13 25329 RUBEN HELPER 8 2 FILLING GRIT IN SAND BOARD & ASSIST BLASTERS 0.75 0.18 0.93 TON
14 21358 TAN BAHADUR HELPER 8 2 FILLING GRIT IN SAND BOARD & ASSIST BLASTERS 0.75 0.18 0.93 TON
15 20719 MAN HELPER 8 2 FILLING GRIT IN SAND BOARD & ASSIST BLASTERS 0.75 0.18 0.93 TON
16 20882 MAN HELPER 8 2 FILLING GRIT IN SAND BOARD & ASSIST BLASTERS 0.75 0.18 0.93 TON
17 11448 CHITHRA HELPER 8 2 FILLING GRIT IN SAND BOARD & ASSIST BLASTERS 0.75 0.18 0.93 TON
18 13520 PANDIT HELPER 8 2 FILLING GRIT IN SAND BOARD & ASSIST BLASTERS 0.75 0.18 0.93 TON
19 20487 QURSHID HELPER 8 2 EQUIPMET STANDBY
20 22322 PREM HELPER 8 2 D DOOR STANDBY
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1612 AIR COMPRESSOR 8 3965.2 1 90 & 20 GRIT COAL SLAG SAND SA2.5 5.6 TON
2 AC1519 AIR COMPRESSOR 8 3950.6 2 HAND TOOLS
3 AC1669 AIR COMPRESSOR 8 4236.7 3
4 GR1816 GENERATOR 8 3928 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 90/20 REPORTING DATE 4-Apr-20

SERVICE ORDER NO. 6510894318 Service Line Item# 1052024/'1052242 TIME REACHED CONTROL ROOM 18:45:00
TANK NUMBER NJBP 101(NIGHT) Direct / Part of DIRECT / PART OF PERMIT START 19:00:00 PM
L.I. Description GRIT BLASTING OF BOTTOM & SHELL PLATE PERMIT CLOSED 5:20:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 2 TAKEN PERMIT & HELPING W0RKERS
2 6170 NOBLE BLASTER 8 2 BLASTED BOTTOM PLATE(6x2Meter) INSIDE TANK 3.5 0.5 4 Plates
3 BLASTED 20" COLUMN UPTO 1 METER INCLUDING BASE PLATE 1 1 COLM
4 18796 HANIPH BLASTER 8 3 BLASTED BOTTOM PLATE(6x2Meter) INSIDE TANK 5 1 6 Plates
5 BLASTED 20" COLUMN UPTO 1 METER INCLUDING BASE PLATE 1 1 COLM
6 18961 UDIM BLASTER 8 2 BLASTED BOTTOM PLATE(6x2Meter) INSIDE TANK 2 2 Plates
7 BLASTED SKETCH PLATE(3x2Meter) INSIDE TANK 6 6 Plates
8 BLASTED 20" COLUMN UPTO 1 METER INCLUDING BASE PLATE 1 1 2 COLM NOTE 1)
S.NO 2 BLASTER BLASTING
9 SHELL PLATE (6x1METER) 6 6 sq.m BLASTING MACHINE
10 15575 BUDAN BLASTER 8 2 BLASTED BOTTOM PLATE(6x2Meter) INSIDE TANK 4 4 Plates BREAKDOWN CHANGING IT
FROM 10.30 TO 11.30
11 SHELL PLATE (12x1METER) 8 4 12 sq.m 2) S.NO 10
12 BLASTER BLASTING HOSE AIR
LEAK FIXING IT FROM 03.05
13 25329 RUBEN HELPER 8 2 FILLING GRIT IN SAND BOARD & ASSIST BLASTERS 0.75 0.15 0.9 TON TO 03.20
14 16678 SELVA RAJ MASON 8 2 FILLING GRIT IN SAND BOARD & ASSIST BLASTERS 0.75 0.15 0.9 TON
15 20719 MAN HELPER 8 2 FILLING GRIT IN SAND BOARD & ASSIST BLASTERS 0.75 0.15 0.9 TON
16 20882 MAN HELPER 8 2 FILLING GRIT IN SAND BOARD & ASSIST BLASTERS 0.75 0.15 0.9 TON
17 11448 CHITHRA HELPER 8 2 FILLING GRIT IN SAND BOARD & ASSIST BLASTERS 0.75 0.15 0.9 TON
18 18753 RABINDAR HELPER 8 2 FILLING GRIT IN SAND BOARD & ASSIST BLASTERS 0.75 0.15 0.9 TON
19 20487 QURSHID HELPER 8 2 EQUIPMET STANDBY
20 22962 PREM HELPER 8 2 D DOOR STANDBY
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1115 AIR COMPRESSOR 8 6666.7 1 90 GRIT COAL SLAG SAND SA2.5 5.4 TON
2 AC1670 AIR COMPRESSOR 8 7109.5 2 HAND TOOLS
3 AC1669 AIR COMPRESSOR 8 4222.4 3
4 GR1816 GENERATOR 8 3914 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 90 REPORTING DATE 4-Apr-20

SERVICE ORDER NO. 6510894318 Service Line Item# 1052024 TIME REACHED CONTROL ROOM 18:45:00
TANK NUMBER NJBP 101(NIGHT) Direct / Part of PART OF PERMIT START 19:00:00 PM
L.I. Description REMOVAL OF GRIT PERMIT CLOSED 5:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 23210 BAL KUMAR HELPER 8 ALL TOGETHER REMOVING USED GRIT SAND FROM INSIDE TO OUTSIDE TANK 4.2 4.2 TON
2 20780 KUMAR KAMI HELPER 8 INSIDE TO OUTSIDE NEARLY 62 METERS DISTANCE
3 25323 KUNATHEPAN HELPER 8
4 23213 LALLU HELPER 8
5 25318 PASKAR HELPER 8
6 25330 SANTHURU HELPER 8
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 HAND TOOLS
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# LINE ITEM N0T PROVIDED REPORTING DATE 4-Apr-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM 18:45:00
TANK NUMBER NJBP 101(NIGHT) Direct / Part of PERMIT START 19:00:00 PM
L.I. Description INSTALLATION OF PONTOON PERMIT CLOSED 5:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 19470 NOOR ALAM FAB 8 ALL TOGETHER INSTALLIN EXISTING PONTOON
2 21865 NAUSHAD FAB 8 FIXING DIA6"x6.7Meter PONTOON 1 1 EA
3 23206 KHUSIRAM HELPER 8 FIXING DIA6"x7.3Meter PONTOON 1 1 EA
4 25042 BUDAN HELPER 8 SAND PAPERING DIA6"x7.3Meter PONTOON & DIA6"x6.7Meter PONTOON 2 2 EA
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 HAND TOOLS
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 140 REPORTING DATE 4-Apr-20

SERVICE ORDER NO. 6510894318 Service Line Item# 1081190 TIME REACHED CONTROL ROOM 18:45:00
TANK NUMBER NJBP 101(NIGHT) Direct / Part of DIRCT/PART OF PERMIT START 19:00:00 PM
L.I. Description WELDING OF DRIP PLATE PERMIT CLOSED 5:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN WPR 8 2 TAKE PERMIT
2 21395 BHIMAYA WELDER 8 2 WELDED DRIP PLATE 10.5 1 11.5 Meter
3 20925 SOMESHWAR WELDER 8 2 WELDED DRIP PLATE 10.5 1 11.5 Meter
4 21855 HARICHARAN 8 2 WELDED DRIP PLATE 10.5 1.5 12 Meter
5
6 21914 CHANDRA HELPER 8 2 ASSIST & GRINDING DRIP PLATE 10.5 1 7.3 Meter
7 22322 PREM HELPER 8 2 ASSIST & GRINDING DRIP PLATE 10.5 1 7.3 Meter
8 13520 PANDIT HELPER 8 2 ASSIST & GRINDING DRIP PLATE 10.5 1.5 12 Meter
9 21358 TAN BAHADUR HELPER 8 2 FIRE WATCH & FORMING FIRE BLANKET
10 14457 KRISHNA P.F 8 2 FIRE WATCH & FORMING FIRE BLANKET
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 WM1714 WELDING MACHINE 8 5812 1 140 7" GRINDING WHEEL 4 EA


2 WM2094 WELDING MACHINE 8 2129.3 2 140 WELDING ELECTRODE DIA 2.5 16 KG
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 140 REPORTING DATE 3-Apr-20

SERVICE ORDER NO. 6510894318 Service Line Item# 1081190 TIME REACHED CONTROL ROOM 18:45:00
TANK NUMBER NJBP 101(NIGHT) Direct / Part of DIRCT/PART OF PERMIT START 19:00:00 PM
L.I. Description WELDING OF DRIP PLATE PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 21395 BHIMAYA WELDER 8 WELDED DRIP PLATE 7.3 - 7.3 Meter
2 20925 SOMESHWAR WELDER 8 WELDED DRIP PLATE 7.3 - 7.3 Meter
3 21855 HARICHARAN
4
5 21914 CHANDRA HELPER 8 ASSIST & GRINDING DRIP PLATE 7.3 - 7.3 Meter
6 22322 PREM HELPER 8 ASSIST & GRINDING DRIP PLATE 7.3 - 7.3 Meter
7 13520 PANDIT HELPER 8 ASSIST & GRINDING DRIP PLATE 7.3 - 7.3 Meter
8 21358 TAN BAHADUR HELPER 8 FIRE WATCH & ASSIST FABRICATORS
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 WM1714 WELDING MACHINE 6 5798 1 140 4" GRINDING WHEEL 4 EA


2 WM2094 WELDING MACHINE 6 2115 2 140 WELDING ELECTRODE DIA 2.5 12 KG
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# LINE ITEM N0T PROVIDED REPORTING DATE 3-Apr-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM 18:45:00
TANK NUMBER NJBP 101(NIGHT) Direct / Part of PERMIT START 19:00:00 PM
L.I. Description PONTOON FXING PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 16678 SELVA RAJ MASON 8 ALL TOGETHER FIXING AND REMOVING PONTOON
2 23206 KHUSIRAM HELPER 8 FIXING DIA6"x6.7Meter PONTOON 1 1 EA
3 6170 NOBLE BLASTER 8 FIXING DIA6"x7.3Meter PONTOON 1 1 EA
4 25042 BUDAN HELPER 8 SAND PAPERING DIA6"x7.3Meter PONTOON & DIA6"x6.7Meter PONTOON 2 2 EA
5 REMOVING PONTOON DIA6"x7.3Meter PONTOON 3 3 EA
6
7 25329 RUBEN HELPER 8 D DOOR STANBY
8 20487 QURSHID HELPER 8 EQUIPMET STANDBY
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1115 AIR COMPRESSOR 6 6652.5 1 HAND TOOLS


2 AC1670 AIR COMPRESSOR IDLE 7093 2
3 AC1669 AIR COMPRESSOR IDLE 4208 3
4 GR1816 GENERATOR 6 3900 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 90 REPORTING DATE 3-Apr-20

SERVICE ORDER NO. 6510894318 Service Line Item# 1052024 TIME REACHED CONTROL ROOM 18:45:00
TANK NUMBER NJBP 101(NIGHT) Direct / Part of PART OF PERMIT START 19:00:00 PM
L.I. Description REMOVAL OF GRIT PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 18753 RABINDAR HELPER 8 ALL TOGETHER REMOVING USED GRIT SAND FROM INSIDE TO OUTSIDE TANK 4.8 4.8 TON
2 20780 KUMAR KAMI HELPER 8 INSIDE TO OUTSIDE NEARLY 65 METERS DISTANCE
3 25323 KUNATHEPAN HELPER 8
4 20719 MAN BAHATHUR HELPER 8
5 25318 PASKAR HELPER 8
6 25330 SANTHURU HELPER 8
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 HAND TOOLS
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# LINE ITEM NT PROVIDED REPORTING DATE 2-Apr-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM 18:45:00
TANK NUMBER NJBP 101(NIGHT) Direct / Part of PERMIT START 19:00:00 PM
L.I. Description PONTOON FXING PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 19470 NOOR ALAM FAB 8 ARRANGING PONTOON (size 2640x2640x2445mm) FOR FIXING AT YARD AREA 6 6 EA
2 21865 NAUSHAD FAB 8
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 90 REPORTING DATE 2-Apr-20

SERVICE ORDER NO. 6510894318 Service Line Item# 1052024 TIME REACHED CONTROL ROOM 18:45:00
TANK NUMBER NJBP 101(NIGHT) Direct / Part of PART OF PERMIT START 19:00:00 PM
L.I. Description REMOVAL OF GRIT PERMIT CLOSED 5:20:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 18753 RABINDAR HELPER 8 2 ALL TOGETHER REMOVING USED GRIT SAND FROM INSIDE TO OUTSIDE TANK 3.6 0.4 4 TON
2 20780 KUMAR KAMI HELPER 8 2 INSIDE TO OUTSIDE NEARLY 47METERS DISTANCE
3 23210 BAL KUMAR HELPER 8 2
4 20719 MAN BAHATHUR HELPER 8 2
5 21358 TAN BAHADUR HELPER 8 2
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 HAND TOOLS
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 90 REPORTING DATE 2-Apr-20

SERVICE ORDER NO. 6510894318 Service Line Item# 1052024 TIME REACHED CONTROL ROOM 18:45:00
TANK NUMBER NJBP 101(NIGHT) Direct / Part of DIRECT / PART OF PERMIT START 19:00:00 PM
L.I. Description GRIT BLASTING OF BOTTOM PLATE PERMIT CLOSED 5:20:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 2 TAKEN PERMIT & HELPING W0RKERS
2 6170 NOBLE BLASTER 8 3 BLASTED BOTTOM PLATE(6x2Meter) INSIDE TANK 5 1 6 Plates
3 BLASTED 20" COLUMN UPTO 1 METER INCLUDING BASE PLATE 1 1 COLM
4 18796 HANIPH BLASTER 8 2 BLASTED BOTTOM PLATE(6x2Meter) INSIDE TANK 5 0.5 5.5 Plates
5 BLASTED 20" COLUMN UPTO 1 METER INCLUDING BASE PLATE 1 1 COLM
6
7 18961 UDIM BLASTER 8 2 BLASTED BOTTOM PLATE(6x2Meter) INSIDE TANK 3 3 Plates
8 BLASTED SKETCH PLATE(3.5x2Meter) INSIDE TANK 1 1 2 Plates NOTE 1)
9 BLASTED 20" COLUMN UPTO 1 METER INCLUDING BASE PLATE 1 1 COLM S.NO10 BLASTER BLASTING
HOSE AIR LEAK FIXING IT
10 15575 BUDAN BLASTER 8 2 BLASTED ANNULAR PLATE(5x0.85Meter) INSIDE TANK 5 5 Plate FROM 09.30 TO 09.45
11 SHELL PLATE (20x1METER) 18 2 20 sq.m 2) S.NO 4
BLASTER BLASTING HOSE AIR
12 BLASTED 20" COLUMN UPTO 1 METER INCLUDING BASE PLATE 1 1 COLM LEAK FIXING IT FROM 02.30
13 TO 02.45
14 16678 SELVA RAJ MASON 8 2 FILLING GRIT IN SAND BOARD & ASSIST BLASTERS 0.75 0.15 0.9 TON
15 23213 LALLU HELPER 8 2 FILLING GRIT IN SAND BOARD & ASSIST BLASTERS 0.75 0.15 0.9 TON
16 20882 MAN HELPER 8 2 FILLING GRIT IN SAND BOARD & ASSIST BLASTERS 0.75 0.15 0.9 TON
17 11448 CHITHRA HELPER 8 2 FILLING GRIT IN SAND BOARD & ASSIST BLASTERS 0.75 0.15 0.9 TON
18 23206 KHUSIRAM HELPER 8 2 FILLING GRIT IN SAND BOARD & ASSIST BLASTERS 0.75 0.15 0.9 TON
19 20487 QURSHID HELPER 8 2 EQUIPMET STANDBY
20 22962 PREM HELPER 8 2 D DOOR STANDBY
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1115 AIR COMPRESSOR 8 6644.7 1 90 GRIT COAL SLAG SAND SA2.5 4.5 TON
2 AC1670 AIR COMPRESSOR 8 7093 2 HAND TOOLS
3 AC1669 AIR COMPRESSOR 8 4208 3
4 GR1816 GENERATOR 8 3892 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 90 REPORTING DATE 1-Apr-20

SERVICE ORDER NO. 6510894318 Service Line Item# 1052024 TIME REACHED CONTROL ROOM 18:40:00
TANK NUMBER NJBP 101(NIGHT) Direct / Part of PART OF PERMIT START 19:00:00 PM
L.I. Description REMOVAL OF GRIT PERMIT CLOSED 5:20:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 18753 RABINDAR HELPER 8 2 ALL TOGETHER REMOVING USED GRIT SAND FROM INSIDE TO OUTSIDE TANK 4.7 0.5 5.2 TON
2 20780 KUMAR KAMI HELPER 8 2 INSIDE TO OUTSIDE NEARLY 52METERS DISTANCE
3 23210 BAL KUMAR HELPER 8 2
4 15019 NARESH MANDAL HELPER 8 2
5 22620 RAMESH HELPER 8 2
6 20719 MAN BAHATHUR HELPER 8 3 CLEANED ADDITIONALLY GRIT FALLEN AREAS NEAR DDOOR 0.25 0.25 TON
7 23211 YAM BAHATHUR HELPER 8 3 CLEANED ADDITIONALLY GRIT FALLEN AREAS NEAR DDOOR 0.25 0.25 TON
8
9
10
11
12 19470 NOOR ALAM FAB 8
13 21865 NAUSHAD FAB 8
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 HAND TOOLS
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 90 REPORTING DATE 1-Apr-20

SERVICE ORDER NO. 6510894318 Service Line Item# 1052024 TIME REACHED CONTROL ROOM 18:40:00
TANK NUMBER NJBP 101(NIGHT) Direct / Part of DIRECT / PART OF PERMIT START 19:00:00 PM
L.I. Description GRIT BLASTING OF BOTTOM PLATE PERMIT CLOSED 5:20:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 2 TAKEN PERMIT & HELPING W0RKERS
2 6170 NOBLE BLASTER 8 3 BLASTED BOTTOM PLATE(6x2Meter) INSIDE TANK 5 1 6 Plates
3 BLASTED 20" COLUMN UPTO 1 METER INCLUDING BASE PLATE 1 1 COLM
4 18796 HANIPH BLASTER 8 3 BLASTED BOTTOM PLATE(6x2Meter) INSIDE TANK 5 1 6 Plates
5 BLASTED 20" COLUMN UPTO 1 METER INCLUDING BASE PLATE 1 1 COLM
6
7 18961 UDIM BLASTER 8 2 BLASTED BOTTOM PLATE(6x2Meter) INSIDE TANK 5 5 Plates
8 BLASTED 20" COLUMN UPTO 1 METER INCLUDING BASE PLATE 1 1 COLM NOTE 1)
9 S.NO10 BLASTER BLASTING
AIR LEAK FIXING IT TAKEN
10 15575 BUDAN BLASTER 8 2 BLASTED BOTTOM PLATE(6x2Meter) INSIDE TANK 5.5 0.5 5 Plate 15MINUTES 2)AIR
11 SHELL PLATE (3.5x1METER) 3.5 3.5 sq.m COMPRESSOR 1018
BREAKDOWN SO S.NO 7
12 BLASTER HOSE CHANGING
13 23206 KHUSIRAM HELPER 8 3 FILLING GRIT IN SAND BOARD &SHIFTING USED GRIT INSIDE TO OUTSIDE 0.75 0.25 1 TON TAKEN 20MIN
14 16678 SELVA RAJ MASON 8 3 FILLING GRIT IN SAND BOARD &SHIFTING USED GRIT INSIDE TO OUTSIDE 0.75 0.25 1 TON
15 13520 PANDIT HELPER 8 3 FILLING GRIT IN SAND BOARD &SHIFTING USED GRIT INSIDE TO OUTSIDE 0.75 0.25 1 TON
16 20882 MAN HELPER 8 3 FILLING GRIT IN SAND BOARD &SHIFTING USED GRIT INSIDE TO OUTSIDE 0.75 0.25 1 TON
17 11448 CHITHRA HELPER 8 3 FILLING GRIT IN SAND BOARD &SHIFTING USED GRIT INSIDE TO OUTSIDE 0.75 0.25 1 TON
18 23213 LALLU HELPER 8 3 FILLING GRIT IN SAND BOARD &SHIFTING USED GRIT INSIDE TO OUTSIDE 0.75 0.25 1 TON
19 20487 QURSHID HELPER 8 2 EQUIPMET STANDBY
20 22962 PREM HELPER 8 2 D DOOR STANDBY
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1018 AIR COMPRESSOR 6 2219.1 1 90 GRIT COAL SLAG SAND SA2.5 6 TON
2 AC1670 AIR COMPRESSOR 9 7080.5 2 HAND TOOLS
3 AC1669 AIR COMPRESSOR 9 4195.2 3
4 GR1816 GENERATOR 9 3879 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 140 REPORTING DATE 1-Apr-20

SERVICE ORDER NO. 6510894318 Service Line Item# 1081190 TIME REACHED CONTROL ROOM 18:40:00
TANK NUMBER NJBP 101(NIGHT) Direct / Part of DIRCT/PART OF PERMIT START 19:00:00 PM
L.I. Description WELDING OF DRIP PLATE PERMIT CLOSED 5:20:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 21395 BHIMAYA WELDER 8 2 WELDED DRIP PLATE 11 1.5 12.5 Meter
2 20925 SOMESHWAR WELDER 8 2 WELDED DRIP PLATE 11 1.5 12.5 Meter
3
4
5 21914 CHANDRA HELPER 8 2 ASSIST & GRINDING DRIP PLATE 11 1.5 12.5 Meter
6 22322 PREM HELPER 8 2 ASSIST & GRINDING DRIP PLATE 11 1.5 12.5 Meter
7 14457 KRISHNA P.F 8 2 FIRE WATCH & ASSIST FABRICATORS
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 WM1714 WELDING MACHINE 8 5778 1 140 4" GRINDING WHEEL 4 EA


2 WM2094 WELDING MACHINE 8 2095.4 2 140 WELDING ELECTRODE DIA 2.5 14 KG
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 140 REPORTING DATE 31-Mar-20

SERVICE ORDER NO. 6510894318 Service Line Item# 1081190 TIME REACHED CONTROL ROOM 18:45:00
TANK NUMBER NJBP 101(NIGHT) Direct / Part of DIRCT/PART OF PERMIT START 19:00:00 PM
L.I. Description WELDING OF DRIP PLATE PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 21395 BHIMAYA WELDER 8 WELDED DRIP PLATE 11 11 Meter
2 22322 PREM HELPER 8 ASSIST & GRINDING DRIP PLATE 11 11 Meter
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 140 7" GRINDING WHEEL 2 EA


2 2 140 WELDING ELECTRODE DIA 2.5 7 KG
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 130 REPORTING DATE 31-Mar-20

SERVICE ORDER NO. 6510894318 Service Line Item# 1055131 TIME REACHED CONTROL ROOM 18:45:00
TANK NUMBER NJBP 101(NIGHT) Direct / Part of DIRCT/PART OF PERMIT START 19:00:00 PM
L.I. Description DRIP PLATE FITUP & TAKA WELDING PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN WPR 8 TAKEN PERMIT & HELPING W0RKERS
2
3 19470 NOOR ALAM FAB 8 TOGETHER MADE FITUP DRIP PLATE & GRINDING (3METER) 4- 4 Plates
4 21865 NAUSHAD FAB 8 GAS CUTTING OF DRIP PLATE
5 20925 SOMESHWAR WELDER 8 TAKA WELDING DRIP PLATE (3 METER) 4- 4 Plates
6
7 21914 CHANDRA HELPER 8 ASSIST FABRICATOR
8 23213 LALLU HELPER 8 ASSIST FABRICATOR
9 14457 KRISHNA P.F 8 FIRE WATCH & ASSIST FABRICATORS NOTE
10 1) OXYGEN CYLINDER SHIFTED
FROM TAK 116 TO TANK 101
11 TAKEN 30MINUTES 2) DRIP
12 PLATE FITUP FINISHED
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 WM2094 WELDING MACHINE 8 2070.6 1 130 7" GRINDING WHEEL 1 EA


2 WM1714 WELDING MACHINE 8 5765 2 130 OXYGEN CYLINDER 0.3 %
3 3 130 ACETYLENE CYLINDER 0.3 %
4 4 130 WELDING ELECTRODE DIA 2.5 0.7 KG
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 90 REPORTING DATE 31-Mar-20

SERVICE ORDER NO. 6510894318 Service Line Item# 1052024 TIME REACHED CONTROL ROOM 18:45:00
TANK NUMBER NJBP 101(NIGHT) Direct / Part of DIRECT / PART OF PERMIT START 19:00:00 PM
L.I. Description BLASTING OF BOTTOM PLATE PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 TAKEN PERMIT & HELPING W0RKERS
2 6170 NOBLE BLASTER 8 2- 2 Plates
3 15575 BUDAN BLASTER 8 BLASTED BOTTOM PLATE(6x2Meter) INSIDE TANK 2 2 Plates
4 18961 UDIM BLASTER 8 BLASTED BOTTOM PLATE(6x2Meter) INSIDE TANK 1 1 Plate
5 SHELL PLATE (20x1METER) 215 215 Sq.ft
6 18796 HANIPH BLASTER 8 BLASTED BOTTOM ANNULAR PLATE(0.8x1.1Meter) INSIDE TANK 5 5 Plate
7
8 18753 RABINDAR HELPER 8 FILLING GRIT IN SAND BOARD 0.6 0.6 TON
9 16678 SELVA RAJ MASON 8 FILLING GRIT IN SAND BOARD 0.6 0.6 TON NOTE
10 13520 PANDIT HELPER 8 FILLING GRIT IN SAND BOARD 0.6 0.6 TON BLASTING FINISHED IN FIRST
HALF HAVE TO SHIFT SAND
11 20882 MAN HELPER 8 FILLING GRIT IN SAND BOARD 0.6 0.6 TON BOARD TO START BLASTING IN
12 20780 KUMAR KAMI HELPER 8 FILLING GRIT IN SAND BOARD 0.6 0.6 TON SECONG HALF
13
14 23206 KHUSIRAM HELPER 8 ALL TOGETHER REMOVING USED GRIT SAND FROM INSIDE TO OUTSIDE TANK 5 5 TON
15 11448 CHITHRA HELPER 8
16 23210 BAL KUMAR HELPER 8
17 15019 NARESH MANDAL HELPER 8
18 22620 RAMESH HELPER 8
19 20487 QURSHID HELPER 8 EQUIPMET STANDBY
20 22962 PREM HELPER 8 D DOOR STANDBY
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1018 AIR COMPRESSOR IDLE 2207 1 90 GRIT COAL SLAG SAND SA2.5 4.6 TON
2 AC1670 AIR COMPRESSOR 8 7073 2 HAND TOOLS
3 AC1669 AIR COMPRESSOR 8 4181 3
4 AC1197 AIR COMPRESSOR 8 5617.2 4
5 GR1816 GENERATOR 8 3865 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 90 REPORTING DATE 30-Mar-20

SERVICE ORDER NO. 6510894318 Service Line Item# 1052024 TIME REACHED CONTROL ROOM 18:45:00
TANK NUMBER NJBP 101(NIGHT) Direct / Part of DIRECT / PART OF PERMIT START 19:00:00 PM
L.I. Description BLASTING OF BOTTOM PLATE PERMIT CLOSED 5:15:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 2 TAKEN PERMIT & HELPING W0RKERS
2 6170 NOBLE BLASTER 8 2 BLASTED BOTTOM PLATE(6x2Meter) INSIDE TANK 5 1 6 Plates
3 BLASTED 20"COULOMN UPTO 1 METER WITH BASE PLAE 1 1 Colm
4 15575 BUDAN BLASTER 8 2 BLASTED BOTTOM PLATE(6x2Meter) INSIDE TANK 5 1 6 Plates
5 BLASTED 20"COULOMN UPTO 1 METER WITH BASE PLAE 1 1 Colm
6
7 18961 UDIM BLASTER 8 2 BLASTED BOTTOM PLATE(6x2Meter) INSIDE TANK 5 5 Plates
8 BLASTED BOTTOM PLATE(3x2Meter) INSIDE TANK 2 2 Plates
9
10 18796 HANIPH BLASTER 8 2 BLASTED BOTTOM PLATE(6x2Meter) INSIDE TANK 5 5 Plates
11 BLASTED BOTTOM PLATE(3x2Meter) INSIDE TANK 2 2 Plates
12
13 18753 RABINDAR HELPER 8 2 FILLING GRIT IN SAND BOARD 0.95 0.2 1.15 TON
14 16678 SELVA RAJ MASON 8 2 FILLING GRIT IN SAND BOARD 0.95 0.2 1.15 TON
15 13520 PANDIT HELPER 8 2 FILLING GRIT IN SAND BOARD 0.95 0.2 1.15 TON
16 20882 MAN HELPER 8 2 FILLING GRIT IN SAND BOARD 0.95 0.2 1.15 TON
17
18 23153 TEK SHRESTHA HELPER ABSENT
19 20487 QURSHID HELPER 8 2 EQUIPMET STANDBY
20 22962 PREM HELPER 8 2 D DOOR STANDBY
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1018 AIR COMPRESSOR 4 2207 1 90 GRIT COAL SLAG SAND SA2.5 4.6 TON
2 AC1670 AIR COMPRESSOR 8 7060.1 2 HAND TOOLS
3 AC1669 AIR COMPRESSOR 8 4168 3
4 AC1197 AIR COMPRESSOR 3 5604.6 4
5 GR1816 GENERATOR 8 3852 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 130 REPORTING DATE 30-Mar-20

SERVICE ORDER NO. 6510894318 Service Line Item# 1055131 TIME REACHED CONTROL ROOM 18:45:00
TANK NUMBER NJBP 101(NIGHT) Direct / Part of DIRCT/PART OF PERMIT START 19:00:00 PM
L.I. Description DRIP PLATE FITUP & TAKA WELDING PERMIT CLOSED 5:15:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN WPR 8 2 TAKEN PERMIT & HELPING W0RKERS
2
3 19470 NOOR ALAM FAB 8 2 TOGETHER MADE FITUP DRIP PLATE & GRINDING (3METER) 6 3 9 Plates
4 21865 NAUSHAD FAB 8 2 GAS CUTTING OF DRIP PLATE
5 21855 HARI CHARAN WELDER 8 2 TAKA WELDING DRIP PLATE (3 METER) 6 3 9 Plates
6
7 21358 TAN BAHADUR HELPER 8 2 ASSIST FABRICATOR
8 20780 KUMAR KAMI HELPER 8 2 ASSIST FABRICATOR
9 14457 KRISHNA P.F 8 2 FIRE WATCH & ASSIST FABRICATORS
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 WM2094 WELDING MACHINE 8 2070.6 1 130 7" GRINDING WHEEL 2 EA


2 2 130 OXYGEN CYLINDER 0.5 %
3 3 130 ACETYLENE CYLINDER 0.5 %
4 4 130 WELDING ELECTRODE DIA 2.5 1.2 KG
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 130 REPORTING DATE 28-Mar-20

SERVICE ORDER NO. 6510894318 Service Line Item# 1055131 TIME REACHED CONTROL ROOM 18:45:00
TANK NUMBER NJBP 101(NIGHT) Direct / Part of DIRCT/PART OF PERMIT START 19:00:00 PM
L.I. Description DRIP PLATE FITUP & TAKA WELDING PERMIT CLOSED 5:05:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 19470 NOOR ALAM FAB 8 2 TOGETHER MADE FITUP DRIP PLATE & GRINDING (3METER) 6 4 10 EA
2 21865 NAUSHAD FAB 8 2 GAS CUTTING OF DRIP PLATE
3 21855 HARI CHARAN WELDER 8 2 TAKA WELDING DRIP PLATE (3 METER) 6 4 10 EA
4
5
6
7 21914 CHANDRA HELPER 8 2 ASSIST FABRICATOR & JACK HAMMERING 0.43 0.43 Cu.m
8 20780 KUMAR KAMI HELPER 8 2 ASSIST FABRICATOR
9 14457 KRISHNA P.F 8 2 FIRE WATCH & ASSIST FABRICATORS
10 24060 KALEESWARAN WPR 8 NO WORK IN TANK 116
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 WM1714 WELDING MACHINE 7 5732 1 130 7" GRINDING WHEEL 2 EA


2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 90 REPORTING DATE 28-Mar-20

SERVICE ORDER NO. 6510894318 Service Line Item# 1052024 TIME REACHED CONTROL ROOM 18:45:00
TANK NUMBER NJBP 101(NIGHT) Direct / Part of DIRECT / PART OF PERMIT START 19:00:00 PM
L.I. Description BLASTING OF BOTTOM PLATE PERMIT CLOSED 5:20:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 2 TAKEN PERMIT & HELPING W0RKERS
2
3 6170 NOBLE BLASTER 8 2 BLASTED BOTTOM PLATE(6x2Meter) INSIDE TANK 5 1 6 Plates
4 15575 BUDAN BLASTER 8 2 BLASTED BOTTOM PLATE(6x2Meter) INSIDE TANK 5 1 6 Plates
5 18961 UDIM BLASTER 8 2 BLASTED BOTTOM PLATE(6x2Meter) INSIDE TANK 5 5 5 Plates
6 18796 HANIPH BLASTER 8 2 BLASTED BOTTOM PLATE(6x2Meter) INSIDE TANK 5 5 5 Plates
7
8 18753 RABINDAR HELPER 8 2 FILLING GRIT IN SAND BOARD 0.7 0.7 TON
9 SHIFTING USED SAND NEAR D DOOR 1 1 TON
10 16678 SELVA RAJ MASON 8 3 FILLING GRIT IN SAND BOARD 0.7 0.7 TON
11 SHIFTING USED SAND NEAR D DOOR 1.2 1.2 TON
12 13520 PANDIT HELPER 8 3 FILLING GRIT IN SAND BOARD 0.7 0.7 TON
13 SHIFTING USED SAND NEAR D DOOR 1.2 1.2 TON
14 25318 PASKARAN HELPER 8 3 FILLING GRIT IN SAND BOARD 0.7 0.7 TON
15 SHIFTING USED SAND NEAR D DOOR 1.2 1.2 TON
16 21358 TAN BAHADUR HELPER 8 2 FILLING GRIT IN SAND BOARD 0.64 0.64 TON
17 SHIFTING USED SAND NEAR D DOOR 1 1 TON
18
19 20487 QURSHID HELPER 8 2 EQUIPMET STANDBY
20 25329 RUBEN HELPER 8 3 D DOOR STANDBY & HELPING WOKERS TO SHIFT SAND
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1018 AIR COMPRESSOR 9 2194 1 90 GRIT COAL SLAG SAND SA2.5 3.5 TON
2 AC1670 AIR COMPRESSOR 9 7031 2 HAND TOOLS
3 AC1669 AIR COMPRESSOR 9 4139 3
4 AC1197 AIR COMPRESSOR 4 5589.1 4
5 GR1816 GENERATOR 9 3823 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 130 REPORTING DATE 26-Mar-20

SERVICE ORDER NO. 6510894318 Service Line Item# 1055131 TIME REACHED CONTROL ROOM 18:45:00
TANK NUMBER NJBP 101(NIGHT) Direct / Part of DIRCT/PART OF PERMIT START 19:00:00 PM
L.I. Description DRIP PLATE FITUP & TAKA WELDING PERMIT CLOSED 4:05:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 19470 NOOR ALAM FAB 8 - TOGETHER MADE FITUP DRIP PLATE & GRINDING (3METER) 5 5 EA
2 21865 NAUSHAD FAB 8 -
3 21855 HARI CHARAN WELDER 8 - TAKA WELDING DRIP PLATE (3 METER) 5 5 EA
4
5
6
7 21914 CHANDRA HELPER 8 - ASSIST FABRICATOR
8 20780 KUMAR KAMI HELPER 8 - ASSIST FABRICATOR
9 14457 KRISHNA P.F 8 FIRE WATCH & ASSIST FABRICATORS
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 WM1714 WELDING MACHINE 7 5719.5 1 7" GRINDING WHEEL 3 EA


2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 90 REPORTING DATE 26-Mar-20

SERVICE ORDER NO. 6510894318 Service Line Item# 1052024 TIME REACHED CONTROL ROOM 18:45:00
TANK NUMBER NJBP 101(NIGHT) Direct / Part of DIRECT / PART OF PERMIT START 19:00:00 PM
L.I. Description BLASTING OF BOTTOM PLATE PERMIT CLOSED 5:10:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 2 TAKEN PERMIT & HELPING W0RKERS
2
3 6170 NOBLE BLASTER 8 2 BLASTED BOTTOM PLATE(6x2Meter) INSIDE TANK 4 0.5 4.5 Plates
4 15575 BUDAN BLASTER 8 2 BLASTED BOTTOM PLATE(6x2Meter) INSIDE TANK 4 0.5 4.5 Plates
5 18961 UDIM BLASTER 8 2 BLASTED BOTTOM PLATE(6x2Meter) INSIDE TANK 4 0.5 4.5 Plates
6 18796 HANIPH BLASTER 8 2 BLASTED BOTTOM PLATE(6x2Meter) INSIDE TANK 3 3 Plates
7 BLASTED SHELL PLATE (3.5x1Meter) INSIDE TANK 3.5 3.5 Sq.M
8 BLASTED COLUMN UPTO 1 METER 1 1 EA
9 NOTE
10 18753 RABINDAR HELPER 8 2 FILLING GRIT IN SAND BOARD & ASSIST BLASTERS 0.8 0.14 0.94 TON ARAMCO OPERATION
CONDUCTED COVID-19
11 16678 SELVA RAJ MASON 8 2 FILLING GRIT IN SAND BOARD & ASSIST BLASTERS 0.8 0.14 0.94 TON SAFETY MEETING AT 01.05AM
12 13520 PANDIT HELPER 8 2 FILLING GRIT IN SAND BOARD & ASSIST BLASTERS 0.8 0.14 0.94 TON TO 01.45AM
13 25318 PASKARAN HELPER 8 2 FILLING GRIT IN SAND BOARD & ASSIST BLASTERS 0.8 0.14 0.94 TON
14 21358 TAN BAHADUR HELPER 8 2 FILLING GRIT IN SAND BOARD & ASSIST BLASTERS 0.8 0.14 0.94 TON
15
16 20487 QURSHID HELPER 8 2 EQUIPMET STANDBY
17 25329 RUBEN HELPER 8 2 D DOOR STANDBY
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1018 AIR COMPRESSOR 8 2187.5 1 90 GRIT COAL SLAG SAND SA2.5 4.7 TON
2 AC1670 AIR COMPRESSOR 8 7016.1 2 HAND TOOLS
3 AC1669 AIR COMPRESSOR 8 4123.6 3
4 AC1197 AIR COMPRESSOR 8 5580.3 4
5 GR1816 GENERATOR 8 3808 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 90 REPORTING DATE 24-Mar-20

SERVICE ORDER NO. 6510894318 Service Line Item# 1052024 TIME REACHED CONTROL ROOM 18:45:00
TANK NUMBER NJBP 101(NIGHT) Direct / Part of PART OF PERMIT START 19:00:00 PM
L.I. Description GRIT SAND REMOVING PERMIT CLOSED 5:10:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 2 TAKEN PERMIT & HELPING W0RKERS
2 16678 SELVA RAJ MASON 8 2 TOGETHER REMOVING GRIT SAND FROM INSIDE TO OUTSIDE TANK 1.2 0.2 1.4 TON
3 13520 PANDIT HELPER 8 2 BY WHEEL BARROW NEARLY 85MTRS
4 23153 TEK SHRESTHA HELPER 8 2
5 20882 MAN HELPER 8 2
6 25324 SIVARANJAN HELPER 8 2
7 25042 BUDAN HELPER 8 2
8
9
10 20487 QURSHID HELPER 8 2 EQUIPMET STANDBY
11 22962 PREM HELPER 8 2 D-DOOR STANDBY
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1018 AIR COMPRESSOR 8 2187.5 1 90 GRIT COAL SLAG SAND SA2.5 3.8 TON
2 AC1670 AIR COMPRESSOR 8 7016.1 2 HAND TOOLS
3 AC1669 AIR COMPRESSOR 8 4123.6 3
4 AC1197 AIR COMPRESSOR 8 5580.3 4
5 GR1816 GENERATOR 8 3808 5
6 WM1714 WELDING MACHINE 8 5719.5 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# NOT AVAILABLE REPORTING DATE 24-Mar-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM 18:45:00
TANK NUMBER NJBP 101(NIGHT) Direct / Part of PERMIT START 19:00:00 PM
L.I. Description NEW PONTOON FIXING PERMIT CLOSED 5:10:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 21358 TAN BAHADUR HELPER 8 - TOGETHER FIXING NEW PONTOON
2 18753 RABINDAR HELPER 8 - PONTOON 7.72METER(2640+2445+2640mm) 2 2 EA
3
4 REMOVING OLD PONTOON FROM INSIDE TO TANK TO DIKE WALL 3060METER
5 PONTOON 7.72METER 2 2 EA
6
7 20780 KUMAR KAMI HELPER 8 - TOGETHER SHIFTING NEW PONTOON FROM DIKE WALL TO TANK INSIDE
8 25042 BUDAN HELPER 8 - PONTOON 2640METER 4 4 EA
9 PONTOON 2445METER 2 2 EA
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 HAND TOOLS
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# NOT AVAILABLE REPORTING DATE 23-Mar-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM 18:45:00
TANK NUMBER NJBP 101(NIGHT) Direct / Part of PERMIT START 19:00:00 PM
L.I. Description NEW PONTOON FIXING PERMIT CLOSED 4:10:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 16678 SELVA RAJ MASON 8 TOGETHER FIXING NEW PONTOON
2 13520 PANDIT HELPER 8 3660METER 6 6 EA
3 23153 TEK SHRESTHA HELPER 8 3060 1 1 EA
4 20882 MAN HELPER 8 3830 1 1 EA
5
6 25324 SIVARANJAN HELPER 8 TOGETHER DISMANTLING OLD PONTOON 3660METER 6 6 EA
7 25042 BUDAN HELPER 8 3060 1 1 EA
8 21358 TAN BAHADUR HELPER 8 3830 1 1 EA
9 7.3 METER 4 4 EA
10
11
12 18753 RABINDAR HELPER 8 TOGETHER SHIFTING NEW PONTOON FROM DIKE WALL TO TANK INSIDE 3660 mtr 6 6 EA
13 20780 KUMAR KAMI HELPER 8 REMOVING OLD PONTOON FROM INSIDE TO TANK TO DIKE WALL 3060METER 1 1 EA
14 PONTOON 3830 METER 1 1 EA
15 PONTOON 7.3 METER 4 4 EA
16
17 20487 QURSHID HELPER 8 EQUIPMET STANDBY
18 22962 PREM HELPER 8 D-DOOR STANDBY
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1018 AIR COMPRESSOR 8 2148.8 1 HAND TOOLS


2 GR1816 GENERATOR 8 3768 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 110 REPORTING DATE 22-Mar-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1055047 TIME REACHED CONTROL ROOM 18:45:00
TANK NUMBER NJBP 116(NIGHT) Direct / Part of DIRECT PERMIT START 19:00:00 PM
L.I. Description FIBER CHIPPING PERMIT CLOSED 4:10:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 18753 RABINDAR HELPER 8 FIBER CHIPPING ON SHELL PLATE 1.7 1.7 Sq.m
2 20780 KUMAR KAMI HELPER 8 FIBER CHIPPING ON SHELL PLATE 1.7 1.7 Sq.m
3 21358 TAN BAHADUR HELPER 8 FIBER CHIPPING ON SHELL PLATE 1.7 1.7 Sq.m
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 HAND TOOLS
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 160 REPORTING DATE 22-Mar-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1057483 TIME REACHED CONTROL ROOM 18:45:00
TANK NUMBER NJBP 116(NIGHT) Direct / Part of DIRECT PERMIT START 19:00:00 PM
L.I. Description SAND SHIFTING & SPREADING PERMIT CLOSED 4:10:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 25331 ROHANATHAS HELPER 8 - SHIFTING SAND FROM OUTSIDE TANK TO INSIDE TANK 0.306 0.306 Cu.m
2 SPREADING SAND
3 25323 GUNATHEEBAN HELPER 8 - SHIFTING SAND FROM OUTSIDE TANK TO INSIDE TANK 0.306 0.306 Cu.m
4 SPREADING SAND
5 22962 PREM HELPER 8 - SHIFTING SAND FROM OUTSIDE TANK TO INSIDE TANK 0.306 0.306 Cu.m
6 SPREADING SAND
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 140 REPORTING DATE 22-Mar-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1000302 TIME REACHED CONTROL ROOM 18:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT / PART OF PERMIT START 19:00:00 PM
L.I. Description ASPHALT BREAKING BY JACK HAMMER PERMIT CLOSED 5:10:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 2 TAKEN PERMIT & HELPING W0RKERS
2
3 23153 TEK SHRESTHA HELPER 8 2 ASPHALT JACK HAMMERING(6x0.85Meter)(BOTH INTERNAL & EXTERNAL OF TANK 0.306 0.306 Cu.M
4 REMOVING BROKEN ASPHALT PIECE
5 ASSIST FABRICATOR PULLING PLATE(6x0.85Meter)
6 25324 SIVARANJAN HELPER 8 2 ASPHALT JACK HAMMERING(6x0.85Meter)(BOTH INTERNAL & EXTERNAL OF TANK 0.306 0.306 Cu.M
7 REMOVING BROKEN ASPHALT PIECE
8 ASSIST FABRICATOR PULLING PLATE(6x0.85Meter)
9
10 20487 QURSHID HELPER 8 2 ASPHALT JACK HAMMERING(6x0.85Meter)(BOTH INTERNAL & EXTERNAL OF TANK 0.306 0.306 Cu.M NOTE
WITH 1 JACK HAMMER
11 REMOVING BROKEN ASPHALT PIECE WORKING
12 ASSIST FABRICATOR PULLING PLATE
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 JACK HAMMER 8 HOURS 1


2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 120/50 REPORTING DATE 22-Mar-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1091341 / '1056028 TIME REACHED CONTROL ROOM 18:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT / PART OF PERMIT START 19:00:00 PM
L.I. Description ANNULAR PLATE FITUP PERMIT CLOSED 5:10:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 19470 NOOR ALAM FAB 8 2 GAS CUTTING OF UNDER SHELL PLATE INTERNAL 6.2 6.2 Meter
2 GAS CUTTING OF DRIP PLATE EXTERNAL 6 6 Meter
3 MAKING FITUP FOR ANNULAR PLATE 1 PLATE
4
5 21865 NAUSHAD FAB 8 2 GAS CUTTING OF SHELL PLATE EXTERNAL 6.2 6.2 Meter
6 GRINDING ANNULAR PLATE(6x0.850Meter) 6.2 6.2 Meter
7 MAKING FITUP FOR ANNULAR PLATE 1 PLATE
8 NOTE 1)
S.NO 3 NOT HAVING ACCESS
9 14457 KRISHNA P.F 8 2 FIRE WATCH & ASSIST FABRICATORS TO STAY INSIDE SECURITY
10 ALLOWED TO WORK UPTO
12CLK,AFTER WENT OUTSIDE
11 24613 WILLIAMS FAB 5 3 ASSIST FABRICATOR OF PLANT 2) ONLY ONE
12 CUTTING SET AVAILABLE IN
TANK S.NO 1 & 2 WORKED
13 WITH IT.
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 50 OXYGEN 1.3 EA
2 2 50 ACETYLENE 0.8 EA
3 3 50 7" GRINDING WHEEL 2 EA
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 70 REPORTING DATE 21-Mar-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1056028 TIME REACHED CONTROL ROOM 18:45:00
TANK NUMBER NJBP 110 (NIGHT) Direct / Part of DIRECT PERMIT START 19:00:00 PM
L.I. Description GAS CUTTING OF OLD BOTTOM PLATE PERMIT CLOSED 5:20:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 19470 NOOR ALAM FAB 8 GAS CUTTING OF OLD BOTTOM PLATES 18 18 Meter
2 21865 NAUSHAD FAB 8 2 GAS CUTTING OF OLD BOTTOM PLATES 19 4 23 Meter
3 24613 WILLIAMS FAB 8 GAS CUTTING OF OLD BOTTOM PLATES 16 16 Meter
4 14457 KRISHNA P.F 8 FIRE WATCH & ASSIST FABRICATORS
5
6
7
8
9 NOTE S.NO 1
10 & 3 ACETYLENE & OXYGEN
CYLINDER FINISHED AT
11 02.30AM NO FULL CYLINDER
12 AVAILABLE
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 GR1765 GENERATOR 9 4003 1 70 OXYGEN 3 EA


2 AC1670 AIR COMPRESSOR 9 6989 2 70 ACETYLENE 2.3 EA
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 90 REPORTING DATE 21-Mar-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1081190 TIME REACHED CONTROL ROOM 18:45:00
TANK NUMBER NJBP 110(NIGHT) Direct / Part of DIRECT / PART OF PERMIT START 19:00:00 PM
L.I. Description WELDING OF BOTTOM PLATES PERMIT CLOSED 5:20:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 22494 ABDUL QUAIDR WELDER 8 2 WELDED BOTTOM PLATE (3PASS) 12 2 14 Meter
2 21855 HARI CHARAN WELDER 8 2 WELDED BOTTOM PLATE (3PASS) 12 2 14 Meter
3 21395 BHIMAYA WELDER 8 2 WELDED BOTTOM PLATE (3PASS) 12 2 14 Meter
4
5 21197 GUNJA HELPER 8 2 ASSIST WELDER & GRINDING (3 PASS) 12 2 14 Meter
6 21914 CHANDRA HELPER 8 2 ASSIST WELDER & GRINDING (3 PASS) 12 2 14 Meter
7 23153 TEK SHRESTHA HELPER 8 2 ASSIST WELDER & GRINDING (3 PASS) 12 2 14 Meter
8 18753 RABINDAR HELPER 8 ASSIST WELDER & GRINDING (3 PASS)
9 20780 KUMAR KAMI HELPER 8 ASSIST WELDER & GRINDING (3 PASS)
10 21358 TAN BAHADUR HELPER 8 2 FIRE WATCH
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 WM2094 WELDING MACHINE 8 2016.7 1 90 WELDING ROD DIA 2.5 28 KG


2 WM1714 WELDING MACHINE 8 5698.8 2 90 4" GRINDING WHEEL 3 EA
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 80 REPORTING DATE 20-Mar-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1055131 TIME REACHED CONTROL ROOM 18:45:00
TANK NUMBER NJBP 110(NIGHT) Direct / Part of PART OF PERMIT START 19:05:00
L.I. Description REMOVING OLD (SCRAP) BOTTOM PLATES PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 18753 RABINDAR HELPER 8 ALL TOGETHER REMOVING SCRAPPLATES INSIDE TO OUTSIDETANK NEARDIKEWALL 7- 7 TON
2 20780 KUMAR KAMI HELPER 8 DISTANCE FROM INSIDE TANK TO DIKEWALL NEARLY 70MTRS
3 25042 BHUDHAN HELPER 8
4 21358 TAN BAHADUR HELPER 8
5 21258 RAJ S.F 8
6 21197 GUNJA HELPER 8
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 HAND TOOLS
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 70 REPORTING DATE 20-Mar-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1056028 TIME REACHED CONTROL ROOM 18:45:00
TANK NUMBER NJBP 110 (NIGHT) Direct / Part of DIRECT PERMIT START 19:05:00
L.I. Description GAS CUTTING OF OLD BOTTOM PLATE PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 19470 NOOR ALAM FAB 8 GAS CUTTING OF OLD BOTTOM PLATES 13 13 Meter
2 21865 NAUSHAD FAB 8 GAS CUTTING OF OLD BOTTOM PLATES 13 13 Meter
3 14457 KRISHNA P.F 8 FIRE WATCH & ASSIST FABRICATORS
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 70 OXYGEN 2.5 EA
2 2 70 ACETYLENE 2 EA
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 300 REPORTING DATE 20-Mar-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM 18:45:00
TANK NUMBER NJBP 101 Direct / Part of DIRECT PERMIT START 19:05:00
L.I. Description RE HYDRO TEST PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 16678 SELVA RAJ MASON 8 TK 101 STANDBY
2 15019 NARESH HELPER 8 INLET VALVE STANDBY
3 25331 ROHANATHAS HELPER 8 TK 106 STANDBY
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 80 REPORTING DATE 20-Mar-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1055131 TIME REACHED CONTROL ROOM 6:55:00
TANK NUMBER NJBP 110(NIGHT) Direct / Part of PART OF PERMIT START 19:05:00 PM
L.I. Description JACK HAMERRING PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 TAKEN PERMIT & HELPING WORKERS
2
3 21914 CHANDRA HELPER 8 ASPHALT BREAKING BY JACK HAMMER 8.2 - 8.2 Cu.m
4 20882 MAN HELPER 8 ASPHALT BREAKING BY JACK HAMMER
5 24592 DINESH S.F 8 TOPPLING HAMMERED ASPHALT
6 25329 RUBEN HELPER 8 TOPPLING HAMMERED ASPHALT
7 25330 SANTHURU HELPER 8 TOPPLING HAMMERED ASPHALT
8
9 25324 SIVARANJAN HELPER 8 ASPHALT BREAKING BY JACK HAMMER
10 25323 GUNATHEEBAN HELPER 8 ASPHALT BREAKING BY JACK HAMMER 7.4 - 7.4 cu.m
11 25330 SANTHURU HELPER 8 TOPPLING HAMMERED ASPHALT
12 25318 PASKARAN HELPER 8 TOPPLING HAMMERED ASPHALT
13
14 20487 QURSHID HELPER 8 EQUIPMET STANDBY
15 22962 PREM HELPER 8 D-DOOR STANDBY
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 GR1765 GENERATOR 6 3989 1 HAND TOOLS


2 AC1670 AIR COMPRESSOR 6 6975 2
3 W/M 1714 WELDING MACHINE IDLE 5683.4 3
4 W/M 2094 WELDING MACHINE IDLE 2000.1 4
5 AC1018 AIR COMPRESSOR IDLE 2133.8 5
6 JACK HAMMER 8 HRS 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 90 REPORTING DATE 19-Mar-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1081190 TIME REACHED CONTROL ROOM 6:50:00
TANK NUMBER NJBP 110(NIGHT) Direct / Part of DIRECT / PART OF PERMIT START 19:05:00 PM
L.I. Description WELDING OF BOTTOM PLATES PERMIT CLOSED 5:15:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 22494 ABDUL QUAIDR WELDER 8 2 WELDED BOTTOM PLATE (3PASS) 12 2 14 Meter
2 21855 HARI CHARAN WELDER 8 2 WELDED BOTTOM PLATE (3PASS) 12 1.5 13.5 Meter
3
4
5
6 21914 CHANDRA HELPER 8 2 ASSIST WELDER & GRINDING (3 PASS) 12 1.5 13.5 Meter
7 23153 TEK SHRESTHA HELPER 8 2 ASSIST WELDER & GRINDING (3 PASS) 12 2 14 Meter
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 90 WELDING ROD DIA 2.5 22 KG


2 2 90 4" GRINDING WHEEL 3 EA
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 70 REPORTING DATE 19-Mar-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1056028 TIME REACHED CONTROL ROOM 6:50:00
TANK NUMBER NJBP 110 (NIGHT) Direct / Part of DIRECT PERMIT START 19:05:00 PM
L.I. Description GAS CUTTING OF OLD BOTTOM PLATE PERMIT CLOSED 5:15:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24613 WILLIAMS FAB 8 2 GAS CUTTING OF OLD BOTTOM PLATES 16 2 18 Meter
2 25330 SANTHURU HELPER 8 2 GAS CUTTING OF OLD BOTTOM PLATES 16 2 18 Meter
3 14457 KRISHNA P.F 8 2 FIRE WATCH & ASSIST FABRICATORS
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 70 OXYGEN 2 EA
2 2 70 ACETYLENE 2 EA
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 80 REPORTING DATE 19-Mar-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1055131 TIME REACHED CONTROL ROOM 6:50:00
TANK NUMBER NJBP 110(NIGHT) Direct / Part of PART OF PERMIT START 19:05:00 PM
L.I. Description REMOVING OLD (SCRAP) BOTTOM PLATES PERMIT CLOSED 5:15:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 2 TAKEN PERMIT & HELPING WORKERS
2 18753 RABINDAR HELPER 8 2 ALL TOGETHER REMOVING SCRAPPLATES INSIDE TO OUTSIDETANK NEARDIKEWALL 9.6 1.5 11.1 TON
3 24913 BOGINDRA S.F 8 2 DISTANCE FROM INSIDE TANK TO DIKEWALL NEARLY 60MTRS
4 20882 MAN HELPER 8 2
5 24592 DINESH S.F 8 2
6 25042 BHUDHAN HELPER 8 2
7 20780 KUMAR KAMI HELPER 8 2
8
9
10 15019 NARESH HELPER 8 2 ALL TOGETHER REMOVING SCRAPPLATES INSIDE TO OUTSIDETANK NEARDIKEWALL 9.4 1.3 10.7 TON
11 21358 TAN BAHADUR HELPER 8 2 DISTANCE FROM INSIDE TANK TO DIKEWALL NEARLY 60MTRS
12 25331 ROHANATHAS HELPER 8 2
13 25324 SIVARANJAN HELPER 8 2
14 25323 GUNATHEEBAN HELPER 8 2
15
16
17
18 20487 QURSHID HELPER 8 2 EQUIPMET STANDBY
19 22962 PREM HELPER 8 2 D-DOOR STANDBY
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 GR1765 GENERATOR 8 3980 1 HAND TOOLS


2 AC1670 AIR COMPRESSOR 8 6964.8 2
3 W/M 1714 WELDING MACHINE 8 5679 3
4 W/M 2094 WELDING MACHINE 8 1996 4
5 AC1018 AIR COMPRESSOR IDLE 2133.8 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 140 REPORTING DATE 18-Mar-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1000302 TIME REACHED CONTROL ROOM 18:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT PERMIT START 19:15:00
L.I. Description ASHPHALT BREAK OUT PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 TAKE PERMIT
2 25329 RUBEN HELPER 8 D DOOR STANDBY MAN
3 21197 GUNJA HELPER 8 JACK HAMMERING 8 M³
4 21914 CHANDRA HELPER 8 JACK HAMMERING
5 23153 TEK HELPER 8 JACK HAMMERING
6 21258 RAJ S.F 8 JACK HAMMERING
7 25318 PASKARAN HELPER 8 EQUIPMENT STANDBY MAN
8
9
10
11
12 21855 HARI CHARAN WELDER 8
13 22494 ABDUL WELDER 8
14 21395 BHIMYA WELDER 8
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 WM2094 WELDING MACHINE IDLE 1969.9 1


2 WM1693 WELDING MACHINE IDLE 7161.1 2
3 GR1865 GENERATOR 8 1856 3
4 AC1669 AIR COMPRESSOR 8 4030.6 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 80 REPORTING DATE 18-Mar-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1055131 TIME REACHED CONTROL ROOM 6:50:00
TANK NUMBER NJBP 110(NIGHT) Direct / Part of PART OF PERMIT START 19:05:00 PM
L.I. Description JACK HAMERRING PERMIT CLOSED 5:15:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 2 TAKEN PERMIT & HELPING WORKERS
2 8.3 2.1 10.4 Cu.m
3 24913 BOGINDRA S.F 8 3 ASPHALT BREAKING BY JACK HAMMER
4 20882 MAN HELPER 8 3 ASPHALT BREAKING BY JACK HAMMER
5 24592 DINESH S.F 8 3 ASPHALT BREAKING BY JACK HAMMER
6 25042 BHUDHAN HELPER 8 3 TOPPLING HAMMERED ASPHALT
7 18753 RABINDAR HELPER 8 3 TOPPLING HAMMERED ASPHALT
8 20780 KUMAR KAMI HELPER 8 3 TOPPLING HAMMERED ASPHALT
9
10 15019 NARESH HELPER 8 3 ASPHALT BREAKING BY JACK HAMMER 8.6 1.9 10.5 cu.m
11 25330 SANTHURU HELPER 8 3 ASPHALT BREAKING BY JACK HAMMER
12 25331 ROHANATHAS HELPER 8 3 TOPPLING HAMMERED ASPHALT
13 25324 SIVARANJAN HELPER 8 3 TOPPLING HAMMERED ASPHALT
14 25323 GUNATHEEBAN HELPER 8 3 TOPPLING HAMMERED ASPHALT
15 21358 TAN BAHADUR HELPER 8 3 FIRE WATCH
16
17
18 20487 QURSHID HELPER 8 EQUIPMET STANDBY
19 22962 PREM HELPER 8 D-DOOR STANDBY
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 GR1765 GENERATOR 8 3966 1 HAND TOOLS


2 AC1018 AIR COMPRESSOR 8 2128.5 2
3 W/M 1714 WELDING MACHINE IDLE 5664.8 3
4 AC1670 AIR COMPRESSOR IDLE 6955.3 4
5 AC1612 AIR COMPRESSOR IDLE 3936.7 5
6 JACK HAMMER 8 HRS 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 80 REPORTING DATE 17-Mar-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1055131 TIME REACHED CONTROL ROOM 6:50:00
TANK NUMBER NJBP 110(NIGHT) Direct / Part of PART OF PERMIT START 19:05:00 PM
L.I. Description JACK HAMERRING PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 TAKEN PERMIT & HELPING WORKERS
2 7- 7 Cu.m
3 24913 BOGINDRA S.F 8 ASPHALT BREAKING BY JACK HAMMER
4 20882 MAN HELPER 8 ASPHALT BREAKING BY JACK HAMMER
5 24592 DINESH S.F 8 TOPPLING HAMMERED ASPHALT
6 25042 BHUDHAN HELPER 8 TOPPLING HAMMERED ASPHALT
7 18753 RABINDAR HELPER 8 TOPPLING HAMMERED ASPHALT
8
9
10 15019 NARESH HELPER 8 ASPHALT BREAKING BY JACK HAMMER 7- 7 cu.m
11 25330 CHANDRU HELPER 8 ASPHALT BREAKING BY JACK HAMMER
12 25331 ROHANATHAS HELPER 8 TOPPLING HAMMERED ASPHALT
13 25324 SIVARANJAN HELPER 8 TOPPLING HAMMERED ASPHALT
14 25323 GUNATHEEBAN HELPER 8 TOPPLING HAMMERED ASPHALT
15 21358 TAN BAHADUR HELPER 8 FIRE WATCH
16
17
18 20487 QURSHID HELPER 8 EQUIPMET STANDBY
19 22962 PREM HELPER 8 D-DOOR STANDBY
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 GR1765 GENERATOR 8 3953 1 HAND TOOLS


2 AC1018 AIR COMPRESSOR 8 2114.7 2
3 W/M 1714 WELDING MACHINE IDLE 5657.1 3
4 AC1670 AIR COMPRESSOR IDLE 6955.3 4
5 AC1612 AIR COMPRESSOR IDLE 3936.7 5
6 JACK HAMMER 8 HRS 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 70 REPORTING DATE 16-Mar-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1056028 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 110 (NIGHT) Direct / Part of DIRECT PERMIT START 19:05:00 PM
L.I. Description GAS CUTTING OF OLD BOTTOM PLATE PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24613 WILLIAMS FAB 8 - GAS CUTTING OF OLD BOTTOM PLATES 7.5 7.5 Meter
2 19470 NOOR ALAM FAB 8 - GAS CUTTING OF OLD BOTTOM PLATES 7.5 7.5 Meter
3 21865 NAUSHAD FAB 8 - GAS CUTTING OF OLD BOTTOM PLATES 7.5 7.5 Meter
4 21358 TAN BAHADUR HELPER 8 - FIRE WATCH & ASSIST FABRICATORS
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 70 OXYGEN 2 EA
2 2 70 ACETYLENE 1.5 EA
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 80 REPORTING DATE 16-Mar-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1055131 TIME REACHED CONTROL ROOM 6:50:00
TANK NUMBER NJBP 110(NIGHT) Direct / Part of PART OF PERMIT START 19:05:00 PM
L.I. Description REMOVING OLD (SCRAP) BOTTOM PLATES PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 TAKEN PERMIT & HELPING WORKERS
2 18753 RABINDAR HELPER 8 ALL TOGETHER REMOVING SCRAPPLATES INSIDE TO OUTSIDETANK NEARDIKEWALL 7- 7 TON
3 24913 BOGINDRA S.F 8 DISTANCE FROM INSIDE TANK TO DIKEWALL NEARLY 62MTRS
4 20882 MAN HELPER 8
5 24592 DINESH S.F 8
6 25042 BHUDHAN HELPER 8
7
8
9
10 15019 NARESH HELPER 8 ALL TOGETHER REMOVING SCRAPPLATES INSIDE TO OUTSIDETANK NEARDIKEWALL 7- 7 TON
11 25330 CHANDRU HELPER 8 DISTANCE FROM INSIDE TANK TO DIKEWALL NEARLY 65MTRS
12 25331 ROHANATHAS HELPER 8
13 25324 SIVARANJAN HELPER 8
14 25323 GUNATHEEBAN HELPER 8
15
16 21358 TAN BAHADUR HELPER 8
17
18 20487 QURSHID HELPER 8 EQUIPMET STANDBY
19 22962 PREM HELPER 8 D-DOOR STANDBY
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 GR1765 GENERATOR 8 3944 1 HAND TOOLS


2 AC1670 AIR COMPRESSOR 8 6962.2 2
3 W/M 1714 WELDING MACHINE IDLE 5643.2 3
4 W/M 1693 WELDING MACHINE IDLE 7127 4
5 AC1018 AIR COMPRESSOR IDLE 2088 5
6 AC1612 AIR COMPRESSOR IDLE 3936.7 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 80 REPORTING DATE 15-Mar-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1055131 TIME REACHED CONTROL ROOM 6:50:00
TANK NUMBER NJBP 110(NIGHT) Direct / Part of PART OF PERMIT START 19:05:00 PM
L.I. Description REMOVING OLD (SCRAP) BOTTOM PLATES PERMIT CLOSED 5:30:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 2 TAKEN PERMIT & HELPING WORKERS
2 18753 RABINDAR HELPER 8 2 ALL TOGETHER REMOVING SCRAPPLATES INSIDE TO OUTSIDETANK NEARDIKEWALL 10.5 2.3 12.7 TON
3 24913 BOGINDRA S.F 8 2 DISTANCE FROM INSIDE TANK TO DIKEWALL NEARLY 62MTRS
4 20882 MAN HELPER 8 2
5 24592 DINESH S.F 8 2
6 25042 BHUDHAN HELPER 8 2
7
8
9
NOTE
10 15019 NARESH HELPER 8 3 ALL TOGETHER REMOVING SCRAPPLATES INSIDE TO OUTSIDETANK NEARDIKEWALL 13.1 2.3 15.4 TON SHIFTING ACETYLENE 2 EA
11 25330 CHANDRU HELPER 8 3 DISTANCE FROM INSIDE TANK TO DIKEWALL NEARLY 65MTRS FROM YARD TO TANK BY
WHEEL STAND TAKEN 25MIN
12 25331 ROHANATHAS HELPER 8 3
13 25324 SIVARANJAN HELPER 8 3
14 25323 GUNATHEEBAN HELPER 8 3
15
16 21358 TAN BAHADUR HELPER 8 2 FIBER CHIPPING OF OLD BOTTOM PLATES 20 20 Meter
17
18 20487 QURSHID HELPER 8 2 EQUIPMET STANDBY
19 22962 PREM HELPER 8 2 D-DOOR STANDBY
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 GR1765 GENERATOR 8 3932 1 HAND TOOLS


2 AC1670 AIR COMPRESSOR 8 6952.2 2
3 W/M 1714 WELDING MACHINE IDLE 5643.2 3
4 W/M 1693 WELDING MACHINE IDLE 7127 4
5 AC1018 AIR COMPRESSOR IDLE 2088 5
6 AC1612 AIR COMPRESSOR IDLE 3936.7 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 70 REPORTING DATE 15-Mar-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1056028 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 110 (NIGHT) Direct / Part of DIRECT PERMIT START 19:05:00 PM
L.I. Description GAS CUTTING OF OLD BOTTOM PLATE PERMIT CLOSED 4:50:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24613 WILLIAMS FAB 8 - GAS CUTTING OF OLD BOTTOM PLATES 19 19 Meter
2 19470 NOOR ALAM FAB 8 2 GAS CUTTING OF OLD BOTTOM PLATES 25 5 30 Meter
3 21865 NAUSHAD FAB 8 2 GAS CUTTING OF OLD BOTTOM PLATES 25 5 30 Meter
4 14457 KRISHNA P.F 8 - FIRE WATCH & ASSIST FABRICATORS
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 70 OXYGEN 2.5 EA
2 2 70 ACETYLENE 2 EA
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 90 REPORTING DATE 14-Mar-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1081190 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 110 (NIGHT) Direct / Part of DIRECT PERMIT START 19:05:00 PM
L.I. Description WELDING OF BOTTOM PLATES PERMIT CLOSED 3:45:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 21395 BIMAYA WELDER 8 - STITCH WELDING OF BOTTOM PLATES 50 50 Meter
2 25331 ROHANATHAS HELPER 8 - HAMMERING ON STITCH WELD & ASSIST WELDER 50 50 Meter
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 WELDING ELECTRODE DIA 2.5 7 KG


2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 70 REPORTING DATE 14-Mar-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1056028 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 110 (NIGHT) Direct / Part of DIRECT PERMIT START 19:05:00 PM
L.I. Description GAS CUTTING OF OLD BOTTOM PLATE PERMIT CLOSED 3:45:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24613 WILLIAMS FAB 8 - GAS CUTTING OF OLD BOTTOM PLATES 18 18 Meter
2 19470 NOOR ALAM FAB 8 - GAS CUTTING OF OLD BOTTOM PLATES 18 18 Meter
3 21865 NAUSHAD FAB 8 - GAS CUTTING OF OLD BOTTOM PLATES 18 18 Meter
4 20780 KUMAR KAMI HELPER 8 - FIRE WATCH & ASSIST FABRICATORS
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 70 OXYGEN 3 EA
2 2 70 ACETYLENE 2.1 EA
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 80 REPORTING DATE 14-Mar-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1055131 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 110(NIGHT) Direct / Part of PART OF PERMIT START 19:05:00 PM
L.I. Description JACK HAMERRING PERMIT CLOSED 5:10:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24913 BOGINDRA S.F 8 2 ASPHALT BREAKING BY JACK HAMMER 2.5 1 3.5 Cu.m
2 14457 KRISHNA P.F 8 2 ASPHALT BREAKING BY JACK HAMMER 2.5 1 3.5 Cu.m
3 25324 SIVARANJAN HELPER 8 2 ASPHALT BREAKING BY JACK HAMMER 2.5 1 3.5 Cu.m
4 25323 GUNATHEEBAN HELPER 8 2 TOPPLING BROKEN ASPHALTS
5 20882 MAN HELPER 8 2 TOPPLING BROKEN ASPHALTS
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 JACK HAMMER 8 HRS 1 HAND TOOLS


2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 80 REPORTING DATE 14-Mar-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1055131 TIME REACHED CONTROL ROOM 6:50:00
TANK NUMBER NJBP 110(NIGHT) Direct / Part of PART OF PERMIT START 19:05:00 PM
L.I. Description REMOVING OLD (SCRAP) BOTTOM PLATES PERMIT CLOSED 5:10:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 2 TAKEN PERMIT & HELPING WORKERS
2 18753 RABINDAR HELPER 8 2 ALL TOGETHER REMOVING SCRAPPLATES INSIDE TO OUTSIDETANK NEARDIKEWALL 13 2.5 15.5 TON
3 21358 TAN BAHADUR HELPER 8 2
4 25330 CHANDRU HELPER 8 3
5 15019 NARESH HELPER 8 3
6 24592 DINESH S.F 8 3
7 23153 TEK SHRESTHA HELPER 8 3
8 25042 BHUDHAN HELPER 8 3
9
10
11
12
13
14
15 20487 QURSHID HELPER 8 2 EQUIPMET STANDBY
16 22962 PREM HELPER 8 2 D-DOOR STANDBY
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 GR1765 GENERATOR 8 3919 1 HAND TOOLS


2 AC1670 AIR COMPRESSOR 8 6938 2
3 W/M 1714 WELDING MACHINE 8 5637.2 3
4 W/M 1693 WELDING MACHINE IDLE 7123 4
5 AC1018 AIR COMPRESSOR IDLE 2076.2 5
6 AC1612 AIR COMPRESSOR IDLE 3936.7 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 80 REPORTING DATE 11-Mar-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1055131 TIME REACHED CONTROL ROOM 6:50:00
TANK NUMBER NJBP 110(NIGHT) Direct / Part of PART OF PERMIT START 19:05:00 PM
L.I. Description REMOVING OLD (SCRAP) BOTTOM PLATES PERMIT CLOSED 5:10:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 2 TAKEN PERMIT & HELPING WORKERS
2 18753 RABINDAR HELPER 8 2 ALL TOGETHER REMOVING SCRAPPLATES INSIDE TO OUTSIDETANK NEARDIKEWALL 11 2.9 13.9 TON
3 21358 TAN BAHADUR HELPER 8 2
4 25330 CHANDRU HELPER 8 3
5 11448 CHITRA HELPER 8 3
6 24592 DINESH S.F 8 3
7 23153 TEK SHRESTHA HELPER 8 3
8 25042 BHUDHAN HELPER 8 3
9 15019 NARESH HELPER 8 3
10 25331 ROHANATHAS HELPER 8 3
11
12
13
14
15 20487 QURSHID HELPER 8 2 EQUIPMET STANDBY
16 22962 PREM HELPER 8 2 D-DOOR STANDBY
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 GR1765 GENERATOR 8 3906 1 HAND TOOLS


2 AC1670 AIR COMPRESSOR 8 6924 2
3 3
4 4
5 AC1018 AIR COMPRESSOR IDLE 2076.2 5
6 AC1612 AIR COMPRESSOR IDLE 3936.7 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 70 REPORTING DATE 12-Mar-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1056028 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 110 (NIGHT) Direct / Part of DIRECT PERMIT START 19:05:00 PM
L.I. Description GAS CUTTING OF OLD BOTTOM PLATE PERMIT CLOSED 5:15:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24613 WILLIAMS FAB 8 2 GAS CUTTING OF OLD BOTTOM PLATES 22 3 22.5 Meter
2 25330 CHANDRU HELPER 8 2 GAS CUTTING OF OLD BOTTOM PLATES 17 2 22.5 Meter
3 20780 KUMAR KAMI HELPER 8 2 FIRE WATCH & CHANGING GAS CYLINDERS
4
5
6
7
8
9
NOTE S.NO 2 DON’T HAVE
10 CUTTING TORCH BRINGING
11 FROM TANK 116 AND
STARTED WORK 20.45
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 70 OXYGEN 2.5 EA
2 2 70 ACETYLENE 1.8 EA
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 70 REPORTING DATE 11-Mar-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1056028 TIME REACHED CONTROL ROOM 6:50:00
TANK NUMBER NJBP 110 (NIGHT) Direct / Part of DIRECT PERMIT START 19:05:00 PM
L.I. Description GAS CUTTING OF OLD BOTTOM PLATE PERMIT CLOSED 5:10:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24613 WILLIAMS FAB 8 2 - CUTTING OLD BOTTOM PLATES 20 2.5 22.5 Meter
2 20780 KUMAR KAMI HELPER 8 2 FIRE WATCH
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 70 OXYGEN 1 EA
2 2 70 ACETYLENE 1 EA
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 80 REPORTING DATE 11-Mar-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1055131 TIME REACHED CONTROL ROOM 6:50:00
TANK NUMBER NJBP 110(NIGHT) Direct / Part of PART OF PERMIT START 19:05:00 PM
L.I. Description REMOVING OLD (SCRAP) BOTTOM PLATES PERMIT CLOSED 5:10:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 2 TAKEN PERMIT & HELPING WORKERS
2 18753 RABINDAR HELPER 8 2 ALL TOGETHER REMOVING SCRAPPLATES INSIDE TO OUTSIDETANK NEARDIKEWALL 9.2 2.3 11.5 TON
3 25330 CHANDRU HELPER 8 2
4 11448 CHITRA HELPER 8 2
5 21358 TAN BAHADUR HELPER 8 2
6 24592 DINESH S.F 8 2
7 23153 TEK SHRESTHA HELPER 8 2
8 25042 BHUDHAN HELPER 8 2
9 15019 NARESH HELPER 8 2 NOTE OLD
BOTTOM PLATE IS WELDED
10 WITH TWO
11 25331 ROHANATHAS HELPER 8 WENT HOSPITAL MEDICAL LEAVE PLATES(OVERLAP) ,SO EACH
PLATE SHIFTING ITS HEAVY BY
12 TROLLEY
13
14
15 20487 QURSHID HELPER 8 2 EQUIPMET STANDBY
16 22962 PREM HELPER 8 2 D-DOOR STANDBY
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 GR1765 GENERATOR 8 3893 1 HAND TOOLS


2 AC1670 AIR COMPRESSOR 8 6909.3 2
3 3
4 4
5 AC1018 AIR COMPRESSOR IDLE 2066 5
6 AC1612 AIR COMPRESSOR IDLE 3936.7 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 90 REPORTING DATE 11-Mar-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1081190 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 110 (NIGHT) Direct / Part of IDLE PERMIT START 7:00:00
L.I. Description WELDING OF BOTTOM PLATES PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 25299 ISHTEYAQ WELDER 8 WAITING FOR ARAMCO INSPECTOR TO PROCEED WELDING
2 21395 BIMAYA WELDER 8 WAITING FOR ARAMCO INSPECTOR TO PROCEED WELDING
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1693 WELDING MACHINE IDLE 7120.1 1


2 1714 WELDING MACHINE IDLE 5616 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 90 REPORTING DATE 10-Mar-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1081190 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 110 Direct / Part of IDLE PERMIT START 7:00:00
L.I. Description WELDING OF BOTTOM PLATES PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 25299 ISHTEYAQ WELDER 8 WAITING FOR ARAMCO INSPECTOR TO PROCEED WELDING
2 21395 BIMAYA WELDER 8 WAITING FOR ARAMCO INSPECTOR TO PROCEED WELDING
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 80 REPORTING DATE 10-Mar-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1055131 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 110(NIGHT) Direct / Part of PART OF PERMIT START 7:00:00
L.I. Description JACK HAMERRING PERMIT CLOSED 17:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 23153 TEK SHRESTHA HELPER 8 2 ASPHALT BREAKING BY JACK HAMMER 3.8 0.6 4.4 Cu.m
2 25042 BHUDHAN HELPER 8 2 TOPPLING BROKEN ASPHALTS 3.8 0.6 4.4 Cu.m
3 15019 NARESH HELPER 8 2 TOPPLING BROKEN ASPHALTS 3.8 0.6 4.4 Cu.m
4 20780 KUMAR KAMI HELPER 8 - FIRE WATCH
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 JACK HAMMER 8 HRS 1 HAND TOOLS


2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 80 REPORTING DATE 10-Mar-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1055131 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 110(NIGHT) Direct / Part of PART OF PERMIT START 7:00:00
L.I. Description REMOVING OLD (SCRAP) BOTTOM PLATES PERMIT CLOSED 17:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 2 TAKEN PERMIT & HELPING WORKERS
2 25331 ROHANATHAS HELPER 8 2 ALL TOGETHER REMOVING SCRAPPLATES INSIDE TO OUTSIDETANK NEARDIKEWALL
3 25330 CHANDRU HELPER 8 2 ALL TOGETHER REMOVING SCRAPPLATES INSIDE TO OUTSIDETANK NEARDIKEWALL
4 11448 CHITRA HELPER 8 2 ALL TOGETHER REMOVING SCRAPPLATES INSIDE TO OUTSIDETANK NEARDIKEWALL
5 21358 TAN BAHADUR HELPER 8 2 ALL TOGETHER REMOVING SCRAPPLATES INSIDE TO OUTSIDETANK NEARDIKEWALL
6 24592 DINESH S.F 8 - ALL TOGETHER REMOVING SCRAPPLATES INSIDE TO OUTSIDETANK NEARDIKEWALL
7 PLATE SIZE (5Meter x 2Meter) 7 1 8 EA
8 PLATE SIZE (6Meter x 2Meter) 2 1 3 EA
9 NOTE OLD
BOTTOM PLATE IS WELDED
10 WITH TWO
11 20487 QURSHID HELPER 8 2 EQUIPMET STANDBY PLATES(OVERLAP) ,SO EACH
PLATE SHIFTING ITS HEAVY BY
12 22962 PREM HELPER 8 2 D-DOOR STANDBY TROLLEY
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1018 AIR COMPRESSOR IDLE 2066 1 HAND TOOLS


2 AC1670 AIR COMPRESSOR 8 6897 2
3 GR1765 GENERATOR 8 3882 3
4 WM1693 WELDING MACHINE IDLE 5608.8 4
5 WM1714 WELDING MACHINE IDLE 5604.8 5
6 AC1612 AIR COMPRESSOR IDLE 3936.7 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 80 REPORTING DATE 9-Mar-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1055131 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 110 Direct / Part of PART OF PERMIT START 7:00:00
L.I. Description REMOVING OLD (SCRAP) BOTTOM PLATES PERMIT CLOSED 17:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 2 TAKEN PERMIT & HELPING WORKERS
2 25331 ROHANATHAS HELPER 8 2 ALL TOGETHER REMOVING SCRAPPLATES INSIDE TO OUTSIDETANK NEARDIKEWALL
3 25330 CHANDRU HELPER 8 2 ALL TOGETHER REMOVING SCRAPPLATES INSIDE TO OUTSIDETANK NEARDIKEWALL
4 23153 TEK SHRESTHA HELPER 8 2 ALL TOGETHER REMOVING SCRAPPLATES INSIDE TO OUTSIDETANK NEARDIKEWALL
5 21358 TAN BAHADUR HELPER 8 2 ALL TOGETHER REMOVING SCRAPPLATES INSIDE TO OUTSIDETANK NEARDIKEWALL
6 25042 BHUDHAN HELPER 8 - ALL TOGETHER REMOVING SCRAPPLATES INSIDE TO OUTSIDETANK NEARDIKEWALL
7 PLATE SIZE (5Meter x 2Meter) 8 8 EA
8 PLATE SIZE (6Meter x 2Meter) 3 1 4 EA
9 PLATE SIZE (4.5Meter x 2Meter) 1 1 1 EA NOTE OLD
BOTTOM PLATE IS WELDED
10 WITH TWO
11 20487 QURSHID HELPER 8 2 EQUIPMET STANDBY PLATES(OVERLAP) ,SO EACH
PLATE SHIFTING ITS HEAVY BY
12 22962 PREM HELPER 8 2 D-DOOR STANDBY TROLLEY
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 HAND TOOLS
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 90 REPORTING DATE 9-Mar-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1081190 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 110 Direct / Part of DIRECT / PART OF PERMIT START 7:00:00
L.I. Description WELDING OF BOTTOM PLATES PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 25299 ISHTEYAQ WELDER 8 - WELDED BOTTOM PLATE (3PASS) 7- 7 Meter
2 21395 BIMAYA WELDER 8 - WELDED BOTTOM PLATE (3PASS) 7- 7 Meter
3
4 20780 KUMAR KAMI HELPER 8 - ASSIST WELDER & GRINDING (3 PASS) 14 - 14 Meter
5 15019 NARESH HELPER 8 - FIRE WATCH
6
7
8
9 NOTE
10 A/C 1018 AUTOMATIC OFF AT
09.40 CHANGING
11 COMPRESSOR 1670 TAKEN
12 20MINUTES
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1018 AIR COMPRESSOR 2 2066 1 90 WELDING ROD DIA 2.5 10 KG


2 AC1670 AIR COMPRESSOR 6 6884 2 90 4" GRINDING WHEEL 2 EA
3 GR1765 GENERATOR 8 3871 3 90 7" GRINDING WHEEL 1 EA
4 WM1693 WELDING MACHINE 8 7120 4
5 WM1714 WELDING MACHINE 8 5604.8 5
6 AC1612 AIR COMPRESSOR IDLE 3936.7 6
7 GRINDING MACHINE 8 HRS 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 70 REPORTING DATE 8-Mar-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1056028 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 110 Direct / Part of DIRECT PERMIT START 7:00:00
L.I. Description GAS CUTTING OF OLD BOTTOM PLATE PERMIT CLOSED 17:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 19470 NOOR ALAM FAB 8 - CUTTING OLD BOTTOM PLATE 10 - 10 Meter
2 21865 NAUSHAD FAB 8 - CUTTING OLD BOTTOM PLATE INCLUDING 3 COLUMN DOWNSIDE 6- 6 Meter
3 24613 WILLIAMS FAB 8 ID NOT ACCESSED 20 7 27 Meter
4 18753 RABINDAR HELPER 8 - ASSIST 2 FABRICATORS CHANGING GAS CYLINDERS
5 HELPING PULLING PLATE FROM INSIDE TO OUTSIDE TANK
6
7
8
9 S.NO 2 & 3 GAS CUTTING OLD
BOTTOM PLATES UPTO 11CLK
10 AFTER NO FULL CYLINDER
11 AVAILABLE (ACETYLENE) SO
HELPING LABOURS TO PULL
12 PLATES
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 150 OXYGEN 0.2 %


2 2 150 ACETYLENE 0.2 %
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 90 REPORTING DATE 8-Mar-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1081190 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 110 Direct / Part of DIRECT / PART OF PERMIT START 7:00:00
L.I. Description WELDING OF BOTTOM PLATES PERMIT CLOSED 17:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 2 TAKEN PERMIT & HELPING WORKERS
2 22494 ABDUL QUAIDR WELDER 8 2 WELDED BOTTOM PLATE (3PASS) 12 3 15 Meter
3 21855 HARI CHARAN WELDER 8 - WELDED BOTTOM PLATE (3PASS) 6- 6 Meter
4 25299 ISHTEYAQ WELDER 8 2 WELDED BOTTOM PLATE (3PASS) 12 3 15 Meter
5 21395 BIMAYA WELDER 8 2 WELDED BOTTOM PLATE (3PASS) 12 3 15 Meter
6
7 21914 CHANDRA HELPER 8 2 ASSIST WELDER & GRINDING (3 PASS) 12 3 15 Meter
8 23153 TEK SHRESTHA HELPER 8 2 ASSIST WELDER & GRINDING (3 PASS) 12 3 15 Meter
9 21197 GUNJA HELPER 8 2 ASSIST WELDER & GRINDING (3 PASS) 12 3 15 Meter
10 20780 KUMAR KAMI HELPER 8 - ASSIST WELDER & GRINDING (3 PASS) 6- 6 Meter NOTE S.NO
2 WELDING CABLE DAMAGED
11 CHANGING AKEN MORE TIME
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1018 AIR COMPRESSOR 8 2056.9 1 90 WELDING ROD DIA 2.5 32 KG


2 GR1765 GENEATOR 8 3858 2 90 4" GRINDING WHEEL 5 EA
3 WM1693 WELDING MACHINE 8 7107.2 3 90 7" GRINDING WHEEL 2 EA
4 WM1714 WELDING MACHINE 8 5591.6 4
5 WM1194 WELDING MACHINE 8 9970 5
6 AC1612 AIR COMPRESSOR IDLE 3936.7 6
7 AC1670 AIR COMPRESSOR IDLE 6876 7
8 GRINDING MACHINE 8 HRS 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 80 REPORTING DATE 8-Mar-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1055131 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 110 Direct / Part of PART OF PERMIT START 7:00:00
L.I. Description REMOVING OLD (SCRAP) BOTTOM PLATES PERMIT CLOSED 17:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 25042 BHUDHAN HELPER 8 2 ALL TOGETHER REMOVING SCRAP PLATES INSIDE TO OUTSIDE TANK DIKEWALL
2 15019 NARESH HELPER 8 2 ALL TOGETHER REMOVING SCRAP PLATES INSIDE TO OUTSIDE TANK DIKEWALL
3 25331 ROHANATHAS HELPER 8 2 ALL TOGETHER REMOVING SCRAP PLATES INSIDE TO OUTSIDE TANK DIKEWALL
4 25330 CHANDRU HELPER 8 2 ALL TOGETHER REMOVING SCRAP PLATES INSIDE TO OUTSIDE TANK DIKEWALL
5 21358 TAN BAHADUR HELPER 8 2 ALL TOGETHER REMOVING SCRAP PLATES INSIDE TO OUTSIDE TANK DIKEWALL
6 PLATE SIZE (5Meter x 2Meter) 4 4 EA
7 PLATE SIZE (6Meter x 2Meter) 5 2 7 EA
8 PLATE SIZE (4.5Meter x 2Meter) 2 1 3 EA
9 PLATE SIZE (5.5Meter x 3Meter) 2 1 3 EA
10
11 20487 QURSHID HELPER 8 2 EQUIPMET STANDBY
12 22962 PREM HELPER 8 2 D-DOOR STANDBY
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 HAND TOOLS
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 80 REPORTING DATE 7-Mar-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1055131 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 110 Direct / Part of PART OF PERMIT START 7:00:00
L.I. Description REMOVING OLD (SCRAP) BOTTOM PLATES PERMIT CLOSED 17:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 25042 BHUDHAN HELPER 8 2 ALL TOGETHER REMOVING SCRAP PLATES INSIDE TO OUTSIDE TANK DIKEWALL
2 15019 NARESH HELPER 8 2 ALL TOGETHER REMOVING SCRAP PLATES INSIDE TO OUTSIDE TANK DIKEWALL
3 25331 ROHANATHAS HELPER 8 2 ALL TOGETHER REMOVING SCRAP PLATES INSIDE TO OUTSIDE TANK DIKEWALL
4 25330 CHANDRU HELPER 8 2 ALL TOGETHER REMOVING SCRAP PLATES INSIDE TO OUTSIDE TANK DIKEWALL
5 21358 TAN BAHADUR HELPER 8 2 ALL TOGETHER REMOVING SCRAP PLATES INSIDE TO OUTSIDE TANK DIKEWALL
6 PLATE SIZE (5Meter x 2Meter) 3 3 EA
7 PLATE SIZE (6Meter x 2Meter) 6 2 8 EA
8 PLATE SIZE (4.5Meter x 2Meter) 2 2 EA
9 PLATE SIZE (3Meter x 2.3Meter) 5 1 6 EA
10 PLATE SIZE (5.5Meter x 3Meter) 2 2 EA
11 20487 QURSHID HELPER 8 2 EQUIPMET STANDBY
12 22962 PREM HELPER 8 2 D-DOOR STANDBY
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 HAND TOOLS
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 90 REPORTING DATE 7-Mar-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1081190 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 110 Direct / Part of DIRECT / PART OF PERMIT START 7:00:00
L.I. Description WELDING OF BOTTOM PLATES PERMIT CLOSED 17:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 22494 ABDUL QUAIDR WELDER 8 2 WELDED BOTTOM PLATE (3PASS) 12 3 15 Meter
2 21855 HARI CHARAN WELDER 8 2 WELDED BOTTOM PLATE (3PASS) 12 3 15 Meter
3 25299 ISHTEYAQ WELDER 8 2 WELDED BOTTOM PLATE (3PASS) 12 3 15 Meter
4 21395 BIMAYA WELDER 8 - WELDED BOTTOM PLATE (3PASS) 10 - 10 Meter
5
6 21914 CHANDRA HELPER 8 2 ASSIST WELDER & GRINDING (3 PASS) 12 3 15 Meter
7 23153 TEK SHRESTHA HELPER 8 2 ASSIST WELDER & GRINDING (3 PASS) 12 3 15 Meter
8 21197 GUNJA HELPER 8 2 ASSIST WELDER & GRINDING (3 PASS) 12 3 15 Meter
9 20780 KUMAR KAMI HELPER 8 - ASSIST WELDER & GRINDING (3 PASS) 10 - 10 Meter NOTE S.NO
10 4 WELDING MACHINE 1194
NOT WORKING PROPERLY
11 ,NOT PROVIDING POWER
12 CONTINOUSLY
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1670 AIR COMPRESSOR 8 6876 1 90 WELDING ROD DIA 2.5 30 KG


2 GR1765 GENEATOR 8 3845 2 90 4" GRINDING WHEEL 5 EA
3 WM1693 WELDING MACHINE 8 7095.5 3
4 WM1714 WELDING MACHINE 8 5580.8 4
5 WM1194 WELDING MACHINE 8 9957.5 5
6 AC1612 AIR COMPRESSOR IDLE 3936.7 6
7 AC1018 AIR COMPRESSOR IDLE 2046.4 7
8 GRINDING MACHINE 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 70 REPORTING DATE 7-Mar-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1056028 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 110 Direct / Part of DIRECT PERMIT START 7:00:00
L.I. Description GAS CUTTING OF OLD BOTTOM PLATE PERMIT CLOSED 17:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 2 TAKEN PERMIT & HELPING WORKERS
2 19470 NOOR ALAM FAB 8 2 CUTTING OLD BOTTOM PLATE 22 8 30 Meter
3 21865 NAUSHAD FAB 8 2 CUTTING OLD BOTTOM PLATE INCLUDING 3 COLUMN DOWNSIDE 18 7 25 Meter
4 24613 WILLIAMS FAB 8 2 CUTTING OLD BOTTOM PLATE 20 7 27 Meter
5 18753 RABINDAR HELPER 8 2 ASSIST 3 FABRICATORS CHANGING GAS CYLINDERS
6 SPRAYING WATER BEFORE & AFTER
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 150 OXYGEN 3.5 EA


2 2 150 ACETYLENE 2 EA
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 300 REPORTING DATE 6-Mar-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 101 Direct / Part of DIRECT PERMIT START 7:00:00
L.I. Description TRANSFERRING WATER(FOR HYDROTEST) PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 TRANSFERRING WATER FROM WATER TANK TO TANK 101(FOR HYDROTEST),LEVEL 15 15 Meter
2 18753 RABINDAR HELPER 8 2 STANBY AT OULET VALVE IN WATER TANK
3
4 20780 KUMAR KAMI HELPER 8 2 STANBY AT INLET VALVE IN TANK 101
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1612 AIR COMPRESSOR IDLE 3936.7 1


2 AC1018 AIR COMPRESSOR IDLE 2046.4 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 150/160 REPORTING DATE 6-Mar-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1091342/'1057483 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 110 Direct / Part of DIRECT / PART OF PERMIT START 7:00:00
L.I. Description FABRICATION OF ANNULAR PLATE PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 TAKEN PERMIT & HELPING WORKERS
2
3 5354 MUTHU FAB 8 FABRICATING ANNNULAR PLATE 1 1 EA
4 (CUTTING ENDBIT LAYOUT TOO)
5 19344 RAJ HELPER 8 FIRE WATCH & ASSISTING FABRICATOR
6 UNLOADING OXYGEN & ACETYLENE CYLINDER FROM DYNA TRUCK 27 27 EA
7 21358 TAN BAHADUR HELPER 8 SHIFITNG WELDING MACHINE FROM YARD WM1714 TO TANK 110 1 1 EA
8 SHIFITNG WELDING MACHINE WM905 FROM TANK 110 TO YARD 1 1 EA
9 SHIFTING FULL OXYGEN CYLINDER FROM YARD TO FABRICATION AREA 1 1 EA
10 EMPTY KEPT IN YARD BY DYNA TRUCK
11 SHIFTING SAND FROM YARD TO TANK 116 BY DUMP TRUCK LOADER 3 3 LOAD
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 150 OXYGEN 0.3 %


2 2 150 ACETYLENE 0.3 %
3 3 HAND TOOLS
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 150 REPORTING DATE 5-Mar-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1091342 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 110 Direct / Part of DIRECT PERMIT START 7:00:00
L.I. Description FABRICATION OF ANNULAR PLATE PERMIT CLOSED 17:15:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 5354 MUTHU FAB 8 2 FABRICATING TEMPLATE PLATE FOR ANNULAR CUTTING 1 1 EA
2 FABRICATING ANNNULAR PLATE 1 1 2 EA
3 19344 RAJ HELPER 8 2 FIRE WATCH & ASSISTING FABRICATOR
4 UNLOADING DEWATER PUMP AT TANK 101 1 1 EA
5 25438 TAYLOR FAB 8 - ASSIST MUTHU FABRICATOR
6 19069 DINESH BLASTER 8 - LOADING OXYGEN & ACETYLENE CYLINDERS ON BOOM TRUCK 2196 27 27 EA
7 WENT GAS FILLING SHOP WITH BOOM TRUCK DRIVER TO REFILL
8
9 NOTE
10 S.NO 1 & 5 STARTED
FABRICATION WORK AT 11.00
11 BEFORE REPARING RAMP AT
12 TANK 116
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 15 OXYGEN 1 EA
2 2 150 ACETYLENE 1 EA
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 300 REPORTING DATE 5-Mar-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 101 Direct / Part of DIRECT PERMIT START 7:00:00
L.I. Description TRANSFERRING WATER(FOR HYDROTEST) PERMIT CLOSED 17:15:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 2 TAKEN PERMIT & HELPING WORKERS
2 TRANSFERRING WATER FROM WATER TANK TO TANK 101(FOR HYDROTEST),LEVEL 11.2 0.9 12.1 Meter
3 18753 RABINDAR HELPER 8 2 STANBY AT OULET VALVE IN WATER TANK
4 21358 TAN BAHADUR HELPER 8 2 STANBY AT INLET VALVE IN TANK 101
5 20780 KUMAR KAMI HELPER 8 2 MONITORING WATER LEAK IN MARINE HOSE ROAD PATH (200MTRS)
6 ASSIST TANK EXTERNAL LAND SURVEY
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1612 AIR COMPRESSOR IDLE 3936.7 1


2 AC1018 AIR COMPRESSOR IDLE 2046.4 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 300 REPORTING DATE 4-Mar-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 101 Direct / Part of DIRECT PERMIT START 7:00:00
L.I. Description TRANSFERRING WATER(FOR HYDROTEST) PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 - TAKEN PERMIT & HELPING WORKERS
2 TRANSFERRING WATER FROM WATER TANK TO TANK 101(FOR HYDROTEST),LEVEL 8.3 - 8.3 Meter
3 11997 GIRI P.F 8 - STANBY AT OULET VALVE IN WATER TANK
4 21358 TAN BAHADUR HELPER 8 - STANBY AT INLET VALVE IN TANK 101
5 19344 RAJ HELPER 8 - MONITORING WATER LEAK IN MARINE HOSE ROAD PATH (200MTRS)
6 20780 KUMAR KAMI HELPER 8 - MONITORING WATER LEAK IN MARINE HOSE ROAD PATH (200MTRS)
7 18753 RABINDAR HELPER 8 - ASSIST TANK EXTERNAL LAND SURVEY
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1612 AIR COMPRESSOR IDLE 3936.7 1 SAND 0.6 Cu.m


2 AC1018 AIR COMPRESSOR IDLE 2046.4 2 HAND TOOLS
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 300 REPORTING DATE 3-Mar-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 101 Direct / Part of DIRECT PERMIT START 7:00:00
L.I. Description TRANSFERRING WATER(FOR HYDROTEST) PERMIT CLOSED 19:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 4 TAKEN PERMIT & HELPING WORKERS
2 TRANSFERRING WATER FROM WATER TANK TO TANK 101(FOR HYDROTEST),LEVEL 3.6 0.7 4.3 Meter
3 11997 GIRI P.F 8 4 HOUSE KEEPING & SAND SHIFTING 0.3 0.3 Cu.m
4 ASSIST TANK EXTERNAL LAND SURVEY UPTO 06.45
5 19344 RAJ HELPER 8 - HOUSE KEEPING & SAND SHIFTING 0.3 0.3 Cu.m
6 20780 KUMAR KAMI HELPER 8 - HOUSE KEEPING & LEVELLING SAND AT EXTERNAL TANK CIRCUMFERENCE
7 18753 RABINDAR HELPER 8 - HOUSE KEEPING & LEVELLING SAND AT EXTERNAL TANK CIRCUMFERENCE
8 21358 TAN BAHADUR HELPER 8 - HOUSE KEEPING & LEVELLING SAND AT EXTERNAL TANK CIRCUMFERENCE
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1612 AIR COMPRESSOR IDLE 3936.7 1 SAND 0.6 Cu.m


2 AC1018 AIR COMPRESSOR IDLE 2046.4 2 HAND TOOLS
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 20 REPORTING DATE 2-Mar-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1052024 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 110 Direct / Part of DIRECT/PART OF PERMIT START 7:00:00
L.I. Description GRIT BLASING OF ANNULAR PLATES PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 19069 DINESH BLASTER 8 - BLASTED ANNULAR PLATE (6x2METER) 3 3 Plates
2 BLASTED ANNULAR PLATE (6x2.5METER) 1 1 Plates
3
4 23329 NITIN BLASTER 8 - BLASTED ANNULAR PLATE (6x2METER) 4 4 Plates
5
6 21358 TAN BAHADUR HELPER 8 - FILLING GRIT IN SAND BOARD 0.7 0.7 TON
7
8 20680 ZAHIN HAMID HELPER 8 - FILLING GRIT IN SAND BOARD 0.7 0.7 TON
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 GRIT COAL SLAG 1.4 TON


2 2 HAND TOOLS
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 30 REPORTING DATE 2-Mar-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1064505 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 110 Direct / Part of PART OF PERMIT START 7:00:00
L.I. Description PAINTING PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 - TAKEN PERMIT & HELPING WORKERS
2 23327 NEELAKANTH PAINTER 8 - PAINTED ANNULAR PLATE APCS 3 BROWN(6x2METER) 8 8 Plates
3 PAINTED ANNULAR PLATE APCS 3 BROWN(6x2.5METER) 1 1 Plates
4 25326 CHATHURA NUWAN HELPER 8 - MIXIN PAINT
5 25325 DANISTAN HELPER 8 - HOLDING PAINT HOSE
6 PONTOON LENGTH 3060 7 7 EA
7 PONTOON LENGTH 3660 20 20 EA
8 PONTOON LENGTH 3355 20 20 EA
9 PONTOON LENGTH 2640 78 78 EA
NOTE
10 PONTOON LENGTH 2895 4 4 EA S.NO 4 & 5 MANUALLY
11 PONTOON LENGTH 3663 4 4 EA UNLOADED PONTOON SETS
FROM ARAMCO TRAILER
12 PONTOON LENGTH 3780 8 8 EA
13 PONTOON LENGTH 32445 2 2 EA
14 PONTOON LENGTH 3860 10 10 EA
15 PONTOON CLAMP 1 1 EA
16 FASTENER SCREW 400 400 SET
17 ALUMINIUM ANGLE 30x30x6000mm 76 76 EA
18 ALUMINIUM BRACKET 300x200x3mm 10 10 EA
19 FASTENER SS HEX BOLT 2650 2650 SET
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1612 AIR COMPRESSOR 8 3936.7 1 30 SIGMA UN1263 C200a CT EPOXY BROWN 40 Litres
2 AC1018 AIR COMPRESSOR IDLE 2046.4 2 30 THINNER 21-06 12 Litres
3 3 HAND TOOLS
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 80/40 REPORTING DATE 1-Mar-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1055131/1017801 TIME REACHED CONTROL ROOM 6:50:00
TANK NUMBER NJBP 110 Direct / Part of PART OF PERMIT START 7:05:00
L.I. Description LOADING SCRAP PLATES / SPREADING ANNULAR PLATES PERMIT CLOSED 17:10:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 2 TAKEN PERMIT & HELPING WORKERS
2 13936 JIMMY FO.OP 8 2 LOADING SCARP PLATES (TANK 110) 28 28 TONS
3 SPREADING ANNULAR PLATE (6x2METER) 9 9 Plates
4 25326 CHATHURA NUWAN HELPER 8 2 HOT BOLTING (TIGHTENING) MARINE HOSE STUD & NUT 30 30 EA
5 ASSIST FORK LIFT OPERATOR TO LOAD SCARP PLATES ON ARAMCO TRAILER 40 40 TONS
6 ASSIST FORK LIFT OPERATOR TO SPREAD ANNULAR PLATES (6x2METER) 8 8 Plates
7 ASSIST FORK LIFT OPERATOR TO SPREAD ANNULAR PLATES (6x2.5METER) 1 1 Plates
8 21358 TAN BAHADUR HELPER 8 2 HOT BOLTING (TIGHTENING) MARINE HOSE STUD & NUT 30 30 EA
9 ASSIST FORK LIFT OPERATOR TO LOAD SCARP PLATES ON ARAMCO TRAILER 40 40 TONS
10 FLAG MAN & ASSIST FORK LIFT
11 25325 DANISTAN HELPER 8 2 HOT BOLTING (TIGHTENING) MARINE HOSE STUD & NUT 30 30 EA
12 ASSIST FORK LIFT OPERATOR TO LOAD SCARP PLATES ON ARAMCO TRAILER 40 40 TONS
13 ASSIST FORK LIFT OPERATOR TO SPREAD ANNULAR PLATES (6x2METER) 8 8 Plates
14 ASSIST FORK LIFT OPERATOR TO SPREAD ANNULAR PLATES (6x2.5METER) 1 1 Plates
15 23326 SURESH PAINTER 8 - SHIFTING SOGEC COMPANY MATERIAL OUTSIDE TO INSIDE PLANT BY BOOMTRUCK
16 LOADING OXYGEN & ACTYLENE CYLINDER ON BOOM TRUCK IN TANK 110 & YARD 7 7 EA
17 19069 DINESH BLASTER 8 - SHIFTING SOGEC COMPANY MATERIAL OUTSIDE TO INSIDE PLANT BY BOOMTRUCK 20 20 EA
18 LOADING OXYGEN & ACTYLENE CYLINDER ON BOOM TRUCK IN TANK 110 & YARD 7 7 EA
19 13520 PANDIT HELPER 8 - SHIFTING SOGEC COMPANY MATERIAL OUTSIDE TO INSIDE PLANT BY BOOMTRUCK 20 20 EA
20 LOADING OXYGEN & ACTYLENE CYLINDER ON BOOM TRUCK IN TANK 110 & YARD 7 7 EA
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1612 AIR COMPRESSOR IDLE 3931.7 1 HAND TOOLS


2 AC1018 AIR COMPRESSOR IDLE 2046.4 2
3 FL909 FORK LIFT 8 432 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 40 REPORTING DATE 29-Feb-20

SERVICE ORDER NO. 6510948963 & 6510949239 Service Line Item# 1017801 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 110 & 116 Direct / Part of DIRECT PERMIT START 7:05:00
L.I. Description TOP COAT PAINTING PERMIT CLOSED 18:55:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 3 TAKEN PERMIT & HELPING WORKERS
2
3 23327 NEELAKANTH PAINTER 8 4 SAND PAPERING ON BOTTOM PLATES & COTTON RAG CLEANING 10 10 Plates
4 PAINTED BOTTOM PLATE(6x2Meter) APCS 3 BLACK TOP COAT 15 35 50 Plates
5 PAINTED BOTTOM PLATE(6x2.5Meter) APCS 3 BLACK TOP COAT(TANK 116) 10 10 Plates
6 13936 JIMMY FO.OP 8 - SHIFTED PAINT CANS IN PAINTING YARD & COMPRESSOR 1612 13 13 EA
7 23326 SURESH PAINTER 8 3 SAND PAPERING ON BOTTOM PLATES & COTTON RAG CLEANING 10 10 Plates
8 MIXING PAINT
9 21358 TAN BAHADUR HELPER 8 3 SAND PAPERING ON BOTTOM PLATES & COTTON RAG CLEANING 10 10 Plates NOTE
10 EQUIPMENT STANDBY 1) ARAMCO INSPECTOR
INSPECTED 03.15 TO 03.50 2)
11 25325 DANISTAN HELPER 8 3 SAND PAPERING ON BOTTOM PLATES & COTTON RAG CLEANING 10 10 Plates SAME LINE ITEM FOR BOTH
12 HOLDING PAINTER HOSE WHEN PAINTING TANK 110 & 116
13 25326 CHATHURA NUWAN HELPER 8 3 SAND PAPERING ON BOTTOM PLATES & COTTON RAG CLEANING 10 10 Plates
14 AIR CLEANING & ASSIST PAINT MIXING
15 20680 ZAHIN HAMID HELPER 8 - LOADING COUNTER WEIGHT BOX WITH SAND IN YARD AREA IN BOOM TRUCK 2196 17 17 EA
16 UNLOADING COUNTER WEIGHT BOX WITH SAND IN TANK 110 17 17 EA
17 SAND PAPERING ON BOTTOM PLATES & COTTON RAG CLEANING 5 5 Plates
18 19097 LOK BAHADUR HELPER 8 - LOADING COUNTER WEIGHT BOX WITH SAND IN YARD AREA IN BOOM TRUCK 2196 17 17 EA
19 UNLOADING COUNTER WEIGHT BOX WITH SAND IN TANK 110 17 17 EA
20 SAND PAPERING ON BOTTOM PLATES & COTTON RAG CLEANING 5 5 Plates
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1612 AIR COMPRESSOR 3 3931.7 1 40 SIGMA UN1263 C200a CT EPOXY BLACK 200 Litres
2 AC1018 AIR COMPRESSOR IDLE 2046.4 2 40 THINNER 21-06 40 Litres
3 3 HAND TOOLS
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 20 REPORTING DATE 28-Feb-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1052024 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 110 Direct / Part of PART OF PERMIT START 7:00:00
L.I. Description LOADING SCRAP PLATES PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 13936 JIMMY FO.OP 8 LOADING SCRAP PLATES ON ARAMCO TRAILER 28 TON
2
3 21358 TAN BAHADUR HELPER 8 FLAG MAN & ASSISTING FOK LIFT OPERATOR 28 TON
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 FL909 FORK LIFT 8 424 1 HAND TOOLS


2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 80 REPORTING DATE 28-Feb-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1055131 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 110 Direct / Part of PART OF PERMIT START 7:00:00
L.I. Description SHIFTING BOTTOM PLATE PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 TAKEN PERMIT & HELPING WORKERS
2
3 13951 VICTOR CRANE OP 8 LOADING PLATES (6x2METER) PLATES IN BLASTING YARD AREA 45 45 Plates
4 UNLOADING PLATES IN TANK 110 INSIDE DIKE WALL 45 45 Plates
5
6 23441 ROBERT RIGGER 8 ASSIST CRANE OPERATOR
7
8 25325 DANISTAN HELPER 8 ASSIST CRANE OPERATOR TO LOADING PLATES ON TRAILER 1168 IN YARD AREA
9 ASSIST CRANE OPERATOR TO UNLOADING PLATES INSIDE DIKE WALL ON TANK 110
10 UNLOADING OXYGEN & ACTYLENE CYLINDERS IN YARD FROM BOOM TRUCK
11
12 25326 CHATHURA NUWAN HELPER 8 ASSIST CRANE OPERATOR TO LOADING PLATES ON TRAILER 1168 IN YARD AREA
13 ASSIST CRANE OPERATOR TO UNLOADING PLATES INSIDE DIKE WALL ON TANK 110
14 UNLOADING OXYGEN & ACTYLENE CYLINDERS IN YARD FROM BOOM TRUCK
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 CN1756 CRANE 8 2610.2 1 HAND TOOLS


2 TH1168 TRAILER 8 467568.7 2
3 AC1018 AIR COMPRESSOR IDLE 2046.4 3
4 AC1612 AIR COMPRESSOR IDLE 3928.9 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 80 REPORTING DATE 27-Feb-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1055131 TIME REACHED CONTROL ROOM 6:50:00
TANK NUMBER NJBP 110 Direct / Part of PART OF PERMIT START 7:05:00
L.I. Description SHIFTING BOTTOM PLATE PERMIT CLOSED 17:20:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 2 TAKEN PERMIT & HELPING WORKERS
2
3 13951 VICTOR CRANE OP 8 2 LOADING PLATES (6x2METER) PLATES IN BLASTING YARD AREA 65 15 80 Plates
4 UNLOADING PLATES IN TANK 110 INSIDE DIKE WALL 65 15 80 Plates
5 23441 ROBERT RIGGER 8 2 ASSIST CRANE OPERATOR
6
7 25325 DANISTAN HELPER 8 2 ASSIST CRANE OPERATOR TO LOADING PLATES ON TRAILER 1168 IN YARD AREA
8 ASSIST CRANE OPERATOR TO UNLOADING PLATES INSIDE DIKE WALL ON TANK 110
9 SHIFTING MANUALLY ACETYLENE FULL CYLINDER FROM OUTSIDE TO INSIDE T-110 3 3 EA
10 25326 CHATHURA NUWAN HELPER 8 2 ASSIST CRANE OPERATOR TO LOADING PLATES ON TRAILER 1168 IN YARD AREA
11 ASSIST CRANE OPERATOR TO UNLOADING PLATES INSIDE DIKE WALL ON TANK 110
12 SHIFTING MANUALLY ACETYLENE FULL CYLINDER FROM OUTSIDE TO INSIDE T-110 2 2 EA
13 20680 ZAHIN HAMID HELPER 8 2 ASSIST CRANE OPERATOR TO LOADING PLATES ON TRAILER 1168 IN YARD AREA
14 ASSIST CRANE OPERATOR TO UNLOADING PLATES INSIDE DIKE WALL ON TANK 110
15 19097 LOK BAHADUR HELPER 8 - ASSIST CRANE OPERATOR TO LOADING PLATES ON TRAILER 1168 IN YARD AREA
16 ASSIST CRANE OPERATOR TO UNLOADING PLATES INSIDE DIKE WALL ON TANK 110
17 21358 TAN BAHADUR HELPER 8 2 ASSIST CRANE OPERATOR
18 HELPING TO LIFT ACETYLENE FULL CYLINDER MANUALLY
19 13936 JIMMY FO.OP 8 2 ASSIST CRANE OPERATOR
20 FORMING BARRICATION TO CLOSE ROAD
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 CN1756 CRANE 9 2605.5 1 HAND TOOLS


2 TH1168 TRAILER 9 467562.5 2
3 FL909 FORK LIFT IDLE 416 3
4 AC1018 AIR COMPRESSOR IDLE 2046.4 4
5 AC1612 AIR COMPRESSOR IDLE 3928.9 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 20 REPORTING DATE 26-Feb-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1052024 TIME REACHED CONTROL ROOM 6:55:00
TANK NUMBER 116 Direct / Part of PART OF PERMIT START 7:10:00
L.I. Description PREPARATION FOR BLASTING PERMIT CLOSED 17:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 - TAKEN PERMIT & HELPING WORKERS
2
3 13936 JIMMY FO.OP 8 - LOADING CARBAGE WASTES IN DUMP TRUCK1021(FULLFILLED) 1 1 LOAD
4 SPREADING PLATE FOR BLASTING(6x2.5Meter) 39 39 Plates
5 21358 TAN BAHADUR HELPER 8 2 FLAG MAN
6
7 25325 DANISTAN HELPER 8 2 ASSIST FORK LIFT OPERATOR TO SPREAD PLATES
8 LOADING CARBAGE WASTES IN DUMP TRUCK NOTE 1)
9 25326 CHATHURA NUWAN HELPER 8 2 ASSIST FORK LIFT OPERATOR TO SPREAD PLATES 7.10 to 09.00 DUMPING
CARBAGE WASTES IN DUMP
10 LOADING CARBAGE WASTES IN DUMP TRUCK TRUCK 2)
11 20680 ZAHIN HAMID HELPER 8 2 ASSIST FORK LIFT OPERATOR TO SPREAD PLATES 2.30"CLK FORK LIFT GOT
PUNCHER AFTER S.NO 5,7,9,11
12 LOADING CARBAGE WASTES IN DUMP TRUCK SENT TO TANK 110 FOR PLATE
13 19097 LOK BAHADUR HELPER 8 2 ASSIST FORK LIFT OPERATOR TO SPREAD PLATES PULLING
14 LOADING CARBAGE WASTES IN DUMP TRUCK
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 FL909 FORK LIFT 6 416 1 HAND TOOLS


2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 80 REPORTING DATE 25-Feb-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1055131 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 110 Direct / Part of PART OF PERMIT START 7:00:00
L.I. Description LOADING & UNLOADING MATERIALS PERMIT CLOSED 17:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 2 TAKEN PERMIT & HELPING WORKERS
2
3 13936 JIMMY FO.OP 8 2 SHIFTING WELDING MACHINE & COMPRESSOR TO TANK 101 2 2 EA
4 LOADING OXYGEN & ACETYLENE CYLINDERS 19 19 EA
5 LOADING OLD SCRAP PLATES ON TRAILER 40 40 EA
6 LOADING CARGO HOSE 4" ON BOOMTRUCK 8 8 EA
7 LOADING CARGO "ENGINE OIL DRUM" ON BOOMTRUCK 1 1 EA
8 UNLOADING OXYGEN CYLINDERS IN YARD 21 21 EA
9 21358 TAN BAHADUR HELPER 8 2 FLAG MAN 6 6 EA
10 LOADING OXYGEN&ACETYLENE EMPTY CYLINDERS ON BOOM TRUCK FROM T-110 6 6 EA
11 LOADING OXYGEN&ACETYLENE EMPTY CYLINDERS ON BOOM TRUCK FROM T-116 6 6 EA
12 20885 MOHAN HELPER 8 2 ASSIST FORKLIFT OPERATOR 6 6 EA
13 LOADING OXYGEN&ACETYLENE EMPTY CYLINDERS ON BOOM TRUCK FROM T-110 6 6 EA
14 LOADING OXYGEN&ACETYLENE EMPTY CYLINDERS ON BOOM TRUCK FROM T-116 6 6 EA
15 23214 BAKTHA HELPER 8 2 ASSIST FORKLIFT OPERATOR
16 LOADING OXYGEN&ACETYLENE EMPTY CYLINDERS ON BOOM TRUCK FROM T-110 6 6 EA
17 LOADING OXYGEN&ACETYLENE EMPTY CYLINDERS ON BOOM TRUCK FROM T-116 6 6 EA
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 FL909 FORK LIFT 11 410 1 HAND TOOLS


2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 60 / 20 REPORTING DATE 24-Feb-20

SERVICE ORDER NO. 6510948963 & 6510949239 Service Line Item# 1057483 / 1052024 TIME REACHED CONTROL ROOM 6:40:00
TANK NUMBER NJBP 110 & 116 Direct / Part of DIRECT / PART OF PERMIT START 6:55:00
L.I. Description SHIFTING PLATE / SPREADING PLATE & BACK FILLING SAND PERMIT CLOSED 17:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 2 TAKEN PERMIT & HELPING WORKERS
2 23921 JOMON JOSE WPR 8 2 TAKEN PERMIT IN YARD TO SPREAD PLATES (FOR TANK 116)
3 13936 JIMMY FO.OP 8 2 SHIFTING (6x2METER) PLATES FROM YARD TANK 110 36 8 28 Plates
4 SHIFTING SAND INSIDE DIKE WALL FROM WAY ROAD BY LOADER 1 1 LOAD
5 21358 TAN BAHADUR HELPER 8 2 SHIFTING PLATE (6x2METER) FROM PAINTING YARD TO TANK 110 9 9 EA
6 UNLOADING SAND IN DUMP TRUCK 1 1 LOAD
7 ASSIST LOADER OPERATOR TO SHIFT SAND FROM WAY ROAD TO INSIDE DIKE WALL 1 1 LOAD
8 SAND FILLING INSIDE TANK BY WHEEL BARROW FROM D'DOOR TO INSIDE TANK 0.3 0.3 Cu.M
9 23208 NASIM KHAN HELPER 8 2 SHIFTING PLATE (6x2METER) FROM PAINTING YARD TO TANK 110 9 9 EA
10 FLAG MAN
11 ASSIST LOADER OPERATOR TO SHIFT SAND FROM ROAD TO INSIDE DIKE WALL 1 1 LOAD
12 SAND FILLING INSIDE TANK BY WHEEL BARROW FROM D'DOOR TO INSIDE TANK 0.3 0.3 Cu.M
13 22620 RAMESH KUMAR HELPER 8 2 SHIFTING PLATE (6x2METER) FROM PAINTING YARD TO TANK 110 9 9 EA
14 UNLOADING SAND IN DUMP TRUCK 1 1 LOAD
15 SPREADING PLATE (6X2.5Meter) FOR BLASTING(FOR TANK 116) 12 12 EA
16 GRAVEL FILLING INSIDE TANK BY WHEEL BARROW FROM D'DOOR TO INSIDE TANK 0.3 0.3 Cu.M
17 23216 BASHEER MANSURI HELPER 8 2 SHIFTING PLATE (6x2METER) FROM PAINTING YARD TO TANK 110 9 9 EA
18 UNLOADING SAND IN DUMP TRUCK 1 1 LOAD
19 SPREADING PLATE (6X2.5Meter) FOR BLASTING(FOR TANK 116) 12 12 EA
20 SAND FILLING INSIDE TANK BY WHEEL BARROW FROM D'DOOR TO INSIDE TANK 0.3 0.3 Cu.M
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 FL909 FORK LIFT 8 399 1 HAND TOOLS


2 WM1693 WELDING MACHINE IDLE 6956.3 2
3 WM1714 WELDING MACHINE IDLE 5432.2 3
4 AC1669 AIR COMPRESSOR IDLE 3817 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 200 REPORTING DATE 23-Feb-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1057550 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT PERMIT START 7:00:00
L.I. Description NEW FOAM PIPE LINE FABRICATION PERMIT CLOSED 17:10:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 2 TAKEN PERMIT & HELPING WORKERS
2
3 20988 MANAN WELDER 8 2 WELDED 3" WNRF FLANGE WITH 4" REDUCER (3PASS) 1 1 EA
4 WELDED 3" WNRF FLANGE WITH REDUCER (3PASS) 2 2 EA
5 WELDED 3" DIA TEE(0.2METER) WITH 4" HDPE SPOOL 1 1 EA
6 23807 GERRY FAB 8 2 MADE FITUP AND GRINDING OF 3" & 4" FLANGE & SPOOL 3 1 4 EA
7 19135 AWDESH FAB 8 - REMOVING 4" HDPE LINE PIPE 8 8 EA
8 MANUALLY SHIFTING 4" HDPE PIPE(6METER PIPE ) NEAR TO DIKE WALL 8 8 EA
9 22494 ABDUL QUADIR WELDER 8 - REMOVING 4" HDPE LINE PIPE 8 8 EA
10 MANUALLY SHIFTING 4" HDPE PIPE(6METER PIPE ) NEAR TO DIKE WALL 8 8 EA
11 21358 TAN BAHADUR HELPER 8 2 EQUIPMENT STAND BY
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 WM1693 WELDING MACHINE 8 6956.3 1 WELDING ELECTRODE DIA 2.5 4 KG


2 WM1714 WELDING MACHINE IDLE 5432.2 2 4"GRINDING WHEEL 2 EA
3 AC1669 AIR COMPRESSOR IDLE 3817 3 4"CUTING WHEEL 1 EA
4 GRINDING MACHINE 8 HRS 4 HAND TOOLS
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# LINE ITEM NOT PROVIDED / RECOMMENDATION REPORTING DATE 22-Feb-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 101 Direct / Part of DIRECT PERMIT START 7:00:00
L.I. Description PAINTING ON TOP ROOF / FIXING HDPE LINE SUPPORT PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 - TAKEN PERMIT & HELPING WORKERS
2
3 21358 TAN BAHADUR HELPER 8 - PAINTING ON AIR VENT SUPPORT BLOCK ,BRACKET & CLAMP 3 3 EA
4 PAINTING ON FOAM LINE PIPE SUPPORTING BEAM 7"(0.5Meter) 8 8 EA
5
6 19135 AWDESH FAB 8 - FIXING HDPE LINE SUPPORT UNDER HDPE PIPE(MAKE DRILLING & FIXING BOLT) 20 20 EA
7 FABRICATED HDPE LINE SUPPORT 3 3 EA
8
9 22494 ABDUL QUADIR WELDER 8 - WELDED HDPE LINE SUPPORT 3 3 EA
NOTE AS
10 ASSIST FABRIICATOR TO FIX HDPE LINE SUPPORT UNDER LINE PER ARAMCO INSPECTION
11 RECOMMENDATION DOING
PAINTING
12 19069 DINESH BLASTER 8 - ASSIST BOTH WELDER AND FABRICATOR TO FIX HDPE LINE SUPPORT 20 20 EA
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 WM2094 WELDING MACHINE 8 1861 1 APCS 4 HEMPEL'S 12090 PRIMER YELLOW 4 Litres
2 WM1714 WELDING MACHINE IDLE 5432.2 2 THINNER 08450 0.2 Litres
3 AC1669 AIR COMPRESSOR IDLE 3817 3 PAINT ROLLER BRUSH 1 EA
4 4 OXYGEN 0.10 PER
5 5 ACETYLENE 0.10 PER
6 6 WELDING ELECTRODE DIA 2.5 25 EA
7 7 HAND TOOLS
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# LINE ITEM NOT PROVIDED / RECOMMENDATION REPORTING DATE 21-Feb-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM 6:50:00
TANK NUMBER NJBP 101 Direct / Part of DIRECT PERMIT START 7:05:00
L.I. Description PAINTING ON TOP ROOF / WELDING PERMIT CLOSED 16:10:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 TAKEN PERMIT & HELPING WORKERS
2
3 21358 TAN BAHADUR HELPER 8 PAINTING ON AIR VENT SUPPORT BLOCK ,BRACKET & CLAMP 2 2 EA
4 PAINTING ON FOAM LINE PIPE SUPPORTING BEAM 7"(0.5Meter) 8 8 EA
5
6 23807 GERRY FAB 8 ASSSIT WELDER,GAS CUTTING & MADE FITUP FOR HDPE SUPPORT 17 17 EA
7
8
9 20988 MANAN WELDER 8 WELDING HDPE LINE SUPPORT 17 17 EA
NOTE AS
10 PER ARAMCO INSPECTION
11 19135 AWDESH FAB 8 ASSSIT WELDER,GRINDING & MADE FITUP FOR HDPE SUPPORT 17 17 EA RECOMMENDATION DOING
PAINTING
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 WM1714 WELDING MACHINE 8 5432.2 1 APCS 4 HEMPEL'S 12090 PRIMER YELLOW 4 Litres
2 WM2094 WELDING MACHINE IDLE 1854.2 2 THINNER 08450 0.2 Litres
3 AC1669 AIR COMPRESSOR IDLE 3817 3 PAINT ROLLER BRUSH 2 EA
4 4 WELDING ROD DIA 2.5 2 KG
5 5 4" GRINDING WHEEL 2 EA
6 6 7" GRINDING WHEEL 2 EA
7 7 7" CUTTING WHEEL 1 EA
8 8 OXYGEN 0.30 EA
9 9 ACETYLENE 0.25 EA
10 10 HAND TOOLS

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# LINE ITEM NOT PROVIDED / RECOMMENDATION REPORTING DATE 20-Feb-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM 6:40:00
TANK NUMBER NJBP 101 Direct / Part of DIRECT PERMIT START 6:55:00
L.I. Description SAND PAPERING /PAINTING ON TOP ROOF / WELDING PERMIT CLOSED 17:45:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 2 TAKEN PERMIT & HELPING WORKERS
2
3 21358 TAN BAHADUR HELPER 8 2 SAND PAPERING ON AIR VENT SUPPORT BLOCK 8 8 EA
4 SAND PAPERING FOAM LINE PIPE SUPPORTING BEAM 7"(0.5Meter) 10 10 EA
5 PAINTING ON AIR VENT SUPPORT BLOCK ,BRACKET & CLAMP 6 6 EA
6
7 23329 NITIN BLASTER 8 2 PREPARATION OF WELDING ON TOP ROOF & ASSIST PAINTER 8 8 EA
8 SAND PAPERING & SCRAPING VENTILATION BOX INNER SIDE 10 10 EA
9 PAINTING ON AIR VENT SUPPORT BLOCK ,BRACKET & CLAMP 5 5 EA NOTE 1) AS
PER ARAMCO INSPECTION
10 RECOMMENDATION DOING
11 22494 ABDUL QUADIR WELDER 8 2 WELDING AIR VENT SUPPORTING BRACKET & CLAMP 13 3 16 EA PAINTING
2) S.NO 15 HAS FIRE WATCH
12 CARD
13 19135 AWDESH FAB 8 2 ASSSIT WELDER,GRINDING & MADE FITUP FOR BRACKETS& CLAMPS 13 3 16 EA
14
15 19069 DINESH BLASTER 8 2 FIRE WATCH & FORMING FIRE BLANCKET ON EVERY AIR VENT SUPPORT WELDING 13 3 16 EA
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1612 AIR COMPRESSOR IDLE 3926 1 APCS 4 HEMPEL'S 12090 PRIMER YELLOW 4 Litres
2 WM2094 WELDING MACHINE 8 1854.2 2 THINNER 08450 0.2 Litres
3 GRINDING M/C 3 SAND PAPER 34 EA
4 4 PAINT ROLLER BRUSH 3 EA
5 5 WELDING ROD DIA 2.5 3 KG
6 6 4" GRINDING WHEEL 2 EA
7 7 4" CUTTING WHEEL 2 EA
8 8 HAND TOOLS
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# LINE ITEM NOT PROVIDED / RECOMMENDATION REPORTING DATE 19-Feb-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 101 Direct / Part of DIRECT PERMIT START 7:00:00
L.I. Description SAND PAPERING & PAINTING ON TOP ROOF PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 - TAKEN PERMIT & HELPING WORKERS
2
3 23327 NEELAKANTH PAINTER 8 - SAND PAPERING ON TOP ROOF PLATE 7 7 Sq.m
4 PAINTING PRIMER COAT ON TOP ROOF PLATE 7 7 Sq.m
5 SAND PAPERING & SCRAPING VENTILATION BOX INNER SIDE 4 4 EA
6 PAINTING PRIMER COAT ON TOP ROOF VENTILATION BOX INSIDE(1.2X0.4METER) 7 7 EA
7
8 21358 TAN BAHADUR HELPER 8 - SAND PAPERING ON HAND RAIL 23 23 Sq.m
9 SAND PAPERING & SCRAPING VENTILATION BOX 5 5 EA
NOTE AS
10 BRUSH CLEANING TANK TOP ROOF 140 140 Sq.m PER ARAMCO INSPECTION
11 RECOMMENDATION DOING
PAINTING
12
13 19069 DINESH BLASTER 8 - PREPARATION OF WELDING ON TOP ROOF & ASSIST PAINTER
14 SAND PAPERING & SCRAPING VENTILATION BOX INNER SIDE 2 2 EA
15
16 23329 NITIN BLASTER 8 - PREPARATION OF WELDING ON TOP ROOF & ASSIST PAINTER
17 SAND PAPERING & SCRAPING VENTILATION BOX INNER SIDE 2 2 EA
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1612 AIR COMPRESSOR IDLE 3926 1 APCS 4 HEMPEL'S 12090 PRIMER YELLOW 1.5 Litres
2 2 THINNER 08450 0.1 Litres
3 3 SAND PAPER 22 EA
4 4 PAINT ROLLER 1 EA
5 5 HAND TOOLS
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# LINE ITEM NOT PROVIDED / RECOMMENDATION REPORTING DATE 18-Feb-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM 6:35:00
TANK NUMBER NJBP 101 Direct / Part of DIRECT PERMIT START 6:50:00
L.I. Description SAND PAPERING & PAINTING ON TOP ROOF PERMIT CLOSED 18:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 2 TAKEN PERMIT & HELPING WORKERS
2
3 23327 NEELAKANTH PAINTER 8 2 SAND PAPERING ON TOP ROOF PLATE 25 25 Sq.m
4 PAINTING PRIMER COAT ON TOP ROOF PLATE 25 25 Sq.m
5 SAND PAPERING & SCRAPING VENTILATION BOX 4 4 EA
6 PAINTING PRIMER COAT ON TOP ROOF VENTILATION BOX INSIDE(1.2X0.4METER) 4 4 EA
7
8 21358 TAN BAHADUR HELPER 8 2 SAND PAPERING ON TOP ROOF PLATE 22 22 Sq.m
9 PAINTING PRIMER COAT ON TOP ROOF PLATE 22 22 Sq.m
NOTE AS
10 SAND PAPERING & SCRAPING VENTILATION BOX 3 3 EA PER ARAMCO INSPECTION
11 PAINTING PRIMER COAT ON TOP ROOF VENTILATION BOX INSIDE(1.2X0.4METER) 3 3 EA RECOMMENDATION DOING
PAINTING
12
13 19069 DINESH BLASTER 8 2 SAND PAPERING ON TOP ROOF PLATE 22 22 Sq.m
14 PAINTING PRIMER COAT ON TOP ROOF PLATE 22 22 Sq.m
15 SAND PAPERING & SCRAPING VENTILATION BOX 3 3 EA
16 PAINTING PRIMER COAT ON TOP ROOF VENTILATION BOX INSIDE(1.2X0.4METER) 3 3 EA
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1612 AIR COMPRESSOR IDLE 3926 1 APCS 4 HEMPEL'S 12090 PRIMER YELLOW 5 Litres
2 2 THINNER 08450 0.4 Litres
3 3 SAND PAPER 20 EA
4 4 PAINT ROLLER 4 EA
5 5 HAND TOOLS
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# LINE ITEM NOT PROVIDED / RECOMMENDATION REPORTING DATE 17-Feb-20

SERVICE ORDER NO. 6510894318 & 6510949239 Service Line Item# TIME REACHED CONTROL ROOM 6:50:00
TANK NUMBER NJBP 101 & 116 Direct / Part of DIRECT PERMIT START 7:05:00
L.I. Description SAND PAPERING & PAINTING ON TOP ROOF PERMIT CLOSED 18:15:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 2 TAKEN PERMIT & HELPING WORKERS
2 21358 TAN BAHADUR HELPER 8 2 SAND PAPERING ON TOP ROOF PLATE DEFECTED AREAS 25 25 Sq.m
3 CLEANING TOP ROOF BY BRUSH & COTTON RAGS 20 - 20 Sq.m
4 SAND PAPERING VENTILATION BOX WITH COTTON RAG CLEANING 18 18 EA
5 PAINTING FOAM BOARD EXTENSION PLATE 2 SIDES (1.1x0.45METER) (TANK 116) 2 2 4 EA
6
7 23329 NITIN BLASTER 8 2 PAINTING PRIMER COAT ON TOP ROOF PLATE 12 12 Sq.m
8 PAINTING PRIMER COAT ON TOP ROOF VENTILATION BOX(1X0.4METER) 5 5 EA
9 PAINTING FOAM BOARD EXTENSION PLATE 2 SIDES (1.1x0.45METER) (TANK 116) 2 2 4 EA
NOTE AS
10 PER ARAMCO INSPECTION
11 23327 NEELAKANTH PAINTER 8 2 PAINTING PRIMER COAT ON TOP ROOF PLATE 12 12 Sq.m RECOMMENDATION DOING
PAINTING
12 PAINTING PRIMER COAT ON TOP ROOF VENTILATION BOX(1X0.4METER) 10 10 EA
13 PAINTING FOAM BOARD EXTENSION PLATE 2 SIDES (1.1x0.45METER) (TANK 116) 2 2 4 EA
14
15 19069 DINESH BLASTER 8 2 PAINTING PRIMER COAT ON TOP ROOF PLATE 12 12 Sq.m
16 PAINTING PRIMER COAT ON TOP ROOF VENTILATION BOX(1X0.4METER) 3 3 EA
17 PAINTING FOAM BOARD EXTENSION PLATE 2 SIDES (1.1x0.45METER) (TANK 116) 2 2 4 EA
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1612 AIR COMPRESSOR IDLE 3926 1 APCS 4 HEMPEL'S 12090 PRIMER YELLOW 6 Litres
2 2 THINNER 08450 0.4 Litres
3 3 SAND PAPER 14 EA
4 4 PAINT ROLLER 4 EA
5 5 MASKING TAPE 2" 2 EA
6 6 HAND TOOLS
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# LINE ITEM NOT PROVIDED / RECOMMENDATION REPORTING DATE 16-Feb-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM 6:40:00
TANK NUMBER NJBP 101 Direct / Part of PART OF PERMIT START 6:55:00
L.I. Description SAND PAPERING & PAINTING ON TOP ROOF PERMIT CLOSED 17:50:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 2 TAKEN PERMIT & HELPING WORKERS
2 21358 TAN BAHADUR HELPER 8 2 SAND PAPERING ON TOP ROOF PLATE DEFECTED AREAS & TOP ROOFHAND RAIL 20 20 Sq.m
3 CLEANING TOP ROOF BY BRUSH & COTTON RAGS 250 40 290 Sq.m
4 ASSSIT 4 PAINTERS
5 23327 NEELAKANTH PAINTER 8 2 SAND PAPERING ON TOP ROOF PLATE DEFECTED AREAS & TOP ROOFHAND RAIL 12 12 Sq.m
6 PAINTING TOP ROOF 30 5 35 Sq.m
7 23329 NITIN BLASTER 8 2 SAND PAPERING ON TOP ROOF PLATE DEFECTED AREAS & TOP ROOFHAND RAIL 12 12 Sq.m
8 PAINTING TOP ROOF 30 5 35 Sq.m
9 13520 PANDIT P/F 8 2 SAND PAPERING ON TOP ROOF PLATE DEFECTED AREAS & TOP ROOFHAND RAIL 12 12 Sq.m
10 PAINTING TOP ROOF 30 5 35 Sq.m
11 19069 DINESH BLASTER 8 2 SAND PAPERING ON TOP ROOF PLATE DEFECTED AREAS & TOP ROOFHAND RAIL 12 12 Sq.m
12 PAINTING TOP ROOF 30 5 35 Sq.m
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1612 AIR COMPRESSOR IDLE 3926 1 HEMPEL'S 12090 PRIMER YELLOW 11 Litres
2 2 THINNER 08450 1.5 Litres
3 3 SAND PAPER 40 EA
4 4 COTTON RAGS 1/4 KG
5 5 PAINT ROLLER 4 EA
6 6 HAND TOOLS
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 360/ SAND PAPRING LINE ITEM NOT PROVIDED REPORTING DATE 15-Feb-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 101 Direct / Part of PART OF PERMIT START 6:55:00
L.I. Description SAND PAPERING ON TOP ROOF PERMIT CLOSED 17:55:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 2 TAKEN PERMIT FOR SKY CLAMPER & SAND PAPERING ON TOP ROOF
2 5891 NARASAYYA P/F 8 2 FIXING SPRINKULAR 2 2 EA
3 SAND PAPERING ON TOP ROOF PLATE DEFECTED AREAS 9 3 12 Sq.m
4 13520 PANDIT P/F 8 2 FIXING SPRINKULAR 2 2 EA
5 SAND PAPERING ON TOP ROOF PLATE DEFECTED AREAS 9 3 12 Sq.m
6 19069 DINESH BLASTER 8 2 ASSIST SKY CLAMPER & SAND PAPERING ON TOP ROOF PLATE DEFECTED AREAS 9 3 12 Sq.m
7 23329 NITIN BLASTER 8 2 ASSIST SKY CLAMPER & SAND PAPERING ON TOP ROOF PLATE DEFECTED AREAS 9 3 12 Sq.m
8 13520 PANDIT P/F 8 2 ASSIST SKY CLAMPER & SAND PAPERING ON TOP ROOF PLATE DEFECTED AREAS 9 3 12 Sq.m
9 17668 ASHFAQ HELPER 8 2 ASSIST SKY CLAMPER & SAND PAPERING ON TOP ROOF PLATE DEFECTED AREAS 9 3 12 Sq.m
10 20680 ZAHIN HAMID HELPER 8 2 ASSIST SKY CLAMPER & SAND PAPERING ON TOP ROOF PLATE DEFECTED AREAS 9 3 12 Sq.m
11 24592 DINESH RAI HELPER 8 2 ASSIST SKY CLAMPER & SAND PAPERING ON TOP ROOF PLATE DEFECTED AREAS 9 3 12 Sq.m
12 21358 TAN BAHADUR HELPER 8 2 ASSIST SKY CLAMPER & SAND PAPERING ON TOP ROOF PLATE DEFECTED AREAS 9 3 12 Sq.m
13 23327 NEELAKANTH PAINTER 8 2 ASSIST SKY CLAMPER & SAND PAPERING ON TOP ROOF PLATE DEFECTED AREAS 9 3 12 Sq.m
14
15 10636 VICTOR
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1669 AIR COMPRESSOR 2 3788 1 SAND PAPER 110 EA


2 2 HAND TOOLS
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 30 REPORTING DATE 13-Feb-20

SERVICE ORDER NO. 6510949239 &6510948963 Service Line Item# 1064505 TIME REACHED CONTROL ROOM 6:40:00
TANK NUMBER NJBP 116 & 110 Direct / Part of DIRECT PERMIT START 6:55:00
L.I. Description PAINTING PERMIT CLOSED 18:20:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 23327 NEELAKANTH PAINTER 8 3 PAINTED APCS 3 BROWN PRIMER COAT (6 x2Meter) 28 28 Plates
2 PAINTED APCS 3 BROWN PRIMER COAT (6 x2.5Meter) 9 9 Plates
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 30 SIGMA UN1263 C200a CT EPOXY BROWN 160 Litres


2 2 30 THINNER 21-06 UN1307 25 Litres
3 3 HAND TOOLS
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 20 & 30 REPORTING DATE 13-Feb-20

SERVICE ORDER NO. 6510949239 &6510948963 Service Line Item# 1052024 & 1064505 TIME REACHED CONTROL ROOM 6:40:00
TANK NUMBER NJBP 116 & 110 Direct / Part of PART OF PERMIT START 6:55:00
L.I. Description ASSIST BLASING & PAINTING PERMIT CLOSED 18:20:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 3 TAKEN PERMIT & HELPING TO FILL GRIT SAND BOARD
2 ASSIT PAINT MIXING
3
4 23329 NITIN BLASTER 8 3 FILLING GRIT IN SAND BOARD 4.7 4.7 TON
5 MIXING PAINT 160 160 Litres
6 LOADING BLASTING MATERIALS & AIR COMPRESSOR ON TRAILER 1168
7
8 24592 DINESH RAI HELPER 8 3 FILLING GRIT IN SAND BOARD 4.7 4.7 TON
9 HOLDING PAINTING HOSE WHEN PAINTING
10 LOADING BLASTING MATERIALS & AIR COMPRESSOR ON TRAILER 1168 NOTE
AIR COMPRESSOR 1667 & 853
11 TRANSFERRED TO YANBU
12 21358 TAN BAHADUR HELPER 8 3 EQUIPMENT STAND BY & FILLING DIESEL ON EQUIPMENTS
13 DUMPING PAINT CANS IN TRASH BIN 17 17 CANS
14 LOADING BLASTING MATERIALS & AIR COMPRESSOR ON TRAILER 1168
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 HAND TOOLS
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 20 REPORTING DATE 13-Feb-20

SERVICE ORDER NO. 6510949239 &6510948963 Service Line Item# 1052024 TIME REACHED CONTROL ROOM 6:40:00
TANK NUMBER NJBP 116 & 110 Direct / Part of DIRECT PERMIT START 6:55:00
L.I. Description BLASING PERMIT CLOSED 18:20:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 19069 DINESH BLASTER 8 3 GRIT BLASTING OF BOTTOM PLATE (6x2Meter) 4 4 Plates
2 GRIT BLASTING OF BOTTOM PLATE (6x2.5Meter) 1 3 4 Plates
3 20783 MAN BAHATHUR BLASTER 8 2 GRIT BLASTING OF BOTTOM PLATE (6x2Meter) 5 2 7 Plates
4 18792 JAKIR BLASTER 8 2 GRIT BLASTING OF BOTTOM PLATE (6x2Meter) 6 1 7 Plates
5 18796 HANIPH BLASTER 8 2 GRIT BLASTING OF BOTTOM PLATE (6x2Meter) 5 1 6 Plates
6 GRIT BLASTING OF BOTTOM PLATE (6x2.5Meter) 1 1 Plates
7 23330 NARASAPPA BLASTER 8 3 GRIT BLASTING OF BOTTOM PLATE (6x2Meter) 4 4 Plates
8 GRIT BLASTING OF BOTTOM PLATE (6x2.5Meter) 1 3 4 Plates
9
NOTE 1)
10 ARAMCO INSPECTOR
11 INSPECTED BLASTED PLATES
03.00 TO 03.55
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC853 AIR COMPRESSOR 8 7426.4 1 20 GRIT COAL SLAG 9.4 TON


2 AC1667 AIR COMPRESSOR 8 6080 2 HAND TOOLS
3 AC1612 AIR COMPRESSOR 8 3926 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 30 REPORTING DATE 12-Feb-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1064505 TIME REACHED CONTROL ROOM 6:35:00
TANK NUMBER NJBP 110 Direct / Part of DIRECT PERMIT START 6:45:00
L.I. Description PAINTING PERMIT CLOSED 17:30:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 23327 NEELAKANTH PAINTER 8 2 PAINTED APCS 3 BROWN PRIMER COAT - 21 21 Plates
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 30 SIGMA UN1263 C200a CT EPOXY BROWN 80 Litres


2 2 30 THINNER 21-06 UN1307 12 Litres
3 3 HAND TOOLS
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 20 & 30 REPORTING DATE 12-Feb-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1052024 & 1064505 TIME REACHED CONTROL ROOM 6:35:00
TANK NUMBER NJBP 110 Direct / Part of PART OF PERMIT START 6:45:00
L.I. Description ASSIST BLASING & PAINTING PERMIT CLOSED 17:30:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 2 TAKEN PERMIT & HELPING WORKERS
2 23329 NITIN BLASTER 8 2 FILLING GRIT IN SAND BOARD 1.5 1.5 TON
3 MIXING PAINT 80 80 Litres
4 23330 NARASAPPA BLASTER 8 2 FILLING GRIT IN SAND BOARD 1.5 1.5 TON
5 ASSIST MIXING PAINT 80 80 Litres
6 24592 DINESH RAI HELPER 8 2 FILLING GRIT IN SAND BOARD 1.5 1.5 TON
7 HOLDING PAINTING HOSE WHEN PAINTING
8 21358 TAN BAHADUR HELPER 8 2 EQUIPMENT STAND BY & HELPING WORKERS
9 DUMPING PAINT CANS IN TRASH BIN 8 8 CANS
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 HAND TOOLS
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 20 REPORTING DATE 12-Feb-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1052024 TIME REACHED CONTROL ROOM 6:35:00
TANK NUMBER NJBP 110 Direct / Part of DIRECT PERMIT START 6:45:00
L.I. Description BLASING PERMIT CLOSED 17:30:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 18796 HANIPH BLASTER 8 2 GRIT BLASTING OF BOTTOM PLATE (6x2Meter) 5 1 6 Plates
2 19069 DINESH BLASTER 8 2 GRIT BLASTING OF BOTTOM PLATE (6x2Meter) 5 1 6 Plates
3 20783 MAN BAHATHUR BLASTER 8 2 GRIT BLASTING OF BOTTOM PLATE (6x2Meter) 5 1 6 Plates
4 18792 JAKIR BLASTER 8 - GRIT BLASTING OF BOTTOM PLATE (6x2Meter) 3- 3 Plates
5
6
7
8
NOTE 1)
9 ARAMCO INSPECTOR
10 INSPECTED BLASTED PLATES
03.15 TO 03.50 2)
11 S.NO 4 BLASTING HOSE AIR
12 LEAK 3TIMES FIXING TAKEN 1
1/2 HOUR
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC853 AIR COMPRESSOR 8 7422 1 20 GRIT COAL SLAG 4.5 TON


2 AC1667 AIR COMPRESSOR IDLE 6075 2 HAND TOOLS
3 AC1612 AIR COMPRESSOR 8 3919 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 20 REPORTING DATE 11-Feb-20

SERVICE ORDER NO. 6510949239 &6510948963 Service Line Item# 1052024 TIME REACHED CONTROL ROOM 6:55:00
TANK NUMBER NJBP 116 & 110 Direct / Part of PART OF PERMIT START 7:05:00
L.I. Description BLASING PREPARATION PERMIT CLOSED 17:30:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 2 TAKEN PERMIT & HELPING WORKERS
2 13936 JIMMY FO.OP 8 2 LOADING WELDING MACHINE ,GENERATOR,COMPRESSOR ON TRAILER 5 5 EA
3 SHIFTING GRIT BAG FROM YARD TO BLASTING AREA 3 3 BAGS
4 TOPPLING & SHIFTED TOP COATED PLATES (6x2Meter) 46 46 Plates
5 TOPPLING & SHIFTED TOP COATED PLATES (6x2.5Meter) 30 13 43 Plates
6 SPREADING NEW PLATE (6x2Meter) FOR BLASTING 15 15 Plates
7 19069 DINESH BLASTER 8 2 ASSIST FORK LIFT OPERATOR
8 23329 NITIN BLASTER 8 2 ASSIST FORK LIFT OPERATOR
9 21358 TAN BAHADUR HELPER 8 2 ASSIST FORK LIFT OPERATOR
NOTE
10 23327 NEELAKANTH PAINTER 8 2 ASSIST FORK LIFT OPERATOR ARAMCO INSPECTOR
11 23330 NARASAPPA BLASTER 8 2 FLAG MAN INSPECTED TOP COATED 89
PLATES FROM 08.10 TO 09.20
12 18792 JAKIR BLASTER 8 - ASSIST FORK LIFT OPERATOR
13 20947 SHYAM HELPER 8 - ASSIST FORK LIFT OPERATOR
14 18796 HANIPH BLASTER 8 - ASSIST FORK LIFT OPERATOR
15 20783 MAN BAHATHUR BLASTER 8 - ASSIST FORK LIFT OPERATOR
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 FL909 FORKLIFT 10 389 1 HAND TOOLS


2 AC853 AIR COMPRESSOR IDLE 7415 2
3 AC1018 AIR COMPRESSOR IDLE/TRANSF 2001.1 3
4 AC1612 AIR COMPRESSOR IDLE 3914.7 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 20 REPORTING DATE 10-Feb-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1052024 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 110 Direct / Part of PART OF PERMIT START 7:00:00
L.I. Description BLASING PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 - TAKEN PERMIT & HELPING WORKERS
2 21358 TAN BAHADUR HELPER 8 - EQUIPMENT STAND BY & HELPING WORKERS
3
4 20887 BIR TAMANG HELPER 8 - FILLING GRIT IN SAND BOARD 1 1 TON
5
6 20863 DHAN BAHADUR HELPER 8 - FILLING GRIT IN SAND BOARD 1 1 TON
7
8 20947 SHYAM HELPER 8 - FILLING GRIT IN SAND BOARD 1 1 TON
9 NOTE
10 23327 NEELAKANTH PAINTER 8 - FILLING GRIT IN SAND BOARD 1 1 TON DUE TO HIGH WIND SPEED
ARAMCO ISSUER STOPPED
11 BLASTING WORK ,AFTER
12 DOING HOUSE KEEPING
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 HAND TOOLS
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 20 REPORTING DATE 10-Feb-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1052024 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 110 Direct / Part of DIRECT PERMIT START 7:00:00
L.I. Description BLASING PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 18796 HANIPH BLASTER 8 - GRIT BLASTING OF BOTTOM PLATE (6x2Meter) 2 2 Plates
2 19069 DINESH BLASTER 8 - GRIT BLASTING OF BOTTOM PLATE (6x2Meter) 2 2 Plates
3 20783 MAN BAHATHUR BLASTER 8 - GRIT BLASTING OF BOTTOM PLATE (6x2Meter) 2 2 Plates
4 23330 NARASAPPA BLASTER 8 - GRIT BLASTING OF BOTTOM PLATE (6x2Meter) 2 2 Plates
5 23329 NITIN BLASTER 8 - GRIT BLASTING OF BOTTOM PLATE (6x2Meter) 2 2 Plates
6 18792 JAKIR BLASTER 8 - GRIT BLASTING OF BOTTOM PLATE (6x2Meter) 2 2 Plates
7
8
9
NOTE
10 DUE TO HIGH WIND SPEED
11 ARAMCO ISSUER STOPPED
BLASTING WORK
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC853 AIR COMPRESSOR 2 7415 1 20 GRIT COAL SLAG 4 TON


2 AC1018 AIR COMPRESSOR 2 2001.1 2 HAND TOOLS
3 AC1612 AIR COMPRESSOR 2 3914.7 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 20 & 30 REPORTING DATE 9-Feb-20

SERVICE ORDER NO. 6510949239 &6510948963 Service Line Item# 1052024 & 1064505 TIME REACHED CONTROL ROOM 6:40:00
TANK NUMBER NJBP 116 & 110 Direct / Part of PART OF PERMIT START 6:55:00
L.I. Description ASSIST BLASING & PAINTING PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 - TAKEN PERMIT & HELPING WORKERS
2 21358 TAN BAHADUR HELPER 8 - EQUIPMENT STAND BY & HELPING WORKERS
3
4 20887 BIR TAMANG HELPER 8 - FILLING GRIT IN SAND BOARD 2.35 2.35 TON
5
6 20863 DHAN BAHADUR HELPER 8 - FILLING GRIT IN SAND BOARD 2.35 2.35 TON
7
8 20947 SHYAM HELPER 8 - FILLING GRIT IN SAND BOARD 2.35 2.35 TON
9
10 23327 NEELAKANTH PAINTER 8 - FILLING GRIT IN SAND BOARD 2.35 2.35 TON
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 HAND TOOLS
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 20 REPORTING DATE 9-Feb-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1052024 TIME REACHED CONTROL ROOM 6:40:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT PERMIT START 6:55:00
L.I. Description BLASTING PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 18796 HANIPH BLASTER 8 - GRIT BLASTING OF BOTTOM PLATE (6x2.5Meter) 5 5 Plates
2 19069 DINESH BLASTER 8 - GRIT BLASTING OF BOTTOM PLATE (6x2.5Meter) 5 5 Plates
3 20783 MAN BAHATHUR BLASTER 5 - GRIT BLASTING OF BOTTOM PLATE (6x2.5Meter) 3 3 Plates
4
5
6
7
8
NOTE
9 ARAMCO INSPECTOR
10 INSPECTED BLASTED PLATES
FROM 03.30 TO 04.10 &
11 STRICLY ADVISED NOT TO
12 PAINT DUE TO HIGH WIND
SPEED
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 20 GRIT COAL SLAG 4.2 TON


2 2 HAND TOOLS
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 20 REPORTING DATE 9-Feb-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1052024 TIME REACHED CONTROL ROOM 6:40:00
TANK NUMBER NJBP 110 Direct / Part of DIRECT PERMIT START 6:55:00
L.I. Description BLASTING PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 23330 NARASAPPA BLASTER 8 - GRIT BLASTING OF BOTTOM PLATE (6x2Meter) 5 5 Plates
2 23329 NITIN BLASTER 8 - GRIT BLASTING OF BOTTOM PLATE (6x2Meter) 6 6 Plates
3 18792 JAKIR BLASTER 8 - GRIT BLASTING OF BOTTOM PLATE (6x2Meter) 5 5 Plates
4 20783 MAN BAHATHUR BLASTER 3 - GRIT BLASTING OF BOTTOM PLATE (6x2Meter) 2 2 Plates
5
6
7
8
NOTE
9 ARAMCO INSPECTOR
10 INSPECTED BLASTED PLATES
FROM 03.30 TO 04.10 &
11 STRICLY ADVISED NOT TO
12 PAINT DUE TO HIGH WIND
SPEED
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC853 AIR COMPRESSOR 8 7413.5 1 20 GRIT COAL SLAG 5.2 TON


2 AC1018 AIR COMPRESSOR 8 1999.4 2 HAND TOOLS
3 AC1612 AIR COMPRESSOR 6 3913 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# TRAVELLING REPORTING DATE 8-Feb-20

SERVICE ORDER NO. Service Line Item# TIME REACHED CONTROL ROOM 6:50:00
TANK NUMBER Direct / Part of PERMIT START 7:00:00
L.I. Description PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 19344 RAJ KUMAR LABOR 8 WENT YANBU FROM JEDDAH TO ATTEN FIRE WATCH COURSE
2 18753 RABINDRA BOTHE LABOR 8 WENT YANBU FROM JEDDAH TO ATTEN FIRE WATCH COURSE
3 23210 BAL KUMAR LABOR 8 WENT YANBU FROM JEDDAH TO ATTEN FIRE WATCH COURSE
4 24492 GULGUL MUHAMMAD MASON 8 WENT YANBU FROM JEDDAH TO ATTEN FIRE WATCH COURSE
5 20887 BIRE TAMANG S/F 8 WENT YANBU FROM JEDDAH TO ATTEN FIRE WATCH COURSE
6 11997 DHARMA RAJ GIRI P/F 8 WENT YANBU FROM JEDDAH TO ATTEN STANDBY MAN COURSE
7 16029 DEXON B EBARLE P/F 8 WENT YANBU FROM JEDDAH TO ATTEN STANDBY MAN COURSE
8 20947 SHAM MAHARA LABOR 8 WENT YANBU FROM JEDDAH TO ATTEN STANDBY MAN COURSE
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 40 REPORTING DATE 8-Feb-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1017801 TIME REACHED CONTROL ROOM 6:50:00
TANK NUMBER NJBP 110 Direct / Part of PART OF PERMIT START 7:00:00
L.I. Description TOP COAT PAINTING PERMIT CLOSED 17:40:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 2 TAKEN PERMIT & HELPING WORKERS
2 23330 NARASAPPA BLASTER 2 MIXING PAINT 165 165 Litres
3 23329 NITIN BLASTER 2 ASSIST MIXING PAINT 165 165 Litres
4 18792 JAKIR BLASTER 2 HOLDING PAINTING HOSE & ASSIST PAINTER
5 21358 TAN BAHADUR HELPER 2 EQUIPMENT STANDBY
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 HAND TOOLS
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 40 REPORTING DATE 8-Feb-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1017801 TIME REACHED CONTROL ROOM 6:50:00
TANK NUMBER NJBP 116 Direct / Part of PART OF PERMIT START 7:00:00
L.I. Description TOP COAT PAINTING PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 - TAKEN PERMIT & HELPING WORKERS
2 23330 NARASAPPA BLASTER 4 - MIXING PAINT 75 75 Litres
3 23329 NITIN BLASTER 4 - MIXING PAINT 75 75 Litres
4 18792 JAKIR BLASTER 4 - HOLDING PAINTING HOSE & ASSIST PAINTER
5 21358 TAN BAHADUR HELPER 4 - EQUIPMENT STANDBY
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 HAND TOOLS
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 20 REPORTING DATE 8-Feb-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1052024 TIME REACHED CONTROL ROOM 6:50:00
TANK NUMBER NJBP 116 Direct / Part of PART OF PERMIT START 7:00:00
L.I. Description PREPARATION FOR BLASTING PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 13936 JIMMY FO.OP 1 - SPREADING BOTTOM PLATE FOR BLASTING (6x2.5Meter) 5 5 Plates
2 23329 NITIN BLASTER 1 - ASSIST FORK LIFT OPERATOR TO SPREADING BOTTOM PLATE FOR BLASTING
3 19069 DINESH BLASTER 1 - ASSIST FORK LIFT OPERATOR TO SPREADING BOTTOM PLATE FOR BLASTING
4 23330 NARASAPPA BLASTER 1 - ASSIST FORK LIFT OPERATOR TO SPREADING BOTTOM PLATE FOR BLASTING
5 20783 MAN BAHATHUR BLASTER 1 - ASSIST FORK LIFT OPERATOR TO SPREADING BOTTOM PLATE FOR BLASTING
6 18792 JAKIR BLASTER 1 - ASSIST FORK LIFT OPERATOR TO SPREADING BOTTOM PLATE FOR BLASTING
7 18796 HANIPH BLASTER 1 - ASSIST FORK LIFT OPERATOR TO SPREADING BOTTOM PLATE FOR BLASTING
8 23327 NEELAKANTH PAINTER 1 - ASSIST FORK LIFT OPERATOR TO SPREADING BOTTOM PLATE FOR BLASTING
9 21358 TAN BAHADUR HELPER 1 - FLAG MAN
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 FL909 FORKLIFT 8 379 1


2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 20 REPORTING DATE 8-Feb-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1052024 TIME REACHED CONTROL ROOM 6:50:00
TANK NUMBER NJBP 110 Direct / Part of PART OF PERMIT START 7:00:00
L.I. Description PREPARATION FOR BLASTING PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 13936 JIMMY FO.OP 7 - SPREADING BOTTOM PLATE FOR BLASTING (6x2Meter) 34 34 Plates
2 SHIFTING GRIT BAG FROM YARD TO BLASTING AREA 12 12 TON
3 SHIFTING PAINT CANS FROM YARD TO PAINTING AREA 240 240 Litres
4 23330 NARASAPPA BLASTER 3 - ASSIST FORK LIFT OPERATOR TO SPREADING BOTTOM PLATE FOR BLASTING
5 20783 MAN BAHATHUR BLASTER 3 - ASSIST FORK LIFT OPERATOR TO SPREADING BOTTOM PLATE FOR BLASTING
6 18792 JAKIR BLASTER 3 - ASSIST FORK LIFT OPERATOR TO SPREADING BOTTOM PLATE FOR BLASTING
7 18796 HANIPH BLASTER 3 - ASSIST FORK LIFT OPERATOR TO SPREADING BOTTOM PLATE FOR BLASTING
8 19069 DINESH BLASTER 3 - ASSIST FORK LIFT OPERATOR TO SPREADING BOTTOM PLATE FOR BLASTING
9 23329 NITIN BLASTER 3 - ASSIST FORK LIFT OPERATOR TO SPREADING BOTTOM PLATE FOR BLASTING
10 23327 NEELAKANTH PAINTER 3 - ASSIST FORK LIFT OPERATOR TO SPREADING BOTTOM PLATE FOR BLASTING
11 21358 TAN BAHADUR HELPER 3 - FLAG MAN
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 FL909 FORKLIFT 8 379 1


2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 40 REPORTING DATE 8-Feb-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1017801 TIME REACHED CONTROL ROOM 6:50:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT PERMIT START 7:00:00
L.I. Description TOP COAT PAINTING PERMIT CLOSED 17:40:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 23327 NEELAKANTH PAINTER 4 - PAINTED BOTTOM PLATE(6x2.5Meter) APCS 3 TOP COAT 43 - 43 Plates
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 40 SIGMA UN1263 C200a CT EPOXY BLACK 165 Litres


2 2 40 THINNER 21-06 30 Litres
3 3 HAND TOOLS
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 40 REPORTING DATE 8-Feb-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1017801 TIME REACHED CONTROL ROOM 6:50:00
TANK NUMBER NJBP 110 Direct / Part of DIRECT PERMIT START 7:00:00
L.I. Description TOP COAT PAINTING PERMIT CLOSED 17:40:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 23327 NEELAKANTH PAINTER 2 PAINTED BOTTOM PLATE(6x2Meter) APCS 3 TOP COAT 21 21 Plates
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC853 AIR COMPRESSOR 4 7407 1 40 SIGMA UN1263 C200a CT EPOXY BLACK 75 Litres
2 AC1018 AIR COMPRESSOR IDLE 1993.6 2 40 THINNER 21-06 13 Litres
3 AC1612 AIR COMPRESSOR IDLE 3907.3 3 HAND TOOLS
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# ARAMCO TIMESHEET REPORTING DATE 7-Jan-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 101 Direct / Part of PERMIT START 7:00:00
L.I. Description PAINTING FOAM PIPE LINE PERMIT CLOSED 16:05:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 TAKEN PERMIT & HELPING WORKERS
2 18753 RABINDER BOTHI HELPER 8 PAINTING Dia 6" FOAM CHAMBER PIPE LINE 15 15 Meter
3 PAINTING Dia 8" FOAM WATER PIPE LINE 8.5 8.5 Meter
4 PAINTING Dia 2 1/2"FOAM WATER PIPE LINE 15 15 Meter
5
6 13520 PANDIT HELPER 8 PAINTING Dia 6" FOAM CHAMBER PIPE LINE 15 15 Meter
7 PAINTING Dia 8" FOAM WATER PIPE LINE 8.5 8.5 Meter
8 PAINTING Dia 2 1/2"FOAM WATER PIPE LINE 15 15 Meter
9 11448 CHITHRA HELPER 8 ASSIST ON TOP ROOF TO PAINT FOAM WATER PIPE LINE
10 23205 MEKH HELPER 8 ASSIST ON TOP ROOF TO PAINT FOAM WATER PIPE LINE
11 20863 DHAN BAHADUR HELPER 8 ASSIST ON TOP ROOF TO PAINT FOAM WATER PIPE LINE
12 16678 SELVARAJ HELPER 8 ASSIST ON TOP ROOF TO PAINT FOAM WATER PIPE LINE
13 21358 TAN BAHADUR HELPER 8 ASSIST TO PAINT FOAM WATER PIPE LINE
14 20719 MAN BAHATHUR HELPER 8 ASSIST TO PAINT FOAM WATER PIPE LINE
15 20947 SHYAM HELPER 8 ASSIST TO PAINT FOAM WATER PIPE LINE
16 23214 BHAKTA HELPER 8 ASSIST TO PAINT FOAM WATER PIPE LINE
17 23520 KHALID HELPER 8 ASSIST TO PAINT FOAM WATER PIPE LINE
18 20776 DHAN BAHADUR HELPER 8 EQUIPMENT STANDBY
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1667 AIR COMPRESSOR 8 6014.5 1


2 SC-004 SKY CLAMPER 8 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 40 REPORTING DATE 6-Feb-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1017801 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 110 Direct / Part of DIRECT PERMIT START 7:00:00
L.I. Description TOP COAT PAINTING PERMIT CLOSED 17:50:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 23327 NEELAKANTH PAINTER 2 PAINTED BOTTOM PLATE(6x2Meter) APCS 3 TOP COAT 25 25 Plates
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC853 AIR COMPRESSOR 2 7403.5 1 40 SIGMA UN1263 C200a CT EPOXY BLACK 80 Litres
2 AC1018 AIR COMPRESSOR IDLE 1993.6 2 40 THINNER 21-06 15 Litres
3 AC1612 AIR COMPRESSOR IDLE 3907.3 3 HAND TOOLS
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 40 REPORTING DATE 6-Feb-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1017801 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 110 Direct / Part of PART OF PERMIT START 7:00:00
L.I. Description HELPING FOR PAINTING PERMIT CLOSED 17:50:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 2 TAKEN PERMIT & SUPERVISING
2 21358 TAN BAHADUR HELPER 2 EQUIPMENT STANDBY & FILLNG DIESEL ON EQUIPMENTS
3
4 20887 BIR TAMANG HELPER 2 HOLDING PAINTING HOSE WHEN PAINTING 25 25 Plates
5
6 20863 DHAN BAHADUR HELPER 2 MIXING PAINT 80 80 Litres
7
8 20947 SHYAM HELPER 2 MIXING PAINT 80 80 Litres
9 DUMPING PAINT CANS IN TRASH BIN 9 9 cans
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 40 REPORTING DATE 6-Feb-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1017801 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 110 Direct / Part of PART OF PERMIT START 7:00:00
L.I. Description SAND PAPERING FOR APPLY TOP COAT PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 - TAKEN PERMIT & SUPERVISING
2 21358 TAN BAHADUR HELPER 8 - SAND PAPERING ON BOTTOM PLATES & COTON RAG CLEANING(6x2Meter) 9 9 Plates
3
4 20887 BIR TAMANG HELPER 8 - SAND PAPERING ON BOTTOM PLATES & COTON RAG CLEANING(6x2Meter) 9 9 Plates
5
6 20863 DHAN BAHADUR HELPER 8 - SAND PAPERING ON BOTTOM PLATES & COTON RAG CLEANING(6x2Meter) 9 9 Plates
7
8 20947 SHYAM HELPER 8 - SAND PAPERING ON BOTTOM PLATES & COTON RAG CLEANING(6x2Meter) 9 9 Plates
9
10 23327 NEELAKANTH PAINTER 8 - SAND PAPERING ON BOTTOM PLATES & COTON RAG CLEANING(6x2Meter) 10 10 Plates
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 40 COTTON RAGS 1/4 KG


2 2 40 SAND PAPER 100 EA
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 40 REPORTING DATE 6-Feb-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1017801 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of PART OF PERMIT START 7:00:00
L.I. Description SAND PAPERING FOR APPLY TOP COAT PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 18796 HANIPH BLASTER 8 - SAND PAPERING ON BOTTOM PLATES & COTON RAG CLEANING(6x2.5Meter) 7 7 Plates
2 19069 DINESH BLASTER 8 - SAND PAPERING ON BOTTOM PLATES & COTON RAG CLEANING(6x2.5Meter) 7 7 Plates
3 23329 NITIN BLASTER 8 - SAND PAPERING ON BOTTOM PLATES & COTON RAG CLEANING(6x2.5Meter) 8 8 Plates
4 23330 NARASAPPA BLASTER 8 - SAND PAPERING ON BOTTOM PLATES & COTON RAG CLEANING(6x2.5Meter) 7 7 Plates
5 20783 MAN BAHATHUR BLASTER 8 - SAND PAPERING ON BOTTOM PLATES & COTON RAG CLEANING(6x2.5Meter) 7 7 Plates
6 18792 JAKIR BLASTER 8 - SAND PAPERING ON BOTTOM PLATES & COTON RAG CLEANING(6x2.5Meter) 7 7 Plates
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 COTTON RAGS 1/4 KG


2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 20 & 30 REPORTING DATE 5-Feb-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1052024 & 1064505 TIME REACHED CONTROL ROOM 6:55:00
TANK NUMBER NJBP 116 Direct / Part of PART OF PERMIT START 7:10:00
L.I. Description ASSIST BLASING & PAINTING PERMIT CLOSED 17:20:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 2 TAKEN PERMIT & HELPING WORKERS
2 21358 TAN BAHADUR HELPER 8 2 EQUIPMENT STAND BY & HELPING WORKERS
3
4 20887 BIR TAMANG HELPER 8 2 FILLING GRIT IN SAND BOARD 3.1 3.1 TON
5 MIXING PAINT 100 100 Litres
6 20863 DHAN BAHADUR HELPER 8 2 FILLING GRIT IN SAND BOARD 3.1 3.1 TON
7 HOLDING PAINTING HOSE
8 20947 SHYAM HELPER 8 2 FILLING GRIT IN SAND BOARD 3.1 3.1 TON
9 MIXING PAINT 100 100 Litres
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC853 AIR COMPRESSOR 8 7401.6 1 HAND TOOLS


2 AC1018 AIR COMPRESSOR 7 1993.6 2
3 AC1612 AIR COMPRESSOR 7 3907.3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 20 REPORTING DATE 5-Feb-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1052024 TIME REACHED CONTROL ROOM 6:55:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT PERMIT START 7:10:00
L.I. Description GRIT BLASTING OF BOTTOM PLATES PERMIT CLOSED 17:20:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 18796 HANIPH BLASTER 8 2 GRIT BLASTING OF BOTTOM PLATE(6x2.5Meter) 4 1 5 Plates
2 19069 DINESH BLASTER 8 2 GRIT BLASTING OF BOTTOM PLATE(6x2.5Meter) 4 1 5 Plates
3 23329 NITIN BLASTER 8 2 GRIT BLASTING OF BOTTOM PLATE(6x2.5Meter) 4 1 5 Plates
4 23330 NARASAPPA BLASTER 8 2 GRIT BLASTING OF BOTTOM PLATE(6x2.5Meter) 4 1 5 Plates
5 20783 MAN BAHATHUR BLASTER 8 2 GRIT BLASTING OF BOTTOM PLATE(6x2.5Meter) 3 1 4 Plates
6 18792 JAKIR BLASTER 8 2 GRIT BLASTING OF BOTTOM PLATE(6x2.5Meter) 3 1 4 Plates
7
8
9 NOTE S.NO 5
10 & 6 AIR COMPRESSOR 1018
GENERATING AT 103PSI
11 PRESSURE, MINIMUM NEED
12 125PSI FOR BLASTING
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 20 GRIT COAL SLAG 9.3 TON


2 2 HAND TOOLS
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 30 REPORTING DATE 5-Feb-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1064505 TIME REACHED CONTROL ROOM 6:55:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT PERMIT START 7:10:00
L.I. Description PAINTING PERMIT CLOSED 17:20:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 23327 NEELAKANTH PAINTER 8 2 PAINTED APCS 3 BROWN PRIMER COAT 1 27 28 Plates
2
3
4
5
6
7
8
9 NOTE
10 ARAMCO INSPECTOR
INSPECTED PLATES AFTER
11 BLASTING FROM 02.45 TO
12 03.30
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 30 SIGMA UN1263 C200a CT EPOXY BROWN 100 Litres


2 2 30 THINNER 21-06 18 Litres
3 3 HAND TOOLS
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 30 REPORTING DATE 4-Feb-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1064505 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT PERMIT START 7:10:00
L.I. Description PAINTING PERMIT CLOSED 17:25:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 23327 NEELAKANTH PAINTER 8 2 PAINTED APCS 3 BROWN PRIMER COAT 2 13 15 Plates
2
3
4
5
6
7
8
9 NOTE
10 ARAMCO INSPECTOR
INSPECTED PLATES AFTER
11 BLASTING FROM 03.10 TO
12 03.45
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 30 SIGMA UN1263 C200a CT EPOXY BROWN 40 Litres


2 2 30 THINNER 21-06 8 Litres
3 3 HAND TOOLS
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 20 REPORTING DATE 4-Feb-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1052024 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT PERMIT START 7:10:00
L.I. Description GRIT BLASTING OF BOTTOM PLATES PERMIT CLOSED 17:25:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 18796 HANIPH BLASTER 8 2 BLASTED BOTTOM PLATE(6x2.5Meter) 4 1 5 Plates
2 19069 DINESH BLASTER 8 2 BLASTED BOTTOM PLATE(6x2.5Meter) 4 1 5 Plates
3 23329 NITIN BLASTER 8 2 BLASTED BOTTOM PLATE(6x2.5Meter) 4 1 5 Plates
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 20 GRIT COAL SLAG 4.5 TON


2 2 HAND TOOLS
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 20 REPORTING DATE 4-Feb-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1052024 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 110 Direct / Part of DIRECT PERMIT START 7:10:00
L.I. Description BLASTING OF BOTTOM PLATES PERMIT CLOSED 17:25:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 23330 NARASAPPA BLASTER 8 - BLASTED BOTTOM PLATE(6x2Meter) 5- 5 Plates
2 20783 MAN BAHATHUR BLASTER 8 2 BLASTED BOTTOM PLATE(6x2Meter) 4 1 5 Plates
3 18792 JAKIR BLASTER 8 2 BLASTED BOTTOM PLATE(6x2Meter) 4 1 5 Plates
4
5
6
7
8
9 NOTE S.NO 2
10 & 3 AIR COMPRESSOR 1018
GENERATING AT 103PSI
11 PRESSURE, MINIMUM NEED
12 125PSI FOR BLASTING
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC853 AIR COMPRESSOR 8 7394.7 1 20 GRIT COAL SLAG 4.5 TON


2 AC1018 AIR COMPRESSOR 8 1988.1 2 HAND TOOLS
3 AC1612 AIR COMPRESSOR 8 3902 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 30 REPORTING DATE 4-Feb-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1064505 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 110 Direct / Part of DIRECT PERMIT START 7:10:00
L.I. Description PAINTING PERMIT CLOSED 17:25:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 23327 NEELAKANTH PAINTER 8 2 PAINTED APCS 3 BROWN PRIMER COAT 2 13 15 Plates
2
3
4
5
6
7
8
9 NOTE
10 ARAMCO INSPECTOR
INSPECTED PLATES AFTER
11 BLASTING FROM 03.10 TO
12 03.45
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 30 SIGMA UN1263 C200a CT EPOXY BROWN 45 Litres


2 2 30 THINNER 21-06 7 Litres
3 3 HAND TOOLS
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 20 & 30 REPORTING DATE 4-Feb-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1052024 & 1064505 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 110 Direct / Part of PART OF PERMIT START 7:10:00
L.I. Description ASSIST BLASING & PAINTING PERMIT CLOSED 17:25:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 2 TAKEN PERMIT & HELPING WORKERS
2 21358 TAN BAHADUR HELPER 8 2 EQUIPMENT STAND BY & REFILLING DIESEL IN EQUIPMENTS
3
4 20887 BIR TAMANG HELPER 8 2 FILLING GRIT IN SAND BOARD 3 3 TON
5 MIXING PAINT 95 95 Litres
6 20863 DHAN BAHADUR HELPER 8 2 FILLING GRIT IN SAND BOARD 3 3 TON
7 HOLDING PAINTING HOSE
8 20947 SHYAM HELPER 8 2 FILLING GRIT IN SAND BOARD 3 3 TON
9 MIXING PAINT 95 95 Litres
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 HAND TOOLS
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 20 & 30 REPORTING DATE 3-Feb-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1052024 & 1064505 TIME REACHED CONTROL ROOM 6:35:00
TANK NUMBER NJBP 110 Direct / Part of PART OF PERMIT START 6:50:00
L.I. Description ASSIST BLASING & PAINTING PERMIT CLOSED 17:45:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 2 TAKEN PERMIT & HELPING WORKERS
2 21358 TAN BAHADUR HELPER 8 2 EQUIPMENT STAND BY & REFILLING DIESEL IN EQUIPMENTS
3 ASSIST FORKLIFT OPERATOR TO SHIFT TOP COATED PLATES (6x2Meter) 17 17 Plates
4 20887 BIR TAMANG HELPER 8 2 FILLING GRIT IN SAND BOARD 2 2 TON
5 MIXING PAINT 95 95 Litres
6 20863 DHAN BAHADUR HELPER 8 2 FILLING GRIT IN SAND BOARD 2 2 TON
7 HOLDING PAINTING HOSE
8 20947 SHYAM HELPER 8 2 FILLING GRIT IN SAND BOARD 2 2 TON
9 MIXING PAINT 95 95 Litres
10 23213 LALLU RAM HELPER 8 3 FILLING GRIT IN SAND BOARD 2 2 TON
11 SPREADING PLATE FOR BLASTING (6x2.5Meter) 30 30 Plates
12 ASSIST FORKLIFT OPERATOR TO SHIFTING TOP COATED PLATES (6x2Meter) 17 17 Plates
13
14 13936 JIMMY FO.OP 8 2 SHIFTING TOP COATED PLATES (6x2Meter) 17 17 Plates
15 SPREADING PLATE FOR BLASTING (6x2.5Meter) 30 30 Plates
16 LOADING HDPE LINER ROLL OUTSIDE ARAMCO SITE 2- 2 ROLLS
17 UNLOADING HDPE LINER ROLL IN TANK 116 2- 2 ROLLS
18 SHIFTING GENERATOR FROM YARD TO TANK 110 1- 1 EA
19 SHIFTING GRIT BAG FROM YARD TO BLASTING AREA 10 - 10 TON
20 SHIFTING PAINT CAN FROM YARD TO PAINTING AREA 100 - 100 Litres
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 FL909 FORKLIFT 9 375.8 1 HAND TOOLS


2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 30 REPORTING DATE 3-Feb-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1064505 TIME REACHED CONTROL ROOM 6:35:00
TANK NUMBER NJBP 110 Direct / Part of DIRECT PERMIT START 6:50:00
L.I. Description PAINTING PERMIT CLOSED 17:45:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 23327 NEELAKANTH PAINTER 8 3 PAINTED APCS 3 BROWN PRIMER COAT 5 27 32 Plates
2
3
4
5
6
7
8
9 NOTE
10 ARAMCO INSPECTOR
INSPECTED PLATES AFTER
11 BLASTING FROM 03.05 TO
12 03.45
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 30 SIGMA UN1263 C200a CT EPOXY BROWN 95 Litres


2 2 30 THINNER 21-06 19 Litres
3 3 HAND TOOLS
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 20 REPORTING DATE 3-Feb-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1052024 TIME REACHED CONTROL ROOM 6:35:00
TANK NUMBER NJBP 110 Direct / Part of DIRECT PERMIT START 6:50:00
L.I. Description BLASTING OF BOTTOM PLATES PERMIT CLOSED 17:45:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 18796 HANIPH BLASTER 8 2 BLASTED BOTTOM PLATE(6x2Meter) 5 1 6 Plates
2 19069 DINESH BLASTER 8 2 BLASTED BOTTOM PLATE(6x2Meter) 5 1 6 Plates
3 23329 NITIN BLASTER 8 2 BLASTED BOTTOM PLATE(6x2Meter) 5 1 6 Plates
4 23330 NARASAPPA BLASTER 8 2 BLASTED BOTTOM PLATE(6x2Meter) 5 1 6 Plates
5 20783 MAN BAHATHUR BLASTER 8 - BLASTED BOTTOM PLATE(6x2Meter) 4- 4 Plates
6 18792 JAKIR BLASTER 8 - BLASTED BOTTOM PLATE(6x2Meter) 4- 4 Plates
7
8
9
10 NOTE S.NO 5
& 6 AIR COMPRESSOR
11 BREAKDOWN 1 1/2 HOUR
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC853 AIR COMPRESSOR 9 7388.8 1 20 GRIT COAL SLAG 8 TON


2 AC1018 AIR COMPRESSOR 6 1982.3 2 HAND TOOLS
3 AC1612 AIR COMPRESSOR 8 3896.5 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 20 REPORTING DATE 2-Feb-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1052024 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 110 Direct / Part of PART OF PERMIT START 7:00:00
L.I. Description PREPARATION FOR BLASTING PERMIT CLOSED 17:20:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 2 TAKEN PERMIT & HELPING WORKERS
2 13936 JIMMY FO.OP 8 2 SHIFTING TOP COAT PAINED PLATES(6x2Meter) 80 80 Plates
3 SPREADING BOTTOM PLATES(6x2Meter) FOR BLASTING 48 48 Plates
4 SPREADING BOTTOM PLATES(6x2.5Meter) FOR BLASTING - 21 21 Plates
5 23329 NITIN BLASTER 8 2 ASSIST FORK LIFT OPERATOR TO SHIFT & SPREAD PLATES 128 21 149 Plates
6 LEVLLING BOTTOM LEVEL SAND BY SHOVEL FOR PLATE FLATNESS 110 15 115 Plates
7 19069 DINESH BLASTER 8 2 ASSIST FORK LIFT OPERATOR TO SHIFT & SPREAD PLATES 128 21 149 Plates
8 COVERING BLASTING AREA WITH BLUE SHEET 10 10 Meter
9 LEVLLING BOTTOM LEVEL SAND BY SHOVEL FOR PLATE FLATNESS 110 15 115 Plates
10 21358 TAN BAHADUR HELPER 8 2 ASSIST FORK LIFT OPERATOR TO SHIFT & SPREAD PLATES 128 21 149 Plates
11 COVERING BLASTING AREA WITH BLUE SHEET 10 10 Meter
12 LEVLLING BOTTOM LEVEL SAND BY SHOVEL FOR PLATE FLATNESS 110 15 115 Plates
13 20783 MAN BAHATHUR BLASTER 8 - ASSIST FORK LIFT OPERATOR TO SHIFT & SPREAD PLATES 128 128 Plates
14 23330 NARASAPPA BLASTER 8 - ASSIST FORK LIFT OPERATOR TO SHIFT & SPREAD PLATES 128 128 Plates
15 23327 NEELAKANTH PAINTER 8 - ASSIST FORK LIFT OPERATOR TO SHIFT & SPREAD PLATES 128 128 Plates
16 18792 JAKIR BLASTER 8 - ASSIST FORK LIFT OPERATOR TO SHIFT & SPREAD PLATES 128 128 Plates
17 18796 HANIPH BLASTER 8 - FLAG MAN 128 128 Plates
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 FL909 FORKLIFT 9 368.8 1


2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 40 REPORTING DATE 1-Feb-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1017801 TIME REACHED CONTROL ROOM 6:40:00
TANK NUMBER NJBP 110 Direct / Part of PART OF PERMIT START 7:10:00
L.I. Description ASSIST PAINTER PERMIT CLOSED 17:20:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 2 TAKEN PERMIT & HELPING WORKERS
2 23329 NITIN BLASTER 8 2 CLEANING BOTTOM PLATES(6x2Meter) BEFORE PAINTING BY COTTON RAGS 17 17 Plates
3 MIXING PAINT 180 40 220 Litres
4 19069 DINESH BLASTER 8 2 CLEANING BOTTOM PLATES(6x2Meter) BEFORE PAINTING BY COTTON RAGS 16 16 Plates
5 MIXING PAINT 180 40 220 Litres
6 21358 TAN BAHADUR HELPER 8 2 CLEANING BOTTOM PLATES(6x2Meter) BEFORE PAINTING BY COTTON RAGS 17 17 Plates
7 EQUIPMENT STANDBY & FLAG MAN
8 20887 BIR TAMANG HELPER 8 2 CLEANING BOTTOM PLATES(6x2Meter) BEFORE PAINTING BY COTTON RAGS 17 17 Plates
9 HOLDING PAINTING HOSE & DUMPING PAINT CANS
10
11 13936 JIMMY FO.OP 8 - SHIFTING BOTTOM PLATES 15 15 Plates
12 SHIFTING GRIT BAGS FOR BLASTING FROM YARD TO BLASTING AREA 20 20 TON
13 SHIFTING PAINT CANS FROM YARD TO PAINTING AREA 22 22 Cans
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 FL909 FORKLIFT 6 362.4 1 COTTON RAGS 1/4 KG


2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 40 REPORTING DATE 1-Feb-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1017801 TIME REACHED CONTROL ROOM 6:40:00
TANK NUMBER NJBP 110 Direct / Part of DIRECT PERMIT START 7:10:00
L.I. Description PAINTING PERMIT CLOSED 17:20:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 23327 NEELAKANTH PAINTER 8 2 PAINTED BOTTOM PLATE (6x2Meter) APCS 3 BLACK TOP COAT 50 17 67 Plates
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC853 AIR COMPRESSOR 6 7380.8 1 40 SIGMA UN1263 C200a CT EPOXY BLACK 220 Litres
2 AC1018 AIR COMPRESSOR IDLE 1976.2 2 40 THINNER 21-06 30 Litres
3 AC1612 AIR COMPRESSOR IDLE 3890.6 3 HAND TOOLS
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# ARAMCO TIMESHEET REPORTING DATE 31-Jan-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM 6:40:00
TANK NUMBER NJBP 101 Direct / Part of PERMIT START 6:55:00
L.I. Description PAINTING FOAM PIPE LINE PERMIT CLOSED 16:05:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 10 TAKEN PERMIT & HELPING WORKERS
2 18753 RABINDER BOTHI HELPER 10 PAINTING FIRE FOAM WATER LINE
3 Dia 4" FOAM CHAMBER PIPE LINE 2 2 Meter
4 Dia 6" FOAM WATER PIPE LINE 5 5 Meter
5 Dia 2 1/2"FOAM WATER PIPE LINE&FIXING FOAM CHAMBER WITH NUT&BOLD(1EA) 20 20 Meter
6 13520 PANDIT HELPER 10 Dia 4" FOAM CHAMBER PIPE LINE 2 2 Meter
7 Dia 6" FOAM WATER PIPE LINE 5 5 Meter
8 Dia 8" FOAM WATER PIPE LINE & FIXING SPRINGULAR(6EA) 16 16 Meter
9 11448 CHITHRA HELPER 10 ASSIST TO PAINT FOAM WATER PIPE LINE
10 23213 LALLU RAM HELPER 10 ASSIST TO PAINT FOAM WATER PIPE LINE
11 20863 DHAN BAHADUR HELPER 10 ASSIST TO PAINT FOAM WATER PIPE LINE
12 16678 SELVARAJ HELPER 10 ASSIST TO PAINT FOAM WATER PIPE LINE
13 21358 TAN BAHADUR HELPER 10 ASSIST TO PAINT FOAM WATER PIPE LINE
14 22322 PREM HELPER 10 ASSIST TO PAINT FOAM WATER PIPE LINE
15 23205 MEKH HELPER 10 ASSIST TO PAINT FOAM WATER PIPE LINE
16 11448 CHITHRA HELPER 10 ASSIST TO PAINT FOAM WATER PIPE LINE
17 20947 SHYAM HELPER 10 ASSIST TO PAINT FOAM WATER PIPE LINE
18 11997 GIRI HELPER 10 ASSIST TO PAINT FOAM WATER PIPE LINE
19 20776 DHAN BAHADUR HELPER 10 EQUIPMENT STANDBY
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1667 AIR COMPRESSOR 8 6014.5 1 APCS 6 RED ENAMEL 52140 6 Litres


2 2 THINNER 1 1/2 Litres
3 3 ANGLE BRUSH 2 EA
4 4 ROLLER BRUSH 7 EA
5 5 HAND TOOLS
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 40 REPORTING DATE 30-Jan-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1017801 TIME REACHED CONTROL ROOM 6:30:00
TANK NUMBER NJBP 110 Direct / Part of DIRECT PERMIT START 6:40:00
L.I. Description PAINTING PERMIT CLOSED 18:05:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 23327 NEELAKANTH PAINTER 8 3 PAINTED APCS 3 BLACK TOP COAT - 28 28 Plates
2
3
4
5
6
7
8
9 NOTE
10 ARAMCO INSPECTOR
INSPECTED 95 PLATES AFTER
11 BLASTING FROM 02:55 TO
12 03.55
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC853 AIR COMPRESSOR 2 7375.9 1 30 SIGMA UN1263 C200a CT EPOXY BLACK 70 Litres
2 AC1018 AIR COMPRESSOR IDLE 1976.2 2 30 THINNER 21-06 13 Litres
3 AC1612 AIR COMPRESSOR IDLE 3890.6 3 HAND TOOLS
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 40 REPORTING DATE 30-Jan-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1017801 TIME REACHED CONTROL ROOM 6:30:00
TANK NUMBER NJBP 110 Direct / Part of PART OF PERMIT START 6:40:00
L.I. Description SAND PAPERING & ASSISTING PAINTER PERMIT CLOSED 18:05:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 2 TAKEN PERMIT & HELPING WORKERS
2 23329 NITIN BLASTER 8 3 SAND PAPERING PLATES(6x2Meter) & CLEANING BY COTTON RAGS 12 2 14 Plates
3 8 MIXING PAINT 70 70 Litres
4 21358 TAN BAHADUR HELPER 8 3 EQUIPMENT STANDBY
5 ASSIST PAINTER & DUMPING PAIN CANS
6 20863 DHAN BAHADUR S/F 8 3 SAND PAPERING PLATES(6x2Meter) & CLEANING BY COTTON RAGS 12 2 14 Plates
7 ASSIST MIXING PAINT
8 19069 DINESH BLASTER 8 2 SAND PAPERING PLATES(6x2Meter) & CLEANING BY COTTON RAGS 12 2 14 Plates
9 SHIFTING AIR COMPRESSOR 1018 TO TANK 101 FROM YARD 1 1 EA
10 SHIFTING AIR COMPRESSOR 1612 TO BLASING AREA FROM YARD 1 1 EA
11 11448 CHITHRA HELPER 8 3 SAND PAPERING PLATES(6x2Meter) & CLEANING BY COTTON RAGS 12 2 14 Plates
12 HOLDING PAINTING HOSE
13 18792 JAKIR BLASTER 8 - SAND PAPERING PLATES(6x2Meter) & CLEANING BY COTTON RAGS 6 6 Plates
14 18796 HANEEF BLASTER 8 - SAND PAPERING PLATES(6x2Meter) & CLEANING BY COTTON RAGS 13 13 Plates
15 20783 MAN BAHATHUR BLASTER 8 - SAND PAPERING PLATES(6x2Meter) & UNLOADING GRIT BAGS 7 7 Plates
16 23330 NARASAPPA BLASTER 8 - SAND PAPERING PLATES(6x2Meter) & CLEANING BY COTTON RAGS 13 13 Plates
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 40 COTTON RAGS 1/4 KG


2 2 40 SAND PAPER 110 EA
3 3 HAND TOOLS
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 20 REPORTING DATE 29-Jan-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1052024 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 110 Direct / Part of DIRECT PERMIT START 7:05:00
L.I. Description BLASTING OF BOTTOM PLATES PERMIT CLOSED 17:50:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 20783 MAN BAHATHUR BLASTER 8 - BLASTED BOTTOM PLATE (6x2Meter) 4- 4 Plates
2 19069 DINESH BLASTER 8 2 BLASTED BOTTOM PLATE (6x2Meter) 5 1 6 Plates
3 23330 NARASAPPA BLASTER 8 2 BLASTED BOTTOM PLATE (6x2Meter) 5 1 6 Plates
4 18796 HANIPH DHUNIYA BLASTER 8 2 BLASTED BOTTOM PLATE (6x2Meter) 5 1 6 Plates
5 23329 NITIN BLASTER 8 2 BLASTED BOTTOM PLATE (6x2Meter) 5 1 6 Plates
6 18792 JAKIR BLASTER 8 2 BLASTED BOTTOM PLATE (6x2Meter) 5 1 6 Plates
7
8
9
NOTE S.NO
10 1 BLASTING HOSE AIR LEAK 2
11 TIMES FIXING IT TAKEN 35
MINUTES
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC853 AIR COMPRESSOR 8 7374 1 20 GRIT COAL SLAG 8.8 TON


2 AC1018 AIR COMPRESSOR 7 1976.2 2 HAND TOOLS
3 AC1669 AIR COMPRESSOR 7 3714.8 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 20 & 30 REPORTING DATE 29-Jan-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1052024 & 1064505 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 110 Direct / Part of PART OF PERMIT START 7:05:00
L.I. Description BLASING & PAINTING PERMIT CLOSED 17:50:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 2 TAKEN PERMIT & HELPING WORKERS
2 21358 TAN BAHADUR HELPER 8 2 GRIT FILLING IN SAND BOARD 2.2 2.2 TON
3 MIXING PAINT 90 90 Litres
4 20947 SHYAM MAHRA HELPER 8 2 GRIT FILLING IN SAND BOARD 2.2 2.2 TON
5 AIR CLEANING AFTER BLASTING & HELPING PAINTER 90 90 Litres
6 20887 BIR TAMANG HELPER 8 2 GRIT FILLING IN SAND BOARD 2.2 2.2 TON
7 HOLDING PAINTER HOSE 90 90 Litres
8 11448 CHITHRA HELPER 8 2 GRIT FILLING IN SAND BOARD 2.2 2.2 TON
9 ASSIST PAINTER & DUMPING PAINT CANS IN TRASH BIN 11 11 Cans
10 20863 DHAN BAHADUR S/F 8 2 EQUIPMENT STANDBY & FILLING DIESEL
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 HAND TOOLS
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 30 REPORTING DATE 29-Jan-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1064505 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 110 Direct / Part of DIRECT PERMIT START 7:05:00
L.I. Description PAINTING PERMIT CLOSED 17:50:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 23327 NEELAKANTH PAINTER 8 2 PAINTED APCS 3 BROWN PRIMER COAT 2 32 34 Plates
2
3
4
5
6
7
8
9 NOTE
10 ARAMCO INSPECTOR
INSPECTED PLATE AFTER
11 BLASTING FROM 03:05 TO
12 03.45
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC853 AIR COMPRESSOR 8 7374 1 30 SIGMA UN1263 C200a CT EPOXY BROWN 95 Litres
2 AC1018 AIR COMPRESSOR 7 1976.2 2 30 THINNER 21-06 19 Litres
3 AC1669 AIR COMPRESSOR 7 3714.8 3 HAND TOOLS
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 30 REPORTING DATE 28-Jan-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1064505 TIME REACHED CONTROL ROOM 6:40:00
TANK NUMBER NJBP 110 Direct / Part of DIRECT PERMIT START 7:10:00
L.I. Description PAINTING PERMIT CLOSED 17:30:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 23327 NEELAKANTH PAINTER 8 2 PAINTED APCS 3 BROWN PRIMER COAT 4 29 33 Plates
2
3
4
5
6
7
8
9 NOTE
10 ARAMCO INSPECTOR
INSPECTED PLATE AFTER
11 BLASTING FROM 02:35 TO
12 03.40
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC853 AIR COMPRESSOR 8 7366.3 1 30 SIGMA UN1263 C200a CT EPOXY BROWN 90 Litres
2 AC1018 AIR COMPRESSOR 8 1970.6 2 30 THINNER 21-06 17 Litres
3 AC1669 AIR COMPRESSOR 8 3708.7 3 HAND TOOLS
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 20 & 30 REPORTING DATE 28-Jan-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1052024 & 1064505 TIME REACHED CONTROL ROOM 6:40:00
TANK NUMBER NJBP 110 Direct / Part of PART OF PERMIT START 7:10:00
L.I. Description BLASING & PAINTING PERMIT CLOSED 17:30:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 2 TAKEN PERMIT & HELPING WORKERS
2 21358 TAN BAHADUR HELPER 8 2 GRIT FILLING IN SAND BOARD 2.12 2.12 TON
3 MIXING PAINT 90 90 Litres
4 20947 SHYAM MAHRA HELPER 8 2 GRIT FILLING IN SAND BOARD 2.12 2.12 TON
5 AIR CLEANING AFTER BLASTING & HELPING PAINTER 90 90 Litres
6 20887 BIR TAMANG HELPER 8 2 GRIT FILLING IN SAND BOARD 2.12 2.12 TON
7 HOLDING PAINTER HOSE 90 90 Litres
8 11448 CHITHRA HELPER 8 2 GRIT FILLING IN SAND BOARD 2.12 2.12 TON
9 ASSIST PAINTER & DUMPING PAINT CANS IN TRASH BIN 10 10 Cans
10 20863 DHAN BAHADUR S/F 8 2 EQUIPMENT STANDBY & FILLING DIESEL
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC853 AIR COMPRESSOR 8 7366.3 1 HAND TOOLS


2 AC1018 AIR COMPRESSOR 8 1970.6 2
3 AC1669 AIR COMPRESSOR 8 3708.7 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 20 REPORTING DATE 28-Jan-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1052024 TIME REACHED CONTROL ROOM 6:40:00
TANK NUMBER NJBP 110 Direct / Part of DIRECT PERMIT START 7:10:00
L.I. Description BLASTING OF BOTTOM PLATES PERMIT CLOSED 17:30:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 20783 MAN BAHATHUR BLASTER 8 2 BLASTED BOTTOM PLATE (6x2Meter) 5 1 6 Plates
2 19069 DINESH BLASTER 8 2 BLASTED BOTTOM PLATE (6x2Meter) 5 1 6 Plates
3 23330 NARASAPPA BLASTER 8 2 BLASTED BOTTOM PLATE (6x2Meter) 5 1 6 Plates
4 18796 HANIPH DHUNIYA BLASTER 8 2 BLASTED BOTTOM PLATE (6x2Meter) 5 1 6 Plates
5 23329 NITIN BLASTER 8 2 BLASTED BOTTOM PLATE (6x2Meter) 5 1 6 Plates
6 18792 JAKIR BLASTER 8 - BLASTED BOTTOM PLATE (6x2Meter) 3- 3 Plates
7
8
9 NOTE S.NO
10 6 BLASTING HOSE AIR LEAK
FIXING IT TAKEN 20MINUTES
11 AND 1.15 TO 2.10 CHANGING
12 GRIT VALVE
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC853 AIR COMPRESSOR 8 7366.3 1 20 GRIT COAL SLAG 8.5 TON


2 AC1018 AIR COMPRESSOR 8 1970.6 2 HAND TOOLS
3 AC1669 AIR COMPRESSOR 8 3708.7 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 20 REPORTING DATE 27-Jan-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1052024 TIME REACHED CONTROL ROOM 6:35:00
TANK NUMBER NJBP 110 Direct / Part of DIRECT PERMIT START 6:55:00
L.I. Description BLASTING OF BOTTOM PLATES PERMIT CLOSED 17:30:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 20783 MAN BAHATHUR BLASTER 8 2 BLASTED BOTTOM PLATE (6x2Meter) 5 1 6 Plates
2 19069 DINESH BLASTER 8 2 BLASTED BOTTOM PLATE (6x2Meter) 5 1 6 Plates
3 23330 NARASAPPA BLASTER 8 2 BLASTED BOTTOM PLATE (6x2Meter) 5 1 6 Plates
4 18796 HANIPH DHUNIYA BLASTER 8 2 BLASTED BOTTOM PLATE (6x2Meter) 5 1 6 Plates
5 23329 NITIN BLASTER 8 - BLASTED BOTTOM PLATE (6x2Meter) 4- 4 Plates
6
7
8
9
NOTE S.NO
10 5 BLASTING HOSE AIR LEAK 3
11 TIMES FIXING IT TAKEN 1
HOUR
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC853 AIR COMPRESSOR 9 7359 1 GRIT COAL SLAG 7.6 TON


2 AC1018 AIR COMPRESSOR 8 1964 2
3 AC1669 AIR COMPRESSOR 8 3703.2 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 20 & 30 REPORTING DATE 27-Jan-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1052024 & 1064505 TIME REACHED CONTROL ROOM 6:35:00
TANK NUMBER NJBP 110 Direct / Part of PART OF PERMIT START 6:55:00
L.I. Description BLASING & PAINTING PERMIT CLOSED 17:30:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 2 TAKEN PERMIT & HELPING WORKERS
2 21358 TAN BAHADUR HELPER 8 2 GRIT FILLING IN SAND BOARD 1.52 1.52 TON
3 ASSIST TO MIX PAINT 80 80 Litres
4 20947 SHYAM MAHRA HELPER 8 2 GRIT FILLING IN SAND BOARD 1.52 1.52 TON
5 AIR CLEANING AFTER BLASTING & HELPING PAINTER 80 80 Litres
6 20887 BIR TAMANG HELPER 8 2 GRIT FILLING IN SAND BOARD 1.52 1.52 TON
7 HOLDING PAINTER HOSE 80 80 Litres
8 11448 CHITHRA HELPER 8 2 GRIT FILLING IN SAND BOARD 1.52 1.52 TON
9 ASSIST PAINTER & DUMPING PAINT CANS IN TRASH BIN 9 9 Cans
10 13520 PANDIT P/F 8 2 GRIT FILLING IN SAND BOARD 1.52 1.52 TON
11 PAINT MIXING 80 80 Litres
12
13 20863 DHAN BAHADUR S/F 8 2 EQUIPMENT STANDBY & FILLING DIESEL
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC853 AIR COMPRESSOR 9 7359 1 HAND TOOLS


2 AC1018 AIR COMPRESSOR 8 1964 2
3 AC1669 AIR COMPRESSOR 8 3703.2 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 30 REPORTING DATE 27-Jan-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1064505 TIME REACHED CONTROL ROOM 6:35:00
TANK NUMBER NJBP 110 Direct / Part of DIRECT PERMIT START 6:55:00
L.I. Description PAINTING PERMIT CLOSED 17:30:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 23327 NEELAKANTH PAINTER 8 2 PAINTED APCS 3 BROWN PRIMER COAT 5 23 28 Plates
2
3
4
5
6
7
8
9 NOTE
10 ARAMCO INSPECTOR
INSPECTED PLATE AFTER
11 BLASTING FROM 02:45 TO
12 03.25
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC853 AIR COMPRESSOR 9 7359 1 30 SIGMA UN1263 C200a CT EPOXY BROWN 80 Litres
2 AC1018 AIR COMPRESSOR 8 1964 2 30 THINNER 21-06 14 Litres
3 AC1669 AIR COMPRESSOR 8 3703.2 3 HAND TOOLS
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 20 REPORTING DATE 26-Jan-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1052024 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 110 Direct / Part of PART OF PERMIT START 7:00:00
L.I. Description PREPARATION FOR BLASTING PERMIT CLOSED 17:20:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 TAKEN PERMIT & HELPING WORKERS
2 13936 JIMMY FL.OP SHIFTING TOP COAT PAINTED PLATES 35 - 35 Plates
3 2 SPREADING PLATES FOR BLASTING 2 20 22 Plates
4 21358 TAN BAHADUR HELPER 8 2 FLAG MAN & ASSIST FORK LIFT OPERATOR
5 LOADING PAINT PUMP & HYDROTEST PUMP EACH 1 1 SET
6 20783 MAN BAHATHUR BLASTER 8 ASSIST FORK LIFT OPERATOR TO SPREAD PLATES
7 18792 JAKIR BLASTER 8 SHIFTING & ARRANGING MATERIALS
8 23330 NARASAPPA BLASTER 8 SHIFTING & ARRANGING MATERIALS
9 18796 HANEEF BLASTER 8 ASSIST FORK LIFT OPERATOR TO SPREAD PLATES
10 23329 NITIN BLASTER 8 ASSIST FORK LIFT OPERATOR TO SPREAD PLATES
11 23327 NEELAKANTH PAINTER 8 ASSIST FORK LIFT OPERATOR TO SHIFT PLATES
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 FL909 FORKLIFT 3 354.4 1 HAND TOOLS


2 AC1018 AIR COMPRESSOR IDLE 1956.8 2
3 AC1669 AIR COMPRESSOR IDLE 3696.2 3
4 AC853 AIR COMPRESSOR IDLE 7351.1 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 20 REPORTING DATE 25-Jan-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1052024 TIME REACHED CONTROL ROOM 6:35:00
TANK NUMBER NJBP 110 Direct / Part of PART OF PERMIT START 7:05:00
L.I. Description PREPARATION FOR BLASTING PERMIT CLOSED 17:25:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 TAKEN PERMIT & HELPING WORKERS
2 13936 JIMMY FL.OP 8 2 SHIFTING TOP COAT PAINTED PLATES 28 28 Plates
3 SPREADING PLATES FOR BLASTING 22 22 Plates
4 21358 TAN BAHADUR HELPER 8 2 FLAG MAN & ASSIST FORK LIFT OPERATOR 1- 1 SET
5 SHIFTING BLASTING BOARD WITH HOSE
6
7 18792 JAKIR BLASTER 8 SHIFTING & ARRANGING MATERIALS
8 23330 NARASAPPA BLASTER 8 SHIFTING & ARRANGING MATERIALS
9 18796 HANEEF BLASTER 8 ASSIST FORK LIFT OPERATOR TO SPREAD PLATES
10 20783 MAN BAHATHUR BLASTER 8 ASSIST FORK LIFT OPERATOR TO SPREAD PLATES
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 FL909 FORKLIFT 4 352.3 1 HAND TOOLS


2 AC1018 AIR COMPRESSOR IDLE 1956.8 2
3 AC1669 AIR COMPRESSOR IDLE 3696.2 3
4 AC853 AIR COMPRESSOR IDLE 7351.1 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 20 REPORTING DATE 24-Jan-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1052024 TIME REACHED CONTROL ROOM 6:55:00
TANK NUMBER NJBP 110 Direct / Part of PART OF PERMIT START 7:15:00
L.I. Description PREPARATION FOR BLASTING PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 TAKEN PERMIT & HELPING WORKERS
2 13936 JIMMY FL.OP 8 SHIFTING TOP COAT PAINTED PLATES 52 52 Plates
3 SPREADING PLATES FOR BLASTING 52 52 Plates
4 21358 TAN BAHADUR HELPER 8 FLAG MAN & ASSIST FORK LIFT OPERATOR
5 15066 BAIJANATH HELPER 8 ASSIST FORK LIFT OPERATOR
6 LOADING GENERATOR 1756 WITH PANEL SWITCH BOARD IN DYNA TRUCK 1 1 EA
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 FL909 FORKLIFT 8 348.9 1 HAND TOOLS


2 AC1018 AIR COMPRESSOR IDLE 1956.8 2
3 AC1669 AIR COMPRESSOR IDLE 3696.2 3
4 AC853 AIR COMPRESSOR IDLE 7351.1 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 40 REPORTING DATE 23-Jan-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1017801 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 110 Direct / Part of PART OF PERMIT START 7:05:00
L.I. Description SAND PAPERING & ASSISTING PAINTER PERMIT CLOSED 17:30:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 2 TAKEN PERMIT & HELPING WORKERS
2 23329 NITIN BLASTER 8 2 SAND PAPERING PLATES(6x2Meter) & CLEANING BY COTTON RAGS 6- 6 Plates
3 8 MIXING PAINT 100 100 Litres
4 21358 TAN BAHADUR HELPER 8 2 EQUIPMENT STANDBY
5 DUMPING PAIN CANS 11 11 CANS
6 23330 NARASAPPA BLASTER 8 2 SAND PAPERING PLATES(6x2Meter) & CLEANING BY COTTON RAGS 6 6 Plates
7 HOLDING UP PAINTING HOSE 100 100 Litres
8 20887 BIR TAMANG HELPER 8 - SAND PAPERING PLATES(6x2Meter) & CLEANING BY COTTON RAGS 6- 6 Plates
9 18792 JAKIR BLASTER 8 - SAND PAPERING PLATES(6x2Meter) & CLEANING BY COTTON RAGS 4- 4 Plates
10 18796 HANEEF BLASTER 8 - SAND PAPERING PLATES(6x2Meter) & CLEANING BY COTTON RAGS 4- 4 Plates
11 19069 DINESH BLASTER 8 - SAND PAPERING PLATES(6x2Meter) & UNLOADING GRIT BAGS 3- 3 Plates
12 20783 MAN BAHATHUR BLASTER 8 - SAND PAPERING PLATES(6x2Meter) & UNLOADING GRIT BAGS 3- 3 Plates
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 40 COTTON RAGS 1/4 KG


2 2 HAND TOOLS
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 40 REPORTING DATE 23-Jan-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1017801 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 110 Direct / Part of DIRECT PERMIT START 7:05:00
L.I. Description PAINTING PERMIT CLOSED 17:30:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 23327 NEELAKANTH PAINTER 8 2 PAINTED BOTTOM PLATE APCS 3 TOP COAT BLACK 5 27 32 Plates
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1018 AIR COMPRESSOR 2 1956.8 1 40 APCS 3 SIGMA C200a CT EPOXY UN1263 BLACK 100 Litres
2 AC1669 AIR COMPRESSOR IDLE 3696.2 2 40 THINNER 21-06 14 Litres
3 AC853 AIR COMPRESSOR IDLE 7351.1 3
4 GR1875 GENERATOR IDLE 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 20 & 30 REPORTING DATE 22-Jan-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1052024 & 1064505 TIME REACHED CONTROL ROOM 6:35:00
TANK NUMBER NJBP 110 Direct / Part of PART OF PERMIT START 6:55:00
L.I. Description BLASING & PAINTING PERMIT CLOSED 17:40:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 2 TAKEN PERMIT & HOLDING PAINTING HOSE
2 23329 NITIN BLASTER 8 3 FILLING GRIT IN SAND POT 1.4 TON
3 MIXING PAINT 80 80 Litres
4 20887 BIR TAMANG HELPER 8 3 FILLING GRIT IN SAND POT
5 MIXING PAINT & DUMPING IN TRASH BIN 80 80 Litres
6 21358 TAN BAHADUR HELPER 8 3 EQUIPMENT STAND BY & HELPING PAINTER
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 20 REPORTING DATE 22-Jan-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1052024 TIME REACHED CONTROL ROOM 6:35:00
TANK NUMBER NJBP 110 Direct / Part of DIRECT PERMIT START 6:55:00
L.I. Description BLASING PERMIT CLOSED 15:50:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 23330 NARASAPPA BLASTER 8 - BLASTED BOTTOM PLATES (6x2Meter) 4- 4 Plates
2 18792 JAKIR BLASTER 8 - BLASTED BOTTOM PLATES (6x2Meter) 4- 4 Plates
3 18796 HANEEF BLASTER 8 - BLASTED BOTTOM PLATES (6x2Meter) 4- 4 Plates
4 19069 DINESH BLASTER 8 - BLASTED BOTTOM PLATES (6x2Meter) 5- 5 Plates
5 20783 MAN BAHATHUR BLASTER 8 - BLASTED BOTTOM PLATES (6x2Meter) 4- 4 Plates
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1669 AIR COMPRESSOR 10 3696.2 1 20 GRIT COAL SLAG 4.2 TON


2 AC1612 AIR COMPRESSOR 6 3862.4 2
3 AC853 AIR COMPRESSOR 6 7351.1 3
4 AC1018 AIR COMPRESSOR IDLE 1954.6 4
5 GR1875 GENERATOR IDLE 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 30 REPORTING DATE 22-Jan-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1064505 TIME REACHED CONTROL ROOM 6:35:00
TANK NUMBER NJBP 110 Direct / Part of DIRECT PERMIT START 6:55:00
L.I. Description PAINTING PERMIT CLOSED 17:40:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 23327 NEELAKANTH PAINTER 8 3 PAINTED BOTTOM PLATE APCS 3 PRIMER COAT BROWN 1 20 21 Plates
2 AND FILLING GRIT IN SAND POT FOR BLASTING 1.4 1.4 Ton
3
4
5
6
7
8
9
NOTE 1)
10 ARAMCO INSPECTOR
11 INSPECTED PLATE FROM 02.50
TO 03.45
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1669 AIR COMPRESSOR 10 3696.2 1 30 SIGMA APCS 3 BROWN UN1263 80 Litres


2 AC1612 AIR COMPRESSOR 6 3862.4 2 30 THINNER 21-06 12 Litres
3 AC853 AIR COMPRESSOR 6 7351.1 3 HAND TOOLS
4 AC1018 AIR COMPRESSOR IDLE 1954.6 4
5 GR1875 GENERATOR IDLE 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 20 REPORTING DATE 21-Jan-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1052024 TIME REACHED CONTROL ROOM 6:30:00
TANK NUMBER NJBP 110 Direct / Part of PART OF PERMIT START 6:45:00
L.I. Description BLASTING PREPARATION PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 18792 JAKIR BLASTER 8 - 4 BLASTERS SPREADING PLATE FOR BLASTING USING FORK LIFT
2 18796 HANEEF BLASTER 8 - MAKING HOSE CONNECTION & CHANGING GRIT VALVE IN SAND BOARD
3 19069 DINESH BLASTER 8 -
4 20783 MAN BAHATHUR BLASTER 8 -
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 FL909 FORK LIFT 6 343.2 1


2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 40 REPORTING DATE 21-Jan-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1017801 TIME REACHED CONTROL ROOM 6:30:00
TANK NUMBER NJBP 110 Direct / Part of DIRECT PERMIT START 6:45:00
L.I. Description PAINTING PERMIT CLOSED 18:40:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 23327 NEELAKANTH PAINTER 8 4 PAINTED BOTTOM PLATE APCS 3 TOP COAT BLACK 70 28 98 Plates
2
3
4
5
6
7
8
NOTE 1)
9 ARAMCO INSPECTOR
10 INSPECTED PLATE FROM 07.50
TO 08.35 2)
11 PAINTING PUMP BREAKDOWN
12 FIXING IT FROM 02.15 TO
02.55
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1669 AIR COMPRESSOR IDLE 3687.8 1 40 SIGMA APCS 3 BLACK 290 Litres
2 AC1612 AIR COMPRESSOR IDLE 3858.2 2 40 THINNER 21-06 43 Litres
3 AC853 AIR COMPRESSOR 9 7347.1 3 HAND TOOLS
4 GR1875 GENERATOR IDLE 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 40 REPORTING DATE 21-Jan-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1017801 TIME REACHED CONTROL ROOM 6:30:00
TANK NUMBER NJBP 110 Direct / Part of PART OF PERMIT START 6:45:00
L.I. Description ASSISTING PAINTER PERMIT CLOSED 18:40:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENR/WPR 8 2 TAKEN PERMIT & HELPING WORKERS
2 23329 NITIN BLASTER 8 2 EQUIPMENT STAND BY & HELPING PAINTER
3 23330 NARASAPPA BLASTER 8 2 HOLDING UP PAINTING HOSE & ASSISTING
4 21358 TAN BAHADUR HELPER 8 2 PAINT MIXING & AIR CLEANING PLATES BEFORE PAINTING 100 45 145 Litres
5 20887 BIR TAMANG HELPER 8 3 PAINT MIXING , AIR CLEANING PLATES BEFORE PAINTING 100 45 145 Litres
6 DUMPING PAINT CANS INTO THE TRASH BIN 30 30 Cans
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# REPORTING DATE 20-Jan-20

SERVICE ORDER NO. 6510948963 Service Line Item# TIME REACHED CONTROL ROOM

TANK NUMBER NJBP 110 Direct / Part of PART OF PERMIT START 6:00:00
L.I. Description TRAVELLING PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 23327 NEELAKANTH PAINTER - 8 WENT RABIGH FOR EYE TEST
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 40 REPORTING DATE 20-Jan-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1017801 TIME REACHED CONTROL ROOM 6:40:00
TANK NUMBER NJBP 110 Direct / Part of PART OF PERMIT START 6:55:00
L.I. Description SAND PAPERING PERMIT CLOSED 17:05:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENR/WPR 8 2 TAKEN PERMIT & HELPING WORKERS
2 18792 JAKIR BLASTER 8 2 SAND PAPERING BOTTOM PLATE FOR TOP COAT FULL PLATE (6x2Meter)&SCRAPIN 11 3 14
3 18796 HANEEF BLASTER 8 2 SAND PAPERING BOTTOM PLATE FOR TOP COAT FULL PLATE (6x2Meter)&SCRAPIN 11 2 13
4 19069 DINESH BLASTER 8 2 SAND PAPERING BOTTOM PLATE FOR TOP COAT FULL PLATE (6x2Meter)&SCRAPIN 11 3 14
5 20783 MAN BAHATHUR BLASTER 8 2 SAND PAPERING BOTTOM PLATE FOR TOP COAT FULL PLATE (6x2Meter)&SCRAPIN 10 2 12
6 23329 NITIN BLASTER 8 2 SAND PAPERING BOTTOM PLATE FOR TOP COAT FULL PLATE (6x2Meter)&SCRAPIN 12 3 15
7 23330 NARASAPPA BLASTER 8 2 SAND PAPERING BOTTOM PLATE FOR TOP COAT FULL PLATE (6x2Meter)&SCRAPIN 11 3 14
8 21358 TAN BAHADUR HELPER 8 2 SAND PAPERING BOTTOM PLATE FOR TOP COAT FULL PLATE (6x2Meter)&SCRAPIN 12 3 15
9 20887 BIR TAMANG HELPER 8 2 SAND PAPERING BOTTOM PLATE FOR TOP COAT FULL PLATE (6x2Meter)&SCRAPIN 11 3 14
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1669 AIR COMPRESSOR IDLE 3687.8 1 40 SAND PAPER 130 EA


2 AC1612 AIR COMPRESSOR IDLE 3858.2 2 40 SCRAPER 5 EA
3 AC853 AIR COMPRESSOR IDLE 7339 3 40 COTTON RAGS 1/4 KG
4 GR1875 GENERATOR IDLE 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 20 & 30 REPORTING DATE 16-Jan-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1064505 & 1052024 TIME REACHED CONTROL ROOM 6:35:00
TANK NUMBER NJBP 110 Direct / Part of PART OF PERMIT START 6:55:00
L.I. Description BLASTING & PAINTING PERMIT CLOSED 17:40:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 5891 NARASAYYA P/F 8 2 EQUIPMENT STANDBY & FILLING DIESEL ON EQUIPMENTS
2 18753 RAVINDRA HELPER 8 2 FILLING GRIT IN SAND BOARD 1.16 1.16 TON
3 MIXING PAINT 80 80 Litres
4 21358 TAN BAHADUR HELPER 8 2 FILLING GRIT IN SAND BOARD 1.16 1.16 TON
5 DUMPING USED PAINT CANS 9 9 CANS
6 23213 LALLU RAM HELPER 8 2 FILLING GRIT IN SAND BOARD 1.16 1.16
7 LOADING CARBAGE WASTES IN TRUCK & AIR CLEANING PLATES AFTER BLASTING 1 1 LOAD
8 11448 CHITHRA HELPER 8 2 FILLING GRIT IN SAND BOARD 1.16 1.16 TON
9 ASSIST PAINTER & MIXING PAINT 30 30 Plates
10 20887 BIR TAMANG HELPER 8 2 FILLING GRIT IN SAND BOARD 1.16 1.16 TON
11 HOLDING PAINTER HOSE & AIR CLEANING PLATES AFTER BLASTING 30 30 Plates
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 HAND TOOLS
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 30 REPORTING DATE 19-Jan-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1064505 TIME REACHED CONTROL ROOM 6:30:00
TANK NUMBER NJBP 110 Direct / Part of DIRECT PERMIT START 6:55:00
L.I. Description PAINTING PERMIT CLOSED 17:10:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENR/WPR 8 2 TAKEN PERMIT & HELPING WORKERS
2 23327 NEELAKANTH PAINTER 8 2 PAINTED BOTTOM PLATES APCS 3 BROWN FIRST COAT 20 10 30 Plates
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1669 AIR COMPRESSOR 8 3687.8 1 30 SIGMA APCS 3 BROWN UN1263 80 Litres


2 AC1612 AIR COMPRESSOR 8 3858.2 2 30 THINNER 21-06 12 Litres
3 AC853 AIR COMPRESSOR 8 7339 3 HAND TOOLS
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 20 REPORTING DATE 19-Jan-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1052024 TIME REACHED CONTROL ROOM 6:40:00
TANK NUMBER NJBP 110 Direct / Part of DIRECT PERMIT START 7:05:00
L.I. Description BLASTING PERMIT CLOSED 17:10:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 23330 NARASAPPA BLASTER 8 2 BLASTED BOTTOM PLATE PLATES (6x2Meter)
2 18792 JAKIR BLASTER 8 2 BLASTED BOTTOM PLATE PLATES (6x2Meter) 5 5 Plates
3 18796 HANEEF BLASTER 8 2 BLASTED BOTTOM PLATE PLATES (6x2Meter) 5 5 Plates
4 19069 DINESH BLASTER 8 2 BLASTED BOTTOM PLATE PLATES (6x2Meter) 5 5 Plates
5 20783 MAN BAHATHUR BLASTER 8 2 BLASTED BOTTOM PLATE PLATES (6x2Meter) 5 5 Plates
6 23329 NITIN BLASTER 8 2 BLASTED BOTTOM PLATE PLATES (6x2Meter) 5 5 Plates
7 5 5 Plates
8 NOTE 1)
S.NO 4 BLASTING HOSE AIR
9 LEAK FIXING IT FROM 11:10 -
10 11:35 2) S.NO 6
BLASTING HOSE AIR LEAK
11 FIXING IT FROM 08:40 - 09:05
12 3) ARAMCO
INSPECTOR INSPECTED 30
13 PLATES FROM 02.35 - 03.15
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1669 AIR COMPRESSOR 8 3687.8 1 20 GRIT COAL SLAG 5.8 TON


2 AC1612 AIR COMPRESSOR 8 3858.2 2 HAND TOOLS
3 AC853 AIR COMPRESSOR 8 7339 3
4 GR1875 GENERATOR IDLE 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 300 REPORTING DATE 18-Jan-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM 6:30:00
TANK NUMBER NJBP 101 Direct / Part of PART OF PERMIT START 6:55:00
L.I. Description HOT BOLTING & SHIFTING MARINE HOSE PERMIT CLOSED 17:10:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENR/WPR 8 2 TAKEN PERMIT & HELPING WORKERS
2 18753 RABINDER HELPER 8 2 SHIFTING MARINE HOSE FROM CROSSING ROAD TO YARD & ASSIST RIGGER 12 3 15 Hoses
3 23213 LALLU HELPER 8 2 HOT BOLTING MARINE HOSE JOINTS (8JOINTS) 65 15 80 Bolts
4 20887 BIR TAMANG HELPER 8 2 HOT BOLTING MARINE HOSE JOINTS (8JOINTS) 65 15 80 Bolts
5 18792 JAKIR BLASTER 8 2 HOT BOLTING HOSE (7JOINTS) 55 15 70 Bolts
6 SHIFTING STUD,NUT & GASKET MANUALLY TO TANK 101
7 11997 GIRI P/F 8 2 HOT BOLTING HOSE(7JOINTS)&SHIFTING MANUALLY STUD ,NUT,GSKT TO TANK 101 55 15 70 Bolts
8 SHIFTING STUD,NUT & GASKET MANUALLY TO TANK 101
9 FORMING BARRICATION FOR EVERY TRIP
10 21358 TAN BAHADUR HELPER 8 2 SHIFTING MARINE HOSE FROM CROSSING ROAD TO YARD & ASSIST RIGGER
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 CN 1756 CRANE 10 2556.4 1 HAND TOOLS


2 TH1168 TRAILER 10 460689 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# REPORTING DATE 17-Jan-20

SERVICE ORDER NO. 6510932388 Service Line Item# TIME REACHED CONTROL ROOM 6:40:00
TANK NUMBER NJBP 116 Direct / Part of PART OF PERMIT START 7:05:00
L.I. Description FOAM CHAMBER BOARD EXTENSION PERMIT CLOSED 14:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENR/WPR 8 TAKEN PERMIT & SUPERVISING
2 5354 MUTHU FAB 8 MADE FIT UP & GRINDING FOAM BORAD EXTENSION PLATE(1.4x0.550Meter) 4 4 Plates
3 19135 AWDESH FAB 8 ASSIST FABRICATOR & LIFTING MATERIALS TO TOP ROOF FROM DOWNSIDE 4 4 Plates
4 23807 JERRY FAB 8 GRINDING EXISTING FOAM BOARD PLATE (1.4x0.550Meter) & ASSIST 4 4 Plates
5 ERECTING SCAFF HOLDING & COVERING WITH FIRE BLANCKET
6 19384 SESHRAJ WELDER 8 TAKA WELDING FOAM CHAMBER BOARD (1.4x0.550Meter) 2 2 Plates
7 20988 MANAAN WELDER 8 TAKA WELDING FOAM CHAMBER BOARD (1.4x0.550Meter) 2 2 Plates
8 24492 GUL RAHIM MASON 8 LIFTING WELDING & FABRICATING MATERIALS TOP ROOF OF THE TANK MANUALLY
9 SCAFF HOLDING PIPE,FIRE BLANCKET,PLY WOOD,FOAM EXTENSION PLATE
10 24493 AKTHER HUSSAIN MASON 8 LIFTING WELDING & FABRICATING MATERIALS TOP ROOF OF THE TANK MANUALLY
11 SCAFF HOLDING PIPE,FIRE BLANCKET,PLY WOOD,FOAM EXTENSION PLATE
12 21385 TAN BAHADUR HELPER 8 FIRE WATCH & MADE PREPARATION FOR WELDING , GRINDING WORK
13 21055 LIBRESH FAB 8 EQUIPMENT STANDBY
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 WM2094 WELDING MACHINE 8 1744.1 1 WELDING ROD DIA 2.5MM 1 KG


2 GRINDING MACHINE 8 2 4" GRINDING WHEEL 3 EA
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 20 & 30 REPORTING DATE 16-Jan-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1064505 & 1052024 TIME REACHED CONTROL ROOM 6:35:00
TANK NUMBER NJBP 110 Direct / Part of PART OF PERMIT START 6:55:00
L.I. Description BLASTING & PAINTING PERMIT CLOSED 17:40:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 5891 NARASAYYA P/F 8 2 EQUIPMENT STANDBY & MAKING SCAFF HOLDING ERECTION FOR SHELTER
2 18753 RAVINDRA HELPER 8 2 FILLING GRIT IN SAND BOARD & HELPING PAINTER 1.3 0.4 1.7 TON
3 11448 CHITHRA HELPER 8 2 FILLING GRIT IN SAND BOARD & MIXING PAINT 1.3 0.4 1.7 TON
4 21385 TAN BAHADUR HELPER 8 2 FILLING GRIT IN SAND BOARD & DUMPING USED PAINT CANS 1.3 0.4 1.7 TON
5 20887 BIR TAMANG HELPER 8 2 FILLING GRIT IN SAND BOARD & HOLDING PAINTER HOSE 1.3 0.4 1.7 TON
6 24060 KALEESWARAN JR.ENGR 8 - TAKEN PERMIT FOR SHIFTING MATERIALS FROM TANK O YARD
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 HAND TOOLS
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 30 REPORTING DATE 16-Jan-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1064505 TIME REACHED CONTROL ROOM 6:35:00
TANK NUMBER NJBP 110 Direct / Part of DIRECT PERMIT START 6:55:00
L.I. Description PAINTING PERMIT CLOSED 18:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 2 TAKEN PERMIT & HELPING PAINTER
2 23327 NEELAKANTH PAINTER 8 2 PAINTED BOTTOM PLATES APCS 3 BROWN FIRST COAT 15 16 31 Plate
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1669 AIR COMPRESSOR 8 3682 1 30 SIGMA APCS 3 BROWN UN1263 90 Litres


2 AC1612 AIR COMPRESSOR 8 3852.8 2 30 THINNER 21-06 12 Litres
3 AC853 AIR COMPRESSOR 8 7331.8 3 HAND TOOLS
4 GR1875 GENERATOR IDLE 4
5 W/M2094 WELDING MACHINE IDLE 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 20 REPORTING DATE 16-Jan-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1052024 TIME REACHED CONTROL ROOM 6:35:00
TANK NUMBER NJBP 110 Direct / Part of DIRECT PERMIT START 6:55:00
L.I. Description BLASING PERMIT CLOSED 18:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 2 TAKEN PERMIT & HELPING BLASTERS 2
2 18792 JAKIR BLASTER 8 2 BLASTED 6 PLATES (6x2Meter) 5 1 6 Plates
3 18796 HANEEF BLASTER 8 2 BLASTED 6 PLATES (6x2Meter) 5 1 6 Plates
4 19069 DINESH BLASTER 8 2 BLASTED 6 PLATES (6x2Meter) 5 1 6 Plates
5 20783 MAN BAHATHUR BLASTER 8 2 BLASTED 6 PLATES (6x2Meter) 5 1 6 Plates
6 23329 NITIN BLASTER 8 2 BLASTED 4 PLATES (6x2Meter) 4- 4 Plates
7 23330 NARASAPPA BLASTER 8 2 BLASTED 3 PLATES (6x2Meter) 3- 3 Plates
NOTE S.NO 6
8 & 7 BLASTING HOSE
9 DAMAGED CHANGING AND
FIXING IT AND SAND BOARD
10 NOT WORKING PROPERLY
11 CHANGING BORAD TIME
TAKEN 1 1/2 HOUR
12 ARAMCO INSPECTOR
13 INSPECTED PLATE 02.35 -
14
02.50
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1669 AIR COMPRESSOR 8 3682 1 20 GRIT COAL SLAG 6.8 TON


2 AC1612 AIR COMPRESSOR 8 3852.8 2 HAND TOOLS
3 AC853 AIR COMPRESSOR 8 7331.8 3
4 GR1875 GENERATOR IDLE 4
5 W/M2094 WELDING MACHINE IDLE 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 130 REPORTING DATE 15-Jan-20

SERVICE ORDER NO. Service Line Item# 1052070 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER Direct / Part of DIRECT PERMIT START 7:05:00
L.I. Description BLASTING PERMIT CLOSED 18:10:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 2 TAKEN PERMIT & HELPING WORKER
2 19069 DINESH BLASTER 8 2 BLASTED 17 PLATES (1.4x0.550Meter) 2 sides FOR PANTOON SETTING 17 2 17 Plate
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1669 AIR COMPRESSOR 7 3676.2 1 130 GRIT COAL SLAG 400 KG


2 AC1612 AIR COMPRESSOR 8 3847.8 2
3 AC1678 AIR COMPRESSOR IDLE 3975.3 3
4 AC853 AIR COMPRESSOR IDLE 7325.8 4
5 GR1875 GENERATOR IDLE 5
6 W/M2094 WELDING MACHINE IDLE 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# REPORTING DATE 15-Jan-20

SERVICE ORDER NO. 6510948963 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 110 Direct / Part of PART OF PERMIT START 7:05:00
L.I. Description HELPING BLASTERS & PAINTERS PERMIT CLOSED 18:10:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 5891 NARASAYYA P/F 8 2 EQUIPMENT STANDBY & UNLOADING PLATES (6x2.5Meter) 24 2 24 Plates
2 23330 NARASAPPA BLASTER 8 2 FILLING GRIT IN SAND BOARD & HELPING PAINTER 0.62 2 0.62 TON
3 23329 NITIN BLASTER 8 2 FILLING GRIT IN SAND BOARD & MIXING PAINT 0.62 2 0.62 TON
4 18751 BHIPALA HELPER 8 - FILLING GRIT IN SAND BOARD 0.62 - 0.62 TON
5 20887 BIR TAMANG HELPER 8 2 FILLING GRIT IN SAND BOARD & HOLDING PAINTER HOSE 0.62 2 0.62 TON
6 21385 TAN BAHADUR HELPER 8 2 FILLING GRIT IN SAND BOARD 0.62 2 0.62 TON
7 UNLOADING MATERIAL SAND BOARD 6 2 6 EA
8 UNLOADING MATERIAL AIR RECIVER ,AIR PURIFIER 4 2 4 EA
9 UNLOADING MATERIAL CO MONITOR 2 2 2 EA
10 UNLOADING BLASTING HOSE DEAD MAN HOSE 6 2 6 EA S.NO 11 BLASTER SAND
BOARD BREAK DOWN ,SO
11 18796 MAN BAHATHUR BLASTER 8 - MAKING BLASTING PREPARATION BLASTING NOT PERFORMED
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 30 REPORTING DATE 15-Jan-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1064505 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 110 Direct / Part of DIRECT PERMIT START 7:05:00
L.I. Description PAINTING PERMIT CLOSED 18:10:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 2 TAKEN PERMIT & HELPING WORKERS 2
2 23327 NEELAKANTH PAINTER 8 2 PAINTED BOTTOM PLATES APCS 3 BROWN FIRST COAT 15 2 15 Plates
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1669 AIR COMPRESSOR 7 3676.2 1 30 SIGMA APCS 3 BROWN UN1263 50 Litres


2 AC1612 AIR COMPRESSOR 8 3847.8 2 30 THINNER 21-06 8 Litres
3 AC1678 AIR COMPRESSOR IDLE 3975.3 3 HAND TOOLS
4 AC853 AIR COMPRESSOR IDLE 7325.8 4
5 GR1875 GENERATOR IDLE 5
6 W/M2094 WELDING MACHINE IDLE 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 20 REPORTING DATE 15-Jan-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1052024 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 110 Direct / Part of DIRECT PERMIT START 7:05:00
L.I. Description BLASING PERMIT CLOSED 18:10:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 2 TAKEN PERMIT & HELPING WORKERS 2
2 23330 JAKIR BLASTER 8 2 BLASTED 6 PLATES (6x2Meter) 6 2 6 Plate
3 18796 HANEEF BLASTER 8 2 BLASTED 6 PLATES (6x2Meter) 6 2 6 Plate
4 19069 DINESH BLASTER 8 2 BLASTED 3 PLATES (6x2Meter) 2 2 2 Plate
5
6
7
8
9 NOTE ARAMCO
10 INSPECTOR INSPECTED PLATE
03.05 TO 03.35 & BLASTING
11 HOSE AIR LEAK FIXED 2 TIMES
12 (TAKEN 20MINUTES)
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1669 AIR COMPRESSOR 7 3676.2 1 20 GRIT COAL SLAG 3 TON


2 AC1612 AIR COMPRESSOR 8 3847.8 2 HAND TOOLS
3 AC1678 AIR COMPRESSOR IDLE 3975.3 3
4 AC853 AIR COMPRESSOR IDLE 7325.8 4
5 GR1875 GENERATOR IDLE 5
6 W/M2094 WELDING MACHINE IDLE 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# REPORTING DATE 14-Jan-20

SERVICE ORDER NO. 6510948963 Service Line Item# TIME REACHED CONTROL ROOM 6:40:00
TANK NUMBER NJBP 110 Direct / Part of PART OF PERMIT START 7:00:00
L.I. Description HELPING BLASTERS & PAINTERS PERMIT CLOSED 18:05:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 5891 NARASAYYA P/F 8 2 EQUIPMENT STANDBY & UNLOADING PLATES (6x2.5Meter) 32 2 32 Plates
2 23330 NARASAPPA BLASTER 8 2 FILLING GRIT IN SAND BOARD & HELPING PAINTER 1.2 2 1.2 Ton
3 23329 NITIN BLASTER 8 2 FILLING GRIT IN SAND BOARD & MIXING PAINT 1.2 2 1.2 Ton
4 18751 BHIPALA HELPER 8 2 FILLING GRIT IN SAND BOARD & UNLOADING PLATES(6x2.5Meter) 1.2 2 1.2 Ton
5 20887 BIR TAMANG HELPER 8 2 FILLING GRIT IN SAND BOARD & HOLDING PAINTER HOSE 1.2 2 1.2 Ton
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1678 AIR COMPRESSOR IDLE 3975.3 1


2 AC853 AIR COMPRESSOR IDLE 7325.8 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 20 & 30 REPORTING DATE 14-Jan-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1052024 & 1064505 TIME REACHED CONTROL ROOM 6:40:00
TANK NUMBER NJBP 110 Direct / Part of DIRECT PERMIT START 7:00:00
L.I. Description BLASTING & PAINTING PERMIT CLOSED 18:05:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 19069 SYED RASHID ENGR/WPR 8 2 TAKEN PERMIT & HELPING WORKERS
2 23330 JAKIR BLASTER 8 2 BLASTED 6 PLATES (6x2Meter) 6 2 6 Plates
3 18796 MAN BAHATHUR BLASTER 8 2 BLASTED 7 PLATES (6x2Meter) 7 2 7 Plates
4 18796 HANEEF BLASTER 8 2 BLASTED 6 PLATES (6x2Meter) 6 2 6 Plates
5 19069 DINESH BLASTER 8 2 BLASTED 7 PLATES (6x2Meter) 7 2 7 Plates
6 23327 NEELAKANTH PAINTER 8 2 PAINTED APCS 3 BROWN FIRST COAT 26 2 26 Plates
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1669 AIR COMPRESSOR 7 3670.2 1 20 COAL SLAG 5.1 TON


2 AC1612 AIR COMPRESSOR 9 3840.2 2 30 SIGMA APCS 3 BROWN UN1263 80 Litres
3 3 30 THINNER 21-06 12 Litres
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# REPORTING DATE 13-Jan-20

SERVICE ORDER NO. 6510948963 Service Line Item# TIME REACHED CONTROL ROOM 7:10:00
TANK NUMBER NJBP 110 Direct / Part of PART OF PERMIT START 7:20:00
L.I. Description IDLE PERMIT CLOSED 16:05:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 19069 DINESH BLASTER 8 DUE TO INCOMPLETE BLASTING SET BLASTING HAS NOT PERFORMED
2 23330 NARASAPPA BLASTER 8
3 18796 HANEEF BLASTER 8
4
5
6
7
8
9 NOTE Due
to incomplete blasting set(AIR
10 PURIFIER,AIR RECEIVER,CO
11 MONITOR ,WOOD HOSE,DEAD
MAN SWITCH + HOSE) blasting
12 has not done by 3 blasters
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1678 AIR COMPRESSOR IDLE 3975.3 1


2 AC853 AIR COMPRESSOR IDLE 7325.8 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 20 & 30 REPORTING DATE 13-Jan-20

SERVICE ORDER NO. 6510948963 Service Line Item# 1052024 & 1064505 TIME REACHED CONTROL ROOM 7:10:00
TANK NUMBER NJBP 110 Direct / Part of DIRECT PERMIT START 7:20:00
L.I. Description BLASTING & PAINTING PERMIT CLOSED 17:55:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID JR.ENGR 8 2 TAKEN PERMIT & HELPING WORKERS
2 18792 JAKIR BLASTER 8 2 BLASTED 6 PLATES (6x2METER) 6 2 6 plates
3 20783 MAN BAHATHUR BLASTER 8 2 BLASTED 6 PLATES (6x2METER) 6 2 6 plates
4 23327 NEELAKANTH PAINTER 8 2 PAINTED 12 PLATES APCS 3 BROWN FIRST COAT 12 2 12 plates
5 23329 NITIN BLASTER 8 2 MAKING BLASTING PREPARATION,MIXING PAINT & EQUIPMENT STANDBY
6 18751 BHIPALA HELPER 8 2 FILLING GRIT SAND IN BLASING BOARD & HELPING PAINTER
7 20887 BIR TAMANG HELPER 8 2 FILLING GRIT SAND IN BLASING BOARD & HELPING PAINTER
8
9
10 NOTE ARAMCO
INSPECTOR INSPECTED PLATES
11 AFTER BLASTING 03:10 - 03:45
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1669 AIR COMPRESSOR 4 3664.1 1 20 COAL SLAG 2.7 TON


2 AC1612 AIR COMPRESSOR 4 3832.1 2 30 SIGMA APCS 3 BROWN UN1263 40 Litres
3 3 30 THINNER 21-06 6 Litres
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# REPORTING DATE 11-Jan-20

SERVICE ORDER NO. Service Line Item# TIME REACHED CONTROL ROOM 6:55:00
TANK NUMBER Direct / Part of PART OF PERMIT START 7:05:00
L.I. Description LOADING & UNLOADING MATERIALS PERMIT CLOSED 17:30:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID JR.ENGR 8 2 TAKEN PERMIT FOR BOOM TRUCK & TRANSFERRING MATERIALS 2
2 23327 NEELAKANTH PAINTER 8 2 LOADING & UNLOADING MATERIALS FROM YARD TO TANK 2
3 18751 BHIPALA HELPER 8 2 LOADING & UNLOADING MATERIALS FROM TANK TO YARD 2
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1669 AIR COMPRESSOR IDLE 3660.6 1


2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# REPORTING DATE 9-Jan-20

SERVICE ORDER NO. Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER Direct / Part of PART OF PERMIT START 7:00:00
L.I. Description LOADING & UNLOADING MATERIALS PERMIT CLOSED 17:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID JR.ENGR 8 TAKEN PERMIT FOR BOOM TRUCK & TRANSFERRING MATERIALS
2 23327 NEELAKANTH PAINTER 8 2 LOADING & UNLOADING MATERIALS FROM YARD TO TANK 2
3 LOADING & UNLOADING MATERIALS FROM TANK TO YARD
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1669 AIR COMPRESSOR IDLE 3660.6 1


2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 90 REPORTING DATE 8-Jan-20

SERVICE ORDER NO. 6510894318 Service Line Item# 1052024 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP TANK 101 Direct / Part of DIRECT PERMIT START 7:00:00
L.I. Description BLASTING PERMIT CLOSED 16:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN ENGR/WPR 8 TAKEN PERMIT & SUPERVISING
2 20783 MAN BAHATHUR BLASTER 8 BLASTED COLUMN BOTTOM 2 2 COLM
3 18792 JAKIR BLASTER 8 BLASTED COLUMN BOTTOM 2 2 COLM
4 20887 BIR TAMANG HELPER 8 FILLING GRIT SAND IN SAND POT
5 23925 DIPENDRA HELPER 8 FILLING GRIT SAND IN SAND POT
6 23814 BIR HELPER 8 FILLING GRIT SAND IN SAND POT
7 18753 RABINDER HELPER 8 FILLING GRIT SAND IN SAND POT
8 5891 NARASAYYA P.F 8 FILLING GRIT SAND IN SAND POT
9 23932 RAM HELPER 8 PREPARATION FOR SAND BLASTING & TRANSFERRING MAERIALS
10 23327 NEELAKANTH PAINTER 8 PREPARATION FOR SAND BLASTING & TRANSFERRING MAERIALS
11 11448 CHITRA HELPER 8 PREPARATION FOR SAND BLASTING & TRANSFERRING MAERIALS
12 20780 KUMAR KAMI HELPER 8 EQUIPMENT STANBY
13 11997 GIRI P.F 8 CSE STANDBY
14 24059 SYED RASHID JR.ENGR 8 TAKEN PERMIT FOR TRANSFERRING BLASTING MATERIALS FROM YARD TO TANK
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1667 AIR COMPRESSOR 8 5868.1 1 90 GRIT COAL SLAG 1.1 TON


2 GR1816 GENERATOR 8 3364 2
3 WM1606 WELDING MACHINE IDLE 6179.2 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 90 REPORTING DATE 7-Jan-20

SERVICE ORDER NO. 6510894318 Service Line Item# 1052024 TIME REACHED CONTROL ROOM 7:00:00
TANK NUMBER NJBP TANK 101 Direct / Part of DIRECT PERMIT START 7:15:00
L.I. Description BLASTING PERMIT CLOSED 18:20:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 SYED RASHID ENGR/WPR 8 2 TAKEN PERMIT & HELPING LABOURS
2 20783 MAN BAHATHUR BLASTER 8 2 BLASTED COLUMN BOTTOM 2 2 2 COLM
3 18792 JAKIR BLASTER 8 2 PREPARATION FOR SAND BLASTING & TRANSFERRING MAERIALS
4 20887 BIR TAMANG HELPER 8 2 PREPARATION FOR SAND BLASTING & TRANSFERRING MAERIALS
5 23925 DIPENDRA HELPER 8 2 FILLING GRIT SAND IN SAND POT
6 23814 BIR HELPER 8 2 FILLING GRIT SAND IN SAND POT
7
8
9
10 NOTE GOT
APPROVAL FOR BLASTING AT
11 02.30 FROM ARAMCO
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1 90 GRIT COAL SLAG 400 KG


2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : SYED RASHID Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24059 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 300 REPORTING DATE 19-Jan-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM 6:30:00
TANK NUMBER NJBP 101 Direct / Part of PART OF PERMIT START 6:55:00
L.I. Description SHIFTING MARINE HOSE PERMIT CLOSED 17:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN ENR/WPR 8 2 TAKE PERMIT
2 11997 GIRI P.F 8 2 ASSISTING MARINE HOSE LOADING AND UNLOADING 10 2 12 EA
3 20780 KUMAR KAMI HELPER 8 2 ASSISTING MARINE HOSE LOADING AND UNLOADING
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 CN 1756 CRANE 10 2559.4 1


2 TH1168 TRAILER 10 460692 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 40 REPORTING DATE 20-Jan-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM 6:30:00
TANK NUMBER NJBP 101 Direct / Part of PART OF PERMIT START 6:55:00
L.I. Description SHIFTING MARINE HOSE PERMIT CLOSED 17:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN ENR/WPR 8 2 TAKE PERMIT
2 11997 GIRI P.F 8 2 D DOOR STANDBY MAN
3 20780 KUMAR KAMI HELPER 8 2 EQUIPMENT STANDBY MAN
4 18753 RABINDAR HELPER 8 2
5 5891 NARSAYYA P.F 8 2 PERFORMING SAND PAPERING ON ROOF PLATE 1500 500 1500 FT²
6 11448 CHITRA HELPER 8 2
7 23213 LALLU RAM HELPER 8 2 ALL PEOPLE PERFORM HOUSEKEEPING AND ARRANGE LIGHTS
8
9 1. WRDD MANAGER
10 2. INSPECTION SUPT
11 3. OPERATION SUPT
12 4. T & I GROUP
13 5. OPERATION FOREMAN
14 ALL PEOPLE COME AND INSPECT THE TANK 8.45 TO 11.30
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1667 AIR COMPRESSOR 4 5938.9 1


2 GR1816 GENERATOR 4 3427 2
3 WM1606 WELDING MACHINE IDLE 6179.2 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 250 REPORTING DATE 21-Jan-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM 6:30:00
TANK NUMBER NJBP 101 Direct / Part of PART OF PERMIT START 6:55:00
L.I. Description REMOVE SEAL FABRIC NUT AND BOLT PERMIT CLOSED 17:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN ENR/WPR 8 2 TAKE PERMIT
2 11997 GIRI P.F 8 2 D DOOR STANDBY MAN
3 20780 KUMAR KAMI HELPER 8 2 EQUIPMENT STANDBY MAN
4 18753 RABINDAR HELPER 8 2 REMOVE SEAL FABRIC NUT AND BOLT 180 40 220 M
5 5891 NARSAYYA P.F 8 2
6 11448 CHITRA HELPER 8 2
7 23213 LALLU RAM HELPER 8 2
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1667 AIR COMPRESSOR 9 5945.9 1


2 GR1816 GENERATOR 9 3435 2
3 WM1606 WELDING MACHINE IDLE 6179.2 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 250 REPORTING DATE 22-Jan-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM 6:30:00
TANK NUMBER NJBP 101 Direct / Part of DIRECT PERMIT START 6:55:00
L.I. Description REMOVE SEAL FABRIC PERMIT CLOSED 17:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN ENR/WPR 8 2 TAKE PERMIT
2 11997 GIRI P.F 8 2 D DOOR STANDBY MAN
3 20780 KUMAR KAMI HELPER 8 2 EQUIPMENT STANDBY MAN
4 18753 RABINDAR HELPER 8 2 REMOVE SEAL FABRIC AND ROLL 180 40 220 M
5 5891 NARSAYYA P.F 8 2 SHITING TO NEAR DIKE WALL
6 11448 CHITRA HELPER 8 2
7 23213 LALLU RAM HELPER 8 2
8
9
10
ARAMCO TIMESHEE
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1667 AIR COMPRESSOR 9 5952.4 1


2 GR1816 GENERATOR 9 3440 2
3 WM1606 WELDING MACHINE IDLE 6179.2 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# REPORTING DATE 23-Jan-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM 6:30:00
TANK NUMBER NJBP 101 Direct / Part of PERMIT START 6:55:00
L.I. Description FIRE WATER PIPE LINE PAINTING PERMIT CLOSED 17:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN ENR/WPR 8 2 TAKE PERMIT
2 11997 GIRI P.F 8 2 D DOOR STANDBY MAN
3 20780 KUMAR KAMI HELPER 8 2 EQUIPMENT STANDBY MAN
4 18753 RABINDAR HELPER 8 2
5 5891 NARSAYYA P.F 8 2 2 1/2 "FIRE WATER PIPE LINE PAINTING 50 10 M
6 11448 CHITRA HELPER 8 2 1 1/2 "FIRE WATER PIPE LINE PAINTING 10 M
7 23213 LALLU RAM HELPER 8 2
8 COLOUM LIFTING EQUIPMENT SHIFTING AROUND 100 M INSIDE DIKE 4 EA
9
10 HELP FOR FIXING EQUIPMENT ON COLOUM
11
12
13 INSPECTION CONDUCTED BY T & I GROUP & INSPECTION TEAM
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1667 AIR COMPRESSOR 5 5958.3 1


2 GR1816 GENERATOR 5 3443 2
3 WM1606 WELDING MACHINE IDLE 6179.2 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# REPORTING DATE 23-Jan-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM 6:30:00
TANK NUMBER NJBP 101 Direct / Part of PERMIT START 6:55:00
L.I. Description COLOUM LIFT EQUP FIXING PERMIT CLOSED 17:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN ENR/WPR 8 2 TAKE PERMIT
2 5354 MUTHU FAB 8 2
3 19135 AWDESH FAB 8 2 COLOUM LIFTING EQUIPMENT SHIFTING 4 EA
4 19384 JESU RAJ WELDER 8 2 LOADING TK 110 & UNLOADING TANK 101
5 21855 HARICHARAN WELDER 8 2 FIX COLOUM LIFTING EQUIPMENT ON COLOUM
6 BOLT AND NUT TIGHT 14 EA
7
8
9
10
ARAMCO TIMESHEET
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# REPORTING DATE 25-Jan-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 101 Direct / Part of PERMIT START 6:55:00
L.I. Description FIRE WATER PIPE LINE PAINTING & FOAM CHAMPER FIXING & SPRINKLER TIGHTNING PERMIT CLOSED 17:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN ENR/WPR 8 2 TAKE PERMIT
2 20780 KUMAR KAMI HELPER 8 2
3 13520 PANDIT HELPER 8 2 8 " FIRE WATER LINE(HORIZONTAL) PAINTING 25 M
4 18753 RABINDAR HELPER 8 2 8 " FIRE WATER LINE(VERTICAL) PAINTING 16 M
5 23213 LALLU RAM HELPER 8 2 1 1/2 FIRE WATER LINE PAINTING 50 M
6 11448 CHITRA HELPER 8 2
7 23327 NILKAND BLASTER 8 2 FOAM CHAMPER FIXING 1 EA
8 23329 NITIN BLASTER 8 2
9 19097 LOK HELPER 8 2 SPRINKLER TIGHTNING 10 EA
10 16678 SELVARAJ MASON 8 2
ARAMCO TIMESHEET
11 20863 DHAN HELPER 8 2 SHIFTING SKY CLIMBER COUNTER WEIGHTS FOUR TIME
12 20947 SHYAM HELPER 8 2
13 ADJUSTING ROPE FOR SKY CLIMBER LIFTING
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1667 AIR COMPRESSOR 9 5970 1


2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# REPORTING DATE 26-Jan-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 101 Direct / Part of PERMIT START 6:55:00
L.I. Description COLOUM LIFTING AND WEAR PAD BLASTING PERMIT CLOSED 17:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN ENR/WPR 8 2 TAKE PERMIT
2 20780 KUMAR KAMI HELPER 8 2 EQUIPMENT STANDBYMAN
3 11997 GIRI P.F 8 2 D DOOR STANDBY MAN
4 5354 MUTHU FAB 8 2 FIXING COLOUM LIFTING EQUIPMENTS ON COLOUM 1 EA
5 21855 HARICHARAN WELDER 8 2 USING HYDRAULIC JACK FOR LIFTING
6 19135 AWDESH FAB 8 2 NUT AND BOLT TIGHTNING
7 21055 LIBRES FAB 8 2 CUTTING WEAR PAD STOPPERS
8 18753 RABINDAR HELPER 8 2 SHIFTING COLOUM LIFTING EQUIPMENT 1 TIME
9 23213 LALLU RAM HELPER 8 2 HELPING FOR FIXING
10 5891 NARSAYYA P.F 8 2 HELPING FOR FIXING
ARAMCO TIMESHEET
11 19344 RAJ HELPER 8 2 HELPING FOR FIXING
12 19069 DINESH BLASTER 8 2 WEAR PAD BLASTING ON BOTH SIDES 1 EA
13 1.65 * 1.65
14 WORKING ON YARD FOR PLATE ARRANGEMENTS UNTILL 12 O CLK
15 16678 SELVARAJ MASON 8 GOING TO YANBU FOR ID RENEWAL
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1667 AIR COMPRESSOR 9 5980 1


2 GR1816 GENERATOR 9 3457 2
3 WM1714 WELDING MACHINE 2 5319.9 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# REPORTING DATE 28-Jan-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 101 Direct / Part of PERMIT START 6:55:00
L.I. Description VACCUM BOX FABRICATION PERMIT CLOSED 17:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN ENR/WPR 8 TAKE PERMIT
2 20780 KUMAR KAMI HELPER 8 EQUIPMENT STANDBYMAN
3 11997 GIRI P.F 8 D DOOR STANDBY MAN
4 5354 MUTHU FAB 8 Vacuum Box fabrication marking & cutting 2 EA
5 21855 HARICHARAN WELDER 8 welding on new vaccum box joint 10 M
6 19135 AWDESH FAB 8 assembling vaccum box
7 19344 RAJ HELPER 8 shifting grit to outside 2 TON
8 18753 RABINDAR HELPER 8 shifting grit to outside
9 23213 LALLU RAM HELPER 8 shifting grit to outside
10 5891 NARSAYYA P.F 8 shifting grit to outside
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1667 AIR COMPRESSOR 7 5994 1


2 GR1816 GENERATOR 7 3470 2
3 WM1714 WELDING MACHINE 7 5324.9 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# REPORTING DATE 29-Jan-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 101 Direct / Part of PERMIT START 6:55:00
L.I. Description VACCUM TEST PERMIT CLOSED 16:30:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN ENR/WPR 8 TAKE PERMIT
2 20780 KUMAR KAMI HELPER 8 EQUIPMENT STANDBYMAN
3 11997 GIRI P.F 8 D DOOR STANDBY MAN
4 5354 MUTHU FAB 8 Old Vacuum Box fabrication
5 21855 HARICHARAN WELDER 8 welding on new vaccum box joint
6 19135 AWDESH FAB 8
7 19344 RAJ HELPER 8 performing vaccum test on weld joints 100 m
8 18753 RABINDAR HELPER 8 cleaning weld joint
9 23213 LALLU RAM HELPER 8 apply soap oil
10 5891 NARSAYYA P.F 8 performing vaccum test on weld joints
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1667 AIR COMPRESSOR 8 5999.5 1


2 GR1816 GENERATOR 8 3476 2
3 WM1714 WELDING MACHINE 8 5330.9 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# REPORTING DATE 30-Jan-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 101 Direct / Part of PERMIT START 6:55:00
L.I. Description CLEAN WELD JOINTS & INSPECTION PERMIT CLOSED 17:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN ENR/WPR 8 2 TAKE PERMIT
2 20780 KUMAR KAMI HELPER 8 2 EQUIPMENT STANDBYMAN
3 11997 GIRI P.F 8 2 D DOOR STANDBY MAN
4 5891 NARSAYYA P.F 8 2 cleaning weld joint using clothes 250 50 m
5 23213 LALLU RAM HELPER 8 2 cleaning weld joint using clothes 250 50 m
6 19135 AWDESH FAB 8 2 cleaning weld joint using clothes 250 50 m
7 19344 RAJ HELPER 8 2 cleaning weld joint using clothes 250 50 m
8 18753 RABINDAR HELPER 8 2 cleaning weld joint using clothes 250 50 m
9 SEVEN ARAMCO INSPECTORS COMING FOR INSPECTION
10
11 20988 MANAN WELDER 8 Arranging cp cable electrical pipe 35 ea
12 19384 SHESRAJ WELDER 8 Arranging cp cable electrical pipe
13 19470 NOOR ALAM FAB 8 Arranging cp cable electrical pipe
14 23807 GERRY FAB 8 Arranging cp cable electrical pipe
15 21855 HARICHARAN WELDER 8 Arranging cp cable electrical pipe
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1667 AIR COMPRESSOR 8 6008 1


2 GR1816 GENERATOR 8 3484 2
3 WM1714 WELDING MACHINE idle 5330.9 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# REPORTING DATE 31-Jan-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 101 Direct / Part of PERMIT START 6:55:00
L.I. Description ULTRASONIC THICKNESS TEST ON COLOUM PERMIT CLOSED 14:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN ENR/WPR 8 TAKE PERMIT
2 15562 RAMLAL HELPER 8 EQUIPMENT STANDBYMAN
3 23520 KHALID HELPER 8 D DOOR STANDBY MAN
4 5891 NARSAYYA P.F 8 HELPING FOR UT INSPECTOR
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1667 AIR COMPRESSOR 8 6014 1


2 GR1816 GENERATOR 8 3488 2
3 WM1714 WELDING MACHINE idle 5330.9 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# ARAMCO TIMESHEET REPORTING DATE 1-Feb-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 101 Direct / Part of PERMIT START 6:55:00
L.I. Description FOAM PIPE & SPRINKLER FITTING (SAND PAPERING & PAINTING PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN ENR/WPR 8 2 TAKE PERMIT
2 18753 RABINDAR HELPER 8 2 1/2 " FIRE WATER LINE SAND PAERING & PAINTING ( ON SKY CLIMBER ) 20 4 M
3 13520 PANDIT HELPER 8 2 8" FIRE WATER LINE SAND PAPERING & PAINTING ( ON SKY CLIMBER 6 M
4 16678 SELVARAJ MASON 8 2 FOAM CHAMBER FITUP ( TWIST AND NUT & BOLT TIGHT ) & PAINTING 1 EA
5 20863 DHAN HELPER 8 2 SPRINKLER TIGHTNING 10 4 EA
6 20947 SHYAM HELPER 8 2 SHIFTING SKY CLIMBERCOUNTER WEIGHTS ( 4 TIMES )
7 19344 RAJ HELPER 8 2 SHIFTING SKY CLIMBERCOUNTER WEIGHTS ( 4 TIMES )
8 23213 LALLU RAM HELPER 8 2 SHIFTING SKY CLIMBERCOUNTER WEIGHTS ( 4 TIMES )
9 15562 RAMLAL HELPER 8 2 SHIFTING SKY CLIMBERCOUNTER WEIGHTS ( 4 TIMES )
10 20783 MAN BAHATHUR BLASTER 8 2 HANDLING SKY CLIMBER ROPE FOR MOVING
11 18792 JAKIR BLASTER 8 2 HANDLING SKY CLIMBER ROPE FOR MOVING
12 18796 HANEEF BLASTER 8 2 HANDLING SKY CLIMBER ROPE FOR MOVING
13 23330 NARASAPPA BLASTER 8 2 HANDLING SKY CLIMBER ROPE FOR MOVING
14 11448 CHITRA HELPER 8 2 HANDLING SKY CLIMBER ROPE FOR MOVING
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1667 AIR COMPRESSOR 8 6015 1


2 GR1816 GENERATOR 8 3490 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# REPORTING DATE 1-Feb-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 101 Direct / Part of PERMIT START 6:55:00
L.I. Description ULTRASONIC THICKNESS TEST ON COLOUM PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 23921 JOMAN WPR 8 PERFERMING UT INSPECTION TANK COLUM
2 20780 KUMAR KAMI HELPER 8
3 11997 GIRI P.F 8 D DOOR STANDBY MAN
4 5891 NARSAYYA P.F 8 HELPING INSPECTORS
5 21855 HARICHARAN WELDER 8 WELDING ON EDGES ( FOR GOOD FINISH )
6 21055 LIBRES FAB 8 FABRICATING CP CABLE JUNCTION BOX
7 5354 MUTHU FAB 8 GRINDING ON EDGES ( FOR GOOD FINISH )
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 WM1714 WELDING MACHINE 8 5335.9 1


2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# ARAMCO TIMESHEET REPORTING DATE 2-Feb-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 101 Direct / Part of PERMIT START 6:55:00
L.I. Description COLOUM WEAR PAD FABRICATION & COLOUM LIFTING EQUP FIXING PERMIT CLOSED 17:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN ENG/WPR 8 2
2 19135 AWDESH FAB 8 2 FABRICATION COLOUM WEAR PAD PLATE
3 19470 NOOR ALAM FAB 8 2 SIZE - 4 * A, A=1.4
4 23807 GERRY FAB 8 2 COLOUM PPLATE CUTTING & GRINDING 20 8 M
5 5354 MUTHU FAB 8 2 COLOUM WEAR PAD BUTT JOINT WELDING 1.4 M
6 20988 MANAN WELDER 8 2 MARKED AREA WELD REPAIRING
7 21855 HARICHARAN WELDER 8 2 COLOUM LIFTING EQUP FIXING ON COLOUM
8 5891 NARSAYYA P.F 8 2 VACCUM PUMP & Vacuum BOX PREPARING
9 18753 RABINDAR HELPER 8 2 ERFORM INFRONT OF ARAMCO INSPECTORS
10 HELPING UT INSPECTOR ( CLEAN COLOUM AREAS )
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 WM1606 WELDING MACHINE 8 6206.6 1


2 WM1714 WELDING MACHINE 8 5353.6 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# REPORTING DATE 2-Feb-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 101 Direct / Part of PERMIT START 6:55:00
L.I. Description INTERNAL CLEAN FOR INSPECTION & HELP COLOUM LIFTING PERMIT CLOSED 17:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 19344 RAJ HELPER 8 2 EQUP STANDBY MAN
2 11997 GIRI P.F 8 2 D DOOR STANDBY MAN
3 23213 LALLU RAM HELPER 8 2 CLEANING ON WELD JOINTS
4 20863 DHAN HELPER 8 2 CLEANING ON WELD JOINTS
5 20947 SHYAM HELPER 8 2 CLEANING QUARTER AREA FOR INSPECTION
6 20887 BIR TAMANG HELPER 8 2 CLEANING QUARTER AREA FOR INSPECTION
7 20780 KUMAR KAMI HELPER 8 2 ALL HELPERS HELPING TO FIXING COLOUM LIFTING EQUIPMENT
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1667 AIR COMPRESSOR 8 6027.4 1


2 GR1816 GENERATOR 8 3500 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# ARAMCO TIMESHEET REPORTING DATE 3-Feb-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 101 Direct / Part of PERMIT START 6:55:00
L.I. Description COLOUM WEAR PAD FABRICATION PERMIT CLOSED 17:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN ENG/WPR 8
2 19135
3
4 23807 GERRY FAB 8
5 FAB 8 COLOUM PLATE FABRICATION
6 MANAN WELDER 8
7
8 5891 P.F 8
9 18753 RABINDAR HELPER 8 ASSISTING
10 RAJ HELPER 8
11 GIRI P.F 8
12 11448 CHITRA HELPER 8 ASSISTING
13 KUMAR KAMI HELPER 8
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 WM1606 WELDING MACHINE 8 6213.6 1


2 WM1714 WELDING MACHINE 8 5360.6 2
3 AC1667 AIR COMPRESSOR 8 6034.4 3
4 GR1816 GENERATOR 8 3506 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# ARAMCO TIMESHEET REPORTING DATE 4-Feb-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 101 Direct / Part of PERMIT START 6:55:00
L.I. Description COLOUM WEAR PAD FABRICATION & COLOUM LIFTING EQUP FIXING PERMIT CLOSED 17:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN ENG/WPR 8 2
2 23807 GERRY FAB 8 2 GRINDING ON COLOUM AREA FOR THREE PASS WELD 12 M
3 19470 NOOR ALAM FAB 8 2 GRINDING ON COLOUM AREA FOR THREE PASS WELD 12 M
4 19135 AWDESH FAB 8 2 COLOUM LIFTING EQUIPMENT FIXING AND LIFT COLOUM REMOVE OLD PLATE & 2 PLATE
5 5354 MUTHU FAB 8 2 INSTALL NEW FABRICATED PLATES ON 2 COLOUMS
6 20988 MANAN WELDER 8 2 PERFORMING COLOUM WEAR PAD(BETWEEN COLOUM AND BOTTOM PLATE)WELD 12 M
7 21855 HARICHARAN WELDER 8 2 PERFORMING COLOUM WEAR PAD(BETWEEN COLOUM AND BOTTOM PLATE)WELD 12 M
8 21080 LOKANATHAM WELDER 8 2 MORNING PERFORMING WELD TEST & AFTN PREPARE WELD CAPLE
9 21395 BHIMYA WELDER 8 2 MORNING PERFORMING WELD TEST & AFTN PREPARE WELD CAPLE
10 5891 NARSAYYA P.F 8 2 BRING 12 MM PLATES FROM YARD FOR WELD TEST
11 18753 RABINDAR HELPER 8 2 HELPING FOR COLOUM LIFTING AND INSTALL NEW PLATES
12 23213 LALLU RAM HELPER 8 2 HELPING FOR COLOUM LIFTING AND INSTALL NEW PLATES
13 11448 CHITRA HELPER 8 2 ARRANGE WELD CAPLES & BRING WELDING ROD FROM OUT TO IN & HELPING
14 19344 RAJ HELPER 8 2 EQUIPMENT STANDBY MAN
15 11997 GIRI P.F 8 2 D DOOR STANDBY MAN
16 20780 KUMAR KAMI HELPER 8 2
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 WM1606 WELDING MACHINE 8 6220 1


2 WM1714 WELDING MACHINE 8 5367 2
3 WM2094 WELDING MACHINE 8 1791 3
4 AC1667 AIR COMPRESSOR 8 6041 4
5 GR1816 GENERATOR 8 3513 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 140 REPORTING DATE 5-Feb-20

SERVICE ORDER NO. 6510894318 Service Line Item# 1081190 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 101 Direct / Part of DIRECT PERMIT START 6:55:00
L.I. Description COLOUM WEAR PAD WELDING ( 3 PASS ) PERMIT CLOSED 17:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN ENG/WPR 8 2
2 23807 GERRY FAB 8 2 GRINDING ON COLOUM AREA FOR THREE PASS WELD ( 3 TIMES ) 12 M
3 19470 NOOR ALAM FAB 8 2 GRINDING ON COLOUM AREA FOR THREE PASS WELD ( 3 TIMES ) 12 M
4 20988 MANAN WELDER 8 2 PERFORMING COLOUM WEAR PAD(BETWEEN COLOUM AND BOTTOM PLATE)WELD 12 M
5 21855 HARICHARAN WELDER 8 2 PERFORMING COLOUM WEAR PAD(BETWEEN COLOUM AND BOTTOM PLATE)WELD 12 M
6 19344 RAJ HELPER 8 2 EQUIPMENT STANDBY MAN
7 11997 GIRI P.F 8 2 D DOOR STANDBY MAN
8 21080 LOKANATHAM WELDER 8 TRANSFER TO RABIGH
9 21395 BHIMYA WELDER 8 TRANSFER TO RABIGH
10 20780 KUMAR KAMI HELPER 8
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 WM1606 WELDING MACHINE 8 6226.6 1


2 WM1714 WELDING MACHINE 8 5373.8 2
3 WM2094 WELDING MACHINE 8 6473 3
4 AC1667 AIR COMPRESSOR 8 6048 4
5 GR1816 GENERATOR 8 3519 5
6 WM1693 WELDING MACHINE IDLE 6857.4 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# ARAMCO TIMESHEET REPORTING DATE 5-Feb-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 101 Direct / Part of PERMIT START 6:55:00
L.I. Description COLOUM WEAR PAD FABRICATION & COLOUM LIFTING EQUP FIXING PERMIT CLOSED 17:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN ENG/WPR 8 2
2 19135 AWDESH FAB 8 2 COLOUM LIFTING EQUIPMENT FIXING AND LIFT COLOUM REMOVE OLD PLATE & 1 PLATE
3 5354 MUTHU FAB 8 2 INSTALL NEW FABRICATED PLATES ON 1 COLOUMS
4 5891 NARSAYYA P.F 8 2 HELPING FOR COLOUM LIFTING AND INSTALL NEW PLATES
5 18753 RABINDAR HELPER 8 2 HELPING FOR COLOUM LIFTING AND INSTALL NEW PLATES
6 23213 LALLU RAM HELPER 8 2 HELPING FOR COLOUM LIFTING AND INSTALL NEW PLATES
7 11448 CHITRA HELPER 8 2 ARRANGE WELD CAPLES & BRING WELDING ROD FROM OUT TO IN & HELPING
8
9 COLOUM LIFTING EQUIPMENT DISMANTLE
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 140 REPORTING DATE 6-Feb-20

SERVICE ORDER NO. 6510894318 Service Line Item# 1081190 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 101 Direct / Part of DIRECT PERMIT START 6:55:00
L.I. Description COLOUM WEAR PAD WELDING ( 3 PASS ) PERMIT CLOSED 17:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN ENG/WPR 8 2
2 23807 GERRY FAB 8 2 GRINDING ON COLOUM AREA FOR THREE PASS WELD ( 3 TIMES ) 12 M
3 19470 NOOR ALAM FAB 8 2 GRINDING ON COLOUM AREA FOR THREE PASS WELD ( 3 TIMES ) 12 M
4 20988 MANAN WELDER 8 2 PERFORMING COLOUM WEAR PAD(BETWEEN COLOUM AND BOTTOM PLATE)WELD 12 M
5 21855 HARICHARAN WELDER 8 2 PERFORMING COLOUM WEAR PAD(BETWEEN COLOUM AND BOTTOM PLATE)WELD 12 M
6 19344 RAJ HELPER 8 2 EQUIPMENT STANDBY MAN
7 11997 GIRI P.F 8 2 D DOOR STANDBY MAN
8 20780 KUMAR KAMI HELPER 8 2
9 23594 SHAJITH IQBAL HELPER 8 2 FIRE WATCH
10 5891 NARSAYYA P.F 8 2 GOING TO BRING CYLINDER WITH TRUCK
11 11448 CHITRA HELPER 8 2 GOING TO BRING CYLINDER WITH TRUCK
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 WM1606 WELDING MACHINE 8 6240.9 1


2 WM1714 WELDING MACHINE 8 5381.2 2
3 WM2094 WELDING MACHINE IDLE 6473 3
4 AC1667 AIR COMPRESSOR 8 6063.1 4
5 GR1816 GENERATOR 8 3533 5
6 WM1693 WELDING MACHINE IDLE 6857.4 6
7 AC1669 AIR COMPRESSOR IDLE 3716 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# ARAMCO TIMESHEET REPORTING DATE 6-Feb-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 101 Direct / Part of PERMIT START 6:55:00
L.I. Description SEAL FABRIC RE INSTALLATION & MAKING CONCRETE FOR CP JUNCTION BOX PERMIT CLOSED 17:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN ENG/WPR 8 2
2 19135 AWDESH FAB 8 2 BRING SEAL FABRIC FROM DIKE WALL TO TANK (AROUN 100 M) 15 RL
3 5354 MUTHU FAB 8 2 MARKING FOR MAKING HOLE 3 RL
4 18753 RABINDAR HELPER 8 2 MARKING HOLE FOR 300 LOCATION FOR INSTALL NEW SEAL FABRIC ( 20 MM )
5 23213 LALLU RAM HELPER 8 2 BRING SEAL FABRIC TOP SIDE OF FLOATING ROOF FOR INSTALLATION 3 RL
6 23580 JUNDAL FAB 8 2
7
8 24492 GUL RAHIM MASON 8 2 MAKE CONCRETE FOR CP CAPLE BOARD 1 M³
9 24493 AKTHAR MASON 8 2 APPLY CONCRETE AFTER HYDROTEST WE
10 REMOVED OLD FABRIC SEAL
NOW WE INSTALL NEW
11 FABRIC SEAL FOR SECOND
12 TIME
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 140 REPORTING DATE 7-Feb-20

SERVICE ORDER NO. 6510894318 Service Line Item# 1081190 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 101 Direct / Part of DIRECT PERMIT START 6:55:00
L.I. Description COLOUM WEAR PAD WELDING ( 3 PASS ) PERMIT CLOSED 15:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN ENG/WPR 8
2 23807 GERRY FAB 8 GRINDING ON COLOUM AREA FOR THREE PASS WELD ( 3 TIMES ) 9 M
3 19470 NOOR ALAM FAB 8 GRINDING ON COLOUM AREA FOR THREE PASS WELD ( 3 TIMES ) 9 M
4 19135 AWDESH FAB 8 GRINDING ON COLOUM AREA FOR THREE PASS WELD ( 3 TIMES ) 9 M
5 21855 HARICHARAN WELDER 8 PERFORMING COLOUM WEAR PAD(BETWEEN COLOUM AND BOTTOM PLATE)WELD 9 M
6 20988 MANAN WELDER 8 PERFORMING COLOUM WEAR PAD(BETWEEN COLOUM AND BOTTOM PLATE)WELD 9 M
7 22494 ABDUL QUADIR WELDER 8 PERFORMING COLOUM WEAR PAD(BETWEEN COLOUM AND BOTTOM PLATE)WELD 9 M
8 23594 SHAJITH IQBAL HELPER 8 FIRE WATCH
9 19344 RAJ HELPER 8 EQUIPMENT STANDBY MAN
10 11997 GIRI P.F 8 D DOOR STANDBY MAN
11
12 WORK UNTILL 3 O CLK .FOR INSPECTION ( WITH INSPECTOR AND SOGEC PEOPLE)
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 WM1606 WELDING MACHINE 6 6252.8 1


2 WM1714 WELDING MACHINE 6 5386.2 2
3 WM2094 WELDING MACHINE IDLE 1796.6 3
4 AC1667 AIR COMPRESSOR 7 6075.1 4
5 GR1816 GENERATOR 7 3546 5
6 WM1693 WELDING MACHINE 6 6862.3 6
7 AC1669 AIR COMPRESSOR 1 3717.3 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# ARAMCO TIMESHEET REPORTING DATE 7-Feb-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 101 Direct / Part of PERMIT START 6:55:00
L.I. Description SEAL FABRIC RE INSTALLATION PERMIT CLOSED 15:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 5891 NARSAYYA P.F 8 MARKING FOR MAKING HOLE 3 RL
2 23580 JUNDAL FAB 8 MARKING HOLE FOR 300 LOCATION FOR INSTALL NEW SEAL FABRIC ( 20 MM )
3 5354 MUTHU FAB 8 BRING SEAL FABRIC TOP SIDE OF FLOATING ROOF FOR INSTALLATION 3 RL
4
5
6
7
8
9 AFTER HYDROTEST WE
10 REMOVED OLD FABRIC SEAL
NOW WE INSTALL NEW
11 FABRIC SEAL FOR (SECOND
12 TIME)
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 140 REPORTING DATE 8-Feb-20

SERVICE ORDER NO. 6510894318 Service Line Item# 1081190 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 101 Direct / Part of DIRECT PERMIT START 6:55:00
L.I. Description COLOUM WEAR PAD WELDING ( 3 PASS ) PERMIT CLOSED 15:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN ENG/WPR 8 2
2 23807 GERRY FAB 8 2 GRINDING ON COLOUM AREA FOR THREE PASS WELD ( 3 TIMES ) 13 M
3 19470 NOOR ALAM FAB 8 2 GRINDING ON COLOUM AREA FOR THREE PASS WELD ( 3 TIMES ) 13 M
4 19135 AWDESH FAB 8 2 GRINDING ON COLOUM AREA FOR THREE PASS WELD ( 3 TIMES ) 13 M
5 21855 HARICHARAN WELDER 8 2 PERFORMING COLOUM WEAR PAD(BETWEEN COLOUM AND BOTTOM PLATE)WELD 13 M
6 20988 MANAN WELDER 8 2 PERFORMING COLOUM WEAR PAD(BETWEEN COLOUM AND BOTTOM PLATE)WELD 13 M
7 22494 ABDUL QUADIR WELDER 8 2 PERFORMING COLOUM WEAR PAD(BETWEEN COLOUM AND BOTTOM PLATE)WELD 13 M
8 23594 SHAJITH IQBAL HELPER 8 2 FIRE WATCH
9 11448 CHITRA HELPER 8 2 EQUIPMENT STANDBY MAN
10 23213 LALLU RAM HELPER 8 2 D DOOR STANDBY MAN
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1669 AIR COMPRESSOR 8 3730 1


2 WM1714 WELDING MACHINE 8 5393.8 2
3 WM2094 WELDING MACHINE 8 1808.2 3
4 WM1693 WELDING MACHINE 8 6870 4
5 GR1816 GENERATOR 8 3553 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# ARAMCO TIMESHEET REPORTING DATE 8-Feb-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 101 Direct / Part of PERMIT START 6:55:00
L.I. Description SEAL FABRIC RE INSTALLATION PERMIT CLOSED 17:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 5354 MUTHU FAB 8 2 MARKING FOR MAKING HOLE 6 RL
2 23580 JUNDAL FAB 8 2 MARKING HOLE FOR 600 LOCATION FOR INSTALL NEW SEAL FABRIC ( 20 MM THIC )
3 21055 LIBRES FAB 8 2 BRING SEAL FABRIC TOP SIDE OF FLOATING ROOF FOR INSTALLATION 6 RL
4 23974 NARAYANAN HELPER 8 2 INSTALL SEAL FABRIC ON LOCATION 6 RL
5 25195 NOEL ELECTICIAN 8 2 MAKE 300 HOLES
6 24493 AKTHAR MASON 8 2 MAKE 300 HOLES
7 20780 KUMAR KAMI HELPER 8 2
8
9 AFTER HYDROTEST WE
10 REMOVED OLD FABRIC SEAL
NOW WE INSTALL NEW
11 FABRIC SEAL FOR (SECOND
12 TIME)
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 140 REPORTING DATE 9-Feb-20

SERVICE ORDER NO. 6510894318 Service Line Item# 1081190 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 101 Direct / Part of DIRECT PERMIT START 6:55:00
L.I. Description COLOUM WEAR PAD WELDING ( 3 PASS ) PERMIT CLOSED 17:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN ENG/WPR 8 2
2 23807 GERRY FAB 8 2 GRINDING ON COLOUM AREA FOR THREE PASS WELD ( 3 TIMES ) 13 M
3 19470 NOOR ALAM FAB 8 2 GRINDING ON COLOUM AREA FOR THREE PASS WELD ( 3 TIMES ) 13 M
4 19135 AWDESH FAB 8 2 GRINDING ON COLOUM AREA FOR THREE PASS WELD ( 3 TIMES ) 13 M
5 21855 HARICHARAN WELDER 8 2 PERFORMING COLOUM WEAR PAD(BETWEEN COLOUM AND BOTTOM PLATE)WELD 13 M
6 20988 MANAN WELDER 8 2 PERFORMING COLOUM WEAR PAD(BETWEEN COLOUM AND BOTTOM PLATE)WELD 13 M
7 22494 ABDUL QUADIR WELDER 8 2 PERFORMING COLOUM WEAR PAD(BETWEEN COLOUM AND BOTTOM PLATE)WELD 13 M
8 23594 SHAJITH IQBAL HELPER 8 2 FIRE WATCH
9 19344 RAJ HELPER 8 2 EQUIPMENT STANDBY MAN
10 11997 GIRI P.F 8 2 D DOOR STANDBY MAN
11 5891 NARSAYYA P.F 8 2 ARRANGE MATERIALS & HOUSE KEEPING
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1669 AIR COMPRESSOR 8 3746.2 1


2 WM1714 WELDING MACHINE 8 5400.7 2
3 WM2094 WELDING MACHINE 8 1823.5 3
4 WM1693 WELDING MACHINE 8 6876.6 4
5 GR1816 GENERATOR 8 3575 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# ARAMCO TIMESHEET REPORTING DATE 9-Feb-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 101 Direct / Part of PERMIT START 6:55:00
L.I. Description SEAL FABRIC RE INSTALLATION PERMIT CLOSED 17:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 5354 MUTHU FAB 8 2 MARKING FOR MAKING HOLE 2 RL
2 23580 JUNDAL FAB 8 2 MARKING HOLE FOR 200 LOCATION FOR INSTALL NEW SEAL FABRIC ( 20 MM THIC )
3 11448 CHITRA HELPER 8 2 BRING SEAL FABRIC TOP SIDE OF FLOATING ROOF FOR INSTALLATION 2 RL
4 24492 GUL RAHIM MASON 8 2 INSTALL SEAL FABRIC ON LOCATION 2 RL
5 18753 RABINDAR HELPER 8 2 PUT TOP SUPPORT AND NUT AND BOLT HAND TIGHT 75 M
6 20780 KUMAR KAMI HELPER 8
7
8
9 AFTER HYDROTEST WE
10 REMOVED OLD FABRIC SEAL
NOW WE INSTALL NEW
11 FABRIC SEAL FOR (SECOND
12 TIME)
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 140 REPORTING DATE 10-Feb-20

SERVICE ORDER NO. 6510894318 Service Line Item# 1081190 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 101 Direct / Part of DIRECT PERMIT START 6:55:00
L.I. Description COLOUM WEAR PAD WELDING ( 3 PASS ) PERMIT CLOSED 17:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN ENG/WPR 8
2 23807 GERRY FAB 8 GRINDING ON COLOUM AREA FOR THREE PASS WELD ( 3 TIMES ) 8 M
3 19470 NOOR ALAM FAB 8 GRINDING ON COLOUM AREA FOR THREE PASS WELD ( 3 TIMES ) 8 M
4 19135 AWDESH FAB 8 GRINDING ON COLOUM AREA FOR THREE PASS WELD ( 3 TIMES ) 8 M
5 21855 HARICHARAN WELDER 8 PERFORMING COLOUM WEAR PAD(BETWEEN COLOUM AND BOTTOM PLATE)WELD 8 M
6 20988 MANAN WELDER 8 PERFORMING COLOUM WEAR PAD(BETWEEN COLOUM AND BOTTOM PLATE)WELD 8 M
7 22494 ABDUL QUADIR WELDER 8 PERFORMING COLOUM WEAR PAD(BETWEEN COLOUM AND BOTTOM PLATE)WELD 8 M
8 5891 NARSAYYA P.F FIRE WATCH
9 19344 RAJ HELPER 8 EQUIPMENT STANDBY MAN
10 11997 GIRI P.F 8 D DOOR STANDBY MAN
11 23594 SHAJITH IQBAL HELPER 8 ARRANGE MATERIALS & HOUSE KEEPING
12 20780 KUMAR KAMI HELPER 8
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1669 AIR COMPRESSOR 8 3762.1 1


2 WM1714 WELDING MACHINE 8 5407.8 2
3 WM2094 WELDING MACHINE 8 1838.7 3
4 WM1693 WELDING MACHINE 8 6883.6 4
5 GR1816 GENERATOR 8 3590 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# ARAMCO TIMESHEET REPORTING DATE 10-Feb-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 101 Direct / Part of PERMIT START 6:55:00
L.I. Description SEAL FABRIC RE INSTALLATION PERMIT CLOSED 17:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 5354 MUTHU FAB 8 PUT TOP SUPPORT AND NUT AND BOLT HAND TIGHT 90 M
2 23580 JUNDAL FAB 8 PUT TOP SUPPORT AND NUT AND BOLT HAND TIGHT
3 11448 CHITRA HELPER 8 PUT TOP SUPPORT AND NUT AND BOLT HAND TIGHT
4 21197 GUNJA HELPER 8 PUT TOP SUPPORT AND NUT AND BOLT HAND TIGHT
5 18753 RABINDAR HELPER 8 PUT TOP SUPPORT AND NUT AND BOLT HAND TIGHT
6
7
8
9 AFTER HYDROTEST WE
10 REMOVED OLD FABRIC SEAL
NOW WE INSTALL NEW
11 FABRIC SEAL FOR (SECOND
12 TIME)
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 140 REPORTING DATE 11-Feb-20

SERVICE ORDER NO. 6510894318 Service Line Item# 1081190 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 101 Direct / Part of DIRECT PERMIT START 6:55:00
L.I. Description COLOUM WEAR PAD WELDING ( 3 PASS ) PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 20991 CHAUHAN WELDER 8 PERFORMING COLOUM WEAR PAD(BETWEEN COLOUM AND BOTTOM PLATE)WELD 6 M
2 20988 MANAN WELDER 8 PERFORMING COLOUM WEAR PAD(BETWEEN COLOUM AND BOTTOM PLATE)WELD 8 M
3 22494 ABDUL QUADIR WELDER 8 PERFORMING COLOUM WEAR PAD(BETWEEN COLOUM AND BOTTOM PLATE)WELD 6 M
4 19470 NOOR ALAM FAB 8
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 WM1693 WELDING MACHINE 8 6890.4 1


2 WM1714 WELDING MACHINE 8 5407.8 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# ARAMCO TIMESHEET REPORTING DATE 11-Feb-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 101 Direct / Part of PERMIT START 6:55:00
L.I. Description Vacuum TEST ON FIRST QUARTAR PERMIT CLOSED 18:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 2
2 23213 LALLU RAM HELPER 8 2 PERFORMING VACCUM TEST ( APPLY SOAP OIL)
3 11448 CHITRA HELPER 8 2 PERFORMING VACCUM TEST ( APPLY SOAP OIL)
4 21197 GUNJA HELPER 8 2 CLEANING SURFACE & SHIFTING Vacuum PUMP
5 18753 RABINDAR HELPER 8 2 PERFORM VACCUM TEST FIRST QUARTAR
6 5891 NARSAYYA P.F 8 2 PERFORM VACCUM TEST FIRST QUARTAR
7 19344 RAJ HELPER 8 2 EQUIPMENT STANDBY MAN
8 11997 GIRI P.F 8 2 D DOOR STANDBY MAN
9 20780 KUMAR KAMI HELPER 8 2
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1669 AIR COMPRESSOR 9.5 3762.1 1


2 GR1816 GENERATOR 9.5 3590 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# ARAMCO TIMESHEET REPORTING DATE 12-Feb-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 101 Direct / Part of PERMIT START 6:55:00
L.I. Description VACCUM TEST ON SECOND QUARTAR PERMIT CLOSED 18:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 2 TAKE PERMIT
2 23213 LALLU RAM HELPER 8 2 PERFORMING VACCUM TEST ( APPLY SOAP OIL)
3 11448 CHITRA HELPER 8 2 PERFORMING VACCUM TEST ( APPLY SOAP OIL)
4 21197 GUNJA HELPER 8 2 CLEANING SURFACE & SHIFTING Vacuum PUMP
5 18753 RABINDAR HELPER 8 2 PERFORM VACCUM TEST SECOND QUARTAR
6 5891 NARSAYYA P.F 8 2 PERFORM VACCUM TEST SECOND QUARTAR
7 19344 RAJ HELPER 8 2 EQUIPMENT STANDBY MAN
8 11997 GIRI P.F 8 2 D DOOR STANDBY MAN
9 20780 KUMAR KAMI HELPER 8 2
10 20680 ZAHID HELPER 8 2
NO LEAK FOUND
11 1. COLOUM Vacuum TEST = 4*1.4 - 12 NOS 68 M
12 2. SHORT SEEN Vacuum TEST( HARIZONTAL JOINTS ) = 98 * 1.95 191 M
13 3. LONG SEEN Vacuum TEST ( VERTICAL JOINTS ) 505 M
14 4.SKETCH TO ANNULAR PLATE WELD JOINT Vacuum TEST 55 M
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1669 AIR COMPRESSOR 9.5 3778.2 1


2 GR1816 GENERATOR 9.5 3606 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# ARAMCO TIMESHEET REPORTING DATE 13-Feb-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 101 Direct / Part of PERMIT START 6:55:00
L.I. Description VACCUM TEST THIRD QUARTAR PERMIT CLOSED 18:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 2 TAKE PERMIT
2 23213 LALLU RAM HELPER 8 2 PERFORMING VACCUM TEST ( APPLY SOAP OIL)
3 11448 CHITRA HELPER 8 2 PERFORMING VACCUM TEST ( APPLY SOAP OIL)
4 21197 GUNJA HELPER 8 2 CLEANING SURFACE & SHIFTING Vacuum PUMP
5 18753 RABINDAR HELPER 8 2 PERFORM VACCUM TEST THIRD QUARTAR
6 20780 KUMAR KAMI HELPER 8 2 PERFORM VACCUM TEST THIRD QUARTAR
7 19344 RAJ HELPER 8 2 EQUIPMENT STANDBY MAN
8 11997 GIRI P.F 8 2 D DOOR STANDBY MAN
9
10
11 1. COLOUM Vacuum TEST = 4*1.4 - 12 NOS 68 M
12 2. SHORT SEEN Vacuum TEST( HARIZONTAL JOINTS ) = 98 * 1.95 191 M
13 3. LONG SEEN Vacuum TEST ( VERTICAL JOINTS ) 505 M
14 4.SKETCH TO ANNULAR PLATE WELD JOINT Vacuum TEST 55 M
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1669 AIR COMPRESSOR 9.5 3786.2 1


2 GR1816 GENERATOR 9.5 3614 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# ARAMCO TIMESHEET REPORTING DATE 15-Feb-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 101 Direct / Part of PERMIT START 6:55:00
L.I. Description VACCUM TEST FOURTH QUARTAR PERMIT CLOSED 18:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 2 TAKE PERMIT
2 23213 LALLU RAM HELPER 8 2 PERFORMING VACCUM TEST ( APPLY SOAP OIL)
3 11448 CHITRA HELPER 8 2 PERFORMING VACCUM TEST ( APPLY SOAP OIL)
4 21197 GUNJA HELPER 8 2 CLEANING SURFACE & SHIFTING Vacuum PUMP
5 18753 RABINDAR HELPER 8 2 PERFORM VACCUM TEST FOURTH QUARTAR
6 20780 KUMAR KAMI HELPER 8 2 PERFORM VACCUM TEST FOURTH QUARTAR
7 19344 RAJ HELPER 8 2 EQUIPMENT STANDBY MAN
8 11997 GIRI P.F 8 2 D DOOR STANDBY MAN
9
10
11 1. COLOUM Vacuum TEST = 4*1.4 - 12 NOS 68 M
12 2. SHORT SEEN Vacuum TEST( HARIZONTAL JOINTS ) = 98 * 1.95 191 M
13 3. LONG SEEN Vacuum TEST ( VERTICAL JOINTS ) 505 M
14 4.SKETCH TO ANNULAR PLATE WELD JOINT Vacuum TEST 55 M
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1669 AIR COMPRESSOR 9 3793.2 1


2 GR1816 GENERATOR 9 3621 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# ARAMCO TIMESHEET REPORTING DATE 16-Feb-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 101 Direct / Part of PERMIT START 6:55:00
L.I. Description RE VACCUM TEST FOURTH QUARTAR PERMIT CLOSED 21:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 2 TAKE PERMIT
2 18753 RABINDAR HELPER 8 2 PERFORMING VACCUM TEST
3 19344 RAJ HELPER 8 2 EQUIPMENT STANDBY MAN
4 11997 GIRI P.F 8 2 D DOOR STANDBY MAN
5 11448 CHITRA HELPER 8 2 PERFORMING VACCUM TEST
6 20680 ZAHID HELPER 8 2 PERFORMING VACCUM TEST
7 20780 KUMAR KAMI HELPER 8 2 PERFORMING VACCUM TEST
8
9
10
11 1. COLOUM RE Vacuum TEST = 4*1.4 - 12 NOS 68 M
12 2. SHORT SEEN RE Vacuum TEST( HARIZONTAL JOINTS ) = 98 * 1.95 191 M
13 3. LONG SEEN RE Vacuum TEST ( VERTICAL JOINTS ) 505 M
14 4.SKETCH TO ANNULAR PLATE WELD JOINT RE Vacuum TEST 55 M
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1669 AIR COMPRESSOR 11 3805.9 1


2 GR1816 GENERATOR 11 3633 2
3 AC1018 AIR COMPRESSOR IDLE 2001.1 3
4 WM2094 WELDING MACHINE IDLE 1838.7 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# REPORTING DATE 16-Feb-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 101 Direct / Part of PERMIT START 6:55:00
L.I. Description ARAMCO INSPECTION & HOUSEKEEPING PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 TAKE PERMIT
2 18753 RABINDAR HELPER 8 ASSIST FOR INSPECTION
3 19344 RAJ HELPER 8 EQUIPMENT STANDBY MAN
4 11997 GIRI P.F 8 D DOOR STANDBY MAN
5 11448 CHITRA HELPER 8 ASSIST FOR INSPECTION
6 20680 ZAHID HELPER 8 CUT COLOUM PLATE AND BRING TO OUTSIDE & HOUSEKEEPING 4 EA
7 20780 KUMAR KAMI HELPER 8 CUT COLOUM PLATE AND BRING TO OUTSIDE & HOUSEKEEPING
8 23213 LALLU RAM HELPER 8 CUT COLOUM PLATE AND BRING TO OUTSIDE & HOUSEKEEPING
9
10
11 INSPECTION TEAM COME AND INSPECT THE AREA
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1669 AIR COMPRESSOR 7 3812.9 1


2 GR1816 GENERATOR 7 3640 2
3 AC1018 AIR COMPRESSOR IDLE 2001.1 3
4 WM2094 WELDING MACHINE IDLE 1838.7 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# ARAMCO TIMESHEET REPORTING DATE 18-Feb-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 101 Direct / Part of PERMIT START 6:55:00
L.I. Description MPI TEST ON WELD JOINTS PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 2 TAKE PERMIT
2 18753 RABINDAR HELPER 8 2 CLEANING THE WELD JOINTS USING POWER BRUSH 70 M
3 19344 RAJ HELPER 8 2 EQUIPMENT STANDBY MAN
4 11997 GIRI P.F 8 2 D DOOR STANDBY MAN
5 23329 NITIN BASTER 8 2 ASSIST INSPECTOR FOR APPLY SOLUTIONS
6 13520 PANDIT HELPER 8 2 CLEANING THE WELD JOINTS USING POWER BRUSH 70 M
7 20780 KUMAR KAMI HELPER 8
8
9
10
11 INSPECTION TEAM COME AND INSPECT THE AREA
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1669 AIR COMPRESSOR 5 3817.9 1


2 GR1816 GENERATOR 8 3648 2
3 AC1018 AIR COMPRESSOR 3 2003.6 3
4 WM2094 WELDING MACHINE IDLE 1838.7 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# ARAMCO TIMESHEET REPORTING DATE 19-Feb-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 101 Direct / Part of PERMIT START 6:55:00
L.I. Description MPI TEST ON WELD JOINTS PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 2 TAKE PERMIT
2 18753 RABINDAR HELPER 8 2 CLEANING THE WELD JOINTS USING POWER BRUSH 65 M
3 19344 RAJ HELPER 8 2 EQUIPMENT STANDBY MAN
4 11997 GIRI P.F 8 2 D DOOR STANDBY MAN
5 13520 PANDIT HELPER 8 2 ASSIST INSPECTOR FOR APPLY SOLUTIONS
6 CLEANING THE WELD JOINTS USING POWER BRUSH 65 M
7 20780 KUMAR KAMI HELPER 8
8
9
10
11 INSPECTION TEAM COME AND INSPECT THE AREA
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1669 AIR COMPRESSOR IDLE 3817.9 1


2 GR1816 GENERATOR 8 3656 2
3 AC1018 AIR COMPRESSOR 8 2010 3
4 WM2094 WELDING MACHINE IDLE 1838.7 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# ARAMCO TIMESHEET REPORTING DATE 20-Feb-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 101 Direct / Part of PERMIT START 6:55:00
L.I. Description MPI TEST ON WELD JOINTS PERMIT CLOSED 17:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 2 TAKE PERMIT
2 18753 RABINDAR HELPER 8 2 CLEANING THE WELD JOINTS USING POWER BRUSH 75 M
3 19344 RAJ HELPER 8 2 EQUIPMENT STANDBY MAN
4 11997 GIRI P.F 8 2 D DOOR STANDBY MAN
5 13520 PANDIT HELPER 8 2 ASSIST INSPECTOR FOR APPLY SOLUTIONS
6 CLEANING THE WELD JOINTS USING POWER BRUSH 75 M
7 20780 KUMAR KAMI HELPER 8
8 INSPECTION TEAM COME AND INSPECT THE AREA
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1669 AIR COMPRESSOR IDLE 3817.9 1


2 GR1816 GENERATOR 8 3663 2
3 AC1018 AIR COMPRESSOR 8 2017 3
4 WM2094 WELDING MACHINE IDLE 1838.7 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# ARAMCO TIMESHEET REPORTING DATE 21-Feb-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 101 Direct / Part of PERMIT START 6:55:00
L.I. Description MPI TEST ON WELD JOINTS PERMIT CLOSED 17:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 TAKE PERMIT
2 5891 NARSAYYA P.F 8 CLEANING THE WELD JOINTS USING POWER BRUSH 75 M
3 19344 RAJ HELPER 8 EQUIPMENT STANDBY MAN
4 11997 GIRI P.F 8 D DOOR STANDBY MAN
5 23329 NITIN BLASTER 8 ASSIST INSPECTOR FOR APPLY SOLUTIONS
6 CLEANING THE WELD JOINTS USING POWER BRUSH 75 M
7
8 INSPECTION TEAM COME AND INSPECT THE AREA
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1669 AIR COMPRESSOR IDLE 3817.9 1


2 GR1816 GENERATOR 8 3668 2
3 AC1018 AIR COMPRESSOR 8 2022 3
4 WM2094 WELDING MACHINE IDLE 1838.7 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# ARAMCO TIMESHEET REPORTING DATE 22-Feb-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 101 Direct / Part of PERMIT START 6:55:00
L.I. Description MPI TEST ON WELD JOINTS PERMIT CLOSED 17:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 2 TAKE PERMIT
2 18753 RABINDAR HELPER 8 2 CLEANING THE WELD JOINTS USING POWER BRUSH 80 M
3 19344 RAJ HELPER 8 2 EQUIPMENT STANDBY MAN
4 11997 GIRI P.F 8 2 D DOOR STANDBY MAN
5 23329 NITIN BLASTER 8 2 ASSIST INSPECTOR FOR APPLY SOLUTIONS
6 20780 KUMAR KAMI HELPER 8 2 CLEANING THE WELD JOINTS USING POWER BRUSH 80 M
7
8 INSPECTION TEAM COME AND INSPECT THE AREA
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 GR1816 GENERATOR 8 3675 2
3 AC1018 AIR COMPRESSOR 8 2029 3
4 WM2094 WELDING MACHINE IDLE 1838.7 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# ARAMCO TIMESHEET REPORTING DATE 24-Feb-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 101 Direct / Part of PERMIT START 6:55:00
L.I. Description MPI TEST ON WELD JOINTS PERMIT CLOSED 18:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 3 TAKE PERMIT
2 19069 DINESH HELPER 8 3 CLEANING THE WELD JOINTS USING POWER BRUSH (GRINDER) 110 M
3 19344 RAJ HELPER 8 3 EQUIPMENT STANDBY MAN
4 11997 GIRI P.F 8 3 D DOOR STANDBY MAN
5 23329 NITIN BLASTER 8 3 CLEANING THE WELD JOINTS USING POWER BRUSH (GRINDER) 110 M
6 13520 PANDIT HELPER 8 3 CLEANING THE WELD JOINTS USING POWER BRUSH (GRINDER) 110 M
7 20780 KUMAR KAMI HELPER 8
8 18753 RABINDAR HELPER 8 INSPECTION TEAM COME AND INSPECT THE AREA
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 GR1816 GENERATOR 8 3693 2
3 AC1018 AIR COMPRESSOR 8 2045 3
4 WM2094 WELDING MACHINE IDLE 1838.7 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# ARAMCO TIMESHEET REPORTING DATE 25-Feb-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 101 Direct / Part of PERMIT START 6:55:00
L.I. Description MPI TEST ON WELD JOINTS PERMIT CLOSED 18:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 3 TAKE PERMIT
2 19069 DINESH HELPER 8 3 CLEANING THE WELD JOINTS USING POWER BRUSH (GRINDER) 110 M
3 19344 RAJ HELPER 8 3 EQUIPMENT STANDBY MAN
4 11997 GIRI P.F 8 3 D DOOR STANDBY MAN
5 23329 NITIN BLASTER 8 3 CLEANING THE WELD JOINTS USING POWER BRUSH (GRINDER) 110 M
6 13520 PANDIT HELPER 8 3 CLEANING THE WELD JOINTS USING POWER BRUSH (GRINDER) 110 M
7 5354 MUTHU FAB 8 GRIND OUT WELD JOINTS ON DAMAGED AREA
8 23921 JOMAN WPR 8
9 20780 KUMAR KAMI HELPER 8
10 18753 RABINDAR HELPER 8
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 GR1816 GENERATOR 8 3699 2
3 AC1018 AIR COMPRESSOR 3 2048 3
4 WM2094 WELDING MACHINE IDLE 1838.7 4
5 AC1669 AIR COMPRESSOR 6 3822.6 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# ARAMCO TIMESHEET REPORTING DATE 26-Feb-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 101 Direct / Part of PERMIT START 6:55:00
L.I. Description MPI TEST ON WELD JOINTS PERMIT CLOSED 18:30:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 3 TAKE PERMIT
2 19069 DINESH HELPER 8 3 CLEANING THE WELD JOINTS USING POWER BRUSH (GRINDER) 90 M
3 19344 RAJ HELPER 8 3 EQUIPMENT STANDBY MAN
4 11997 GIRI P.F 8 3 D DOOR STANDBY MAN
5 23329 NITIN BLASTER 8 3 CLEANING THE WELD JOINTS USING POWER BRUSH (GRINDER) 90 M
6 13520 PANDIT HELPER 8 3 CLEANING THE WELD JOINTS USING POWER BRUSH (GRINDER) 90 M
7 23520 KHALID HELPER 8 3 CLEANING THE WELD JOINTS USING POWER BRUSH (GRINDER) 80 M
8 20776 DHAN HELPER 8 3 CLEANING THE WELD JOINTS USING POWER BRUSH (GRINDER) 80 M
9
10 20991 CHAUHAN WELDER 8 2 TACK WELD & FITUP
11 23205 MEK HELPER 8 2 IRE WATCH AND ASSISTING FABRICATOR
12 5354 MUTHU FAB 8 2 GRIND OUT WELD JOINTS ON DAMAGED AREA REMOVE HE PLATE ON BOTH SIDE
13 23921 JOMAN WPR 8 2 CENTRE COLOUM AREA . FABRICATE NEW PLATE INSTALL AND TACK WELD
14 23807 JERRY FAB 8 2 ON RIGHT SIDE
15 20780 KUMAR KAMI HELPER 8
16 18753 RABINDAR HELPER 8
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 GR1816 GENERATOR 10 3708 2
3 AC1669 AIR COMPRESSOR 10 3832.6 3
4 WM2094 WELDING MACHINE 3 1841.7 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# ARAMCO TIMESHEET REPORTING DATE 27-Feb-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 101 Direct / Part of PERMIT START 6:55:00
L.I. Description MPI TEST ON WELD JOINTS PERMIT CLOSED 18:30:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 3 TAKE PERMIT
2 19069 DINESH HELPER 8 3 CLEANING THE WELD JOINTS USING POWER BRUSH (GRINDER) 100 M
3 19344 RAJ HELPER 8 3 EQUIPMENT STANDBY MAN
4 11997 GIRI P.F 8 3 D DOOR STANDBY MAN
5 23329 NITIN BLASTER 8 3 CLEANING THE WELD JOINTS USING POWER BRUSH (GRINDER) 100 M
6 13520 PANDIT HELPER 8 3 CLEANING THE WELD JOINTS USING POWER BRUSH (GRINDER) 100 M
7 23520 KHALID HELPER 8 3 CLEANING THE WELD JOINTS USING POWER BRUSH (GRINDER) 90 M
8 20776 DHAN HELPER 8 3 CLEANING THE WELD JOINTS USING POWER BRUSH (GRINDER) 90 M
9 23205 MEK HELPER 8 3
10 20991 CHAUHAN WELDER 8 2 WELDING ON REPAIR AREA NEW PLATE (3 PASS ) 10 M
11 5354 MUTHU FAB 8 2 FIRE WATCH AND ASSISTING FABRICATOR
12 FABRICATE NEW PLATE & FITUP & GRINDING
13 20780 KUMAR KAMI HELPER 8
14 18753 RABINDAR HELPER 8
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 GR1816 GENERATOR 10 3718 2
3 AC1669 AIR COMPRESSOR 10 3841.6 3
4 WM2094 WELDING MACHINE 10 1849.7 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# ARAMCO TIMESHEET REPORTING DATE 27-Feb-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 101 Direct / Part of PERMIT START 6:55:00
L.I. Description MPI TEST ON WELD JOINTS PERMIT CLOSED 18:30:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 3 TAKE PERMIT
2 19069 DINESH HELPER 8 3 CLEANING THE WELD JOINTS USING POWER BRUSH (GRINDER) 100 M
3 19344 RAJ HELPER 8 3 EQUIPMENT STANDBY MAN
4 11997 GIRI P.F 8 3 D DOOR STANDBY MAN
5 23329 NITIN BLASTER 8 3 CLEANING THE WELD JOINTS USING POWER BRUSH (GRINDER) 100 M
6 13520 PANDIT HELPER 8 3 CLEANING THE WELD JOINTS USING POWER BRUSH (GRINDER) 100 M
7 23520 KHALID HELPER 8 3 CLEANING THE WELD JOINTS USING POWER BRUSH (GRINDER) 90 M
8 20776 DHAN HELPER 8 3 CLEANING THE WELD JOINTS USING POWER BRUSH (GRINDER) 90 M
9 23205 MEK HELPER 8 3
10 20991 CHAUHAN WELDER 8 2 WELDING ON REPAIR AREA NEW PLATE (3 PASS ) 10 M
11 5354 MUTHU FAB 8 2 FIRE WATCH AND ASSISTING FABRICATOR
12 FABRICATE NEW PLATE & FITUP & GRINDING
13 20780 KUMAR KAMI HELPER 8
14 18753 RABINDAR HELPER 8
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 GR1816 GENERATOR 10 3718 2
3 AC1669 AIR COMPRESSOR 10 3841.6 3
4 WM2094 WELDING MACHINE 10 1849.7 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# ARAMCO TIMESHEET REPORTING DATE 28-Feb-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 101 Direct / Part of PERMIT START 6:55:00
L.I. Description MPI TEST ON WELD JOINTS & SEAL FABRIC NUD BOLT TIGHTING & WELDING PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 TAKE PERMIT
2 20776 DHAN HELPER 8 CLEANING THE WELD JOINTS USING POWER BRUSH (GRINDER) 50 M
3 19344 RAJ HELPER 8 EQUIPMENT STANDBY MAN
4 11997 GIRI P.F 8 D DOOR STANDBY MAN
5 23329 NITIN BLASTER 8 CLEANING THE WELD JOINTS USING POWER BRUSH (GRINDER) 50 M
6 13520 PANDIT HELPER 8 CLEANING THE WELD JOINTS USING POWER BRUSH (GRINDER) 50 M
7 23520 KHALID HELPER 8 CLEANING THE WELD JOINTS USING POWER BRUSH (GRINDER) 50 M
8
9
10 20991 CHAUHAN WELDER 8 WELDING ON REPAIR AREA INSPECTOR COME AND
11 5354 MUTHU FAB 8 GRIND OUT INSPECTOR MARKED AREA AND HELP WELDER INSPECT THE AREA.
12
13
14 23213 LALLU RAM HELPER 8 SEAL FABRIC NUT AND BOLT TIGHTNING 25 M
15 11448 CHITRA HELPER 8 SEAL FABRIC NUT AND BOLT TIGHTNING 25 M
16 23580 JUDAL P.F 8 SEAL FABRIC NUT AND BOLT TIGHTNING 25 M
17 20947 SHYAM HELPER 8 SEAL FABRIC NUT AND BOLT TIGHTNING 25 M
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 GR1816 GENERATOR 8 3725 2
3 AC1669 AIR COMPRESSOR 8 3848.6 3
4 WM2094 WELDING MACHINE 6 1849.7 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# ARAMCO TIMESHEET REPORTING DATE 29-Feb-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 101 Direct / Part of PERMIT START 6:55:00
L.I. Description MPI TEST ON WELD JOINTS & SEAL FABRIC NUD BOLT TIGHTING & WELDING PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 2 TAKE PERMIT
2 11997 GIRI P.F 8 2 D DOOR STANDBY MAN
3 19344 RAJ HELPER 8 2 EQUIPMENT STANDBY MAN
4 19069 DINESH HELPER 8 2 SEAL FABRIC NUT AND BOLT TIGHT 40 M
5 23329 NITIN BLASTER 8 2 SEAL FABRIC NUT AND BOLT TIGHT 40 M
6 13520 PANDIT HELPER 8 2 SEAL FABRIC NUT AND BOLT TIGHT 40 M
7
8 20991 CHAUHAN WELDER 8 WORKING WITH ARAMCO INSPECTION DEPT ( MARKED AREA WELD AND GRIND)
9 5354 MUTHU FAB 8 WORKING WITH ARAMCO INSPECTION DEPT ( MARKED AREA GRIND)
10 23205 MEK HELPER 8 CLEANING FOR INSPECTION INSPECTOR COME AND
11 INSPECT THE AREA.
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 GR1816 GENERATOR 8 3731 2
3 AC1669 AIR COMPRESSOR 8 3854.6 3
4 WM2094 WELDING MACHINE 8 1855.7 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# REPORTING DATE 1-Mar-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 101 Direct / Part of PERMIT START 6:55:00
L.I. Description INSPECTION PERMIT CLOSED 16:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 TAKE PERMIT
2 11997 GIRI P.F 8 D DOOR STANDBY MAN
3 19344 RAJ HELPER 8 EQUIPMENT STANDBY MAN
4 23327 NEELKANTH PAINTER 8 SHIFTING MATERIALS 40 M
5 23329 NITIN BLASTER 8 SHIFTING MATERIALS 40 M
6 23205 MEK HELPER 8 FIRE WATCH 40 M
7 20991 CHAUHAN WELDER 8 WELDING ON CUTTED COUPON PLATE
8 WORKING WITH ARAMCO INSPECTION DEPT ( MARKED AREA WELD AND GRIND)
9
10 INSPECTOR COME AND
11 INSPECT THE AREA.
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 GR1816 GENERATOR 8 3736 2
3 AC1669 AIR COMPRESSOR 8 3859.6 3
4 WM2094 WELDING MACHINE 8 1860.7 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 300 REPORTING DATE 2-Mar-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 101 Direct / Part of PART OF PERMIT START 6:55:00
L.I. Description MARINE HOSE CONNECTION FOR HYDRO TEST PERMIT CLOSED 20:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 4 TAKE PERMIT
2 13936 JIMMY OPRTR 8 4 MARINE HOSE SHIFTING & CONNECTING
3 13520 PANDIT HELPER 8 4 MARINE HOSE CONNECTION (USE FORKLIFT) NUT & BOLT HAND TIGHT 12 EA
4 16678 SELVA RAJ MASON 8 4 MARINE HOSE CONNECTION (USE FORKLIFT) NUT & BOLT HAND TIGHT
5 5354 MUTHU FAB 8 4 MARINE HOSE CONNECTION (USE FORKLIFT) NUT & BOLT HAND TIGHT
6
7 SHIFTING LIGHTS & MATERIALS INSIDE TO OUTSIDE THE TANK
8
9
10 INSPECTOR COME AND
11 INSPECT THE AREA.
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 GR1816 GENERATOR 7 3745 2
3 AC1669 AIR COMPRESSOR 7 3868.6 3
4 WM2094 WELDING MACHINE IDLE 1860.7 4
5 FL 909 FORKLIFT 10 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 300 REPORTING DATE 2-Mar-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 101 Direct / Part of PART OF PERMIT START 6:50:00
L.I. Description ASSIST MARINE HOSE CONNECTION PERMIT CLOSED 14:45:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 22620 RAMESH HELPER 8 OPEN NUT AND BOLT REMOVE AIR BLOWER 1 EA
2 23206 KUSHI RAM HELPER 8
3 24949 BISHNU S.F 8 CLOSE MANWAY 1 EA
4 24878 RAJESHWAR S.F 8
5 23214 BHAKTA HELPER 8 ASSIST FOR SHIFT MATERIALS
6 23211 YAM HELPER 8
7 21051 HIRA HELPER 8 ASSIST FOR MARINE HOSE CONNECTION
8 20885 MOHAN S.F 8
9 20719 MAN B HELPER 8
10 11997 GIRI P.F 8 D DOOR STANDBY MAN
11 19344 RAJ HELPER 8 EQUIPMENT STANDBY MAN
12 20991 CHAUHAN WELDER 8 ASSIST FOR INSPECTION
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 160 REPORTING DATE 3-Mar-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1057483 TIME REACHED CONTROL ROOM 18:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT / PART OF PERMIT START 19:05:00
L.I. Description SAND SHIFTING & LEVELLING PERMIT CLOSED 4:30:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 2 TAKE PERMIT
2 16678 SELVA RAJ MASON 8 2 SAND SHIFTING OUTSIDE TO INSIDE THE TANK 25 5 M³
3 13520 PANDIT HELPER 8 2 SAND SHIFTING OUTSIDE TO INSIDE THE TANK
4 14457 KRISHNA P.F 8 2 SAND SHIFTING OUTSIDE TO INSIDE THE TANK
5 21258 RAJ S.F 8 2 SAND SHIFTING OUTSIDE TO INSIDE THE TANK
6 25042 BUDAN HELPER 8 2 SAND SHIFTING OUTSIDE TO INSIDE THE TANK
7 23153 TEK HELPER 8 2 SAND SHIFTING OUTSIDE TO INSIDE THE TANK
8 24592 DINESH S.F 8 2 SAND LEVELLING 25 5 M³
9 24913 BOGINDRA S.F 8 2 SAND LEVELLING
10 25324 SIVARANJAN HELPER 8 2 D DOOR STANDBY MAN
11 25318 PASKARAN HELPER 8 2 EQUIPMENT STANDBY MAN
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1669 AIR COMPRESSOR 9 3880.4 1


2 GR1865 GENERATOR 9 1693 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 160 REPORTING DATE 4-Mar-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1057483 TIME REACHED CONTROL ROOM 18:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT / PART OF PERMIT START 19:05:00
L.I. Description SAND SHIFTING & LEVELLING PERMIT CLOSED 4:30:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 2 TAKE PERMIT
2 16678 SELVA RAJ MASON 8 2 SAND SHIFTING OUTSIDE TO INSIDE THE TANK 15 5 20 M³
3 13520 PANDIT HELPER 8 2 SAND SHIFTING OUTSIDE TO INSIDE THE TANK
4 14457 KRISHNA P.F 8 2 SAND SHIFTING OUTSIDE TO INSIDE THE TANK
5 25324 SIVARANJAN HELPER 8 2 D DOOR STANDBY MAN
6 25318 PASKARAN HELPER 8 2 EQUIPMENT STANDBY MAN
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1669 AIR COMPRESSOR 8 3894.4 1


2 GR1865 GENERATOR 8 1707 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 160 REPORTING DATE 5-Mar-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1057483 TIME REACHED CONTROL ROOM 18:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT / PART OF PERMIT START 19:05:00
L.I. Description SAND SHIFTING & LEVELLING PERMIT CLOSED 4:30:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 2 TAKE PERMIT
2 16678 SELVA RAJ MASON 8 2 SAND SHIFTING OUTSIDE TO INSIDE THE TANK 25 5 30 M³
3 13520 PANDIT HELPER 8 2 SAND SHIFTING OUTSIDE TO INSIDE THE TANK
4 14457 KRISHNA P.F 8 2 SAND SHIFTING OUTSIDE TO INSIDE THE TANK
5 21258 RAJ S.F 8 2 SAND SHIFTING OUTSIDE TO INSIDE THE TANK
6 25042 BUDAN HELPER 8 2 SAND SHIFTING OUTSIDE TO INSIDE THE TANK
7 20882 MAN HELPER 8 2 SAND SHIFTING OUTSIDE TO INSIDE THE TANK
8 24592 DINESH S.F 8 2 SAND LEVELLING 25 5 30 M³
9 24913 BOGINDRA S.F 8 2 SAND LEVELLING
10 25329 RUBEN HELPER 8 2 SAND LEVELLING
11 25318 PASKARAN HELPER 8 2 EQUIPMENT STANDBY MAN
12 25324 SIVARANJAN HELPER 8 2 D DOOR STANDBY MAN
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1669 AIR COMPRESSOR 8.5 3909 1


2 GR1865 GENERATOR 8.5 1720 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 160 REPORTING DATE 5-Mar-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1057483 TIME REACHED CONTROL ROOM 18:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT / PART OF PERMIT START 19:05:00
L.I. Description SAND SHIFTING & LEVELLING PERMIT CLOSED 3:45:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 TAKE PERMIT
2 16678 SELVA RAJ MASON 8 SAND LEVELLING 15 15 M³
3 13520 PANDIT HELPER 8 SAND LEVELLING
4 14457 KRISHNA P.F 8 SAND SHIFTING OUTSIDE TO INSIDE THE TANK 17 17 M³
5 21258 RAJ S.F 8 SAND SHIFTING OUTSIDE TO INSIDE THE TANK
6 25323 GUNATHEEBAN HELPER 8 SAND SHIFTING OUTSIDE TO INSIDE THE TANK
7 20882 MAN HELPER 8 SAND SHIFTING OUTSIDE TO INSIDE THE TANK
8 24592 DINESH S.F 8 SAND LEVELLING
9 24913 BOGINDRA S.F 8 SAND LEVELLING
10 25329 RUBEN HELPER 8 SAND LEVELLING
11 25318 PASKARAN HELPER 8 EQUIPMENT STANDBY MAN
12 25324 SIVARANJAN HELPER 8 D DOOR STANDBY MAN
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1669 AIR COMPRESSOR 7.5 3925.9 1


2 GR1865 GENERATOR 7.5 1735 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 60 REPORTING DATE 8-Mar-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1055131 TIME REACHED CONTROL ROOM 18:45:00
TANK NUMBER NJBP 116 Direct / Part of PART OF PERMIT START 19:05:00
L.I. Description BOTTOM PLATE SHIFTING TO INSIDE THE TANK & ARRANGE PERMIT CLOSED 4:35:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 2 TAKE PERMIT
2 16678 SELVA RAJ MASON 8 2 BOTTOM PLATE SHIFTING TO INSIDE THE TANK & ARRANGE EXACT LOCATIONS 12 4.5 16.5 TON
3 13520 PANDIT HELPER 8 2 BOTTOM PLATE SHIFTING TO INSIDE THE TANK & ARRANGE EXACT LOCATIONS
4 14457 KRISHNA P.F 8 2 BOTTOM PLATE SHIFTING TO INSIDE THE TANK & ARRANGE EXACT LOCATIONS
5 21258 RAJ S.F 8 2 BOTTOM PLATE SHIFTING TO INSIDE THE TANK & ARRANGE EXACT LOCATIONS
6 25323 GUNATHEEBAN HELPER 8 2 BOTTOM PLATE SHIFTING TO INSIDE THE TANK & ARRANGE EXACT LOCATIONS
7 20882 MAN HELPER 8 2 BOTTOM PLATE SHIFTING TO INSIDE THE TANK & ARRANGE EXACT LOCATIONS
8 24592 DINESH S.F 8 2 BOTTOM PLATE SHIFTING TO INSIDE THE TANK & ARRANGE EXACT LOCATIONS
9 24913 BOGINDRA S.F 8 2 BOTTOM PLATE SHIFTING TO INSIDE THE TANK & ARRANGE EXACT LOCATIONS
10 25324 SIVARANJAN HELPER 8 2 BOTTOM PLATE SHIFTING TO INSIDE THE TANK & ARRANGE EXACT LOCATIONS
11 25318 PASKARAN HELPER 8 2 EQUIPMENT STANDBY MAN
12 25329 RUBEN HELPER 8 2 D DOOR STANDBY MAN
13
14 PLATE SHIFTING 15 5 20 PLATE
15 PLATE SIZE - 6 M * 2.5 M * 0.007 M
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1669 AIR COMPRESSOR 2 3930.5 1


2 GR1865 GENERATOR 8.5 1746 2
3 AC1519 AIR COMPRESSOR 6.5 3921 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 60 REPORTING DATE 9-Mar-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1055131 TIME REACHED CONTROL ROOM 18:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT AND PART OFF PERMIT START 19:05:00
L.I. Description BOTTOM PLATE SHIFTING TO INSIDE THE TANK & ARRANGE PERMIT CLOSED 4:35:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 2 TAKE PERMIT
2 16678 SELVA RAJ MASON 8 2 BOTTOM PLATE ARRANGING FOR FITUP 10 4.5 14.5 TON
3 13520 PANDIT HELPER 8 2 BOTTOM PLATE ARRANGING FOR FITUP
4 14457 KRISHNA P.F 8 2 BOTTOM PLATE ARRANGING FOR FITUP
5 21258 RAJ S.F 8 2 BOTTOM PLATE ARRANGING FOR FITUP
6 25323 GUNATHEEBAN HELPER 8 2 BOTTOM PLATE ARRANGING FOR FITUP
7 20882 MAN HELPER 8 2 BOTTOM PLATE ARRANGING FOR FITUP
8 24592 DINESH S.F 8 2 BOTTOM PLATE ARRANGING FOR FITUP
9 24913 BOGINDRA S.F 8 2 BOTTOM PLATE ARRANGING FOR FITUP
10 25324 SIVARANJAN HELPER 8 2 FIRE WATCH
11 21197 GUNJA HELPER 8 2 LIFTING ROOF LEGS FOR PLATE FITUP
12 11448 CHITRA HELPER 8 2 LIFTING ROOF LEGS FOR PLATE FITUP
13 25318 PASKARAN HELPER 8 2 EQUIPMENT STANDBY MAN
14 25329 RUBEN HELPER 8 2 D DOOR STANDBY MAN
15 19470 NOOR ALAM FAB 8 2 BOTTOM PLATE MARK AND FITUP 10 4.5 14.5 TON
16 21865 NAUSAD FAB 8 2 BOTTOM PLATE MARK AND FITUP
17 24613 WILLIAM FAB 8 2 PLATE QUANTITY 12 4 16 PLATE
18 21855 HARI CHARAN WELDER 8 2 WELDING FOR PLATE FITUP
19 22494 ABDUL WELDER 8 2 WELDING FOR PLATE FITUP
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1669 AIR COMPRESSOR 8.5 3945.7 1


2 GR1865 GENERATOR 8.5 1760 2
3 WM2094 WELDING MACHINE 8.5 1897.7 3
4 WM1194 WELDING MACHINE 8.5 9982.8 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 50 REPORTING DATE 10-Mar-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1056028 TIME REACHED CONTROL ROOM 18:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT AND PART OFF PERMIT START 19:05:00
L.I. Description OLD BOTTOM PLATE CUTTING & SHIFTING TO OUTSIDE PERMIT CLOSED 4:35:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 2 TAKE PERMIT
2 13520 PANDIT HELPER 8 2 OLD BOTTOM PLATE PULLING OUTSIDE AROUND 45 M 7 PLATE
3 24913 BOGINDRA S.F 8 2 OLD BOTTOM PLATE PULLING OUTSIDE AROUND 45 M
4 14457 KRISHNA P.F 8 2 OLD BOTTOM PLATE PULLING OUTSIDE AROUND 45 M
5 21258 RAJ S.F 8 2 OLD BOTTOM PLATE PULLING OUTSIDE AROUND 45 M
6 25323 GUNATHEEBAN HELPER 8 2 OLD BOTTOM PLATE PULLING OUTSIDE AROUND 45 M
7 20882 MAN HELPER 8 2 OLD BOTTOM PLATE PULLING OUTSIDE AROUND 45 M
8 21197 GUNJA HELPER 8 2 OLD BOTTOM PLATE PULLING OUTSIDE AROUND 45 M
9 16678 SELVA RAJ MASON 8 2 OLD BOTTOM PLATE PULLING OUTSIDE AROUND 45 M
10 25324 SIVARANJAN HELPER 8 2 FIRE WATCH
11 25318 PASKARAN HELPER 8 2 EQUIPMENT STANDBY MAN
12 25329 RUBEN HELPER 8 2 D DOOR STANDBY MAN
13 19470 NOOR ALAM FAB 8 2 OLD BOTTOM PLATE CUTTING 70 10 80 M
14 21865 NAUSAD FAB 8 2
15 21855 HARI CHARAN WELDER 8 WAITING FOR INSPECTION ( FOR PLATE FITUP PROCESS ) .AFTER INSPECTION
16 22494 ABDUL WELDER 8 ACCEPTED WE PERFORM WELDING
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1669 AIR COMPRESSOR 8 3952.7 1


2 GR1865 GENERATOR 8 1767 2
3 WM2094 WELDING MACHINE IDLE 1904.7 3
4 WM1194 WELDING MACHINE IDLE 9989.8 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 50 & 60 REPORTING DATE 11-Mar-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1056028 & 1055131 TIME REACHED CONTROL ROOM 18:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT AND PART OFF PERMIT START 19:05:00
L.I. Description OLD BOTTOM PLATE CUTTING & SHIFTING TO OUTSIDE & NEW PLATE SHIFT AND FITUP PERMIT CLOSED 4:35:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 2 TAKE PERMIT
2 13520 PANDIT HELPER 8 2 OLD BOTTOM PLATE PULLING TO OUTSIDE & NEW PLATE BRING INSIDE 12 5 17 PLATE
3 24913 BOGINDRA S.F 8 2 OLD BOTTOM PLATE PULLING TO OUTSIDE & NEW PLATE BRING INSIDE
4 14457 KRISHNA P.F 8 2 OLD BOTTOM PLATE PULLING TO OUTSIDE & NEW PLATE BRING INSIDE
5 21258 RAJ S.F 8 2 OLD BOTTOM PLATE PULLING TO OUTSIDE & NEW PLATE BRING INSIDE
6 25323 GUNATHEEBAN HELPER 8 2 OLD BOTTOM PLATE PULLING TO OUTSIDE & NEW PLATE BRING INSIDE
7 20882 MAN HELPER 8 2 OLD BOTTOM PLATE PULLING TO OUTSIDE & NEW PLATE BRING INSIDE
8 21197 GUNJA HELPER 8 2 OLD BOTTOM PLATE PULLING TO OUTSIDE & NEW PLATE BRING INSIDE
9 16678 SELVA RAJ MASON 8 2 OLD BOTTOM PLATE PULLING TO OUTSIDE & NEW PLATE BRING INSIDE
10 25324 SIVARANJAN HELPER 8 2 FIRE WATCH
11 25318 PASKARAN HELPER 8 2 EQUIPMENT STANDBY MAN
12 25329 RUBEN HELPER 8 2 D DOOR STANDBY MAN
13 19470 NOOR ALAM FAB 8 2 OLD BOTTOM PLATE CUTTING 60 10 70 M
14 21865 NAUSAD FAB 8 2 OLD BOTTOM PLATE CUTTING 30 M
15 BOTTOM PLATE MARKING & FITUP 4.2 TON
16 22494 ABDUL WELDER 8 BOTTOM PLATE FITUP
17 21855 HARI CHARAN WELDER 8 BOTTOM PLATE FITUP
18 WAITING FOR INSPECTION ACCEPTANCE FOR WELDING WORKS
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1669 AIR COMPRESSOR 8 3967.7 1


2 GR1865 GENERATOR 8 1779 2
3 WM2094 WELDING MACHINE 6 1908 3
4 WM1194 WELDING MACHINE 6 10000 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 50 REPORTING DATE 12-Mar-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1056028 TIME REACHED CONTROL ROOM 18:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT PERMIT START 19:05:00
L.I. Description OLD BOTTOM PLATE CUTTING & SHIFTING TO OUTSIDE PERMIT CLOSED 4:35:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 2 TAKE PERMIT
2 13520 PANDIT HELPER 8 2 OLD BOTTOM PLATE PULLING TO OUTSIDE 13 3 16 PLATE
3 24913 BOGINDRA S.F 8 2 OLD BOTTOM PLATE PULLING TO OUTSIDE
4 14457 KRISHNA P.F 8 2 OLD BOTTOM PLATE PULLING TO OUTSIDE
5 16678 SELVA RAJ MASON 8 2 OLD BOTTOM PLATE PULLING TO OUTSIDE
6 25323 GUNATHEEBAN HELPER 8 2 OLD BOTTOM PLATE PULLING TO OUTSIDE
7 20882 MAN HELPER 8 2 OLD BOTTOM PLATE PULLING TO OUTSIDE
8 25324 SIVARANJAN HELPER 8 2 OLD BOTTOM PLATE PULLING TO OUTSIDE
9 25318 PASKARAN HELPER 8 2 OLD BOTTOM PLATE PULLING TO OUTSIDE
10 25329 RUBEN HELPER 8 2 D DOOR STANDBY MAN
11 19470 NOOR ALAM FAB 8 2 OLD BOTTOM PLATE CUTTING 40 M
12 21865 NAUSAD FAB 8 2 OLD BOTTOM PLATE CUTTING 40 M
13 BOTH ASSIST FOR PLATE PULLING
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1669 AIR COMPRESSOR 2 3969.4 1


2 GR1865 GENERATOR 8 1793 2
3 AC1519 AIR COMPRESSOR 6 3934 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 70 REPORTING DATE 11-Mar-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1081190 TIME REACHED CONTROL ROOM 18:45:00
TANK NUMBER NJBP 116 Direct / Part of PART OFF PERMIT START 19:05:00
L.I. Description BOTTOM PLATE TACK WELD PERMIT CLOSED 4:35:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1
2
3 21855 HARI CHARAN WELDER 8 2 BOTTOM PLATE TACK WELDING 55 20 75 M
4 21258 RAJ S.F 8 2 HAMMERING FOR TACK WELD
5 22494 ABDUL WELDER 8 2 BOTTOM PLATE TACK WELDING 55 20 75 M
6 21197 GUNJA HELPER 8 2 HAMMERING FOR TACK WELD
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 WM2094 WELDING MACHINE 8 1916.2 1


2 WM1194 WELDING MACHINE 8 10009.4 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 70 REPORTING DATE 14-Mar-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1081190 TIME REACHED CONTROL ROOM 18:45:00
TANK NUMBER NJBP 116 Direct / Part of PART OFF PERMIT START 19:05:00
L.I. Description BOTTOM PLATE TACK WELD PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 TAKE PERMIT
2 22494 ABDUL WELDER 8 BOTTOM PLATE TACK WELDING 40 M
3 21197 GUNJA HELPER 8 HAMMERING FOR TACK WELD
4 21855 HARI CHARAN WELDER 8 BOTTOM PLATE TACK WELDING 40 M
5 21258 RAJ S.F 8 HAMMERING FOR TACK WELD
6 25318 PASKARAN HELPER 8 EQUIPMENT STANDBY MAN
7 25329 RUBEN HELPER 8 D DOOR STANDBY MAN
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 WM2094 WELDING MACHINE 7 1928.1 1


2 WM1194 WELDING MACHINE 7 10016.7 2
3 AC1669 AIR COMPRESSOR 7 3982.3 3
4 GR1865 GENERATOR 7 1805 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# REPORTING DATE 17/3/2020

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM 18:45:00
TANK NUMBER NJBP 101 Direct / Part of PERMIT START 19:05:00
L.I. Description RE HYDRO TEST PERMIT CLOSED 7:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 16678 SELVA RAJ MASON 8 4 TK 101 STANDBY
2 13520 PANDIT HELPER 8 4 TK 106 STANDBY
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 70 & 80 REPORTING DATE 15-Mar-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1081190 & 1054480 TIME REACHED CONTROL ROOM 18:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT PERMIT START 19:05:00
L.I. Description BOTTOM PLATE WELD & GRINDING PERMIT CLOSED 4:35:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 2 TAKE PERMIT
2 25329 RUBEN HELPER 8 2 D DOOR STANDBY MAN
3 21855 HARI CHARAN WELDER 8 2 BOTTOM PLATE WELDING ( 3 PASS ) 12 2 14 M
4 21914 CHANDRA HELPER 8 2 BOTTOM PLATE GRINDING ( 3 TIMES ) 12 2 14 M
5 22494 ABDUL WELDER 8 2 BOTTOM PLATE WELDING ( 3 PASS ) 12 3 15 M
6 21197 GUNJA HELPER 8 2 BOTTOM PLATE GRINDING ( 3 TIMES ) 12 3 15 M
7 21395 BHIMYA WELDER 8 2 BOTTOM PLATE WELDING ( 3 PASS ) 12 2 14 M
8 23153 TEK HELPER 8 2 BOTTOM PLATE GRINDING ( 3 TIMES ) 12 2 14 M
9 21258 RAJ S.F 8 2 FIRE WATCH & ASSIST WELDERS FOR ARRANGE ELECTRODE
10 25318 PASKARAN HELPER 8 2 EQUIPMENT STANDBY MAN
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 WM2094 WELDING MACHINE 8 1941.6 1


2 WM1693 WELDING MACHINE 8 7134.3 2
3 GR1865 GENERATOR 8 1817 3
4 AC1519 AIR COMPRESSOR 8 3941.5 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 70 & 80 REPORTING DATE 17-Mar-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1081190 & 1054480 TIME REACHED CONTROL ROOM 18:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT PERMIT START 19:15:00
L.I. Description BOTTOM PLATE WELD & GRINDING PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 TAKE PERMIT
2 25329 RUBEN HELPER 8 D DOOR STANDBY MAN
3 21855 HARI CHARAN WELDER 8 BOTTOM PLATE WELDING ( 3 PASS ) 5 5 M
4 21914 CHANDRA HELPER 8 BOTTOM PLATE GRINDING ( 3 TIMES ) 5 5 M
5 22494 ABDUL WELDER 8 BOTTOM PLATE WELDING ( 3 PASS ) 5 5 M
6 21197 GUNJA HELPER 8 BOTTOM PLATE GRINDING ( 3 TIMES ) 5 5 M
7 21395 BHIMYA WELDER 8 BOTTOM PLATE WELDING ( 3 PASS ) 5 5 M
8 23153 TEK HELPER 8 BOTTOM PLATE GRINDING ( 3 TIMES ) 5 5 M
9 21258 RAJ S.F 8 ASSIST WELDERS FOR ARRANGE ELECTRODE
10 25318 PASKARAN HELPER 8 EQUIPMENT STANDBY MAN
11 14457 KRISHNA P.F 8 FIRE WATCH
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 WM2094 WELDING MACHINE 8 1955.9 1


2 WM1693 WELDING MACHINE 8 7147.1 2
3 GR1865 GENERATOR 8 1830 3
4 AC1669 AIR COMPRESSOR 8 4002.7 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 50 REPORTING DATE 18-Mar-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1056028 TIME REACHED CONTROL ROOM 18:45:00
TANK NUMBER NJBP 116 Direct / Part of PART OF PERMIT START 19:05:00
L.I. Description BOTTOM PLATE WELD JOINTS CUTTING PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 19470 NOOR ALAM FAB 8 BOTTOM PLATE WELD JOINTS CUTTING
2 21865 NAUSAD FAB 8 BOTTOM PLATE WELD JOINTS CUTTING
3 24613 WILLIAM FAB 8 BOTTOM PLATE WELD JOINTS CUTTING
4 14457 KRISHNA P.F 8 FIRE WATCH
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 140 REPORTING DATE 22-Mar-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1000302 TIME REACHED CONTROL ROOM 18:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT PERMIT START 19:15:00
L.I. Description ASHPALT BREAK OUT ( JACK HAMMERING ) PERMIT CLOSED 4:30:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 2 TAKE PERMIT
2 25329 RUBEN HELPER 8 2 D DOOR STANDBY MAN
3 25318 PASKARAN HELPER 8 2 EQUIPMENT STANDBY MAN
4 21258 RAJ S.F 8 2 ASHBHALT BREAKED OUT (JACK HAMMERING ) 5 2.2 7.2 M³
5 15019 NARESH MANDAL HELPER 8 2 ASHBHALT BREAKED OUT (JACK HAMMERING )
6 20882 MAN HELPER 8 2 ASHBHALT BREAKED OUT (JACK HAMMERING )
7 24592 DINESH S.F 8 2 ASHBHALT BREAKED OUT (JACK HAMMERING )
8 24913 BOGINDRA S.F 8 2 ASHBHALT BREAKED OUT (JACK HAMMERING )
9 13520 PANDIT HELPER 8 2 ASHBHALT BREAKED OUT (JACK HAMMERING ) 5 2.2 7.2 M³
10 16678 SELVA RAJ MASON 8 2 ASHBHALT BREAKED OUT (JACK HAMMERING )
11 25330 CHANDRU HELPER 8 2 ASHBHALT BREAKED OUT (JACK HAMMERING )
12 25042 BUDAN HELPER 8 2 ASHBHALT BREAKED OUT (JACK HAMMERING )
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 GR1865 GENERATOR 8 1896 1


2 AC1669 AIR COMPRESSOR 8 4074 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 70 & 80 REPORTING DATE 23-Mar-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1081190 & 1054480 TIME REACHED CONTROL ROOM 18:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT PERMIT START 19:05:00
L.I. Description BOTTOM PLATE WELD & GRINDING PERMIT CLOSED 4:30:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 2 TAKE PERMIT
2
3 21855 HARI CHARAN WELDER 8 2 BOTTOM PLATE WELDING ( 3 PASS ) 12 2 14 M
4
5 21914 CHANDRA HELPER 8 2 BOTTOM PLATE GRINDING ( 3 TIMES ) 12 2 14 M
6
7
8 22494 ABDUL WELDER 8 2 BOTTOM PLATE WELDING ( 3 PASS ) 12 2 14 M
9
10 21197 GUNJA HELPER 8 2 BOTTOM PLATE GRINDING ( 3 TIMES ) 12 2 14 M
11
12 25329 RUBEN HELPER 8 2 D DOOR STANDBY MAN
13 25318 PASKARAN HELPER 8 2 EQUIPMENT STANDBY MAN
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 WM1693 WELDING MACHINE 8 7219.6 2
3 WM2094 WELDING MACHINE 8 2033.2 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 50 & 60 REPORTING DATE 23-Mar-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1056028 & 1055131 TIME REACHED CONTROL ROOM 18:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT PERMIT START 19:15:00
L.I. Description ASHPALT BREAK OUT ( JACK HAMMERING ) PERMIT CLOSED 4:30:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 19470 NOOR ALAM FAB 8 2 OLD ANNULAR PLATE CUTTING 10 M
2 21865 NAUSAD FAB 8 2 OLD ANNULAR PLATE CUTTING 10 M
3 SHELL GRINDING FOR FITUP 12 M
4 ANNULAR PLATE FITUP 1 EA
5 21395 BHIMYA WELDER 8 TACK WELD
6
7 14457 KRISHNA P.F 8 2 FIRE WATCH & ASSIST WELDERS FOR FITUP
8
9 15019 NARESH MANDAL HELPER 8 CIMEND MIXED SAND SHIFTING TO INSIDE ( AROUND 90 M ) 1.5 M³
10 25330 CHANDRU HELPER 8 ARRANGE PLATE FOR FITUP
11 25331 ROHANATHAS HELPER 8 JACK HAMMERING ASHPALT FOR ANNULAR PLATE FITUP
12 25323 GUNATHEEBAN HELPER 8 SHIFTING ASHPALT OUTSIDE 1 M³
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 GR1865 GENERATOR 8 1910 1


2 AC1669 AIR COMPRESSOR 8 4088.6 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 140 REPORTING DATE 24-Mar-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1000302 TIME REACHED CONTROL ROOM 18:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT PERMIT START 19:15:00
L.I. Description ASHPALT BREAK OUT ( JACK HAMMERING ) PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8
2
3 19470 NOOR ALAM FAB 8 NEW ANNULAR PLATE GRINDING & BEVELLING BOTH END 14 M
4 21865 NAUSAD FAB 8
5 21395 BHIMYA WELDER 8
6 22494 ABDUL WELDER 8
7 21855 HARI CHARAN WELDER 8
8 14457 KRISHNA P.F 8 ASHPALT BREAK OUT ( JACK HAMMERING ) 8 M³
9 15019 NARESH MANDAL HELPER 8 ASHPALT BREAK OUT ( JACK HAMMERING )
10 25330 CHANDRU HELPER 8 ASHPALT BREAK OUT ( JACK HAMMERING )
11 25331 ROHANATHAS HELPER 8 ASHPALT BREAK OUT ( JACK HAMMERING )
12 21914 CHANDRA HELPER 8 ASHPALT BREAK OUT ( JACK HAMMERING )
13 21197 GUNJA HELPER 8 ASHPALT BREAK OUT ( JACK HAMMERING )
14
15 25329 RUBEN HELPER 8
16 25318 PASKARAN HELPER 8
17
18 25323 GUNATHEEBAN HELPER 4 4 GOING TO ARAMCO CLINIC
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 GR1865 GENERATOR 8 1924 1


2 AC1669 AIR COMPRESSOR 8 4100 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 90 REPORTING DATE 29-Mar-20

SERVICE ORDER NO. 6510894318 Service Line Item# 1052024 TIME REACHED CONTROL ROOM 18:45:00
TANK NUMBER NJBP 101(NIGHT) Direct / Part of DIRECT / PART OF PERMIT START 19:00:00 PM
L.I. Description BLASTING OF BOTTOM PLATE PERMIT CLOSED 5:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN ENGR/WPR 8 2 TAKE PERMIT
2
3 6170 NOBLE BLASTER 8 2 BOTTOM PLATE GRIT BLASTING 600 175 775 FT²
4 15575 BUDAN BLASTER 8 2 BOTTOM PLATE GRIT BLASTING 600 175 775 FT²
5 20" COLOUM BLASTING 1 EA
6
7 18961 UDIM BLASTER 8 2 BOTTOM PLATE GRIT BLASTING 600 45 645 FT²
8 18796 HANIPH BLASTER 8 2 BOTTOM PLATE GRIT BLASTING 600 45 645 FT²
9 FIBRE COATED SHELL BLASTING 105 FT²
10 20" COLOUM BLASTING 3 EA
2945 FT² = 274 M²
11
12 13520 PANDIT HELPER 8 2 GRIT FILLING ON SAND PORT 1 0.4 1.4 TON
13 16678 SELVA RAJ MASON 8 2 GRIT FILLING ON SAND PORT 1 0.4 1.4 TON
14 20882 MAN HELPER 8 2 GRIT FILLING ON SAND PORT 1 0.4 1.4 TON
15
16 20487 KHURSHID HELPER 8 2 EQUIPMENT STANDBYMAN
17 22962 PREM HELPER 8 2 D DOOR STANDBYMAN
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 GR1816 GENERATOR 8 3838 1 90 GRIT COAL SLAG SAND SA2.5 3-Jan TON
2 AC1670 AIR COMPRESSOR 8 7045.8 2
3 AC1669 AIR COMPRESSOR 8 4153.7 3
4 AC1197 AIR COMPRESSOR 8 5602.3 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 130 REPORTING DATE 29-Mar-20

SERVICE ORDER NO. 6510894318 Service Line Item# 1055131 TIME REACHED CONTROL ROOM 18:45:00
TANK NUMBER NJBP 101(NIGHT) Direct / Part of DIRCT/PART OF PERMIT START 19:00:00 PM
L.I. Description DRIP PLATE FITUP & TACK WELDING PERMIT CLOSED 5:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24059 RASHID WPR 8 2 TAKE PERMIT
2 19470 NOOR ALAM FAB 8 2 DRIP PLATE FITUP ( GAS CUT & ARRANGE ) 5 EA
3 21855 HARI CHARAN WELDER 8 TACK WELD ON DRIP PLATE
4 21865 NAUSHAD FAB 8
5
6 14457 KRISHNA P.F 8 2 FIRE WATCH & FILLING GRIT
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 WM1714 WELDING MACHINE 7 5744 1


2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 130 REPORTING DATE 2-Apr-20

SERVICE ORDER NO. 6510894318 Service Line Item# 1055131 TIME REACHED CONTROL ROOM 18:45:00
TANK NUMBER NJBP 101(NIGHT) Direct / Part of DIRECT PERMIT START 19:00:00 PM
L.I. Description DRIP PLATE WELDING ( 2.5 MM ROD ) PERMIT CLOSED 5:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN WPR 8 2 TAKE PERMIT
2 21395 BHIMYA WELDER 8 2 DRIP PLATE WELDING (2.5 MM ROD ) 10 3.5 13.5 M
3 21855 HARI CHARAN WELDER 8 2 DRIP PLATE WELDING (2.5 MM ROD ) 10 3 13 M
4 20925 SOMESWAR WELDER 8 2 DRIP PLATE WELDING (2.5 MM ROD ) 10 3 13 M
5 13520 PANDIT HELPER 8 2 DRIP PLATE GRINDING ( 2 TIMES ) 10 3 13 M
6 21914 CHANDRA HELPER 8 2 DRIP PLATE GRINDING ( 2 TIMES ) 10 3 13 M
7 22322 PREM HELPER 8 2 DRIP PLATE GRINDING ( 2 TIMES ) 10 3.5 13.5 M
8 14457 KRISHNA P.F 8 2 FIRE WATCH
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 WM1714 WELDING MACHINE 8 5789.8 1


2 WM2094 WELDING MACHINE 8 2107.1 2
3 GR1816 GENERATOR 8 3892 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 120 & 140 REPORTING DATE 15-Apr-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1091341 & 1000302 TIME REACHED CONTROL ROOM 18:45:00
TANK NUMBER NJBP 116 Direct / Part of PART OF PERMIT START 19:05:00
L.I. Description NEW ANNULAR PLATE FABRICATION PERMIT CLOSED 4:05:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 2 TAKE PERMIT
2 12491 JIMYGEL FAB 8 2 OLD ANNULAR PLATE CUTTING UNDER THE SHELL 12 M
3 24455 JOVETO FAB 8 2 SHELL DOWN SIDE GRINDING FOR PLATE FITUP 12 M
4 NEW ANNULAR PLATE GRINDING 10 M
5 23594 SHAJITH HELPER 8 2 ASHPALT & CONCRETE BREAK OUT ( USING JACK HAMMER ) 1.2 M³
6 15562 RAMLAL HELPER 8 2 SHIFTING BREAKED ASHPALT TO OUTSIDE ( WHEEL BARROW ) - AROUND 60 M 1.2 M³
7 20680 ZAHID HELPER 8 2 SHIFTING CEMENT MIXED SAND TO INSIDE(WHEEL BARROW) - AROUND 90 M 1.2 M³
8
9 11997 GIRI HELPER 8 2 D DOOR STANDBY MAN
10 12875 BISHESWAR HELPER 8 2 EQUIPMENT STANDBY MAN
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 GR1865 GENERATOR 8 1938 1


2 AC1519 AIR COMPRESSOR 8 3986.5 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 120 & 50 REPORTING DATE 16-Apr-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1091341 & 1056028 TIME REACHED CONTROL ROOM 18:45:00
TANK NUMBER NJBP 116 Direct / Part of PART OF PERMIT START 19:05:00
L.I. Description BOTTOM SKETCH PLATE CUTING & SHIFTING TO OUTSIDE & ANNULAR FITUP WORK PERMIT CLOSED 4:05:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 TAKE PERMIT
2 12491 JIMYGEL FAB 8 ANNLAR PLATE FITUP
3 24455 JOVETO FAB 8 BOTTOM PLATE CUTTING & REMVOVE
4 20925 SOMESWAR RAO WELDER 8 ASSIST FABRICATOR FOR FITUP
5 21892 OM PRAKASH WELDER 8
6 15562 RAMLAL HELPER 8 BOTTOM SKETCH PLATE SHIFTING TO OUTSIDE ( AROUND 45 M ) - 5 EA 2 TON
7 20680 ZAHID HELPER 8
8 23594 SHAJITH HELPER 8 LIFTING ROOF LEGS FOR REMOVE PLATE 4 EA
9 11997 GIRI HELPER 8
10 12875 BISHESWAR HELPER 8
11 21914 CHNDRA HELPER 8
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 GR1865 GENERATOR 7.2 1948 1


2 AC1519 AIR COMPRESSOR 7.2 3996.3 2
3 WM1714 WELDING MACHINE 2 5829.7 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# REPORTING DATE 18-Apr-20

SERVICE ORDER NO. 6510894318 Service Line Item# TIME REACHED CONTROL ROOM 18:45:00
TANK NUMBER NJBP 101 Direct / Part of PERMIT START 19:05:00
L.I. Description TANK INTERNAL FLOAING ROOF & COLOUM SEAL INSTALLATION PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8
2 12491 JIMYGEL FAB 8 COLOUM SEAL CUTTING ( 10 SETS ) 20 EA
3 24455 JOVETO FAB 8 COLOUM SEAL INSTALLATION ( 4 SETS ) 8 EA
4 20925 SOMESWAR RAO WELDER 4 4
5 21892 OM PRAKASH WELDER 4 4
6 21395 BHIMYA WELDER 4 4
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 270 REPORTING DATE 19-Apr-20

SERVICE ORDER NO. 6510894318 Service Line Item# 1091339 TIME REACHED CONTROL ROOM 18:45:00
TANK NUMBER NJBP 101 Direct / Part of PART OF PERMIT START 19:05:00
L.I. Description DRIP PLATE WELDING ( INSPECTOR MARKED AREA ) PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8
2 12491 JIMYGEL FAB 8 GRINDING ON MARKED LOCATIONS 10 M
3 24455 JOVETO FAB 8
4 20925 SOMESWAR RAO WELDER 8 DRIP PLATE WELDING ( INSPECTOR MARKED AREA ) - 15 LOCATIONS
5 21892 OM PRAKASH WELDER 8
6 21395 BHIMYA WELDER 8 DRIP PLATE WELDING ( INSPECTOR MARKED AREA ) 10 M
7 12875 BISHESWAR HELPER 8 FIRE WATCH
8 15562 RAMLAL HELPER 8
9 SHIFTING WELDING MACHINE MANUALLY
10 FROM TANK 116 TO TANK 101
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 WM294 WELDING MACHINE 2088 7.5 1


2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 120 REPORTING DATE 20-Apr-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1091341 TIME REACHED CONTROL ROOM 18:45:00
TANK NUMBER NJBP 116 Direct / Part of PART OF PERMIT START 19:05:00
L.I. Description OLD ANNULAR PLATE CUTTING & FIT UP PERMIT CLOSED 4:05:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 TAKE PERMIT
2 12491 JIMYGEL FAB 8 OLD ANNULAR PLATE CUTTING UNDER THE SHELL 12 M
3 24455 JOVETO FAB 8 ANNULAR PLATE FITUP
4 20925 SOMESWAR RAO WELDER 8
5 23594 SHAJITH HELPER 8 2 ASHPALT & CONCRETE BREAK OUT ( USING JACK HAMMER ) 1.2 M³
6 21051 HIRA HELPER 8 2 SHIFTING BREAKED ASHPALT TO OUTSIDE ( WHEEL BARROW ) - AROUND 60 M 1.2 M³
7 20680 ZAHID HELPER 8 2 SHIFTING CEMENT MIXED SAND TO INSIDE(WHEEL BARROW) - AROUND 90 M 1.2 M³
8 23205 KUSHIRAM HELPER 8 2 GAS CYLINDER SHIFTING
9 SHIFTING CUTTED ANNULAR PLATE TO OUTSIDE
10 23213 LALLURAM HELPER 8 2 EQUIPMENT STANDBY MAN
11 11997 GIRI HELPER 8 2 D DOOR STANDBY MAN
12
13 21892 OM PRAKASH WELDER 8
14 21395 BHIMYA WELDER 8
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 GR1865 GENERATOR 8 1963 1


2 AC1519 AIR COMPRESSOR 8 4010.7 2
3 WM1606 WELDING MACHINE 8 6263.1 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 120 REPORTING DATE 21-Apr-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1091341 TIME REACHED CONTROL ROOM 18:45:00
TANK NUMBER NJBP 116 Direct / Part of PART OF PERMIT START 19:05:00
L.I. Description OLD ANNULAR PLATE CUTTING & FIT UP PERMIT CLOSED 4:05:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 2 TAKE PERMIT
2 12491 JIMYGEL FAB 8 2 NEW ANNULAR PLATE FITUP & GRINDING NEW PLATE 1 EA
3 24455 JOVETO FAB 8 2 OLD ANNULAR PLATE CUTTING & GRINDING 12 M
4 20925 SOMESWAR RAO WELDER 8 TACK WELD
5 23594 SHAJITH HELPER 8 2 ASHPALT & CONCRETE BREAK OUT ( USING JACK HAMMER ) 1.2 M³
6 21051 HIRA HELPER 8 2 SHIFTING BREAKED ASHPALT TO OUTSIDE ( WHEEL BARROW ) - AROUND 60 M 1.2 M³
7 20680 ZAHID HELPER 8 2 SHIFTING CEMENT MIXED SAND TO INSIDE(WHEEL BARROW) - AROUND 90 M 1.2 M³
8 23206 KUSHIRAM HELPER 8 2 GAS CYLINDER SHIFTING
9 SHIFTING CUTTED ANNULAR PLATE TO OUTSIDE
10 UNLOAD MATERIALS FROM BOOM TRUCK FROM YANBU ( ALL HELPERS) 1 LOAD
11 11997 GIRI HELPER 8 2 D DOOR STANDBY MAN
12 23213 LALLURAM HELPER 8 2 EQUIPMENT STANDBY MAN
13 21892 OM PRAKASH WELDER 8
14 21395 BHIMYA WELDER 8
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 GR1865 GENERATOR 8 1969 1


2 AC1519 AIR COMPRESSOR 8 4018 2
3 WM1606 WELDING MACHINE 8 6269.6 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 120 REPORTING DATE 22-Apr-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1091341 TIME REACHED CONTROL ROOM 18:45:00
TANK NUMBER NJBP 116 Direct / Part of PART OF PERMIT START 19:05:00
L.I. Description OLD ANNULAR PLATE CUTTING & FIT UP PERMIT CLOSED 4:05:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 2 TAKE PERMIT
2 12491 JIMYGEL FAB 8 NEW ANNULAR PLATE MARKING AND CUTTING 1 EA
3 24455 JOVETO FAB 8 2 OLD ANNULAR PLATE CUTTING ( 8 MM ) & ASSISTING HELPER 16 M
4 20925 SOMESWAR RAO WELDER 8
5 23594 SHAJITH HELPER 8 2 ASHPALT & CONCRETE BREAK OUT ( USING JACK HAMMER ) 1.2 M³
6 21051 HIRA HELPER 8 2 SHIFTING BREAKED ASHPALT TO OUTSIDE ( WHEEL BARROW ) - AROUND 60 M 1.2 M³
7 20680 ZAHID HELPER 8 2 SHIFTING ANNULAR PLATE ( 6*2.5* 0.008 ) INSIDE MANUALLY 0.9 TON
8 23206 KUSHIRAM HELPER 8 2 SHIFTING CUTTED ANNULAR PLATE TO OUTSIDE 0.5 TON
9 11997 GIRI HELPER 8 2 D DOOR STANDBY MAN
10 23213 LALLURAM HELPER 8 2 EQUIPMENT STANDBY MAN
11 21892 OM PRAKASH WELDER 8
12 21395 BHIMYA WELDER 8
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 GR1865 GENERATOR 8 1980 1


2 AC1519 AIR COMPRESSOR 8 4030.6 2
3 WM2094 WELDING MACHINE 8 2159.1 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 120 & 140 REPORTING DATE 23-Apr-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1091341 & 1000302 TIME REACHED CONTROL ROOM 18:45:00
TANK NUMBER NJBP 116 Direct / Part of PART OF & DIRECT PERMIT START 19:05:00
L.I. Description ANNULAR PLATE FABRICATION & ASHPALT BREAK PERMIT CLOSED 4:05:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 2 TAKE PERMIT
2 12491 JIMYGEL FAB 8 2 NEW ANNULAR PLATE MARKING AND CUTTING & BEVELLING 14 M
3 24455 JOVETO FAB 8 2 OLD ANNULAR PLATE CUTTING ( 8 MM PLATE ) & ASSISTING HELPER 16 M
4
5 23594 SHAJITH HELPER 8 2 ASHPALT & CONCRETE BREAK OUT ( USING JACK HAMMER ) 1.2 M³
6 21051 HIRA HELPER 8 2 SHIFTING BREAKED ASHPALT TO OUTSIDE ( WHEEL BARROW ) - AROUND 60 M 1.2 M³
7 20680 ZAHID HELPER 8 2 SHIFTING CEMENT MIXING SAND TO INSIDE 1.2 M³
8 23206 KUSHIRAM HELPER 8 2 SHIFTING CUTTED ANNULAR PLATE TO OUTSIDE 0.5 TON
9 11997 GIRI HELPER 8 2 D DOOR STANDBY MAN
10 23213 LALLURAM HELPER 8 2 EQUIPMENT STANDBY MAN
11 21892 OM PRAKASH WELDER 8
12 21395 BHIMYA WELDER 8
13 20925 SOMESWAR RAO WELDER 8
14
15 20719 MAN HELPER 8 ASHPALT BREAKING ( USING JACK HAMMER ) 4 M³
16 22962 PREM HELPER 8 ASHPALT BREAKING ( USING JACK HAMMER )
17 15019 NARESH HELPER 8 ASHPALT BREAKING ( USING JACK HAMMER )
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 GR1865 GENERATOR 8 1991 1


2 AC1669 AIR COMPRESSOR 8 4423.7 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 10 REPORTING DATE 24-Apr-20

SERVICE ORDER NO. 6510894318 Service Line Item# 1058358 TIME REACHED CONTROL ROOM 14:45:00
TANK NUMBER NJBP 101 Direct / Part of DIRECT PERMIT START 15:05:00
L.I. Description ANODE INSTALL & WELD BOLT PERMIT CLOSED 22:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 TAKE PERMIT
2 12491 JIMYGEL FAB 8 MARKING & GRINDING FOR ANODE INSTALLATION - 84 BOLTS 21 EA
3 24455 JOVETO FAB 8 FIXING BOLT & NUT ARRANGE ANODE EXACT LOCATION - 84 BOLTS
4 21395 BHIMYA WELDER 8 WELDING ANODE BOLT - 52 BOLT 14 EA
5 20719 MAN HELPER 8 SHIFTING ANODE OUTSIDE TOINSIDE
6 21051 HIRA HELPER 8 SHIFTING ANODE OUTSIDE TOINSIDE
7 15019 NARESH HELPER 8 ASSIST WELDER & FABRICATOR FOR ARRANGE & WELDING
8 23206 KUSHIRAM HELPER 8 ASSIST WELDER & FABRICATOR FOR ARRANGE & WELDING
9 11997 GIRI HELPER 8 D DOOR STATNDBY MAN
10 23213 LALLURAM HELPER 8 EQUIPMENT STANDBY MAN
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 GR1816 GENERATOR 7 4159 1


2 AC1519 AIR COMPRESSOR 7 4431.8 2
3 WM2094 WELDING MACHINE 7 2175 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 120 & 140 REPORTING DATE 25-Apr-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1091341 & 1000302 TIME REACHED CONTROL ROOM 18:45:00
TANK NUMBER NJBP 116 Direct / Part of PART OF & DIRECT PERMIT START 19:05:00
L.I. Description ANNULAR PLATE FABRICATION & ASHPALT BREAK PERMIT CLOSED 4:05:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 2 TAKE PERMIT
2 12491 JIMYGEL FAB 8 2 OLD ANNULAR PLATE CUTTING ( 8 MM PLATE ) 12 M
3 24455 JOVETO FAB 8 2 ANNULAR PLATE GRINDING 12 M
4 NEW ANNULAR PLATE FIT UP 1 EA
5 20925 SOMESWAR RAO WELDER 8 TACK WELD FOR FIT UP
6 21051 HIRA HELPER 8 2 ASHPALT BREAKING ( USING JACK HAMMER ) 4 M³
7 23206 KUSHIRAM HELPER 8 2 SHIFTING NEW ANNULAR PLATE TO INSIDE 6*2.5*0.008 0.9 TON
8 20719 MAN HELPER 8 2 ASSISTING FABRICATOR FOR FITUP WORK
9 23594 SHAJITH HELPER 8 2 SHIFTING CUTTED ANNULAR PLATE TO INSIDE ( MANUALLY) 0.4 TON
10 22962 PREM HELPER 8 2 EQUIPMENT STANDBY MAN
11 11997 GIRI HELPER 8 2 D DOOR STANDBY MAN
12 21395 BHIMYA WELDER 8 ASSISTING FABRICATOR
13 21892 OM PRAKASH WELDER 8 NO WORK
14 15019 NARESH HELPER 8 2 ASHPALT BREAKING ( USING JACK HAMMER )
15
16
17
18
19 20680 ZAHID HELPER 8 TARANSFER TO YANBU
20 23213 LALLURAM HELPER 8 HE DON’T HAVE SPECIAL PERMISSION LETTER
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 GR1865 GENERATOR 8 1997 1


2 AC1612 AIR COMPRESSOR 8 4014.8 2
3 WM1606 WELDING MACHINE 8 6289.6 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 120 & 140 REPORTING DATE 26-Apr-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1091341 & 1000302 TIME REACHED CONTROL ROOM 18:45:00
TANK NUMBER NJBP 116 Direct / Part of PART OF & DIRECT PERMIT START 19:05:00
L.I. Description ANNULAR PLATE FABRICATION & ASHPALT BREAK PERMIT CLOSED 4:05:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 2 TAKE PERMIT
2 12491 JIMYGEL FAB 8 OLD ANNULAR PLATE CUTTING ( 8 MM PLATE ) 13 M
3 24455 JOVETO FAB 8 NEW ANNULAR PLATE GRINDING & SHELL GRINDING 26 M
4 20925 SOMESWAR RAO WELDER 8 ARRANGE PLATE FOR FITUP
5 20680 ZAHID HELPER 8 ASSIST FABRICATOR
6 21051 HIRA HELPER 8 2 ASHPALT BREAKING ( USING JACK HAMMER ) 1.2 M³
7 23206 KUSHIRAM HELPER 8 2 SHIFTING NEW ANNULAR PLATE TO INSIDE 6*2.5*0.008 0.9 TON
8 20719 MAN HELPER 8 2 SHIFTING BREAKED ASHPALT TO OUTSIDE 1.2 M³
9 23594 SHAJITH HELPER 8 2 SHIFTING CUTTED ANNULAR PLATE TO INSIDE ( MANUALLY) 0.4 TON
10 23213 LALLURAM HELPER 8 2 EQUIPMENT STANDBY MAN
11 11997 GIRI HELPER 8 2 D DOOR STANDBY MAN
12 15019 NARESH HELPER 8 2 CEMENT MIXING SAND BRING INSIDE 1.2 M³
13 22962 PREM HELPER 8 2
14
15
16 21395 BHIMYA WELDER 8 NO WELDING WORK IN THE TANK
17 21892 OM PRAKASH WELDER 8
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 GR1865 GENERATOR 8 2008 1


2 AC1612 AIR COMPRESSOR 8 4025.9 2
3 WM1606 WELDING MACHINE 8 6300 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 120 REPORTING DATE 28-Apr-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1091341 TIME REACHED CONTROL ROOM 5:45:00
TANK NUMBER NJBP 116 Direct / Part of PART OF PERMIT START 6:10:00
L.I. Description ANNULAR PLATE FABRICATION PERMIT CLOSED 2:10:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 TAKE PERMIT
2 19135 AWDESH FAB 8 ANNULAR PLATE CUTTING 14 M
3 23807 GERRY FAB 8 ANNULAR PLATE GRINDING 14 M
4 20988 MANAN WELDER 8 ASSISTING FABRICATOR FOR FITUP WORKS
5 23210 BALRAI HELPER 8 FIRE WATCH
6 21197 GUNJA HELPER 8 ASSISTING FABRICATOR FOR SHIFTING CYLINDER & PLATE INSTALLATION
7 20776 DHAN HELPER 8 EQUIPMENT STANDBY MAN
8 20432 MISHRA HELPER 8 D DOOR STANDBY MAN
9
10 ALL HELPERS PERFORMING HOUSE KEEPING AROUND THE TANK UNTILL 8 O CLK
11 AS PER ARAMCO ISSUER INSTRUCTION
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 GR1865 GENERATOR 8 2016 1


2 AC1670 AIR COMPRESSOR 8 7266.4 2
3 WM1606 WELDING MACHINE 8 6307.7 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 120 & 140 & 80 REPORTING DATE 29-Apr-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1091341 & 1000302 & 1054480 TIME REACHED CONTROL ROOM 5:45:00
TANK NUMBER NJBP 116 Direct / Part of PART OF & DIRECT PERMIT START 6:05:00
L.I. Description ANNULAR PLATE FABRICATION & INSTALLATION & ASHPALT BREAK & GRINDING PERMIT CLOSED 3:05:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 2 TAKE PERMIT
2 19135 AWDESH FAB 8 2 OLD ANNULAR PLATE CUTTING 24 M
3 23807 GERRY FAB 8 2 NEW ANNULAR PLATE MARKING & CUTTING 14 M
4 20991 CHAUHAN WELDER 8 2 SHELL GRINDING ( IN & OUT SIDE ) 12 M
5 NEW ANNULAR PLATE GRINDING 14 M
6 NEW ANNULAR PLATE FITUP & TACK WELD 1 EA
7 22322 PREM HELPER 8 2 ASHBALT & CONCRETE BREAK OUT ( JACK HAMMER 1.2 M³
8 23205 MEK HELPER 8 2 ASHBALT & CONCRETE BREAK OUT
9 ASSISTING FABRICATOR FOR PULLING PLATES
10 22620 RAMESH HELPER 8 2 BREAKED ASHPALT SHIFTING TO OUTSIDE 1.2 M³
11 21197 GUNJA HELPER 8 2 CEMENT MIXING SAND SHIFTING INSIDE 1.2 M³
12 ASSISTING FABRICATOR FOR PULLING PLATES
13 11997 GIRI HELPER 8 2 D DOOR STANDBY MAN
14 20776 DHAN HELPER 8 2 EQUIPMENT STANDBY MAN
15 12875 BISESWAR HELPER 8 FIRE WATCH
16
17
18 20925 SOMESWAR RAO WELDER 8
19 21892 OM PRAKASH WELDER 8
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 GR1865 GENERATOR 8 2027 1


2 AC1670 AIR COMPRESSOR 8 7278.4 2
3 WM1606 WELDING MACHINE 8 6319.7 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 50 & 60 REPORTING DATE 30-Apr-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1056028 & 1055131 TIME REACHED CONTROL ROOM 5:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT PERMIT START 6:05:00
L.I. Description BOTTOM SKETCH PLATE FIT UP PERMIT CLOSED 3:05:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 2 TAKE PERMIT
2 19135 AWDESH FAB 8 2 SKETCH PLATE GRINDING & FIT UP 15 M
3 23807 GERRY FAB 8 2 BOTTOM SKETCH PLATE FIT UP - 5 EA 1.7 TON
4 21055 LIBRES FAB 8 2
5 19470 NOOR FAB 6 BOTTOM SKETCH PLATE MARKING & CUTTING 15 M
6 21865 NAUSHAD FAB 6
7 20991 CHAUHAN WELDER 8 TACK WELD FOR FITUP
8 23205 MEK HELPER 8 2 LIFTING ROOF LEG ( USE HYDRAULIC JACK ) 4 EA
9 22322 PREM HELPER 8 2 SHIFTING PLATES ( AROUND ) 40 M FOR FIT UP - 5 EA 1.7 TON
10 22620 RAMESH HELPER 8 2 ASSISTING FABRICATORS FOR FIT UP
11 21197 GUNJA HELPER 8 2 SHIFTING SCRAP PLATES TO NEAE DIKE WALL
12 21914 CHANDRA HELPER 8 2
13 11997 GIRI HELPER 8 2 D DOOR STANDBY MAN
14 20776 DHAN HELPER 8 2 EQUIPMENT STANDBY MAN
15 12875 BISESWAR HELPER 8 FIRE WATCH
16
17
18 20925 SOMESWAR RAO WELDER 8
19 21892 OM PRAKASH WELDER 8
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 GR1865 GENERATOR 8 2039 1


2 AC1670 AIR COMPRESSOR 8 7289.5 2
3 WM1606 WELDING MACHINE 8 6332.5 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 50 & 60 REPORTING DATE 1-May-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1056028 & 1055131 TIME REACHED CONTROL ROOM 5:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT PERMIT START 6:05:00
L.I. Description BOTTOM SKETCH PLATE FIT UP PERMIT CLOSED 2:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 TAKE PERMIT
2 19135 AWDESH FAB 8 SKETCH PLATE GRINDING & FIT UP 20 M
3 19470 NOOR FAB 8 BOTTOM SKETCH PLATE FIT UP - 5 EA 2 TON
4 21865 NAUSHAD FAB 8 BOTTOM SKETCH PLATE MARKING & CUTTING 20 M
5 20991 CHAUHAN WELDER 8 TACK WELD FOR FITUP
6 20925 SOMESWAR RAO WELDER 8 ASSISTING FABRICATORS FOR FIT UP
7
8 12875 BISESWAR HELPER 8 LIFTING ROOF LEG ( USE HYDRAULIC JACK ) 4 EA
9 16678 SELVARAJ MASON 8 SHIFTING PLATES ( AROUND ) 40 M FOR FIT UP - 5 EA 1.7 TON
10 13520 PANDIT HELPER 8 ASSISTING FABRICATORS FOR FIT UP
11 SHIFTING SCRAP PLATES TO NEAE DIKE WALL 1.5 TON
12 FIRE WATCH
13 11997 GIRI HELPER 8 D DOOR STANDBY MAN
14 20776 DHAN HELPER 8 EQUIPMENT STANDBY MAN
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 GR1865 GENERATOR 8 2049 1


2 AC1670 AIR COMPRESSOR 8 7300.8 2
3 WM1606 WELDING MACHINE 8 6343.7 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 50 & 60 REPORTING DATE 2-May-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1056028 & 1055131 TIME REACHED CONTROL ROOM 5:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT PERMIT START 6:05:00
L.I. Description BOTTOM SKETCH PLATE FIT UP PERMIT CLOSED 3:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 2 TAKE PERMIT
2 19135 AWDESH FAB 8 2 SKETCH PLATE GRINDING & FIT UP 26 M
3 19470 NOOR FAB 8 2 BOTTOM SKETCH PLATE FIT UP - 6 EA 3.2 TON
4 21865 NAUSHAD FAB 8 2 BOTTOM SKETCH PLATE MARKING & CUTTING 26 M
5 23807 GERRY FAB 8 2
6 20991 CHAUHAN WELDER 8 2 TACK WELD FOR FITUP & ASSIST FABRICATOR FOR FIT UP
7 PULL PLATES
8 12875 BISESWAR HELPER 8 2 LIFTING ROOF LEG ( USE HYDRAULIC JACK ) 4 EA
9 16678 SELVARAJ MASON 8 2 SHIFTING PLATES ( AROUND ) 40 M FOR FIT UP - 5 EA 1.7 TON
10 13520 PANDIT HELPER 8 2 ASSISTING FABRICATORS FOR FIT UP
11 22620 RAMESH HELPER 8 2 SHIFTING SCRAP PLATES TO NEAE DIKE WALL 1.5 TON
12 FIRE WATCH
13 11997 GIRI HELPER 8 2 D DOOR STANDBY MAN
14 20776 DHAN HELPER 8 2 EQUIPMENT STANDBY MAN
15
16 20925 SOMESWAR RAO WELDER 8 2 BOTTOM PLATE STICH WELDING 50 M
17 21197 GUNJA HELPER 8 2 HAMMERING FOR STICH WELD
18
19 21892 OM PRAKASH WELDER 8
20 21855 HARICHARAN WELDER 8
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 GR1865 GENERATOR 8 2055 1


2 AC1670 AIR COMPRESSOR 8 7307.2 2
3 WM1606 WELDING MACHINE 8 6350 3
4 WM1192 WELDING MACHINE 8 7903.2 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 140 REPORTING DATE 2-May-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1000302 TIME REACHED CONTROL ROOM 5:45:00
TANK NUMBER NJBP 116 Direct / Part of PART OFF PERMIT START 6:05:00
L.I. Description ASPHALT BREAK OUT ( SHIFTING TO OUTSIDE ) PERMIT CLOSED 3:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 23421 SARFUDIN S.O 6 2 HANDLING TK-116 ,TK-110
2
3 13936 JIMMY OPERATOR 8 2 SHIFTING ASPHALT TO OUTSIDE 14 M³
4 22322 PREM HELPER 8 2 ASSISTING BOBCAT OPERATOR
5 19344 RAJ KUMAR HELPER 8 2 ASSISTING BOBCAT OPERATOR
6 25329 RUBEN HELPER 8 2 ASSISTING BOBCAT OPERATOR
7 25318 PASKARAN HELPER 8 2 ASSISTING BOBCAT OPERATOR
8
9 SHIFTING BOTTOM PLATES INSIDE FOR FIT UP - 4 EA 2.4 TON
10 ALL HELPERS
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 SL1407 BOBCAT 8 2465 1


2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 50 & 60 & 70 REPORTING DATE 3-May-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1056028 & 1055131 & 1081190 TIME REACHED CONTROL ROOM 5:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT & PART OFF PERMIT START 6:05:00
L.I. Description BOTTOM SKETCH PLATE FIT UP PERMIT CLOSED 3:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 2 TAKE PERMIT
2 23421 SARFUDIN S.O 6 2
3 19470 NOOR FAB 6 BOTTOM SKETCH PLATE FIT UP - 1 EA 0.6 TON
4 21865 NAUSHAD FAB 6 SKETCH PLATE CUTTING & GRINDING & FIT UP 8 M
5 23807 GERRY FAB 8 2 NEW ANNULAR PLATE MARKING & CUTTING & GRINDING - 1 EA 14 M
6 21055 LIBRES FAB 8 2 OLD ANNULAR PLATE CUTTING & SHIFTING CYLINDER 10 M
7
8 20991 CHAUHAN WELDER 8 2 BOTTOM PLATE STICH WELDING 50 M
9 22322 PREM HELPER 8 2 HAMMERING FOR STICH WELD
10 21855 HARICHARAN WELDER 8 2 BOTTOM PLATE STICH WELDING 50 M
11 21197 GUNJA HELPER 8 2 HAMMERING FOR STICH WELD
12
13 11997 GIRI HELPER 8 2 D DOOR STANDBY MAN
14 20776 DHAN HELPER 8 2 EQUIPMENT STANDBY MAN
15
16 21892 OM PRAKASH WELDER 8
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 GR1865 GENERATOR 8 2068 1


2 AC1670 AIR COMPRESSOR 8 7319.2 2
3 WM1606 WELDING MACHINE 8 6362 3
4 WM1192 WELDING MACHINE 8 7915.2 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 140 REPORTING DATE 2-May-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1000302 TIME REACHED CONTROL ROOM 5:45:00
TANK NUMBER NJBP 116 Direct / Part of PART OFF PERMIT START 6:05:00
L.I. Description ASPHALT BREAK OUT PERMIT CLOSED 3:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 13936 JIMMY OPERATOR 8 2 SHIFTING SCRAP PLATES & FULL PLATES TO INSIDE
2 23205 MEK HELPER 8 2 ASPHALT BREAKING ( JACK HAMMERING ) 6 M³
3 13520 PANDIT HELPER 8 2
4 25329 RUBEN HELPER 8 PLATE SHIFTING TO INSIDE
5 25318 PASKARAN HELPER 8 SHIFT SCRAP PLATES TO OUTSIDE
6
7 21914 CHANDRA HELPER 8 SHIFTING CYLINDERS IN YARD ASSISTING BOOM TRUCK
8 19344 RAJ KUMAR HELPER 8 SHIFTING CYLINDERS IN YARD ASSISTING BOOM TRUCK
9
10 22620 RAMESH HELPER 8 SHIFTING CYLINDERS FROM TANK & ASSISTING BOOM TRUCK
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 FL909 FORKLIFT 8 578 1


2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 50 & 60 & 70 REPORTING DATE 4-May-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1056028 & 1055131 & 1081190 TIME REACHED CONTROL ROOM 5:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT & PART OFF PERMIT START 7:05:00
L.I. Description BOTTOM SKETCH PLATE FIT UP / BOTTOM PLATE WELDING PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 2 TAKE PERMIT
2 23421 SARFUDIN S.O 6 2
3 19470 NOOR FAB 6
4 21865 NAUSHAD FAB 6 SKETCH PLATE CUTTING & GRINDING & FIT UP 12 M
5 23807 GERRY FAB 8 2 OLD BOTTOM PLATE CUTTING 15 M
6 21055 LIBRES FAB 8 2 BOTTOM SKETCH PLATE FIT UP - 4 EA 2 TON
7 CHANGING CYLINDER - 2EA (SHIFT AROUND 40 M )
8 20991 CHAUHAN WELDER 8 2 BOTTOM PLATE WELDING( ROOT PASS ) & FIT UP &ASSIS FABRICATOR 15 M
9 20925 SOMESWAR RAO WELDER 8 BOTTOM PLATE WELDING( ROOT PASS ) 10 M
10
11 21197 GUNJA HELPER 8 2 CLEAN AROUND THE TANK FOR INSPECTION
12
13 11997 GIRI HELPER 8 2 D DOOR STANDBY MAN
14 20776 DHAN HELPER 8 2 EQUIPMENT STANDBY MAN
15 12875 BISESWAR HELPER 8 FIRE WATCH
16 21892 OM PRAKASH WELDER 8 ASSISTING FABRICATOR
17
18 23205 MEK HELPER 8 2 SHIFTING OLD BOTTOM PLATE TO OUTSIDE 1.5 TON
19 13520 PANDIT HELPER 8 2 SHIFTING SCRAP PLATES TO OUTSIDE 2.5 TON
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 GR1865 GENERATOR 8 2077 1


2 AC1670 AIR COMPRESSOR 8 7332.7 2
3 WM1606 WELDING MACHINE 8 6375.2 3
4 WM1192 WELDING MACHINE 8 7928.4 4
5 5
6 WM1714 WELDING MACHINE IDLE 6
7 AC1115 AIR COMPRESSOR IDLE 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 140 REPORTING DATE 4-May-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1000302 TIME REACHED CONTROL ROOM 5:45:00
TANK NUMBER NJBP 116 Direct / Part of PART OFF PERMIT START 7:05:00
L.I. Description ASPHALT BREAK OUT PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 22322 PREM HELPER 8 2 ASPHALT BREAKING ( JACK HAMMERING ) & TWIST ASPHALT
2 25329 RUBEN HELPER 8 2 ASPHALT BREAKING ( JACK HAMMERING ) & TWIST ASPHALT 8 3 11 M³
3 25318 PASKARAN HELPER 8 2 ASPHALT BREAKING ( JACK HAMMERING ) & TWIST ASPHALT
4 22620 RAMESH HELPER 8 2 ASPHALT BREAKING ( JACK HAMMERING ) & TWIST ASPHALT
5 25325 DANISTAN HELPER 8 2 ASPHALT BREAKING ( JACK HAMMERING ) & TWIST ASPHALT
6
7 13936 JIMMY OPERATOR 8 2 SHIFTING SCRAP PLATES & FULL PLATES TO INSIDE
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 FL909 FORKLIFT 8 578 1


2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 50 & 70 & 120 REPORTING DATE 5-May-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1056028 & 1081190 & 1091341 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT & PART OFF PERMIT START 7:05:00
L.I. Description BOTTOM PLATE WELDING / ANNULAR PLATE FIT UP / OLD PLATE CUTTING PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 2 TAKE PERMIT
2 23807 GERRY FAB 8 2 OLD ANNULAR PLATE CUTTING 12 M
3 21055 LIBRES FAB 8 2 NEW ANNULAR PLATE FIT UP 1 EA
4 OLD BOTTOM PLATE CUTTING 10 M
5 20991 CHAUHAN WELDER 8 2 BOTTOM PLATE STICH WELDING 70 M
6 22322 PREM HELPER 8 2 HAMMERING FOR STICH WELD
7 20925 SOMESWAR RAO WELDER 8 2 BOTTOM PLATE WELDING (ROOT PASS) 28 M
8 21892 OM PRAKASH WELDER 8 ANNULAR PLATE STICH WELD 40 M
9 21197 GUNJA HELPER 8 2 HAMMERING FOR STICH WELD
10
11 11997 GIRI HELPER 8 2 D DOOR STANDBY MAN
12 20776 DHAN HELPER 8 2 EQUIPMENT STANDBY MAN
13
14 23205 MEK HELPER 8 2 BREAKING ASPHALT & CONCRETE UNDER THE SHELL FOR ANNULAR PLATE FIT UP 1.2 M³
15 13520 PANDIT HELPER 8 2 SHIFTING BREAKED ASPHALT TO OUTSIDE 1.2 M³
16 SHIFTING CEMENT MIXED SAND TO INSIDE 1.2 M³
17 ASSISTING FABRICATOR FOR ANNULAR PLATE FIT UP
18 SHIFTING COUNTER WEIGHT BOXES TO INSIDE 5 EA
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 GR1865 GENERATOR 8 2088 1


2 AC1670 AIR COMPRESSOR 8 7345.5 2
3 WM1606 WELDING MACHINE 8 6387.8 3
4 WM1192 WELDING MACHINE 8 7940.9 4
5 WM1714 WELDING MACHINE IDLE 5838.4 5
6 AC1115 AIR COMPRESSOR IDLE 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 140 REPORTING DATE 4-May-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1000302 TIME REACHED CONTROL ROOM 5:45:00
TANK NUMBER NJBP 116 Direct / Part of PART OFF PERMIT START 7:05:00
L.I. Description ASPHALT BREAK OUT PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 13936 JIMMY OPERATOR 8 2 SHIFTING BREAKED ASPHALT TO OUTSIDE 12 3 15 M³
2 25329 RUBEN HELPER 8 2 SHIFTING ASPHALT ASSIST BOB CAT
3 25318 PASKARAN HELPER 8 2 SHIFTING ASPHALT ASSIST BOB CAT
4 22620 RAMESH HELPER 8 2 SHIFTING ASPHALT ASSIST BOB CAT
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 SL1407 BOBCAT 2911.7 HRS 1


2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 50 REPORTING DATE 6-May-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1056028 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT & PART OFF PERMIT START 7:05:00
L.I. Description BOTTOM PLATE WELDING PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 2 TAKE PERMIT
2 20991 CHAUHAN WELDER 8 2 BOTTOM PLATE STICH WELDING 70 M
3 22322 PREM HELPER 8 2 HAMMERING FOR STICH WELD
4 21892 OM PRAKASH WELDER 8 2 ANNULAR PLATE STICH WELD 50 M
5 21197 GUNJA HELPER 8 2 HAMMERING FOR STICH WELD
6 20925 SOMESWAR RAO WELDER 8 2 BOTTOM PLATE WELDING (FILLING & GAPPING) 16 M
7 13520 PANDIT HELPER 8 2 BOTTOM PLATE GRINDING ( 3 TIMES) 16 M
8
9 11997 GIRI HELPER 8 2 D DOOR STANDBY MAN
10 12875 BISESWAR HELPER 8 2 EQUIPMENT STANDBY MAN
11
12
13
14
15
16
17
18 23807 GERRY FAB 8 GOING TO MEDICAL
19 20776 DHAN HELPER 8 GOING TO MEDICAL
20 21055 LIBRES FAB 8 GOING TO MEDICAL
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 GR1865 GENERATOR 8 2101 1


2 AC1670 AIR COMPRESSOR 8 7359.3 2
3 WM1606 WELDING MACHINE 8 6401.4 3
4 WM1192 WELDING MACHINE 8 7954.5 4
5 WM1714 WELDING MACHINE IDLE 5838.7 5
6 AC1115 AIR COMPRESSOR IDLE 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 140 REPORTING DATE 6-May-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1000302 TIME REACHED CONTROL ROOM 5:45:00
TANK NUMBER NJBP 116 Direct / Part of PART OFF PERMIT START 7:05:00
L.I. Description ASPHALT SHIFTING TO OUTSIDE PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 13936 JIMMY OPERATOR 8 2 SHIFTING BREAKED ASPHALT TO OUTSIDE 12 3 15 M³
2 25329 RUBEN HELPER 8 2 SHIFTING ASPHALT ASSIST BOB CAT
3 25318 PASKARAN HELPER 8 2 SHIFTING ASPHALT ASSIST BOB CAT
4 23205 MEK HELPER 8 2 SHIFTING ASPHALT ASSIST BOB CAT
5 FIRE WATCH
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 SL1407 BOBCAT 2915 HRS 1


2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 140 REPORTING DATE 7-May-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1000302 TIME REACHED CONTROL ROOM 5:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT & PART OFF PERMIT START 7:05:00
L.I. Description ASPHALT SHIFTING TO OUTSIDE & ASPHALT BREAKING PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 13936 JIMMY OPERATOR 8 2 SHIFTING BREAKED ASPHALT TO OUTSIDE 12 3 15 M³
2 25329 RUBEN HELPER 8 2 ASPHALT BREAKING ( JACK HAMMERING ) 6 M³
3 25318 PASKARAN HELPER 8 2 ASPHALT BREAKING ( JACK HAMMERING )
4 21197 GUNJA HELPER 8 2 SHIFTING ASPHALT ASSIST BOB CAT
5 22620 RAMESH HELPER 8 2 SHIFTING ASPHALT ASSIST BOB CAT
6 21914 CHANDRA HELPER 8 2 OLD BOTTOM PLATE SHIFTING - 3 EA 2.1 TON
7
8 LOADING ASPHALT IN DUMP TRUCK 30 M³
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 SL1407 BOBCAT 2918 1


2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 70 & 80 REPORTING DATE 6-May-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1081190 & 1054480 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT & PART OFF PERMIT START 7:05:00
L.I. Description BOTTOM PLATE WELDING PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 2 TAKE PERMIT
2 20991 CHAUHAN WELDER 8 2 BOTTOM PLATE WELDING (3 PASS ) 11 3.5 14.5 M
3 22322 PREM HELPER 8 2 BOTTOM PLATE GRINDING ( 3 TIMES ) 11 3.5 14.5 M
4 21892 OM PRAKASH WELDER 8 2 ANNULAR PLATE(12MM) WELDING ( ROOT PASS ) 23 M
5 20925 SOMESWAR RAO WELDER 8 2 BOTTOM PLATE(12MM) WELDING (ROOT PASS) 23 M
6
7 11997 GIRI HELPER 8 2 D DOOR STANDBY MAN
8 20776 DHAN HELPER 8 2 EQUIPMENT STANDBY MAN
9
10
11
12
13
14
15
16
17
18
19 13520 PANDIT HELPER 8 GOING TO MEDICAL
20 23205 MEK HELPER 8 GOING TO MEDICAL
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 GR1865 GENERATOR 8 2113 1


2 AC1670 AIR COMPRESSOR 8 7372.8 2
3 WM1606 WELDING MACHINE 8 6411.1 3
4 WM1192 WELDING MACHINE 8 7967.8 4
5 WM1714 WELDING MACHINE IDLE 5842 5
6 AC1115 AIR COMPRESSOR IDLE 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 70 & 80 REPORTING DATE 8-May-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1081190 & 1054480 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT & PART OFF PERMIT START 7:05:00
L.I. Description BOTTOM PLATE WELDING PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 TAKE PERMIT
2 20991 CHAUHAN WELDER 8 BOTTOM PLATE WELDING (3 PASS ) 11 M
3 22322 PREM HELPER 8 BOTTOM PLATE GRINDING ( 3 TIMES ) 11 M
4 20925 SOMESWAR RAO WELDER 8 BOTTOM PLATE(12MM) WELDING (ROOT PASS) 21 M
5
6
7 11997 GIRI HELPER 8 D DOOR STANDBY MAN
8 12875 BISESWAR HELPER 8 EQUIPMENT STANDBY MAN
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 GR1865 GENERATOR 7 2123 1


2 AC1670 AIR COMPRESSOR 7 7383 2
3 WM1606 WELDING MACHINE IDLE 6411.1 3
4 WM1192 WELDING MACHINE 7 7978 4
5 WM1714 WELDING MACHINE 7 5849.5 5
6 AC1115 AIR COMPRESSOR IDLE 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 140 REPORTING DATE 8-May-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1000302 TIME REACHED CONTROL ROOM 5:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT & PART OFF PERMIT START 7:05:00
L.I. Description ASPHALT SHIFTING TO OUTSIDE & ASPHALT BREAKING PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 13936 JIMMY OPERATOR 8 SHIFTING BREAKED ASPHALT TO OUTSIDE 20 20 M³
2 25329 RUBEN HELPER 8 SHIFTING ASPHALT ASSIST BOB CAT (FILL ASPHALT ON BOB CAT )
3 25318 PASKARAN HELPER 8 SHIFTING ASPHALT ASSIST BOB CAT (FILL ASPHALT ON BOB CAT )
4 21197 GUNJA HELPER 8 SHIFTING ASPHALT ASSIST BOB CAT (FILL ASPHALT ON BOB CAT )
5 13520 PANDIT HELPER 8 SHIFTING ASPHALT ASSIST BOB CAT (FILL ASPHALT ON BOB CAT )
6 25042 BUDAN HELPER 8 SHIFTING ASPHALT ASSIST BOB CAT (FILL ASPHALT ON BOB CAT )
7
8 LOAD ASPHALT ON DUMP TRUCK 15 M³
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 SL1407 BOBCAT 2921.5 1


2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 140 REPORTING DATE 9-May-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1000302 TIME REACHED CONTROL ROOM 5:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT & PART OFF PERMIT START 7:05:00
L.I. Description ASPHALT SHIFTING TO OUTSIDE & ASPHALT BREAKING PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 2 TAKE PERMIT
2 13936 JIMMY OPERATOR 8 3 SHIFTING ASPHALT TO OUTSIDE THE TANK 15 15 30 M³
3 22620 RAMESH HELPER 8 3 FILLING ASPHALT ON BOBCAT
4 21914 CHANDRA HELPER 8 3 FILLING ASPHALT ON BOBCAT
5 13520 PANDIT HELPER 8 3 FILLING ASPHALT ON BOBCAT
6 LOADING ASPHALT IN DUMP TRUCK 15 M³
7 25329 RUBEN HELPER 8 2 ASPHALT BREAKING ( JACH HAMMER ) 8 3 11 M³
8 25318 PASKARAN HELPER 8 2 ASPHALT BREAKING ( JACH HAMMER )
9 23205 MEK HELPER 8 2 ASPHALT BREAKING ( JACH HAMMER )
10 19344 RAJ KUMAR HELPER 8 2 ASPHALT BREAKING ( JACH HAMMER )
11
12 11997 GIRI HELPER 8 2 D DOOR STANDBY MAN
13 20776 DHAN HELPER 8 2 EQUIPMENT STANDBY MAN
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 SL1407 BOBCAT 8 2927.2 1


2 GR1865 GENERATOR 8 2129 2
3 AC1670 AIR COMPRESSOR 8 7390 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 70 & 80 REPORTING DATE 9-May-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1081190 & 1054480 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT & PART OFF PERMIT START 7:05:00
L.I. Description BOTTOM PLATE WELDING PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1
2 20991 CHAUHAN WELDER 8 2 BOTTOM PLATE WELDING ( 3 PASS ) 3 M
3 SKETCH TO ANNULAR PLATE(12MM) WELDING ( ROOT PASS ) 12 M
4 20925 SOMESWAR RAO WELDER 8 2 SKETCH TO ANNULAR PLATE(12MM) WELDING ( ROOT PASS ) 20 M
5
6 21892 OM PRAKASH WELDER 8 2 ANNULAR PLATE WELDING 20 M
7
8 21197 GUNJA HELPER 8 2 GRINDING BEFORE WELDING ( ALL 3 WELDERS ) 40 M
9 ARRANGING WELDING ROD FOR ALL 3 WELDERS
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 WM1714 WELDING MACHINE 8 5855.4 1


2 WM1192 WELDING MACHINE 8 7984 2
3 WM1606 WELDING MACHINE IDLE 6411.1 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 140 REPORTING DATE 10-May-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1000302 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT & PART OFF PERMIT START 7:05:00
L.I. Description ASPHALT SHIFTING TO OUTSIDE & ASPHALT BREAKING PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 2 TAKE PERMIT
2 13936 JIMMY OPERATOR 8 2 SHIFTING ASPHALT TO OUTSIDE THE TANK 15 10 25 M³
3 13520 PANDIT HELPER 8 2 FILLING ASPHALT ON BOBCAT
4 21914 CHANDRA HELPER 8 2 FILLING ASPHALT ON BOBCAT
5 23205 MEK HELPER 8 2 FILLING ASPHALT ON BOBCAT
6 25318 PASKARAN HELPER 8 2 FILLING ASPHALT ON BOBCAT
7 25329 RUBEN HELPER 8 2 ASPHALT BREAKING ( JACH HAMMER ) 7 2 9 M³
8 22322 PREM HELPER 8 2 ASPHALT BREAKING ( JACH HAMMER )
9 21197 GUNJA HELPER 8 2 ASPHALT BREAKING ( JACH HAMMER )
10 22620 RAMESH HELPER 8 FLAG MAN ASPHALT SHIFING COMPLETED
11 20776 DHAN HELPER 8 2 EQUIPMENT STANDBY MAN 100%
12 11997 GIRI HELPER 8 2 D DOOR STANDBY MAN
13 LOADING ASPHALT IN DUMP TRUCK ( USE LOADER ) 30 M³
14 20991 CHAUHAN WELDER 8 ANNULAR PLATE GRINDING 6 M
15
16 20925 SOMESWAR RAO WELDER 8 ISSUER NOT ISSUING PERMIT FOR WELDING ( BEACAUSE OF BOBCAT WORKING ON
17 21892 OM PRAKASH WELDER 8 INSIDE )
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 SL1407 BOBCAT 8 2932.2 1


2 GR1865 GENERATOR 8 2141 2
3 AC1670 AIR COMPRESSOR 8 7402.2 3
4 WM1714 WELDING MACHINE IDLE 5863.6 4
5 WM1192 WELDING MACHINE IDLE 7992 5
6 WM1606 WELDING MACHINE IDLE 6411.1 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 140 REPORTING DATE 11-May-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1000302 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT & PART OFF PERMIT START 7:05:00
L.I. Description MARL SHIFTING TO OUTSIDE & MARL BREAKING PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 2 TAKE PERMIT
2 13936 JIMMY OPERATOR 8 2 SHIFTING MARL TO OUTSIDE THE TANK 15 5 20 M³
3 13520 PANDIT HELPER 8 2 MARL BREAKING ( JACK HAMMERING ) 10 5 15 M³
4 21914 CHANDRA HELPER 8 2 MARL BREAKING ( JACK HAMMERING )
5 23205 MEK HELPER 8 2 MARL BREAKING ( JACK HAMMERING )
6 25318 PASKARAN HELPER 8 2 MARL BREAKING ( JACK HAMMERING )
7 25329 RUBEN HELPER 8 2 MARL BREAKING ( JACK HAMMERING ) 8 5 13 M³
8 22322 PREM HELPER 8 2 MARL BREAKING ( JACK HAMMERING )
9 21197 GUNJA HELPER 8 2 MARL BREAKING ( JACK HAMMERING )
10 FLAG MAN
11 20776 DHAN HELPER 8 2 EQUIPMENT STANDBY MAN
12 11997 GIRI HELPER 8 2 D DOOR STANDBY MAN
13 LOADING ASPHALT IN DUMP TRUCK ( USE LOADER ) 30 M³
14 20991 CHAUHAN WELDER 8 ANNULAR PLATE GRINDING 9 M
15
16 20925 SOMESWAR RAO WELDER 8 ISSUER NOT ISSUING PERMIT FOR WELDING ( BEACAUSE OF BOBCAT WORKING ON
17 21892 OM PRAKASH WELDER 8 INSIDE )
18 THEY ARE NOT PERFORM GRINDING
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 SL1407 BOBCAT 8 2938 1


2 GR1865 GENERATOR 8 2153 2
3 AC1670 AIR COMPRESSOR 8 7415.6 3
4 WM1714 WELDING MACHINE IDLE 5863.6 4
5 WM1192 WELDING MACHINE IDLE 7992 5
6 WM1606 WELDING MACHINE IDLE 6411.1 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 130 REPORTING DATE 12-May-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1074566 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT & PART OFF PERMIT START 7:05:00
L.I. Description MARL SHIFTING TO OUTSIDE & MARL BREAKING PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 2 TAKE PERMIT
2 13936 JIMMY OPERATOR 8 2 SHIFTING MARL TO OUTSIDE THE TANK 15 5 20 M³
3 23205 MEK HELPER 8 2 MARL BREAKING ( JACK HAMMERING ) 10 3 13 M³
4 21914 CHANDRA HELPER 8 2 MARL BREAKING ( JACK HAMMERING )
5 22322 PREM HELPER 8 2 MARL BREAKING ( JACK HAMMERING )
6 25318 PASKARAN HELPER 8 2 MARL BREAKING ( JACK HAMMERING )
7 20776 DHAN HELPER 8 2 EQUIPMENT STANDBY MAN
8 11997 GIRI HELPER 8 2 D DOOR STANDBY MAN
9 20991 CHAUHAN WELDER 8 ANNULAR PLATE GRINDING 12 M
10 13520 PANDIT HELPER 8 GOING TO ARAMCO SAFETY MEETING
11 21197 GUNJA HELPER 8 GOING TO ARAMCO SAFETY MEETING
12 25329 RUBEN HELPER 8 GOING TO ARAMCO SAFETY MEETING
13 22620 RAMESH HELPER 8 GOING TO ARAMCO SAFETY MEETING
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 SL1407 BOBCAT 8 2943 1


2 GR1865 GENERATOR 8 2165 2
3 AC1670 AIR COMPRESSOR 8 7428 3
4 WM1714 WELDING MACHINE IDLE 5863.6 4
5 WM1192 WELDING MACHINE IDLE 7992 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 130 REPORTING DATE 13-May-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1074566 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT & PART OFF PERMIT START 7:05:00
L.I. Description MARL SHIFTING TO OUTSIDE & MARL BREAKING PERMIT CLOSED 4:30:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 2 TAKE PERMIT
2 23421 SARFUDIN S.O 6 2 SAFETY OFFICER
3 23205 MEK HELPER 8 2 MARL BREAKING ( JACK HAMMERING ) 10 3 13 M³
4 25329 RUBEN HELPER 8 2 MARL BREAKING ( JACK HAMMERING )
5 22322 PREM HELPER 8 2 MARL BREAKING ( JACK HAMMERING )
6 13520 PANDIT HELPER 8 2 MARL BREAKING ( JACK HAMMERING )
7 21197 GUNJA HELPER 8 2 FILLING SAND ON BOBCAT - ASSIST BOB CAT
8 25318 PASKARAN HELPER 8 2 FILLING SAND ON BOBCAT - ASSIST BOB CAT
9 21914 CHANDRA HELPER 8 2 FILLING SAND ON BOBCAT - ASSIST BOB CAT
10 20776 DHAN HELPER 8 2 EQUIPMENT STANDBY MAN
11 11997 GIRI HELPER 8 2 D DOOR STANDBY MAN
12 22620 RAMESH HELPER 8 2
13 13936 JIMMY OPERATOR 8 2 SHIFTING MARL TO OUTSIDE THE TANK 15 5 20 M³
14 LOADING MARL IN DUMP TRUCKS 15 M³
15 20991 CHAUHAN WELDER 8 2 ANNULAR PLATE GRINDING 21 M
16 16678 SELVARAJ MASON 8 2 LIFTING ROOF LEGS IN SECOND HALF AND PUTTING SUPPORTS FOR ROOF LEG 5 EA
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 SL1407 BOBCAT 8 2949 1


2 GR1865 GENERATOR 8 2178 2
3 AC1670 AIR COMPRESSOR 8 7441 3
4 WM1714 WELDING MACHINE IDLE 4
5 WM1192 WELDING MACHINE IDLE 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 130 REPORTING DATE 14-May-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1074566 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT & PART OFF PERMIT START 7:05:00
L.I. Description MARL SHIFTING TO OUTSIDE & MARL BREAKING PERMIT CLOSED 4:30:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 2 TAKE PERMIT
2 23421 SARFUDIN S.O 6 2 SAFETY OFFICER
3 23205 MEK HELPER 8 2 MARL BREAKING ( JACK HAMMERING ) FOR LEAK DEDUCTION PIPE EXCAVATION 3 M³
4 25329 RUBEN HELPER 8 2 MARL BREAKING ( JACK HAMMERING ) FOR LEAK DEDUCTION PIPE EXCAVATION AS PER INSTRUCTIONS
BOBCAT WORKING TIME ONLY
5 22322 PREM HELPER 8 2 MARL REMOVING AFTER JACK HAMMERING 2 PERSONS ONLY ALLOWED
6 13520 PANDIT HELPER 8 2 MARL REMOVING AFTER JACK HAMMERING INSIDE. BUT I WORK WITH 10
7 22620 RAMESH HELPER 8 FILLING SAND ON BOBCAT - ASSIST BOB CAT
PEOPLE INSIDE (LAST 10 DAYS)
. BECAUSE OF FLLOW OUR
8 25318 PASKARAN HELPER 8 2 FILLING SAND ON BOBCAT - ASSIST BOB CAT SCHEDULE AND FINISH THE
9 JOB AS SOON AS POSSIBLE .I
GET PERMISSION FROM
10 20776 DHAN HELPER 8 2 EQUIPMENT STANDBY MAN PERMIT ISSUER FOR
11 11997 GIRI HELPER 8 2 D DOOR STANDBY MAN GRINDING ANNULAR PLATE
DURING EARLY MORNING
12 13936 JIMMY OPERATOR 8 2 SHIFTING MARL TO OUTSIDE THE TANK 15 5 20 M³ DISCUSSION. BUT SAFETY
13 LOAD ASPHALT IN DUMP TRUCK 15 M³ OFFICER ARRIVED TANK AT 11
14 21197 GUNJA HELPER 8 2 LIFTING ROOF LEGS IN SECOND HALF AND PUTTING SUPPORTS FOR ROOF LEG 10 EA
O CLK ONLY . HE GIVE ME A
VIOLATION FOR DOING THAT .
15 21914 CHANDRA HELPER 8 2 I EXPLAINED HIM BUT HE
16 16678 SELVARAJ MASON 8 2 DONT ACCEPT IT .CAN I
FOOLOW OUR SCHEDULE?
17 MANAGER SIR
18 20991 CHAUHAN WELDER 8 BOBCAT PERFORMING INSIDE SO WELDER IDLE
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 SL1407 BOBCAT 8 2953 1


2 GR1865 GENERATOR 8 2190 2
3 AC1670 AIR COMPRESSOR 8 7454.5 3
4 WM1714 WELDING MACHINE IDLE 4
5 WM1192 WELDING MACHINE IDLE 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 130 REPORTING DATE 15-May-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1074566 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT & PART OFF PERMIT START 7:05:00
L.I. Description MARL SHIFTING TO OUTSIDE & MARL BREAKING PERMIT CLOSED 2:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 TAKE PERMIT
2
3 23205 MEK HELPER 8 MARL BREAKING ( JACK HAMMERING ) ( NEAR ANNULAR PLATE) AND LEVELLING 5 M³
4 13520 PANDIT HELPER 8 MARL BREAKING ( JACK HAMMERING ) ( NEAR ANNULAR PLATE) AND LEVELLING
5 21197 GUNJA HELPER 8 MARL BREAKING ( JACK HAMMERING ) ( NEAR ANNULAR PLATE) AND LEVELLING
6 13936 JIMMY OPERATOR 8 SHIFTING MARL TO OUTSIDE THE TANK
7 22322 PREM HELPER 8 LOAD ASPHALT IN DUMP TRUCK 15 M³
8 19344 RAJ KUMAR HELPER 8 ASSISTING BOBCAT FOR SHIFTING MARL 30 M³
9 25324 SIVARANJAN HELPER 8 ASSISTING BOBCAT FOR SHIFTING MARL
10 20776 DHAN HELPER 8 EQUIPMENT STANDBY MAN
11 11997 GIRI HELPER 8 D DOOR STANDBY MAN
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 SL1407 BOBCAT 6 2956 1


2 GR1865 GENERATOR 6 21201 2
3 AC1670 AIR COMPRESSOR 6 7465.8 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 130 & 160 REPORTING DATE 16-May-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1074566 & 1057483 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT & PART OFF PERMIT START 7:05:00
L.I. Description MARL SHIFTING TO OUTSIDE & MARL BREAKING & SAND BACK FILLING 5 CM PERMIT CLOSED 4:30:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 2 TAKE PERMIT
2 23421 SARFUDIN S.O 6 2 SAFETY OFFICER
3 23205 MEK HELPER 8 2 CONCRETE & MARL BREAKING INSIDE THE TANK FOR LEAK DEDUCTION PIPE 1.5 M³
4 25329 RUBEN HELPER 8 2 CONCRETE & MARL BREAKING INSIDE THE TANK FOR LEAK DEDUCTION PIPE
5 22322 PREM HELPER 8 2 SHIFTING BREAKED CONCRETE
6 13520 PANDIT HELPER 8 2 CONCRETE & MARL BREAKING OUTSIDE THE TANK FOR LEAK DEDUCTION PIPE 1.5 M³
7 21197 GUNJA HELPER 8 2 CONCRETE & MARL BREAKING OUTSIDE THE TANK FOR LEAK DEDUCTION PIPE
8 19344 RAJ KUMAR HELPER 8 2 LEVELLING THE AREA & REMOVE SMALL STONES 400 M²
9 11997 GIRI HELPER 8 2 D DOOR STANDBY MAN
10 20776 DHAN HELPER 8 2 EQUIPMENT STANDBY MAN
11 13936 JIMMY OPERATOR 8 2 SHIFTING SWEET SAND TO INSIDE 13 M³
12 SHIFTING MARL TO OUTSIDE
13 LOAD ASPHALT IN DUMP TRUCK 30 M³
14 16678 SELVARAJ MASON 8 2 SAND BACK FILL & LEVELLING ( 5 CM ) 13 M³
15 25318 PASKARAN HELPER 8 2 SAND BACK FILL & LEVELLING ( 5 CM )
16 22620 RAMESH HELPER 8 2 LIFTING ROOF LEGS WITH HYDRAULIC JACK 10 EA
17 21914 CHANDRA HELPER 8 2 BRING SUPPORTS TO INSIDE
18 19135 AWDESH FAB 8 ANNULAR PLATE CUTTING FOR LEAK DEDUCTION PIPE EXCAVATION
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 SL1407 BOBCAT 8 2960 1


2 GR1865 GENERATOR 8 2207 2
3 AC1670 AIR COMPRESSOR 8 7471 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 130 & 160 REPORTING DATE 17-May-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1074566 & 1057483 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT & PART OFF PERMIT START 7:05:00
L.I. Description MARL SHIFTING TO OUTSIDE & MARL BREAKING & SAND BACK FILLING 5 CM PERMIT CLOSED 4:30:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 2 TAKE PERMIT
2 23421 SARFUDIN S.O 6 2 SAFETY OFFICER
3 23205 MEK HELPER 8 2 CONCRETE & MARL BREAKING INSIDE THE TANK FOR LEAK DEDUCTION PIPE 1.5 M³
4 25329 RUBEN HELPER 8 2 CONCRETE & MARL BREAKING INSIDE THE TANK FOR LEAK DEDUCTION PIPE
5 22322 PREM HELPER 8 2 SHIFTING BREAKED CONCRETE
6 13520 PANDIT HELPER 8 2 CONCRETE & MARL BREAKING OUTSIDE THE TANK FOR LEAK DEDUCTION PIPE 1.5 M³
7 21197 GUNJA HELPER 8 CONCRETE & MARL BREAKING OUTSIDE THE TANK FOR LEAK DEDUCTION PIPE
8 19344 RAJ KUMAR HELPER 8 2 LEVELLING THE AREA & REMOVE SMALL STONES 450 M²
9 11997 GIRI HELPER 8 2 D DOOR STANDBY MAN
10 20776 DHAN HELPER 8 2 EQUIPMENT STANDBY MAN
11 13936 JIMMY OPERATOR 8 2 SHIFTING SWEET SAND TO INSIDE 15 M³
12 SHIFTING MARL TO OUTSIDE
13 LOAD ASPHALT IN DUMP TRUCK USING LOADER 30 M³
14 16678 SELVARAJ MASON 8 2 SAND BACK FILL & LEVELLING ( 5 CM ) 15 M³
15 25318 PASKARAN HELPER 8 2 SAND BACK FILL & LEVELLING ( 5 CM )
16 22620 RAMESH HELPER 8 LIFTING ROOF LEGS WITH HYDRAULIC JACK 5 EA
17 21914 CHANDRA HELPER 8 2 BRING SUPPORTS TO INSIDE
18 LEAK DEDUCTION PIPE CONNECTING AND LAYING - 2EA 50 M
19 BACK FILLING LEAK DEDUCTION EXCAVATION 18 M³
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 SL1407 BOBCAT 4 2963 1


2 GR1865 GENERATOR 8 2220 2
3 AC1670 AIR COMPRESSOR 8 7485.8 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 130 & 160 REPORTING DATE 18-May-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1074566 & 1057483 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT & PART OFF PERMIT START 7:05:00
L.I. Description MARL SHIFTING TO OUTSIDE & MARL BREAKING & SAND BACK FILLING 5 CM PERMIT CLOSED 4:30:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 2 TAKE PERMIT
2 23421 SARFUDIN S.O 6 2 SAFETY OFFICER
3 23205 MEK HELPER 8 2 ASPHALT AND MARL BREAK AND LEVELLING NEAR ANNULAR PLATE 45 M
4 13520 PANDIT HELPER 8 2 ASPHALT AND MARL BREAK AND LEVELLING NEAR ANNULAR PLATE
5 22322 PREM HELPER 8 2 FILLING ASPHALT AND MARL ON BOBCAT & REMOVING SMALL STONES ON SAND
6 19344 RAJ KUMAR HELPER 8 2 FILLING ASPHALT AND MARL ON BOBCAT & REMOVING SMALL STONES ON SAND
7 20776 DHAN HELPER 8 2 EQUIPMENT STANDBY MAN
8 11997 GIRI HELPER 8 2 D DOOR STANDBY MAN
9 13936 JIMMY OPERATOR 8 2 SHIFTING SWEET SAND TO INSIDE & SHIFTING SAND DIKE TO INSIDE TANK 13 M³
10 21914 CHANDRA HELPER 8 2 FLAG MAN SAND BACKILLING 5 CM
11 COMPLETED
12 16678 SELVARAJ MASON 8 2 LEVELLING THE SAND ( 5 CM )
13 25318 PASKARAN HELPER 8 2 LEVELLING THE SAND ( 5 CM )
14 20991 CHAUHAN WELDER 8 2 GRINDING ANNULAR PLATE & WELD SUPPORT ON RTG PIPE
15 21197 GUNJA HELPER 8 2 GRINDING ANNULAR PLATE AND CLEANING ALL ANNULAR PLATE & APPLY DIESEL 18 M
16 22620 RAMESH HELPER 8 2 LIFTING ROOF LEG FOR LINER ACTIVITIES 10 EA
17 25329 RUBEN HELPER 8 2 LIFTING ROOF LEG FOR LINER ACTIVITIES
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 SL1407 BOBCAT 4 2967 1


2 GR1865 GENERATOR 8 2233 2
3 AC1670 AIR COMPRESSOR 8 7496.8 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 160 REPORTING DATE 19-May-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1057483 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT PERMIT START 7:05:00
L.I. Description SAND BACK FILLING 5 CM PERMIT CLOSED 4:30:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 TAKE PERMIT
2 23421 SARFUDIN S.O 6 2 SAFETY OFFICER
3 13936 JIMMY OPERATOR 8 2 SWEET SAND SHIFTING TO DIKE WALL TO INSIDE THE TANK 49 M³
4 ARRANGE PLATES FOR ANNULAR PLATE PAINTING IN YARD 25 EA
5 13520 PANDIT HELPER 8 2 SWEET SAND LEVELLING SECOND HALF OF THE TANK ( 5 CM ) 49 M³
6 16678 SELVARAJ MASON 8 2 SWEET SAND LEVELLING SECOND HALF OF THE TANK ( 5 CM )
7 23205 MEK HELPER 8 2 SWEET SAND LEVELLING SECOND HALF OF THE TANK ( 5 CM )
8 22620 RAMESH HELPER 8 2 SWEET SAND LEVELLING SECOND HALF OF THE TANK ( 5 CM )
9 25329 RUBEN HELPER 8 2 SWEET SAND LEVELLING SECOND HALF OF THE TANK ( 5 CM )
HDEP LINER WORK
10 25318 PASKARAN HELPER 8 2 SWEET SAND LEVELLING SECOND HALF OF THE TANK ( 5 CM ) COMPLETED.INSPECTION
11 22322 PREM HELPER 8 2 SWEET SAND LEVELLING SECOND HALF OF THE TANK ( 5 CM ) ACCEPTED. 5 CM SAND BACK
FILLING ON PROGRESS
12
13 20991 CHAUHAN WELDER 8 2 ANNULAR PLATE GRINDING & WELDING & APPLY DIESEL - 18 LOCATIONS
14 20776 DHAN HELPER 8 2 EQUIPMENT STANDBY MAN
15 19344 RAJ KUMAR HELPER 8 2 D DOOR STANDBY MAN
16
17 11997 GIRI HELPER 8 GOING TO MEDICAL AFTER 12 O CLOCK
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 SL1407 BOBCAT 4 2971.7 1


2 GR1865 GENERATOR 8 2246 2
3 AC1670 AIR COMPRESSOR 8 7513.2 3
4 WM1606 WELDING MACHINE 8 6448 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 70 REPORTING DATE 20-May-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1081190 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT PERMIT START 7:05:00
L.I. Description WELDING & CATHODIC PROTECTION ( RIPPON ANODE ) ARRANGEMENTS & WELD PERMIT CLOSED 4:30:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 TAKE PERMIT
2 23421 SARFUDIN S.O 6 SAFETY OFFICER
3 25318 PASKARAN HELPER 8 CATHODIC PROTECTION RIPPON ANODE ARRANGEMENTS HALF OF THE TANK
4 19344 RAJ KUMAR HELPER 8 CATHODIC PROTECTION RIPPON ANODE ARRANGEMENTS HALF OF THE TANK
5 13520 PANDIT HELPER 8 CATHODIC PROTECTION RIPPON ANODE ARRANGEMENTS HALF OF THE TANK
6 16678 SELVARAJ MASON 8 CATHODIC PROTECTION RIPPON ANODE ARRANGEMENTS HALF OF THE TANK
7 23205 MEK HELPER 8 ASSISTING FOR CATHODIC WELDING
8 22620 RAMESH HELPER 8 ASSISTING FOR CATHODIC WELDING
9 25329 RUBEN HELPER 8 ASSISTING FOR CATHODIC WELDING
10 11997 GIRI HELPER 8 D DOOR STANDBY MAN
11 20776 DHAN HELPER 8 EQUIPMENT STANDBY MAN
12 20991 CHAUHAN WELDER 8 BOTTOM PLATE T JOINT WELDING 6 EA
13 22322 PREM HELPER 8 GINDING ON SHELL ( FOR ANNULAR FITUP HOOK )
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 WM1606 WELDING MACHINE 8 6460.1 1


2 GR1865 GENERATOR 8 2257 2
3 AC1670 AIR COMPRESSOR 8 7525.7 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 160 & 70 REPORTING DATE 21-May-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1057483 & 1081190 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT & PART OFF PERMIT START 7:05:00
L.I. Description SAND BACK FILLING (25 CM) & BOTTOM PLATE WELDING PERMIT CLOSED 4:30:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 2 TAKE PERMIT
2 23421 SARFUDIN S.O 6 2 SAFETY OFFICER
3 13936 JIMMY OPERATOR 8 2 SWEET SAND SHIFTING DIKE WALL TO D DOOR ( USING LOADER ) 50 M³
4 SWEET SAND SHIFTING D DOOR TO INSIDE THE TANK ( USING LOADER ) 40 M³
5 13520 PANDIT HELPER 8 2 SWEET SAND LEVELLING SECOND HALF OF THE TANK ( 25 CM ) 20 20 40 M³
6 16678 SELVARAJ MASON 8 2 SWEET SAND LEVELLING SECOND HALF OF THE TANK ( 25 CM )
7 23205 MEK HELPER 8 2 SWEET SAND LEVELLING SECOND HALF OF THE TANK ( 25 CM )
8 22620 RAMESH HELPER 8 2 SWEET SAND LEVELLING SECOND HALF OF THE TANK ( 25 CM )
9 25329 RUBEN HELPER 8 2 SWEET SAND LEVELLING SECOND HALF OF THE TANK ( 25 CM ) RIPPON ANODE INSTALLATION
10 25318 PASKARAN HELPER 8 2 SWEET SAND LEVELLING SECOND HALF OF THE TANK ( 25 CM ) COMPLETED AND ACCEPTED
BY ARAMCO INSPECTOR . 25
11 FLAG MAN CM SAND BACK FILLING
12 20776 DHAN HELPER 8 2 EQUIPMENT STANDBY MAN STARTED AND ON PROGRESS
13 11997 GIRI HELPER 8 2 D DOOR STANDBYMAN
14
15 20991 CHAUHAN WELDER 8 2 BOTTOM TO ANNULAR PLATE T JOINT WELDING ( 4 PASS ) 20 5 25 JOINT
16 22322 PREM HELPER 8 2 BOTTOM PLATE T JOINT WELDED AREA GRINDING 20 5 25 JOINT
17 25391 MARWAN ELECTRICIAN 8 2 RIPPON ANODE CAPLES INSTALLATION
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 SL1407 BOBCAT 8 2981 1


2 GR1865 GENERATOR 8 2268 2
3 AC1670 AIR COMPRESSOR 8 7537.5 3
4 WM1606 WELDING MACHINE 8 6471.5 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 160 & 120 REPORTING DATE 22-May-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1057483 & 1091341 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT & PART OFF PERMIT START 7:05:00
L.I. Description SAND BACK FILLING (25 CM) &ANNULAR PLATE WELDING PERMIT CLOSED 2:30:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 TAKE PERMIT
2 13936 JIMMY OPERATOR 8 SWEET SAND SHIFTING DIKE WALL TO D DOOR ( USING LOADER ) 40 M³
3 SWEET SAND SHIFTING D DOOR TO INSIDE THE TANK ( USING LOADER ) 40 M³
4
5 13520 PANDIT HELPER 8 SWEET SAND LEVELLING SECOND HALF OF THE TANK ( 25 CM ) 40 40 M³
6 16678 SELVARAJ MASON 8 SWEET SAND LEVELLING SECOND HALF OF THE TANK ( 25 CM )
7 23205 MEK HELPER 8 SWEET SAND LEVELLING SECOND HALF OF THE TANK ( 25 CM )
8 25318 PASKARAN HELPER 8 SWEET SAND LEVELLING SECOND HALF OF THE TANK ( 25 CM )
9 25329 RUBEN HELPER 8 SWEET SAND LEVELLING SECOND HALF OF THE TANK ( 25 CM )
10 SWEET SAND LEVELLING SECOND HALF OF THE TANK ( 25 CM )
11 FLAG MAN
12 20776 DHAN HELPER 8 EQUIPMENT STANDBY MAN
13 11997 GIRI HELPER 8 D DOOR STANDBYMAN
14
15 20991 CHAUHAN WELDER 8 ANNULAR PLATE WELDING ( 4 PASS ) 6 M
16 22322 PREM HELPER 8 ANNULAR PLATE GRINDING ( 4 TIMES) 6 M
17 25391 MARWAN ELECTRICIAN 8 RIPPON ANODE CAPLES INSTALLATION AS PER DRAWINGS IN ( 20 CM DEEP )
18
19 21262 LIMBU OPRTR 8 PLATE SHIFTING ( USING BOOM TRUCK )
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 SL1407 BOBCAT 6 2988 1


2 GR1865 GENERATOR 6 2280 2
3 AC1670 AIR COMPRESSOR 6 7550 3
4 WM1606 WELDING MACHINE 6 6481 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 60 & 120 REPORTING DATE 25-May-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1055131 & 1091341 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT & PART OFF PERMIT START 7:05:00
L.I. Description BOTTOM PLATE FITUP &ANNULAR PLATE WELDING PERMIT CLOSED 3:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 TAKE PERMIT
2 19470 NOOR ALAM FAB 8 BOTTOM PLATE CUTTING SUMPIT PLATE 7 M
3 21865 NAUSAD FAB 8 BOTTOM PLATE FITUP - 6 EA 4.8 TON
4
5 13520 PANDIT HELPER 8 BOTTOM PLATE SHIFTING INSIDE - 10 PLATES ( 6 * 2.5 * 0.006 ) 8 TON
6 16678 SELVARAJ MASON 8 BOTTOM PLATE SHIFTING INSIDE - 10 PLATES ( 6 * 2.5 * 0.006 )
7 23205 MEK HELPER 8 BOTTOM PLATE SHIFTING INSIDE - 10 PLATES ( 6 * 2.5 * 0.006 )
8 25318 PASKARAN HELPER 8 BOTTOM PLATE SHIFTING INSIDE - 10 PLATES ( 6 * 2.5 * 0.006 )
9 25329 RUBEN HELPER 8 BOTTOM PLATE SHIFTING INSIDE - 10 PLATES ( 6 * 2.5 * 0.006 ) SAND BACKFILLING
10 18753 RABINDAR HELPER 8 BOTTOM PLATE SHIFTING INSIDE - 10 PLATES ( 6 * 2.5 * 0.006 ) COMPLETED AND INSPECTION
ACCEPTED & SECOND HALF
11 ROOF LEG LIFTING USING HYDRALIC JACK 4 EA BOTTOM PLATE FIT UP
12 20776 DHAN HELPER 8 EQUIPMENT STANDBY MAN STARTED
13 11997 GIRI HELPER 8 D DOOR STANDBYMAN
14
15 20991 CHAUHAN WELDER 8 ANNULAR PLATE WELDING ( 4 PASS ) 6 M
16 22322 PREM HELPER 8 ANNULAR PLATE GRINDING ( 4 TIMES) 6 M
17
18 21080 LOKNATH WELDER 8 ANNULAR PLATE WELDING ( 4 PASS ) 6 M
19 21258 RAJKUMAR HELEPR 8 ANNULAR PLATE GRINDING ( 4 TIMES) 6 M
20 25391 MARWAN ELECTRICIAN 8 ARRANGING WELDING CAPLES & ELECTRICAL WORKS
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 GR1865 GENERATOR 8 2299 2
3 AC1670 AIR COMPRESSOR 8 7569.5 3
4 WM1606 WELDING MACHINE 8 6497.5 4
5 WM1192 WELDING MACHINE 8 8054.9 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 60 & 120 REPORTING DATE 26-May-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1055131 & 1091341 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT & PART OFF PERMIT START 7:05:00
L.I. Description BOTTOM PLATE FITUP &ANNULAR PLATE WELDING PERMIT CLOSED 3:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 TAKE PERMIT
2 21865 NAUSAD FAB 8 BOTTOM PLATE FIT UP - 8 EA 6.4 TON
3 20991 CHAUHAN WELDER 8 TACK WELD AND ASSIST FITUP
4 22322 PREM HELPER 8 HAMMERING FOR TACK WELD & GRINDING
5 13520 PANDIT HELPER 8 BOTTOM PLATE SHIFTING INSIDE -8 PLATES ( 6 * 2.5 * 0.006 ) & ASSIST FIT UP 6.4 TON
6 16678 SELVARAJ MASON 8 BOTTOM PLATE SHIFTING INSIDE -8 PLATES ( 6 * 2.5 * 0.006 ) & ASSIST FIT UP
7 23205 MEK HELPER 8 BOTTOM PLATE SHIFTING INSIDE -8 PLATES ( 6 * 2.5 * 0.006 ) & ASSIST FIT UP
8 25318 PASKARAN HELPER 8 BOTTOM PLATE SHIFTING INSIDE -8 PLATES ( 6 * 2.5 * 0.006 ) & ASSIST FIT UP
9 25329 RUBEN HELPER 8 BOTTOM PLATE SHIFTING INSIDE -8 PLATES ( 6 * 2.5 * 0.006 ) & ASSIST FIT UP SAND BACKFILLING
10 18753 RABINDAR HELPER 8 BOTTOM PLATE SHIFTING INSIDE -8 PLATES ( 6 * 2.5 * 0.006 ) & ASSIST FIT UP COMPLETED AND INSPECTION
ACCEPTED & SECOND HALF
11 ROOF LEG LIFTING USING HYDRALIC JACK 4 EA BOTTOM PLATE FIT UP
12 20776 DHAN HELPER 8 EQUIPMENT STANDBY MAN STARTED
13 11997 GIRI HELPER 8 D DOOR STANDBYMAN
14
15 21080 LOKNATH WELDER 8 ANNULAR PLATE WELDING ( 4 PASS ) 6 M
16 21258 RAJKUMAR HELEPR 8 ANNULAR PLATE GRINDING ( 4 TIMES) 6 M
17 25391 MARWAN ELECTRICIAN 8 ARRANGING WELDING CAPLES & ELECTRICAL WORKS & ASSIST FIT UP
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 GR1865 GENERATOR 7 2308 2
3 AC1670 AIR COMPRESSOR 7 7578.3 3
4 WM1606 WELDING MACHINE IDLE 6497.5 4
5 WM1192 WELDING MACHINE 7 8063.7 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 60 & 70 REPORTING DATE 27-May-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1055131 & 1081190 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT & PART OFF PERMIT START 7:05:00
L.I. Description BOTTOM PLATE FITUP &BOTTOM PLATE STITCH WELD PERMIT CLOSED 3:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 TAKE PERMIT
2 21865 NAUSAD FAB 8 BOTTOM PLATE FIT UP - 8 EA 6.4 TON
3 20991 CHAUHAN WELDER 8 TACK WELD AND ASSIST FITUP
4
5 13520 PANDIT HELPER 8 BOTTOM PLATE SHIFTING INSIDE -10 PLATES ( 6 * 2.5 * 0.006 ) & ASSIST FIT UP 8 TON
6 16678 SELVARAJ MASON 8 BOTTOM PLATE SHIFTING INSIDE -10 PLATES ( 6 * 2.5 * 0.006 ) & ASSIST FIT UP
7 23205 MEK HELPER 8 BOTTOM PLATE SHIFTING INSIDE -10 PLATES ( 6 * 2.5 * 0.006 ) & ASSIST FIT UP
8 25318 PASKARAN HELPER 8 BOTTOM PLATE SHIFTING INSIDE -10 PLATES ( 6 * 2.5 * 0.006 ) & ASSIST FIT UP
9 25329 RUBEN HELPER 8 BOTTOM PLATE SHIFTING INSIDE -10 PLATES ( 6 * 2.5 * 0.006 ) & ASSIST FIT UP
10 18753 RABINDAR HELPER 8 BOTTOM PLATE SHIFTING INSIDE -10 PLATES ( 6 * 2.5 * 0.006 ) & ASSIST FIT UP
11 17594 DILLY BLASTER 8 BOTTOM PLATE SHIFTING INSIDE -10 PLATES ( 6 * 2.5 * 0.006 ) & ASSIST FIT UP
12 13219 DINESH BLASTER 8 BOTTOM PLATE SHIFTING INSIDE -10 PLATES ( 6 * 2.5 * 0.006 ) & ASSIST FIT UP
13 ROOF LEG LIFTING USING HYDRALIC JACK 4 EA
14
15
16 20776 DHAN HELPER 8 EQUIPMENT STANDBY MAN
17 11997 GIRI HELPER 8 D DOOR STANDBYMAN
18 21080 LOKNATH WELDER 8 BOTTOM PLATE STICH WELDING 50 M
19 22322 PREM HELPER 8 HAMMERING FOR STICH WELD 50 M
20 25391 MARWAN ELECTRICIAN 8 ELECTRICAL WORKS IN TK 110& ASSIST FIT UP
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 GR1865 GENERATOR 7 2316 2
3 AC1670 AIR COMPRESSOR 7 7587 3
4 WM1606 WELDING MACHINE IDLE 6497.5 4
5 WM1192 WELDING MACHINE 7 8072 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 60 & 70 & 120 REPORTING DATE 28-May-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1055131 & 1081190 & 1091341 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT & PART OFF PERMIT START 7:05:00
L.I. Description BOTTOM PLATE FITUP &BOTTOM PLATE STITCH WELD & ANNULAR PLATE CUTTING PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 2 TAKE PERMIT
2 23421 SARFUDIN S.O 8 2 SAFETY OFFICER
3 21055 LIBRES FAB 8 2 ANNULAR AND DRIP PLATE CUTTING (12 MM PLATE ) 24 M
4 21865 NAUSAD FAB 8 BOTTOM PLATE FIT UP - 2 EA & LEAK DEDUCTION PIPE CUTTING 1.6 TON
5 13520 PANDIT HELPER 8 2 BOTTOM PLATE SHIFTING INSIDE -2 PLATES ( 6 * 2.5 * 0.006 ) & ASSIST FIT UP 1.6 TON
6 23205 MEK HELPER 8 2 CUTTED ANNULAR PLATE SHIFTING TO OUTSIDE 1.2 TON
7 18753 RABINDAR HELPER 8 ARRANGING HOSE AND JACK HAMMER FOR ASPHALT BREAKING
8 ASSISTING FOR LEAK DEDUCTION PIPE WORKS
9 FIRE WATCH
10 SHIFTING CYLINDER ( AROUND 50 M ) 4 EA
11 17594 DILLY BLASTER 8 ARRANGE SCAFFOLDING FOR STORING CYLINDER
12 13219 DINESH BLASTER 8 ARRANGE SCAFFOLDING FOR STORING CYLINDER
13 20776 DHAN HELPER 8 2 EQUIPMENT STANDBY MAN 4 EA
14 11997 GIRI HELPER 8 2 D DOOR STANDBYMAN
15
16 20991 CHAUHAN WELDER 8 2 BOTTOM PLATE STICH WELDING 70 M
17 22322 PREM HELPER 8 2 HAMMERING FOR STICH WELD 70 M
18 21080 LOKNATH WELDER 8 2 BOTTOM PLATE STICH WELDING 50 M
19 25329 RUBEN HELPER 8 2 HAMMERING FOR STICH WELD 50 M
20 25391 MARWAN ELECTRICIAN 8 2 ASSIST PLATE FITUP & ELECTRICAL WORKS
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 GR1865 GENERATOR 8 2326 2
3 AC1670 AIR COMPRESSOR 8 7597.4 3
4 WM1606 WELDING MACHINE IDLE 6497.5 4
5 WM1192 WELDING MACHINE 8 8082.3 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 120 REPORTING DATE 29-May-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1091341 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT & PART OFF PERMIT START 7:05:00
L.I. Description ANNULAR PLATE CUTTING & ANNULAR PLATE WELDING PERMIT CLOSED 2:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 TAKE PERMIT
2 23421 SARFUDIN S.O 8 SAFETY OFFICER
3 21055 LIBRES FAB 8 ANNULAR PLATE CUTTING UNDER THE SHELL (12 MM PLATE ) 12 M
4 21865 NAUSAD FAB 8 ANNULAR PLATE GRINDING UNDER THE SHELL FOR PLATE FIT UP 1.6 TON
5 13520 PANDIT HELPER 8 ASPHALT & CONCRETE BREAKING (FOR CP CABLE INSTALLATION) 1 M³
6 23205 MEK HELPER 8 ASPHALT & CONCRETE BREAKING (FOR ANNULAR PLATE FIT UP ) 1 M³
7 16678 SELVARAJ MASON 8 CP CAPLE ARRANGING UNDER THE SHELL ( ASSIST ELECTRICIAN )
8 25318 PASKARAN HELPER 8 CP CAPLE ARRANGING UNDER THE SHELL ( ASSIST ELECTRICIAN )
9 SHIFTING BREAKED ASPHALT TO OUTSIDE 2 M³
10 25391 MARWAN ELECTRICIAN 8 CP CAPLE WORK
11 11997 GIRI HELPER 8 D DOOR STANDBYMAN
12 20776 DHAN HELPER 8 EQUIPMENT STANDBY MAN
13
14 20991 CHAUHAN WELDER 8 ANNULAR PLATE WELDING ( 6 PASS ) 6 6 M
15 22322 PREM HELPER 8 ANNULAR PLATE GRINDING ( 6 TIMES ) 6 6 M
16 21080 LOKNATH WELDER 8 ANNULAR PLATE WELDING ( 6 PASS ) 6 6 M
17 21258 RAJKUMAR HELEPR 8 ANNULAR PLATE GRINDING ( 6 TIMES ) 6 6 M
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 GR1865 GENERATOR 6 2335 2
3 AC1670 AIR COMPRESSOR 6 7607.9 3
4 WM1606 WELDING MACHINE 6 6515.3 4
5 WM1192 WELDING MACHINE 6 8088.6 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 60 REPORTING DATE 30-May-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1055131 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT & PART OF PERMIT START 7:05:00
L.I. Description BOTTOM PLATE FIT UP & TACK WELD & PLATE SHIFTING MANUALLY PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 2 TAKE PERMIT
2 23421 SARFUDIN S.O 8 2 SAFETY OFFICER
3 21055 LIBRES FAB 8 2 BOTTOM PLATE FIT UP - 11 PLATES ( 6 * 2.5 * 0.006 ) 6 2.8 8.8 TON
4 21865 NAUSAD FAB 8 2 BOTTOM PLATE FIT UP
5 21042 BALA KRISHNA WELDER 8 2 BOTTOM PLATE TACK WELDING
6 23205 MEK HELPER 8 2 BOTTOM PLATE SHIFTING - 11 PLATES ( AROUND 30 M ) MANUALLY 6 2.8 8.8 TON
7 16678 SELVARAJ MASON 8 2 BOTTOM PLATE SHIFTING - 11 PLATES ( AROUND 30 M ) MANUALLY
8 25318 PASKARAN HELPER 8 2 BOTTOM PLATE SHIFTING - 11 PLATES ( AROUND 30 M ) MANUALLY
9 13520 PANDIT HELPER 8 2 BOTTOM PLATE SHIFTING - 11 PLATES ( AROUND 30 M ) MANUALLY
10 25329 RUBEN HELPER 8 2 BOTTOM PLATE SHIFTING - 11 PLATES ( AROUND 30 M ) MANUALLY
11 13219 DINESH BLASTER 8 2 BOTTOM PLATE SHIFTING - 11 PLATES ( AROUND 30 M ) MANUALLY
12 25391 MARWAN ELECTRICIAN 8 2 BOTTOM PLATE SHIFTING - 11 PLATES ( AROUND 30 M ) MANUALLY
13 ALL HELPERS ASSISTING FABRICATOR FOR PLATE FIT UP
14 LEAK DEDUCTION PIPE LAYING AND BACKFILLING - 2 LOCATIONS 3 M³
15 20776 DHAN HELPER 8 2 EQUIPMENT STANDBY MAN
16 11997 GIRI HELPER 8 2 D DOOR STANDBYMAN
17
18 1623 MOHAMMED KHAN PAINTER 8 ASSISTING FOR PLATE FIT UP
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1670 AIR COMPRESSOR 8 7617.4 1


2 GR1865 GENERATOR 8 2343 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 120 REPORTING DATE 30-May-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1091341 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT PERMIT START 7:05:00
L.I. Description EXTERNAL ANNULAR PLATE WELDING PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 20991 CHAUHAN WELDER 8 2 EXTERNAL ANNULAR PLATE WELDING ( 6 PASS ) 6 1 7 M
2 22322 PREM HELPER 8 2 ANNULAR PLATE GRINDING ( 6 TIMES ) 6 1 7 M
3 21080 LOKNATH WELDER 8 2 EXTERNAL ANNULAR PLATE WELDING ( 6 PASS ) 6 1 7 M
4 19344 RAJ KUMAR HELPER 8 2 ANNULAR PLATE GRINDING ( 6 TIMES ) 6 1 7 M
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 WM1606 WELDING MACHINE 8 6524.7 1


2 WM1192 WELDING MACHINE 8 8094.9 2
3 WL022 LOADER IDLE 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 120 REPORTING DATE 31-May-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1091341 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT PERMIT START 7:05:00
L.I. Description EXTERNAL ANNULAR PLATE WELDING PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 20991 CHAUHAN WELDER 8 2 EXTERNAL ANNULAR PLATE WELDING ( 6 PASS ) 6 1 7 M
2 22322 PREM HELPER 8 2 ANNULAR PLATE GRINDING ( 6 TIMES ) 6 1 7 M
3 21080 LOKNATH WELDER 8 2 EXTERNAL ANNULAR PLATE WELDING ( 6 PASS ) 6 1 7 M
4 19344 RAJ KUMAR HELPER 8 2 ANNULAR PLATE GRINDING ( 6 TIMES ) 6 1 7 M
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 WM1606 WELDING MACHINE 8 6538.2 1


2 WM1192 WELDING MACHINE 8 8108.3 2
3 WL022 LOADER IDLE 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 120 & 50 REPORTING DATE 30-May-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1091341 & 1056028 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT & PART OF PERMIT START 7:05:00
L.I. Description ANNULAR PLATE FIT UP & OLD ANNULAR PLATE CUTTING PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 2 TAKE PERMIT
2 23421 SARFUDIN S.O 8 2 SAFETY OFFICER
3 21055 LIBRES FAB 8 2 ANNULAR PLATE(12MM) CUTTING 18 M
4 21865 NAUSAD FAB 8 2 ANNULAR PLATE GRINDING 12 M
5 NEW ANNULAR PLATE GRINDING & BEVELLING BOTH ENDS 12 M
6 ANNULAR PLATE FIT UP 1 EA
7 21042 BALA KRISHNA WELDER 8 ANNULAR PLATE TACK WELD
8 SUMPIT WELDING 10 M
9 23205 MEK HELPER 8 2 ASHPALT & CONCRETE BREAKING UNDER THE SHELL( JACK HAMMERING ) 1.5 M³
10 13520 PANDIT HELPER 8 2 SHIFTING ANNULAR PLATE FOR PLATE FIT UP 0.6 TON
11 25329 RUBEN HELPER 8 2 SHIFTING BREAKED ASHPALT TO OUTSIDE 1.5 M³
12 25318 PASKARAN HELPER 8 2 BACK FILLING CEMENT MIXING SAND ( SHIFTING AROUND 30 M ) 1.5 M³
13 16678 SELVARAJ MASON 8 2
14 25391 MARWAN ELECTRICIAN 8 2 REPAIR LIGHT & GRINDING MACHINE & ASSIST FIT UP 3 M³
15 20776 DHAN HELPER 8 2 EQUIPMENT STANDBY MAN
16 11997 GIRI HELPER 8 2 D DOOR STANDBYMAN
17 13219 DINESH BLASTER 8 2 PERFORM HOUSE KEEPING IN SECOND HALF OF THE TANK FOR INSPECTION
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1670 AIR COMPRESSOR 8 7631 1


2 GR1865 GENERATOR 8 2355 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 120 & 70 REPORTING DATE 1-Jun-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1091341 & 1081190 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT & PART OF PERMIT START 7:05:00
L.I. Description EXTERNAL ANNULAR PLATE WELDING & BOTTOM PLATE WELDING ( ROOT PASS ) PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 21080 LOKNATH WELDER 8 2 EXTERNAL ANNULAR PLATE WELDING ( 6 PASS ) 6 1 7 M
2 19344 RAJ KUMAR HELPER 8 2 ANNULAR PLATE GRINDING ( 6 TIMES ) 6 1 7 M
3 20991 CHAUHAN WELDER 8 2 BOTTOM PLATE WELDING ( ROOT PASS ) 20 15 33 M
4 22322 PREM HELPER 8 2 ASSISTING WELDER
5 21042 BALA KRISHNA WELDER 8 BOTTOM PLATE WELDING ( ROOT PASS ) 18 M
6 ANNULAR PLATE FIT UP & TACK WELD
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 WM1606 WELDING MACHINE 8 6551.1 1


2 WM1192 WELDING MACHINE 8 8121.2 2
3 WL022 LOADER IDLE 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 120 & 50 REPORTING DATE 1-Jun-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1091341 & 1056028 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT & PART OF PERMIT START 7:05:00
L.I. Description ANNULAR PLATE FIT UP & OLD ANNULAR PLATE CUTTING PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 2 TAKE PERMIT
2 23421 SARFUDIN S.O 8 2 SAFETY OFFICER
3 21055 LIBRES FAB 8 2 ANNULAR PLATE(12MM) CUTTING 18 M
4 21865 NAUSAD FAB 8 2 SHELL UNDER SIDE GRINDING 12 M
5 NEW ANNULAR PLATE GRINDING & BEVELLING BOTH ENDS 12 M
6 ANNULAR PLATE FIT UP 1 EA
7
8
9 23205 MEK HELPER 8 2 ASHPALT & CONCRETE BREAKING UNDER THE SHELL( JACK HAMMERING ) 1.5 M³
10 13520 PANDIT HELPER 8 2 SHIFTING ANNULAR PLATE FOR PLATE FIT UP 0.6 TON
11 25329 RUBEN HELPER 8 2 SHIFTING BREAKED ASHPALT TO OUTSIDE ( 40 M ) 1.5 M³
12 25318 PASKARAN HELPER 8 2 BACK FILLING CEMENT MIXING SAND ( SHIFTING AROUND 50 M ) 1.5 M³
13 16678 SELVARAJ MASON 8 2 ALL HELPERS ASSISTING FOR FIT UP
14
15 20776 DHAN HELPER 8 2 EQUIPMENT STANDBY MAN
16 11997 GIRI HELPER 8 2 D DOOR STANDBYMAN
17
18
19 25391 MARWAN ELECTRICIAN 8 PERFORM ELECTRICAL WORKS
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1670 AIR COMPRESSOR 8 7644.2 1


2 GR1865 GENERATOR 8 2367 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 120 & 70 REPORTING DATE 2-Jun-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1091341 & 1081190 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT & PART OF PERMIT START 7:05:00
L.I. Description EXTERNAL ANNULAR PLATE WELDING & BOTTOM PLATE WELDING ( ROOT PASS ) PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 21080 LOKNATH WELDER 8 2 EXTERNAL ANNULAR PLATE WELDING ( 6 PASS ) 6 1 7 M
2 19344 RAJ KUMAR HELPER 8 2 ANNULAR PLATE GRINDING ( 6 TIMES ) 6 1 7 M
3 20991 CHAUHAN WELDER 8 2 BOTTOM PLATE WELDING ( ROOT PASS ) 20 8 28 M
4 22322 PREM HELPER 8 ASSISTING WELDERS ( ARRANGE COUNTER WEIGHT BOX )
5 21042 BALA KRISHNA WELDER 8 2 BOTTOM PLATE WELDING ( ROOT PASS ) 25 M
6 ANNULAR PLATE FIT UP & TACK WELD
7
8 17594 DILLY BLASTER 8 PERFORM VALVE HYDROTEST
9 13219 DINESH BLASTER 8 PERFORM VALVE HYDROTEST
10 1623 MOHAMMED KHAN PAINTER 8 PERFORM VALVE HYDROTEST
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 WM1606 WELDING MACHINE 8 6563.1 1


2 WM1192 WELDING MACHINE 8 8134.2 2
3 MANLIFT IDLE 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 120 & 50 REPORTING DATE 2-Jun-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1091341 & 1056028 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT & PART OF PERMIT START 7:05:00
L.I. Description ANNULAR PLATE FIT UP & OLD ANNULAR PLATE CUTTING PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 2 TAKE PERMIT
2 23421 SARFUDIN S.O 8 2 SAFETY OFFICER
3 21055 LIBRES FAB 8 2 ANNULAR PLATE(12MM) CUTTING 18 M
4 21865 NAUSAD FAB 8 2 SHELL UNDER SIDE GRINDING 12 M
5 NEW ANNULAR PLATE GRINDING & BEVELLING BOTH ENDS 12 M
6 23999 PHILIP FAB 8 ANNULAR PLATE FIT UP 1 EA
7 24671 SONNY FAB 8 ANNULAR PLATE CUTTING 8 M
8 19454 NAGENDRAN FAB 8 NEW ANNULAR PLATE GRINDING & BEVELLING BOTH ENDS 12 M
9 23205 MEK HELPER 8 2 ASHPALT & CONCRETE BREAKING UNDER THE SHELL( JACK HAMMERING ) 1.5 M³
10 13520 PANDIT HELPER 8 2 SHIFTING ANNULAR PLATE FOR PLATE FIT UP 0.6 TON
11 25329 RUBEN HELPER 8 2 SHIFTING BREAKED ASHPALT TO OUTSIDE ( 40 M ) 1.5 M³
12 25318 PASKARAN HELPER 8 2 BACK FILLING CEMENT MIXING SAND ( SHIFTING AROUND 50 M ) 1.5 M³
13 16678 SELVARAJ MASON 8 2 ALL HELPERS ASSISTING FOR FIT UP
14
15 20776 DHAN HELPER 8 2 EQUIPMENT STANDBY MAN
16 11997 GIRI HELPER 8 2 D DOOR STANDBYMAN
17
18
19 25391 MARWAN ELECTRICIAN 8 2 PERFORM ELECTRICAL WORKS
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1670 AIR COMPRESSOR 8 7657.2 1


2 GR1865 GENERATOR 8 2380 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 70 & 80 REPORTING DATE 3-Jun-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1081190 & 1054480 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT PERMIT START 7:05:00
L.I. Description BOTTOM PLATE WELDING (2 PASS ) & GRINDING PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 21080 LOKNATH WELDER 8 2 BOTTOM PLATE WELDING ( GAPPING AND FILLING ) - 2 PASS 15 9 24 M
2 19344 RAJ KUMAR HELPER 8 2 BOTTOM PLATE GRINDING ( GRINDING ) 15 9 24 M
3 20991 CHAUHAN WELDER 8 2 BOTTOM PLATE WELDING ( GAPPING AND FILLING ) - 2 PASS 15 9 24 M
4 22322 PREM HELPER 8 2 BOTTOM PLATE GRINDING ( GRINDING ) 15 9 24 M
5 21042 BALA KRISHNA WELDER 8 ANNULAR TACK WELD 25 M
6
7
8 17594 DILLY BLASTER 8 PERFORM VALVE HYDROTEST
9 13219 DINESH BLASTER 8 PERFORM VALVE HYDROTEST
10 1623 MOHAMMED KHAN PAINTER 8 PERFORM VALVE HYDROTEST
11
12 16 " INLET VALVE PERFORMING HYDROTEST(SEAT & BODY )
13 ACCEPTED BY ARAMCO INSPECTOR
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 WM1606 WELDING MACHINE 8 6579 1


2 WM1192 WELDING MACHINE 8 8149 2
3 MANLIFT IDLE 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 120 & 50 REPORTING DATE 3-Jun-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1091341 & 1056028 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT & PART OF PERMIT START 7:05:00
L.I. Description ANNULAR PLATE FIT UP & OLD ANNULAR PLATE CUTTING PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 2 TAKE PERMIT
2 23421 SARFUDIN S.O 8 2 SAFETY OFFICER
3 21055 LIBRES FAB 8 ANNULAR PLATE(12MM) CUTTING 18 M
4 21865 NAUSAD FAB 8 2 SHELL UNDER SIDE GRINDING 12 M
5 NEW ANNULAR PLATE GRINDING & BEVELLING BOTH ENDS 12 M
6 23999 PHILIP FAB 8 ANNULAR PLATE FIT UP 1 EA
7 24671 SONNY FAB 8 EXTERNAL ANNULAR PLATE CUTTING 6 M
8 19454 NAGENDRAN FAB 8 NEW ANNULAR PLATE GRINDING & BEVELLING BOTH ENDS 12 M
9 23205 MEK HELPER 8 2 ASHPALT & CONCRETE BREAKING UNDER THE SHELL( JACK HAMMERING ) - 10 MTR 2.5 M³
10 13520 PANDIT HELPER 8 2 SHIFTING ANNULAR PLATE FOR PLATE FIT UP 0.6 TON
11 25329 RUBEN HELPER 8 SHIFTING BREAKED ASHPALT TO OUTSIDE ( 40 M ) 2.5 M³
12 25318 PASKARAN HELPER 8 BACK FILLING CEMENT MIXING SAND ( SHIFTING AROUND 50 M ) 1.5 M³
13 16678 SELVARAJ MASON 8 2 ALL HELPERS ASSISTING FOR FIT UP
14
15 20776 DHAN HELPER 8 2 EQUIPMENT STANDBY MAN
16 11997 GIRI HELPER 8 2 D DOOR STANDBYMAN
17
18
19 25391 MARWAN ELECTRICIAN 8 TANK 101 CP CABLE TRANSFORMER WORK
20 RECTIFY WELDING CABLE PROBLEM & LIGHT PROBLEM
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1670 AIR COMPRESSOR 8 7672.6 1


2 GR1865 GENERATOR 8 2393 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 120 & 50 REPORTING DATE 4-Jun-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1091341 & 1056028 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT & PART OF PERMIT START 7:05:00
L.I. Description ANNULAR PLATE FIT UP & OLD ANNULAR PLATE CUTTING PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 2 TAKE PERMIT
2 23421 SARFUDIN S.O 8 2 SAFETY OFFICER
3 21055 LIBRES FAB 8 2 ANNULAR PLATE(12MM) CUTTING 18 M
4 24671 SONNY FAB 8 2 SHELL UNDER SIDE GRINDING 12 M
5 23999 PHILIP FAB 8 2 NEW ANNULAR PLATE GRINDING & BEVELLING BOTH ENDS 12 M
6 ANNULAR PLATE FIT UP 1 EA
7 21865 NAUSAD FAB 8 NEW ANNULAR PLATE CUTTING 18 M
8 19454 NAGENDRAN FAB 8 BOTTOM SKETCH PLATE FIT UP 0.4 TON
9 23205 MEK HELPER 8 2 ASHPALT & CONCRETE BREAKING UNDER THE SHELL( JACK HAMMERING ) - 10 MTR 1.5 M³
10 13520 PANDIT HELPER 8 2 SHIFTING ANNULAR PLATE FOR PLATE FIT UP 0.6 TON
11 25329 RUBEN HELPER 8 2 SHIFTING BREAKED ASHPALT TO OUTSIDE ( 40 M ) 1.5 M³
12 25318 PASKARAN HELPER 8 2 BACK FILLING CEMENT MIXING SAND ( SHIFTING AROUND 50 M ) 1.5 M³
13 16678 SELVARAJ MASON 8 ALL HELPERS ASSISTING FOR FIT UP
14 24219 DURGA HELPER 8
15 20776 DHAN HELPER 8 2 EQUIPMENT STANDBY MAN
16 11997 GIRI HELPER 8 2 D DOOR STANDBYMAN
17
18
19 25391 MARWAN ELECTRICIAN 8 2 ARRANGING WELDING CABLES
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1670 AIR COMPRESSOR 8 7687.4 1


2 GR1865 GENERATOR 8 2406 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 70 & 80 REPORTING DATE 3-Jun-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1081190 & 1054480 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT PERMIT START 7:05:00
L.I. Description BOTTOM PLATE WELDING (2 PASS ) & GRINDING PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 21080 LOKNATH WELDER 8 BOTTOM PLATE WELDING ( GAPPING AND FILLING ) - 2 PASS 10 10 M
2 19344 RAJ KUMAR HELPER 8 BOTTOM PLATE GRINDING ( GRINDING ) 10 10 M
3 20991 CHAUHAN WELDER 8 2 BOTTOM PLATE WELDING ( GAPPING AND FILLING ) - 2 PASS 15 7 22 M
4 22322 PREM HELPER 8 2 BOTTOM PLATE GRINDING ( GRINDING ) 15 7 22 M
5 21042 BALA KRISHNA WELDER 8 ANNULAR PLATE TACK WELD 6 M
6 BOTTOM PLATE ROOT PASS 10 M
7
8 17594 DILLY BLASTER 8 CYLINDER LOADING ON BOOM TRUCK ( OXYGEN & ACETYLENE) 15 EA
9 13219 DINESH BLASTER 8 CYLINDER UNLOADING (OXYGEN & ACETYLENE) 15 EA
10 1623 MOHAMMED KHAN PAINTER 8
11
12 17440 JUDE WELDER 8
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 WM1606 WELDING MACHINE 8 6592.8 1


2 WM1192 WELDING MACHINE 8 8163.5 2
3 MANLIFT IDLE 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 120 & 50 REPORTING DATE 5-Jun-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1091341 & 1056028 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT & PART OF PERMIT START 7:05:00
L.I. Description ANNULAR PLATE FIT UP & OLD ANNULAR PLATE CUTTING PERMIT CLOSED 2:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 TAKE PERMIT
2 23421 SARFUDIN S.O 8 SAFETY OFFICER
3 21865 NAUSAD FAB 8 ANNULAR PLATE(12MM) CUTTING 24 M
4 24671 SONNY FAB 8 SHELL UNDER SIDE GRINDING 12 M
5 19454 NAGENDRAN FAB 8 NEW ANNULAR PLATE GRINDING & BEVELLING BOTH ENDS 12 M
6 ANNULAR PLATE FIT UP 1 EA
7
8
9 23205 MEK HELPER 8 ASHPALT & CONCRETE BREAKING UNDER THE SHELL( JACK HAMMERING ) - 8 MTR 1.3 M³
10 13520 PANDIT HELPER 8 SHIFTING ANNULAR PLATE FOR PLATE FIT UP 0.6 TON
11 25329 RUBEN HELPER 8 SHIFTING BREAKED ASHPALT TO OUTSIDE ( 40 M ) 1.3 M³
12 BACK FILLING CEMENT MIXING SAND ( SHIFTING AROUND 50 M ) 1.3 M³
13 ALL HELPERS ASSISTING FOR FIT UP
14
15 20776 DHAN HELPER 8 EQUIPMENT STANDBY MAN
16 11997 GIRI HELPER 8 D DOOR STANDBYMAN
17
18
19 25391 MARWAN ELECTRICIAN 8 TK-101 CP CABLE JUNCTION BOX ARRANGEMENTS
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1670 AIR COMPRESSOR 8 7698.5 1


2 GR1865 GENERATOR 8 2416 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 60 & 50 REPORTING DATE 5-Jun-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1055131 & 1056028 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT & PART OF PERMIT START 7:05:00
L.I. Description BOTTOM PLATE CUTTING & FITUP & TACK WELD PERMIT CLOSED 2:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 21055 LIBRES FAB 8 BOTTOM PLATE CUTTING 11 M
2 23999 PHILIP FAB 8 BOTTOM SKETCH PLATE FITUP - 3 EA 1.5 TON
3 17594 DILLY BLASTER 8 BOTTOM PLATE SHHIFTING TO TANK INSIDE (40 M) 2 EA
4 13219 DINESH BLASTER 8 OXYGEN AND ACETYLENE CYLINDER CHANGING 4 EA
5 1623 MOHAMMED KHAN PAINTER 8 ASSISTING PLATE FITUP & FIRE WATCH
6 17440 JUDE WELDER 8 BOTTOM PLATE TACK WELD
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 70 & 80 REPORTING DATE 5-Jun-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1081190 & 1054480 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT PERMIT START 7:05:00
L.I. Description BOTTOM PLATE WELDING (2 PASS ) & GRINDING PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 21080 LOKNATH WELDER 8 BOTTOM PLATE WELDING ( GAPPING AND FILLING ) - 2 PASS 11 11 M
2 19344 RAJ KUMAR HELPER 8 BOTTOM PLATE GRINDING ( GRINDING ) 11 11 M
3 20991 CHAUHAN WELDER 8 BOTTOM PLATE WELDING ( GAPPING AND FILLING ) - 2 PASS 11 11 M
4 22322 PREM HELPER 8 BOTTOM PLATE GRINDING ( GRINDING ) 11 11 M
5 21042 BALA KRISHNA WELDER 8 BOTTOM PLATE WELDING (ROOT PASS ) 15 15 M
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 WM1606 WELDING MACHINE 8 6603.3 1


2 WM1192 WELDING MACHINE 8 8174 2
3 MANLIFT IDLE 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 120 & 50 REPORTING DATE 6-Jun-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1091341 & 1056028 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT & PART OF PERMIT START 7:05:00
L.I. Description ANNULAR PLATE FIT UP & OLD ANNULAR PLATE CUTTING PERMIT CLOSED 4:30:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 2 TAKE PERMIT
2 23421 SARFUDIN S.O 8 2 SAFETY OFFICER
3 21055 LIBRES FAB 8 2 OLD ANNULAR PLATE(12MM) CUTTING 24 M
4 23999 PHILIP FAB 8 2 SHELL UNDER SIDE GRINDING 12 M
5 19454 NAGENDRAN FAB 8 2 NEW ANNULAR PLATE GRINDING & BEVELLING BOTH ENDS 12 M
6 ANNULAR PLATE FIT UP 1 EA
7 PULLING ANNULAR PLATE FITUP
8
9 23205 MEK HELPER 8 2 ASHPALT & CONCRETE BREAKING UNDER THE SHELL( JACK HAMMERING ) - 8 MTR 1.3 M³
10 13520 PANDIT HELPER 8 2 SHIFTING ANNULAR PLATE FOR PLATE FIT UP 0.6 TON
11 25329 RUBEN HELPER 8 2 SHIFTING BREAKED ASHPALT TO OUTSIDE ( 40 M ) 1.3 M³
12 1623 MOHAMMED KHAN PAINTER 8 2 BACK FILLING CEMENT MIXING SAND ( SHIFTING AROUND 50 M ) 1.3 M³
13 16678 SELVARAJ MASON 8 ALL HELPERS ASSISTING FOR FIT UP
14 SHIFTING SCRAP PLATES TO OUTSIDE 2 TON
15 BOTTOM PLATE SHIFTING TO INSIDE - 3 EA 2.4 TON
16
17
18 20776 DHAN HELPER 8 2 EQUIPMENT STANDBY MAN
19 11997 GIRI HELPER 8 2 D DOOR STANDBYMAN
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1670 AIR COMPRESSOR 8 7710 1


2 GR1865 GENERATOR 8 2425 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 70 & 80 REPORTING DATE 6-Jun-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1081190 & 1054480 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT PERMIT START 7:05:00
L.I. Description BOTTOM PLATE WELDING (2 PASS ) & GRINDING PERMIT CLOSED 4:30:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 21080 LOKNATH WELDER 8 2 BOTTOM PLATE STICH WELDING 50 50 M
2 17594 DILLY BLASTER 8 2 HAMMERING FOR STICH WELD 50 50 M
3 20991 CHAUHAN WELDER 8 2 BOTTOM PLATE WELDING ( GAPPING AND FILLING ) - 2 PASS 20 20 M
4 22322 PREM HELPER 8 2 BOTTOM PLATE GRINDING 20 20 M
5 21042 BALA KRISHNA WELDER 8 2 ANNULAR PLATE STICH WELDING 50 50 M
6 13219 DINESH BLASTER 8 2 HAMMERING FOR STICH WELD 50 50 M
7 ASSISTING FOR PLATE FITUP WORKS
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 WM1606 WELDING MACHINE 8 6614.6 1


2 WM1192 WELDING MACHINE 8 8185.3 2
3 MANLIFT IDLE 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 120 & 50 REPORTING DATE 7-Jun-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1091341 & 1056028 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT & PART OF PERMIT START 7:05:00
L.I. Description ANNULAR PLATE FIT UP & OLD ANNULAR PLATE CUTTING PERMIT CLOSED 4:30:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 2 TAKE PERMIT
2 23421 SARFUDIN S.O 8 2 SAFETY OFFICER
3 21055 LIBRES FAB 8 2 OLD ANNULAR PLATE(12MM) CUTTING 24 M
4 23999 PHILIP FAB 8 2 SHELL UNDER SIDE GRINDING 12 M
5 19454 NAGENDRAN FAB 8 2 NEW ANNULAR PLATE GRINDING & BEVELLING BOTH ENDS 12 M
6 NEW ANNULAR PLATE MARKING AND CUTTING 12 M
7 PULLING ANNULAR PLATE FITUP
8 ANNULAR PLATE FIT UP 1 EA
9 23205 MEK HELPER 8 2 ASHPALT & CONCRETE BREAKING UNDER THE SHELL( JACK HAMMERING ) - 8 MTR 1.3 M³
10 13520 PANDIT HELPER 8 2 SHIFTING ANNULAR PLATE FOR PLATE FIT UP 0.6 TON
11 25329 RUBEN HELPER 8 2 SHIFTING BREAKED ASHPALT TO OUTSIDE ( 40 M ) 1.3 M³
12 25318 PASKARAN HELPER 8 2 BACK FILLING CEMENT MIXING SAND ( SHIFTING AROUND 50 M ) 1.3 M³
13 ALL HELPERS ASSISTING FOR FIT UP
14 1623 MOHAMMED KHAN PAINTER 8 2 SHIFTING SCRAP PLATES TO OUTSIDE 3 TON
15 17594 DILLY BLASTER 8 2 NEW ANNULAR PLATE SHIFTING INSIDE - 2 EA 2.4 TON
16 13219 DINESH BLASTER 8 2 ARRANGING SCAFFOLDING OUTSIDE FOR CUTTED D DOOR WORK
17 SHIFTING CYLINDERS 4 EA
18 20776 DHAN HELPER 8 2 EQUIPMENT STANDBY MAN
19 11997 GIRI HELPER 8 2 D DOOR STANDBYMAN
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1670 AIR COMPRESSOR 8 7724.1 1


2 GR1865 GENERATOR 8 2439 2
3 3
4 4 S
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 70 & 80 REPORTING DATE 7-Jun-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1081190 & 1054480 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT PERMIT START 7:05:00
L.I. Description BOTTOM PLATE WELDING (2 PASS ) & GRINDING PERMIT CLOSED 4:30:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 21080 LOKNATH WELDER 8 2 BOTTOM PLATE WELDING ( ROOT PASS ) 30 30 M
2 21042 BALA KRISHNA WELDER 8 2 BOTTOM PLATE WELDING ( ROOT PASS ) 28 28 M
3 20991 CHAUHAN WELDER 8 2 BOTTOM PLATE WELDING ( GAPPING AND FILLING ) - 2 PASS 24 24 M
4 22322 PREM HELPER 8 2 BOTTOM PLATE GRINDING 24 24 M
5
6
7 21865 NAUSAD FAB 8 2 CUTTED D DOOR WORK ON OUTSIDE
8 MARKING AND BEVELLING GAS CUT 9 M
9
10
11
12
13
14 21865 NAUSAD FAB 8 2 CUTTED D DOOR WORK ON OUTSIDE
15 MARKING AND BEVELLING GAS CUT 9 M
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 WM1606 WELDING MACHINE 8 6628.8 1


2 WM1192 WELDING MACHINE 8 8199.8 2
3 MANLIFT IDLE 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 120 & 50 REPORTING DATE 8-Jun-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1091341 & 1056028 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT & PART OF PERMIT START 7:05:00
L.I. Description ANNULAR PLATE FIT UP & OLD ANNULAR PLATE CUTTING PERMIT CLOSED 4:30:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 2 TAKE PERMIT
2 23421 SARFUDIN S.O 8 2 SAFETY OFFICER
3 21055 LIBRES FAB 8 2 OLD ANNULAR PLATE(12MM) CUTTING 20 M
4 23999 PHILIP FAB 8 2 SHELL UNDER SIDE GRINDING 10 M
5 19454 NAGENDRAN FAB 8 2 NEW ANNULAR PLATE GRINDING & BEVELLING BOTH ENDS 10 M
6 NEW ANNULAR PLATE MARKING AND CUTTING 10 M
7 ANNULAR PLATE FIT UP 1 EA
8 BOTTOM SKETCH PLATE FITUP - 2 EA 1.6 TON
9 23205 MEK HELPER 8 2 ASHPALT & CONCRETE BREAKING UNDER THE SHELL( JACK HAMMERING ) - 5 MTR 1 M³
10 13520 PANDIT HELPER 8 2 SHIFTING ANNULAR PLATE FOR PLATE FIT UP 0.6 TON
11 25329 RUBEN HELPER 8 2 SHIFTING BREAKED ASHPALT TO OUTSIDE ( 40 M ) 1 M³
12 25318 PASKARAN HELPER 8 2 BACK FILLING CEMENT MIXING SAND ( SHIFTING AROUND 50 M ) 1 M³
13 ALL HELPERS ASSISTING FOR FIT UP
14 1623 MOHAMMED KHAN PAINTER 8 SHIFTING SCRAP PLATES TO OUTSIDE 1.6 TON
15 17594 DILLY BLASTER 8 NEW ANNULAR PLATE SHIFTING INSIDE -4 EA 3 TON
16 13219 DINESH BLASTER 8 SHIFTING CYLINDERS 4 EA
17
18 20776 DHAN HELPER 8 2 EQUIPMENT STANDBY MAN
19 11997 GIRI HELPER 8 2 D DOOR STANDBYMAN
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1670 AIR COMPRESSOR 8 7738 1


2 GR1865 GENERATOR 8 2453 2
3 3
4 4 S
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 70 & 80 REPORTING DATE 8-Jun-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1081190 & 1054480 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT PERMIT START 7:05:00
L.I. Description BOTTOM PLATE WELDING (2 PASS ) & GRINDING PERMIT CLOSED 4:30:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 21080 LOKNATH WELDER 8 2 BOTTOM PLATE WELDING ( 2 PASS ) 10 10 M
2 BOTTOM PLATE GRINDING ( 2 TIMES ) 10 10 M
3
4 21042 BALA KRISHNA WELDER 8 2 BOTTOM PLATE WELDING ( 2 PASS ) 10 10 M
5 BOTTOM PLATE GRINDING ( 2 TIMES ) 10 10 M
6
7 20991 CHAUHAN WELDER 8 2 BOTTOM PLATE WELDING ( GAPPING AND FILLING ) - 2 PASS 22 22 M
8 22322 PREM HELPER 8 2 BOTTOM PLATE GRINDING 22 22 M
9
10
11 21865 NAUSAD FAB 8 CUTTED D DOOR FABRICATION ON OUTSIDE THE TANK
12 1831 MURALI FAB 8 BEVELLING USE GRINDER
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 WM1606 WELDING MACHINE 8 6642.6 1


2 WM1192 WELDING MACHINE 8 8213.5 2
3 WM1696 WELDING MACHINE 4879.3 3
4 MANLIFT IDLE 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 70 & 80 REPORTING DATE 9-Jun-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1081190 & 1054480 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT PERMIT START 7:05:00
L.I. Description BOTTOM PLATE WELDING (2 PASS ) & GRINDING PERMIT CLOSED 5:15:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 2 TAKE PERMIT
2 23421 SARFUDIN S.O 8 2 SAFETY OFFICER
3
4 20991 CHAUHAN WELDER 8 2 BOTTOM PLATE WELDING ( GAPPING AND FILLING ) - 2 PASS 23 23 M
5 22322 PREM HELPER 8 2 BOTTOM PLATE GRINDING 23 23 M
6
7 21042 BALA KRISHNA WELDER 8 2 BOTTOM PLATE WELDING ( 3 PASS ) 12 12 M
8 21080 LOKNATH WELDER 8 2 BOTTOM PLATE WELDING ( 3 PASS ) 12 12 M
9 20882 MAN BAHADUR HELPER 8 3 BOTTOM PLATE GRINDING ( 3 TIMES ) ( GRINDING FOR 2 WELDERS ) 24 24 M
10
11 20925 SOMESWAR WELDER 8 ANNULAR PLATE WELDING ( ROOT PASS ) 10 M
12 20987 SUDESH WELDER 8 2 ANNULAR PLATE WELDING ( ROOT PASS ) 12 M
13 ARRANGE CABLE VIA SMALL D DOOR FOR NIGHT SHIFT WELD
14 21197 GUNJA HELPER 8 ANNULAR PLATE GRINDING 12 M
15
16
17 20776 DHAN HELPER 8 2 EQUIPMENT STANDBY MAN
18 11997 GIRI HELPER 8 2 D DOOR STANDBYMAN
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1670 AIR COMPRESSOR 8 7752.7 1


2 GR1865 GENERATOR 8 2466 2
3 WM1606 WELDING MACHINE 8 6656.5 3
4 WM1192 WELDING MACHINE 8 8227.3 4 S
5 WM1696 WELDING MACHINE 8 4892 5
6 WM1194 WELDING MACHINE 8 158.8 6
7 WM1693 WELDING MACHINE IDLE 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 70 & 80 REPORTING DATE 9-Jun-20

SERVICE ORDER NO. 6510949239 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of PERMIT START 7:05:00
L.I. Description D DOOR BEVELLING & GRINDING & FIT UP AND WEAR PAD CUTTING PERMIT CLOSED 5:15:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 21865 NAUSAD FAB 8 2 CUTTED D DOOR MAKE BEVELLING USING CUTTING TORCH 9 M
2 1831 MURALI FAB 8 2 D DOOR GRINDING 9 M
3 WELD FILL UP IN GAP & GRINDING
4 21055 LIBRES FAB 8 2 SHELL GRINDING FOR D DOOR FITUP LEFT SIDE 6 M
5 19135 AWDESH FAB 8 2 SHELL GRINDING FOR D DOOR FITUP RIGHT SIDE 6 M
6 WELD FILL UP IN GAP & AGAIN GRINDING
7 21855 HARICHARAN WELDER 8 2 WELDING FILL UP IN D DOOR & SHELL & ASSISTING FABRICATORS FOR PLATE FIT UP
8 USING CHAIN BLOCK LIFT THE D DOOR AND FIT UP IN SHELL
9 C HOOK CUTTING AND GRINDING FOR SHELL FIT UP 6 EA
10 L HOOK CUTTING AND GRINDING FOR SHELL FIT UP 5 EA
11 13219 DINESH BLASTER 8 FIRE WATCH IN D DOOR AREA
12 23999 PHILIP FAB 8 2 15 " WEAR PAD CUTTING FOR ROOF LEGS 30 EA
13 19454 NAGENDRAN FAB 8 2 15 " WEAR PAD CUTTING FOR ROOF LEGS
14 17594 DILLY BLASTER 8 FIRE WATCH IN DIKE AREA
15 CYLINDER SHIFTING 2 EA
16
17 20885 MOHAN S.F 8 2 MAKING SHELTER EXTENSION
18 24219 DURGA S.F 8 MAKING SHELTER EXTENSION
19 21258 RAJKUMAR S.F 8 MAKING SHELTER EXTENSION
20 FALCO 20885 ASSISTING D DOOR FIT UP
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 60 REPORTING DATE 9-Jun-20

SERVICE ORDER NO. 6510949239 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of PART OF PERMIT START 7:05:00
L.I. Description BOTTOM SCRAP PLATES SHIFTING PERMIT CLOSED 5:10:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 23205 MEK HELPER 8 2 SHIFTING SCRAP PLATES TO OUTSIDE THE TANK - 9 EA 4 TON
2 13520 PANDIT HELPER 8 2 SHIFTING ROOF DRAIN PIPE ( JACK KNIFE ) TO INSIDE THE TANK - 3 EA
3 25329 RUBEN HELPER 8 2 ASSISTING FOR D DOOR FIT UP
4 25318 PASKARAN HELPER 8 2 ARRANGING Vacuum BOX AND PUMP
5 SHIFTING CYLINDER 2 EA
6 ASSISTING WELDER FOR ARRANGE WELD CABLES
7
8 13936 GIMMY OPERATOR 8 2 OPERATE FORKLIFT , LOADER , BOBCAT
9 19344 RAJ KUMAR HELPER 8 2 ASSISTING BOOM TRUCK FOR UNLOADING CARGO HOSES
10 UNLOAD CARGO HOSE 5 EA
11 FLAG MAN
12 LOAD CARGO HOSES IN YARD
13
14 25391 MARWAN ELECTRICIAN 8 2 ARRANGE WELDING CABLES
15 RECTIFY ELECTRICAL PROBLEMS
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 70 & 80 REPORTING DATE 10-Jun-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1081190 & 1054480 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT PERMIT START 7:05:00
L.I. Description BOTTOM PLATE WELDING (2 PASS ) & GRINDING PERMIT CLOSED 5:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 2 TAKE PERMIT
2 23421 SARFUDIN S.O 8 2 SAFETY OFFICER
3
4 20991 CHAUHAN WELDER 8 2 BOTTOM PLATE WELDING ROOT PASS 15 15 M
5 BOTTOM PLATE T JOINT WELDING (4 PASS ) - 15 JOINTS
6 22322 PREM HELPER 8 BOTTOM PLATE GRINDING
7 21042 BALA KRISHNA WELDER 8 2 BOTTOM PLATE WELDING ROOT PASS 14 14 M
8 BOTTOM PLATE T JOINT WELDING (4 PASS ) - 19 JOINTS
9
10 21080 LOKNATH WELDER 8 2 BOTTOM PLATE WELDING ( 2 PASS ) 3 3 M
11 BOTTOM PLATE T JOINT WELDING - 22 JOINTS
12 20882 MAN BAHADUR HELPER 8 2 BOTTOM PLATE GRINDING ( FOR TWO WELDERS )
13
14 20925 SOMESWAR WELDER 8 2 ANNULAR PLATE WELDING ( ROOT PASS ) 22 22 M
15 20987 SUDESH WELDER 8 2 SKETCH TO ANNULAR PLATE WELDING ( ROOT PASS ) 22 22 M
16 19344 RAJ KUMAR HELPER 8 2 ANNULAR PLATE GRINDING & T JOINT GRINDING 35 M
17 21855 HARICHARAN WELDER 8 2 BOTTOM PLATE T JOINT WELDING - 27 JOINTS
18 21197 GUNJA HELPER 8 2 ANNULAR PLATE GRINDING & T JOINT GRINDING 30 M
19 20776 DHAN HELPER 8 2 EQUIPMENT STANDBY MAN
20 11997 GIRI HELPER 8 2 D DOOR STANDBYMAN
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1670 AIR COMPRESSOR 8 7766.7 1


2 GR1865 GENERATOR 8 2478 2
3 WM1606 WELDING MACHINE 8 6670.4 3
4 WM1192 WELDING MACHINE 8 8241.2 4
5 WM1696 WELDING MACHINE 8 4905.8 5
6 WM1194 WELDING MACHINE IDLE 158.8 6
7 WM1693 WELDING MACHINE 8 7309.3 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# NO LINE ITEM REPORTING DATE 10-Jun-20

SERVICE ORDER NO. 6510949239 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of PERMIT START 7:05:00
L.I. Description ROOF LEG WEAR PAD CUT & INSTALLATION & SEAL FABRIC INSTALLATION PERMIT CLOSED 5:15:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 21865 NAUSAD FAB 8 2 SEAL FABRIC INSTALLATION 3 M
2 1831 MURALI FAB 8 2 ROOF LEG 15" WEAR PAD GRINDING DOUBLE SIDE - 19 EA 19 EA
3 19135 AWDESH FAB 8 2 LIFTING ROOF LEG FOR INSTALL WEAR PAD - 19 ROOF LEG
4 INSTALL WEAR PAD ON EXACT LOCATIONS 19 EA
5 17594 DILLY BLASTER 8 2 SHIFTING WEAR PAD DIKE TO INSIDE THE TANK ( AROUND 80 M )
6 23999 PHILIP FAB 8 2 15 " WEAR PAD CUTTING FOR ROOF LEGS 40 EA
7 19454 NAGENDRAN FAB 8 2
8 13219 DINESH BLASTER 8 2 FIRE WATCH IN DIKE AREA & ASSIST FOR FABRICATORS
9 ARRANGE PLATE FOR CUTTING
10
11 23205 MEK HELPER 8 2 HOUSEKEEPING PERFORMED THE TANK INSIDE THE TANK FIRST HALF USE BRUSH 981 M²
12 13520 PANDIT HELPER 8 2 HOUSEKEEPING PERFORMED THE TANK INSIDE THE TANK FIRST HALF USE BRUSH
13 25329 RUBEN HELPER 8 2 HOUSEKEEPING PERFORMED THE TANK INSIDE THE TANK FIRST HALF USE BRUSH
14 25318 PASKARAN HELPER 8 2 HOUSEKEEPING PERFORMED THE TANK INSIDE THE TANK FIRST HALF USE BRUSH
15 SHIFTING UNWANTED MATERIAL TO OUTSIDE THETANK
16 SHIFTING SAND TO OUTSIDE
17 ARRANGE Vacuum BOX & CHECKING
18 25391 MARWAN ELECTRICIAN 8 2 CHCKING WELDING MACHINE PROBLEMS
19 CHECKING Vacuum PUMP
20 DO ELECTRICAL WORKS
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 70 & 80 REPORTING DATE 11-Jun-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1081190 & 1054480 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT PERMIT START 7:05:00
L.I. Description BOTTOM PLATE WELDING (2 PASS ) & GRINDING PERMIT CLOSED 19:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 4 TAKE PERMIT
2 23421 SARFUDIN S.O 8 4 SAFETY OFFICER
3 AS PER T & I INSTRUCTION SAFETY OFFICER WORK UNTILL 7 O CLK
4 20991 CHAUHAN WELDER 8 4 BOTTOM PLATE WELDING ( 2 PASS ) 24 24 M
5
6 21855 HARICHARAN WELDER 8 4 BOTTOM PLATE WELDING ( 3 PASS ) 15 15 M
7 WELDER 20991, 21855 AFTER 5 O CLOCK START D DOOR WELDING
8 D DOOR WELDING (ROOT PASS )
9 D DOOR HARIZONTAL WELDING (ROOT PASS ) 2.55 2.55 M
10 D DOOR VERTICAL WELDING (ROOT PASS ) 4.8 4.8 M
11
12 22322 PREM HELPER 8 4 BOTTOM PLATE GRINDING ( 2 TIMES ) 24 24 M
13 WORK UNTILL 7 O CLOCK ASSISTING WELDERS
14 13219 DINESH BLASTER 8 2 BOTTOM PLATE GRINDING ( 3 TIMES ) 15 15 M
15
16 20776 DHAN HELPER 8 4 EQUIPMENT STANDBY MAN
17 11997 GIRI HELPER 8 4 D DOOR STANDBYMAN
18
19 19454 NAGENDRAN FAB 8 D DOOR FREE HEATING BEFORE THE ROOT PASS
20 ASSIST FOR ROOF DRAIN PIPE INSTALLATION
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1670 AIR COMPRESSOR 11 7784.2 1


2 GR1865 GENERATOR 11 2493 2
3 WM1606 WELDING MACHINE 11 6687.9 3
4 WM1192 WELDING MACHINE 11 8249.1 4
5 WM1696 WELDING MACHINE 8 4920 5
6 WM1714 WELDING MACHINE 8 6160 6
7 WM1693 WELDING MACHINE 8 7309.3 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 70 & 80 REPORTING DATE 11-Jun-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1081190 & 1054480 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT PERMIT START 7:05:00
L.I. Description BOTTOM PLATE WELDING & GRINDING PERMIT CLOSED 17:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 20925 SOMESWAR WELDER 8 2 SKETCH TO ANULAR PLATE STICH WELDING 24 24 M
2 SKETCH TO ANULAR PLATE WELDING (ROOT PASS ) 15 15 M
3 20987 SUDESH WELDER 8 2 SKETCH TO ANULAR PLATE WELDING (4 PASS ) 8 8 M
4 BOTTOM PLATE WELDING ( 2 PASS ) 3 3 M
5
6
7 21042 BALA KRISHNA WELDER 8 2 BOTTOM PLATE WELDING ( 3 PASS ) 10 10 M
8 BOTTOM PLATE WELDING ( ROOT PASS ) 10 10 M
9 20882 MAN BAHADUR HELPER 8 2 BOTTOM PLATE GRINDING ( 3 PASS ) 15 15 M
10 21080 LOKNATH WELDER 8 2 SKETCH TO ANULAR PLATE WELDING (ROOT PASS ) 18 18 M
11 SKETCH TO ANULAR PLATE STICH WELDING 7 7 M
12 17594 DILLY BLASTER 8 2 ANNULAR TO SHELL GRINDING 24 24 M
13
14 25318 PASKARAN HELPER 8 2 PERFORM HAMMERING FOR TWO WELDERS
15 ASSISTING TWO WELDERS ( WELDER 21080 , 20925 )
16 19344 RAJ KUMAR HELPER 8 2 ANNULAR PLATE WELDING 25 25 M
17 Vacuum TEST ASSISTING
18 21197 GUNJA HELPER 8 2 SKETCH TO ANULAR PLATE GRINDING (4 PASS ) 8 8 M
19 BOTTOM PLATE GRINDING ( 2 PASS ) 3 3 M
20 1623 MOHAMMED KHAN PAINTER 8 ASSISTING
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# NO LINE ITEM REPORTING DATE 11-Jun-20

SERVICE ORDER NO. 6510949239 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of PERMIT START 7:05:00
L.I. Description ROOF DRAIN PIPE ( JACK KNIFE ) INSTALLATION PERMIT CLOSED 17:15:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 21865 NAUSAD FAB 8 2 ROOF DRAIN PIPE( JACK KNIFE ) INSTALLATION - 2 PIPES
2 1831 MURALI FAB 8 2 ROOF DRAIN PIPE( JACK KNIFE ) INSTALLATION - 2 ELBOWS
3 19135 AWDESH FAB 8 2 ROOF DRAIN PIPE NUT & BOLT TIGHT - 36 EA
4
5 21055 LIBRES FAB 8 2 ROOF DRAIN PIPE ( JACK KNIFE ) SUPPORTS OLD WEAR PAD CUTTING 18 EA
6 23999 PHILIP FAB 8 2 ROOF DRAIN PIPE ( JACK KNIFE ) SUPPORTS NEW WEAR PAD INSTALLING 18 EA
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 90 REPORTING DATE 11-Jun-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1054898 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT PERMIT START 7:05:00
L.I. Description Vacuum TEST ON WELD JOINTS PERMIT CLOSED 17:15:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1
2
3 23205 MEK HELPER 8 2 PERFORM Vacuum TEST ON WELD JOINTS 100 70 170 M
4 13520 PANDIT HELPER 8 2 PERFORM Vacuum TEST ON WELD JOINTS
5 25329 RUBEN HELPER 8 2 PERFORM Vacuum TEST ON WELD JOINTS
6 25325 TANISTAN HELPER 8 2 PERFORM Vacuum TEST ON WELD JOINTS
7 25391 MARWAN ELECTRICIAN 8 2 APPLY SOAP ON WELD JOINTS
8 OPERATING Vacuum BOX
9 WITH ARRAMCO INSPECTOR
10 170 M WELD JOINTS ACCEPTED
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 70 & 80 REPORTING DATE 12-Jun-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1081190 & 1054480 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT PERMIT START 7:05:00
L.I. Description BOTTOM PLATE WELDING (2 PASS ) & GRINDING PERMIT CLOSED 14:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 TAKE PERMIT
2 23421 SARFUDIN S.O 8 SAFETY OFFICER
3
4 20991 CHAUHAN WELDER 8 BOTTOM PLATE WELDING ( 3 PASS ) 10 10 M
5 22322 PREM HELPER 8 BOTTOM PLATE GRINDING ( 3 TIMES ) 10 10 M
6 21855 HARICHARAN WELDER 8 BOTTOM PLATE WELDING ( 3 PASS ) 10 10 M
7 19344 RAJ KUMAR HELPER 8 BOTTOM PLATE GRINDING ( 3 TIMES ) 10 10 M
8 20987 SUDESH WELDER 8 BOTTOM PLATE WELDING ( 2 PASS ) 5 5 M
9 ANNULAR PLATE WELDING ( ROOT PASS ) 4 4 M
10 AFTER DIESEL TEST INSPECTOR MARKED 15 LOCATIONS IN SECOND HALF
11 ANNULAR PLATE
12 ANNULAR PLATE WELDING REPAIR - 15 LOCATIONS
13 19135 AWDESH FAB 8 AFTER FIRST HALF ANNULAR PLATE WELD INSPECTION INSPECTOR NEED
14 MORE GRINDING
15 PERFORM GRINDING IN FIRST HALF ANNULAR PLATE 60 60 M
16 PERFORM GRINDING IN SECOND HALF REPAIR AREA - 15 LOCATIONS
17 20925 SOMESWAR WELDER 8 ANNULAR PLATE BUT JOINT WELDING ( 6 PASS ) - 2 JOINTS
18
19 20776 DHAN HELPER 8 EQUIPMENT STANDBY MAN
20 11997 GIRI HELPER 8 D DOOR STANDBYMAN
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1670 AIR COMPRESSOR 6 7797 1


2 GR1865 GENERATOR 6 2504 2
3 WM1606 WELDING MACHINE 6 6700 3
4 WM1192 WELDING MACHINE IDLE 4
5 WM1696 WELDING MACHINE 6 4933 5
6 WM1714 WELDING MACHINE 6 6172 6
7 WM1693 WELDING MACHINE 6 7339 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# NO LINE ITEM REPORTING DATE 12-Jun-20

SERVICE ORDER NO. 6510949239 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of PERMIT START 7:05:00
L.I. Description D DOOR GRINDING & ROOF DRAIN PIPE ( JACK KNIFE ) INSTALLATION PERMIT CLOSED 14:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 21055 LIBRES FAB 8 D DOOR ( SHELL ) GRINDING ( AFTER ROOT PASS ) 7.4 7.4 M
2 19454 NAGENDRAN FAB 8 D DOOR ( SHELL ) GRINDING ( AFTER ROOT PASS )
3 FABRICATE NEW DRAIN PIPE SUPPORT - 2 EA
4 FITUP & TACK WELD DRAIN PIPE WEAR PAD 5 5 EA
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 90 REPORTING DATE 12-Jun-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1054898 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT PERMIT START 7:05:00
L.I. Description Vacuum TEST ON WELD JOINTS PERMIT CLOSED 14:15:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1
2
3 23205 MEK HELPER 8 PERFORM Vacuum TEST ON WELD JOINTS 150 150 M
4 13520 PANDIT HELPER 8 PERFORM Vacuum TEST ON WELD JOINTS
5 25329 RUBEN HELPER 8 PERFORM Vacuum TEST ON WELD JOINTS
6 25318 PASKARAN HELPER 8 PERFORM Vacuum TEST ON WELD JOINTS
7 25391 MARWAN ELECTRICIAN 8 APPLY SOAP ON WELD JOINTS
8 OPERATING Vacuum BOX
9 SHIFTING Vacuum PUMP
10 WITH ARRAMCO INSPECTOR
11 150 M WELD JOINTS ACCEPTED
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 70 & 80 REPORTING DATE 13-Jun-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1081190 & 1054480 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT PERMIT START 7:05:00
L.I. Description BOTTOM PLATE WELDING & GRINDING PERMIT CLOSED 14:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 2 TAKE PERMIT
2 23421 SARFUDIN S.O 8 2 SAFETY OFFICER
3 19135 AWDESH FAB 8 2 D DOOR GRINDING ( AFETR FILL UP WELD ) INTERNAL AND EXTERNAL 14.6 M
4 19454 NAGENDRAN FAB 8 2 WE PERFORM PT TEST ( WITH INSPECTORS ) THEY MARKED SOME LOCATIONS FOR
5 REPAIRING
6 20991 CHAUHAN WELDER 8 2 SKETCH TO ANNULAR PLATE WELDING( 5 PASS ) & GRINDING 3 M
7 ANNULAR PLATE BUT JOINT WELDING ( 9 PASS ) - 1 JOINTS & GRINDING
8 15" WEAR PAD WELDING - 3 EA & GRINDING
9 21855 HARICHARAN WELDER 8 2 BOTTOM PLATE WELDING ( 3 PASS ) 4 M
10 ANNULAR PLATE BUT JOINT WELDING ( 6 PASS ) -3 JOINTS
11 20987 SUDESH WELDER 8 2 SKETCH TO ANNULAR PLATE WELDING( 5 PASS ) 4 M
12 SKETCH TO ANNULAR PLATE WELDING( 3 PASS ) 6 M
13 21080 LOKNATH WELDER 8 2 SKETCH TO ANNULAR PLATE WELDING( 5 PASS ) 7.5 M
14 BOTTOM PLATE T JOINT WELDING -6JOINTS
15
16 21042 BALA KRISHNA WELDER 8 2 SKETCH TO ANNULAR PLATE WELDING( 5 PASS ) 8.5 M
17 20925 SOMESWAR WELDER 8 2 ANNULAR PLATE BUT JOINT WELDING ( 6 PASS ) - 4 JOINTS
18 ANNULAR PLATE BUT JOINT GRINDING ( 6 PASS ) - 4 JOINTS
19 20776 DHAN HELPER 8 2 EQUIPMENT STANDBY MAN
20 11997 GIRI HELPER 8 2 D DOOR STANDBYMAN
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1670 AIR COMPRESSOR 8 7811 1


2 GR1865 GENERATOR 8 2518 2
3 WM1606 WELDING MACHINE 8 6711.2 3
4 WM1192 WELDING MACHINE IDLE 4
5 WM1696 WELDING MACHINE 8 4943.7 5
6 WM1714 WELDING MACHINE 8 6183.2 6
7 WM1693 WELDING MACHINE 8 7352.3 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 80 REPORTING DATE 13-Jun-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1054480 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT PERMIT START 7:05:00
L.I. Description GRINDING PERMIT CLOSED 17:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 20882 MAN BAHADUR HELPER 8 2 BOTTOM PLATE GRINDING ( 3 PASS ) 4 M
2 19344 RAJ KUMAR HELPER 8 ANNULAR PLATE BUT JOINT GRINDING ( 6 PASS ) -3 JOINTS
3 21197 GUNJA HELPER 8 SKETCH TO ANNULAR PLATE GRINDING( 5 PASS ) 4 M
4 SKETCH TO ANNULAR PLATE GRINDING( 3 PASS ) 6 M
5 SKETCH TO ANNULAR PLATE GRINDING( 5 PASS ) 7.5 M
6 BOTTOM PLATE T JOINT GRINDING -6JOINTS
7 SKETCH TO ANNULAR PLATE GRINDING( 5 PASS ) 8.5 M
8
9
10
11
12
13 25329 RUBEN HELPER 8 ASSISTING TANK SETTLEMENT SURVEY
14 25318 PASKARAN HELPER 8 ASSISTING TANK SETTLEMENT SURVEY
15 17594 DILLY BLASTER 8 ASSISTING TANK SETTLEMENT SURVEY
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# REPORTING DATE 13-Jun-20

SERVICE ORDER NO. 6510949239 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT PERMIT START 7:05:00
L.I. Description INTERNAL FLOATING ROOF C CHANNEL(SEAL FABRIC ) INSTALLATION PERMIT CLOSED 17:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 21055 LIBRES FAB 8 2 MARKED 52 LOCATIONS IN INTERNAL ROOF
2 23999 PHILIP FAB 8 2 GRINDING MARKED LOCATION - 52 LOCATION
3 FIX THE C CHANNEL & TACK WELD - 52 C CHANNEL
4
5 23205 MEK HELPER 8 2 SHIFTING C CHANNEL DIKE WALL TO INSIDE THE TANK
6 13520 PANDIT HELPER 8 2 ASSISTING FOR FIT UP
7 ASSISTING SHIFT DRAIN PIPE SUPPORT & INSTALLATION
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER RPO Line# REPORTING DATE

SERVICE ORDER NO. Service Line Item# TIME REACHED CONTROL ROOM

TANK NUMBER Direct / Part of PERMIT START


L.I. Description PERMIT CLOSED

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 70 & 80 REPORTING DATE 14-Jun-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1081190 & 1054480 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT PERMIT START 7:05:00
L.I. Description BOTTOM PLATE WELDING & GRINDING PERMIT CLOSED 17:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 2 TAKE PERMIT
2 23421 SARFUDIN S.O 8 2 SAFETY OFFICER
3 20991 CHAUHAN WELDER 8 2 15" WEAR PAD WELDING ( 3 PASS ) - 4 EA 4.8 4.8 M
4 ANNULAR TO SHELL PLATE WELDING ( 6 PASS ) 1.3 1.3 M
5 D DOOR MARKED AREA REPAIRING AND WELD FILL UP
6 21855 HARICHARAN WELDER 8 2 SKETCH TO ANNULAR PLATE ( 14 MM ) WELDING ( 6 PASS ) 7 7 M
7
8 20987 SUDESH WELDER 8 2 15" WEAR PAD WELDING ( 3 PASS ) - 3 EA 3.6 3.6 M
9 ROOF DRAIN PIPE SUPPORT WEAR PAD WELDING 40" * 10" - ( 3 PASS ) - 2 EA 3.1 3.1 M
10 10" WEAR PAD WELDING ( 3 PASS ) - 4 EA 3 3 M
11 21080 LOKNATH WELDER 8 2 15" WEAR PAD WELDING ( 3 PASS ) - 8 EA 9.6 9.6 M
12 ROOF DRAIN PIPE SUPPORT WEAR PAD WELDING 10" * 10" - ( 3 PASS ) - 4 EA 4 4 M
13 21042 BALA KRISHNA WELDER 8 2 SKETCH TO ANNULAR PLATE WELDING(6 PASS ) 6.5 6.5 M
14 20925 SOMESWAR WELDER 8 2 15" WEAR PAD WELDING ( 3 PASS ) -7 EA 8.4 8.4 M
15
16 20776 DHAN HELPER 8 2 EQUIPMENT STANDBY MAN
17 11997 GIRI HELPER 8 2 D DOOR STANDBYMAN
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1670 AIR COMPRESSOR 2 7821.3 1


2 GR1865 GENERATOR 8 2535 2
3 WM1606 WELDING MACHINE 8 6726.7 3
4 WM1192 WELDING MACHINE IDLE 4
5 WM1696 WELDING MACHINE 8 4955.8 5
6 WM1714 WELDING MACHINE 8 6199.3 6
7 WM1693 WELDING MACHINE 8 7369.4 7
8 AC1115 AIR COMPRESSOR 6 6966.5 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 80 REPORTING DATE 14-Jun-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1054480 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT PERMIT START 7:05:00
L.I. Description GRINDING PERMIT CLOSED 17:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 20882 MAN BAHADUR HELPER 8 3 15" WEAR PAD GRINDING ( 3 PASS ) - 4 EA 4.8 4.8 M
2 19344 RAJ KUMAR HELPER 8 2 ANNULAR TO SHELL PLATE GRINDING ( 6 PASS ) 1.3 1.3 M
3 21197 GUNJA HELPER 8 2 SKETCH TO ANNULAR PLATE ( 14 MM ) GRINDING ( 6 PASS ) 7 7 M
4 23999 PHILIP FAB 8 2 SKETCH TO ANNULAR PLATE GRINDING(6 PASS ) 6.5 6.5 M
5 22322 PREM HELPER 8 2 15" WEAR PAD GRINDING ( 3 PASS ) -7 EA 8.4 8.4 M
6 15" WEAR PAD GRINDING ( 3 PASS ) - 3 EA 3.6 3.6 M
7 ROOF DRAIN PIPE SUPPORT WEAR PAD GRINDING 40" * 10" - ( 3 PASS ) - 2 EA 3.1 3.1 M
8 10" WEAR PAD GRINDING( 3 PASS ) - 4 EA 3 3 M
9 15" WEAR PAD GRINDING ( 3 PASS ) - 8 EA 9.6 9.6 M
10 ROOF DRAIN PIPE SUPPORT WEAR PAD GRINDING 10" * 10" - ( 3 PASS ) - 4 EA 4 4 M
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# REPORTING DATE 14-Jun-20

SERVICE ORDER NO. 6510949239 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of PERMIT START 7:05:00
L.I. Description INTERNAL FLOATING ROOF SEAL FABRIC BEAM INSTALLATION PERMIT CLOSED 17:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 21865 NAUSAD FAB 8 2 INTERNAL FLOATING ROOF SEAL FABRIC BEAM INSTALLATION 52 52 EA
2 1831 MURALI FAB 8 2 TIGHT NUT AND BOLT - 200 PAIRS
3 19454 NAGENDRAN FAB 8 2
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 90 REPORTING DATE 14-Jun-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1054898 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT PERMIT START 7:05:00
L.I. Description Vacuum TEST ON WELD JOINTS PERMIT CLOSED 17:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1
2
3 23205 MEK HELPER 8 2 PERFORM Vacuum TEST ON WELD JOINTS 130 130 M
4 13520 PANDIT HELPER 8 2 PERFORM Vacuum TEST ON WELD JOINTS
5 25329 RUBEN HELPER 8 2 PERFORM Vacuum TEST ON WELD JOINTS
6 25318 PASKARAN HELPER 8 2 PERFORM Vacuum TEST ON WELD JOINTS
7 25391 MARWAN ELECTRICIAN 8 2 APPLY SOAP ON WELD JOINTS
8 OPERATING Vacuum BOX
9 SHIFTING Vacuum PUMP
10 WITH ARRAMCO INSPECTOR
11 130 M WELD JOINTS ACCEPTED
12 ASSISTING SURVEY PEOPLE
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 70 & 80 REPORTING DATE 15-Jun-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1081190 & 1054480 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT PERMIT START 7:05:00
L.I. Description BOTTOM PLATE WELDING & GRINDING PERMIT CLOSED 17:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 4 TAKE PERMIT
2 23421 SARFUDIN S.O 8 4 AS PER T & I QATANI SIR INSTRUCTION SAFETY OFFICER WORK UNTILL 8. 30
3 20991 CHAUHAN WELDER 8 4 EXTERNAL SHELL ( D DOOR ) WELDING - ( 10 PASS ) 7.6 7.6 M
4 21855 HARICHARAN WELDER 8 4 EXTERNAL SHELL ( D DOOR ) WELDING - ( 10 PASS )
5 19454 NAGENDRAN FAB 8 4 EXTERNAL SHELL ( D DOOR ) GRINDING - ( 10 PASS ) 7.6 7.6 M
6 21865 NAUSAD FAB 8 4 EXTERNAL SHELL ( D DOOR ) GRINDING - ( 10 PASS )
7 D DOOR PREHEATING USING GAS TORCH
8 24117 GURU QA/QC 8 4 QUALITY CONTROLLER
9 20776 DHAN HELPER 8 4 EQUIPMENT STANDBY MAN
10 23205 MEK HELPER 8 2 EXTERNAL D DOOR MAKE SCAFFOLINDING
11 ARRANGE FIRE BARRIERS
12 FIRE WATCH
13 11997 GIRI HELPER 8 2 D DOOR STANDBYMAN
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1115 AIR COMPRESSOR 10 6981.3 1


2 GR1865 GENERATOR 12 2554 2
3 WM1606 WELDING MACHINE 12 6746 3
4 WM1192 WELDING MACHINE IDLE 4
5 WM1696 WELDING MACHINE 8 4966.6 5
6 WM1714 WELDING MACHINE 8 6214 6
7 WM1693 WELDING MACHINE 8 7384 7
8 AC1670 AIR COMPRESSOR 8 6981.3 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 90 REPORTING DATE 14-Jun-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1054898 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT PERMIT START 7:05:00
L.I. Description Vacuum TEST ON WELD JOINTS PERMIT CLOSED 17:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1
2 13520 PANDIT HELPER 8 2 PERFORM HOUSE KEEPING IN SCOND HAL TANK FOR Vacuum TEST 650 M²
3 25329 RUBEN HELPER 8 2 SHIFTING COUNTER WEIGHT BOXES TO OUTSIDE 6 EA
4 25318 PASKARAN HELPER 8 2 ASSISTING EXTERNAL SURVRY WORKS
5 25391 MARWAN ELECTRICIAN 8 2 WELDING CABLE REMOVE FROM INSIDE
6 ARRANGE WELD CABLE EXTERNAL SIDE
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 90 REPORTING DATE 16-Jun-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1054898 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT PERMIT START 7:05:00
L.I. Description Vacuum TEST ON WELD JOINTS PERMIT CLOSED 17:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1
2
3 23205 MEK HELPER 8 2 PERFORM Vacuum TEST ON WELD JOINTS 120 120 M
4 13520 PANDIT HELPER 8 2 PERFORM Vacuum TEST ON WELD JOINTS
5 25329 RUBEN HELPER 8 2 PERFORM Vacuum TEST ON WELD JOINTS
6 24944 SAROJ HELPER 8 2 PERFORM Vacuum TEST ON WELD JOINTS
7 25391 MARWAN ELECTRICIAN 8 2 APPLY SOAP ON WELD JOINTS
8 OPERATING Vacuum BOX
9 SHIFTING Vacuum PUMP
10 WITH ARRAMCO INSPECTOR
11 120 M WELD JOINTS ACCEPTED
12
13 PULLING THE ALL WELDING CABLES FROM INSIDE TANK TO OUT SIDE
14 ARRANGING SCAFFOLDING FOR ALL WELDERS
15
16 SHIFTING COUNTER WEIGHT BOXES ASSISTING BOOM TRUCK
17 ANNULAR WELD JOINTS CLEANING WITH BUFFING WHEEL FOR MPI TEST
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 70 & 80 REPORTING DATE 16-Jun-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1081190 & 1054480 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT PERMIT START 7:05:00
L.I. Description BOTTOM PLATE WELDING & GRINDING PERMIT CLOSED 17:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 2 PERMIT RECEIVER
2 23421 SARFUDIN S.O 8 2 SAFETY OFFICER
3 21080 LOKNATH WELDER 8 EXTERNAL ANNULAR TO SHELL PLATE WELDING ( 4 PASS ) 6 6 M
4 20991 CHAUHAN WELDER 8 2 EXTERNAL ANNULAR TO SHELL PLATE WELDING (6 PASS ) 6 6 M
5 21042 BALA KRISHNA WELDER 8 EXTERNAL ANNULAR TO SHELL PLATE WELDING ( 4 PASS ) 6 6 M
6 21855 HARICHARAN WELDER 8 2 EXTERNAL ANNULAR TO SHELL PLATE WELDING (6 PASS ) 6 6 M
7 20925 SOMESWAR WELDER 8 INTERNAL ANNULAR TO SHELL PLATE WELDING ( 4 PASS ) 4 4 M
8 INTERNAL ANNULAR TO SHELL PLATE GRINDING ( 4 PASS ) 4 4 M
9 20987 SUDESH WELDER 8 2 EXTERNAL ANNULAR TO SHELL PLATE WELDING ( 4 PASS ) 6 6 M
10
11
12 23999 PHILIP FAB 8 2 EXTERNAL ANNULAR TO SHELL PLATE GRINDING ( 6PASS ) 6 6
13 21197 GUNJA HELPER 8 2 EXTERNAL ANNULAR TO SHELL PLATE GRINDING ( 4PASS ) 9 9 M
14 22322 PREM HELPER 8 2 EXTERNAL ANNULAR TO SHELL PLATE GRINDING ( 6PASS ) 6 6 M
15 19344 RAJ KUMAR HELPER 8 2 EXTERNAL ANNULAR TO SHELL PLATE GRINDING ( 4PASS ) 9 9 M
16 20776 DHAN HELPER 8 2 EQUIPMENT STANDBY MAN
17 11997 GIRI HELPER 8 2 D DOOR STANDBYMAN
18 1831 MURALI FAB 8 ROOF DRAIN PIPE HYDROTEST ARRANGEMENTS
19 21865 NAUSAD FAB 8 ROOF DRAIN PIPE HYDROTEST ARRANGEMENTS
20 19454 NAGENDRAN FAB 8 ANNULAR WELD JOINTS CLEANING WITH BUFFING WHEEL FOR MPI TEST
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1670 AIR COMPRESSOR IDLE 1


2 GR1865 GENERATOR 8 2565 2
3 WM1606 WELDING MACHINE 8 6753.3 3
4 WM1192 WELDING MACHINE IDLE 4
5 WM1696 WELDING MACHINE IDLE 5
6 WM1714 WELDING MACHINE 8 6220.1 6
7 WM1693 WELDING MACHINE 8 7390.9 7
8 AC1115 AIR COMPRESSOR 8 6994.7 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 90 REPORTING DATE 17-Jun-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1054898 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT PERMIT START 7:05:00
L.I. Description Vacuum TEST ON WELD JOINTS PERMIT CLOSED 17:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1
2
3 23205 MEK HELPER 8 2 PERFORM Vacuum TEST ON WELD JOINTS 130 130 M
4 13520 PANDIT HELPER 8 2 PERFORM Vacuum TEST ON WELD JOINTS
5 25329 RUBEN HELPER 8 2 PERFORM Vacuum TEST ON WELD JOINTS
6 19344 RAJ KUMAR HELPER 8 2 PERFORM Vacuum TEST ON WELD JOINTS
7 25391 MARWAN ELECTRICIAN 8 2 APPLY SOAP ON WELD JOINTS
8 OPERATING Vacuum BOX
9 SHIFTING Vacuum PUMP
10 WITH ARRAMCO INSPECTOR
11 130 M WELD JOINTS ACCEPTED
12
13 20947 SHYAM HELPER 8 FIBRE CHIPPING ON SUMPIT
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 70 & 80 REPORTING DATE 17-Jun-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1081190 & 1054480 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT PERMIT START 7:05:00
L.I. Description BOTTOM PLATE WELDING & GRINDING PERMIT CLOSED 19:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 4 PERMIT RECEIVER
2 23421 SARFUDIN S.O 8 4 SAFETY OFFICER
3 20991 CHAUHAN WELDER 8 4 D DOOR REPAIRING WEIDIING - 4 LOCATIONS
4 1831 MURALI FAB 8 4 D DOOR REPAIR GAUGING - 4 LOCATIONS
5 21042 BALA KRISHNA WELDER 8 2 EXTERNAL ANNULAR TO SHELL PLATE WELDING ( 7 PASS ) 5 5 M
6 21855 HARICHARAN WELDER 8 2 EXTERNAL ANNULAR TO SHELL PLATE WELDING (6 PASS ) 6 6 M
7 20925 SOMESWAR WELDER 8 2 EXTERNAL ANNULAR TO SHELL PLATE WELDING (6 PASS ) 6 6 M
8 20987 SUDESH WELDER 8 2 EXTERNAL ANNULAR TO SHELL PLATE WELDING ( 2 PASS ) 6 6 M
9 EXTERNAL ANNULAR TO SHELL PLATE WELDING ( 6 PASS ) 4 4 M
10 21080 LOKNATH WELDER 8 2 EXTERNAL ANNULAR TO SHELL PLATE WELDING ( 2 PASS ) 6 6 M
11 EXTERNAL ANNULAR TO SHELL PLATE WELDING ( 6 PASS ) 4 4 M
12
13
14
15 21865 NAUSAD FAB 8 2 D DOOR SUPPORT BEAM CUTTING INTERNAL SIDE
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1670 AIR COMPRESSOR 4 7825.3 1


2 GR1865 GENERATOR 8 2581 2
3 WM1606 WELDING MACHINE 8 6768.3 3
4 WM1192 WELDING MACHINE IDLE 4
5 WM1696 WELDING MACHINE IDLE 5
6 WM1714 WELDING MACHINE 8 6235 6
7 WM1693 WELDING MACHINE 8 7405.1 7
8 AC1115 AIR COMPRESSOR 5 6999.1 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 70 & 80 REPORTING DATE 17-Jun-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1081190 & 1054480 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT PERMIT START 7:05:00
L.I. Description BOTTOM PLATE WELDING & GRINDING PERMIT CLOSED 19:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1
2
3
4 23999 PHILIP FAB 8 2 EXTERNAL ANNULAR TO SHELL PLATE GRINDING ( 7 PASS ) 5 5 M
5 21197 GUNJA HELPER 8 2 EXTERNAL ANNULAR TO SHELL PLATE GRINDING (6 PASS ) 6 6 M
6 22322 PREM HELPER 8 2 EXTERNAL ANNULAR TO SHELL PLATE GRINDING (6 PASS ) 6 6 M
7 19454 NAGENDRAN FAB 8 2 EXTERNAL ANNULAR TO SHELL PLATE GRINDING ( 2 PASS ) 6 6 M
8 EXTERNAL ANNULAR TO SHELL PLATE GRINDING ( 6 PASS ) 4 4 M
9 EXTERNAL ANNULAR TO SHELL PLATE GRINDING ( 2 PASS ) 6 6 M
10 EXTERNAL ANNULAR TO SHELL PLATE GRINDING ( 6 PASS ) 4 4 M
11
12
13
14 20776 DHAN HELPER 8 2 EQUIPMENT STANDBY MAN
15 11997 GIRI HELPER 8 2 D DOOR STANDBYMAN
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 90 REPORTING DATE 18-Jun-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1054898 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT PERMIT START 7:05:00
L.I. Description Vacuum TEST ON WELD JOINTS PERMIT CLOSED 19:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 4 PERMIT RECEIVER
2 23421 SARFUDIN S.O 8 2 SAFETY OFFICER
3 23205 MEK HELPER 8 4 PERFORM Vacuum TEST ON WELD JOINTS 200 200 M
4 13520 PANDIT HELPER 8 4 PERFORM Vacuum TEST ON WELD JOINTS
5 25329 RUBEN HELPER 8 4 PERFORM Vacuum TEST ON WELD JOINTS
6 19344 RAJ KUMAR HELPER 8 4 PERFORM Vacuum TEST ON WELD JOINTS
7 21197 GUNJA HELPER 8 4 APPLY SOAP ON WELD JOINTS
8 25391 MARWAN ELECTRICIAN 8 4 OPERATING Vacuum BOX
9 SHIFTING Vacuum PUMP
10 WITH ARRAMCO INSPECTOR
11 200 M WELD JOINTS ACCEPTED
12
13 SHIFTING COUNTER WEIGHT BOXES TO OUTSIDE - 3 EA
14 CLEANING ON WELD JOINTS - 200 M
15 LIFTING ROOF LEGS FOR INSTALLING WEAR PAD - 13 EA
16
17
18 20776 DHAN HELPER 8 2 EQUIPMENT STANDBY MAN
19 11997 GIRI HELPER 8 2 D DOOR STANDBYMAN
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1670 AIR COMPRESSOR 12 7843 1


2 GR1865 GENERATOR 12 2600 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 70 & 80 REPORTING DATE 18-Jun-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1081190 & 1054480 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT PERMIT START 7:05:00
L.I. Description BOTTOM PLATE WELDING & GRINDING PERMIT CLOSED 19:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1
2
3 20991 CHAUHAN WELDER 8 2 ANODE INSTALLATION NUD & BOLD WELDING - 36 EA
4 BOTTOM PLATE WEAR PAD ( 15 " ) WELDING - 4 EA
5 21042 BALA KRISHNA WELDER 8 JACK KNIFE WEAR PAD (40") FIT UP & WELDING - 4 EA
6
7 20925 SOMESWAR WELDER 8 2 C CHANNEL WELDING(ROOT PASS)- 11 EA
8 BOTTOM PLATE WEAR PAD ( 15 " ) WELDING - 4 EA
9
10 21080 LOKNATH WELDER 8 C CHANNEL WELDING(ROOT PASS)- 20 EA
11
12
13 20987 SUDESH WELDER 8 2 C CHANNEL WELDING(ROOT PASS)- 20 EA
14 SUMPIT PIPE WEAR PAD (12") FIT UP & WELDING (ROOT PASS ) - 4 EA
15
16 21855 HARICHARAN WELDER 8 2 BOTTOM PLATE WEAR PAD ( 15 " ) WELDING - 5 EA
17 RTG PIPE WEAR PAD(12 " ) WELDING - 3 EA
18
19 19454 NAGENDRAN FAB 8 2 GRINDING ON WEAR PAD FOR 3 WELDERS
20 22322 PREM HELPER 8 2 GRINDING ON WEAR PAD FOR 2 WELDERS
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 WM1606 WELDING MACHINE 10 6782.7 3
4 WM1192 WELDING MACHINE IDLE 4
5 WM1696 WELDING MACHINE IDLE 5
6 WM1714 WELDING MACHINE 10 6252.8 6
7 WM1693 WELDING MACHINE 8 7419.2 7
8 AC1115 AIR COMPRESSOR IDLE 8
9 WM2094 AIR COMPRESSOR 10 2556.4 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 90 REPORTING DATE 18-Jun-20

SERVICE ORDER NO. 6510932388 Service Line Item# 1057516 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT PERMIT START 7:05:00
L.I. Description DRAIN PIPE ( JACK KNIFE ) HYDROTEST PERMIT CLOSED 19:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 1831 MURALI FAB 8 2 PERFORMING JACK KNIFE HYDROTEST IN 50 PSI 1 1 EA
2 21865 NAUSAD FAB 8 2 OLD CHECK VALVE CUT & REMOVE
3 INSTALL BLIND - 1 EA
4 16 " GASKET MARKING & CUTTING
5 20" GASKET MARKING & CUTTING
6 D DOOR GASKET MARKING & CUTTING
7 6"GASKET MARKING & CUTTING - 2 EA
8 RTG PIPE SUPPORT CUTTING & LIFTING FOR INSTALL WEAR PAD
9
10 23999 PHILIP FAB 8 2 ANODE INSTALLATION - 9 EA PER (36 NUD & BOLD ) 9 EA
11 21055 LIBRES FAB 8 2 TANK FLOATINGH ROOF PANTAGRAPH INSTALLATION IN D DOOR AREA 3 EA
12 DOWN THE HYDRALIC JACK IN FLOATING ROOF
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 90 REPORTING DATE 19-Jun-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1054898 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT PERMIT START 7:05:00
L.I. Description Vacuum TEST ON WELD JOINTS PERMIT CLOSED 14:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 PERMIT RECEIVER
2 23421 SARFUDIN S.O 8 SAFETY OFFICER
3 23205 MEK HELPER 8 PERFORM Vacuum TEST ON BOTTOM PLATE WELD JOINTS 110 110 M
4 13520 PANDIT HELPER 8 PERFORM Vacuum TEST ON ANNULAR TO ANNULAR BUT WELD JOINTS 23 23 M
5 25329 RUBEN HELPER 8 PERFORM Vacuum TEST ON SKETCH TO ANNULAR WELD JOINTS 75 75 M
6 21865 NAUSAD FAB 8 PERFORM Vacuum TEST ON WELD JOINTS
7 21197 GUNJA HELPER 8 APPLY SOAP ON WELD JOINTS
8 25391 MARWAN ELECTRICIAN 8 OPERATING Vacuum BOX
9 SHIFTING Vacuum PUMP
10 WITH ARRAMCO INSPECTOR
11 208 M WELD JOINTS ACCEPTED
12
13
14 19454 NAGENDRAN FAB 8 INSIDE THE SUMPIT ALL WELD JOINTS CLEANING WITH POWER BRUSH FOR
15 MPI TEST
16 20991 CHAUHAN WELDER 8 15" WEAR PAD WELDING 3 3 EA
17 20947 SHYAM HELPER 8 ANNULAR PLATE ALL T JOINT CLEAN WITH POWER BRUSH FOR MPI - 27 LOCATIONS
18 20776 DHAN HELPER 8 EQUIPMENT STANDBY MAN
19 11997 GIRI HELPER 8 D DOOR STANDBYMAN
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1670 AIR COMPRESSOR 6 7856 1


2 GR1865 GENERATOR 6 2612 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 40 REPORTING DATE 20-Jun-20

SERVICE ORDER NO. 6510932388 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of PERMIT START 7:05:00
L.I. Description INSTALL MANWAY IN ROOF & FOAM PIPE MODIFICATION & BLIND INSTALLATION PERMIT CLOSED 17:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 23999 PHILIP FAB 8 2 FOAM PIPE MODIFICATION
2 21055 LIBRES FAB 8 2 INSTALL WEAR PAD (10") FOR PIPE SUPPORT & TACK WELD 7 7 EA
3 20925 SOMESWAR WELDER 8 2 WEAR PAD (10") FULL WELDING (3 PASS ) 7 7 EA
4 12875 BISHESWAR OPERATOR 8 2 MANLIFT OPERATOR
5
6
7 1831 MURALI FAB 8 2 RTG PIPE PLATFORM DISMANTLE AND CLEAN & CLOSING ROOF MANWAY
8 21865 NAUSAD FAB 8 2 SECONDARY SEAL FABRIC INSTALLATION 5 5 M
9 19454 NAGENDRAN FAB 8 2 MANUALLY SHIFTING END BLIND ( 16" AND 20" )
10 CLOSE INLET PIPE USING 20" BLIND 1 1 EA
11 CLOSE OUTLET PIPE USING 16"BLIND 1 1 EA
12 TIGHTEN NUD & BOLT
13 21197 GUNJA HELPER 8 2 RTG PIPE CLEANING
14 EXTERNAL MANWAY CLOSING 1 1 EA
15 TIGHTEN NUD & BOLT
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 WM1714 WELDING MACHINE 8 6272.2 1


2 ML1597 MANLIFT 8 4256.8 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 90 & 50 REPORTING DATE 20-Jun-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1054898 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT PERMIT START 7:05:00
L.I. Description Vacuum TEST ON WELD JOINTS & INSTALL MANWAY SHELL PERMIT CLOSED 19:00:00 PM
MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 4 PERMIT RECEIVER
2 23421 SARFUDIN S.O 8 2 SAFETY OFFICER
3 23205 MEK HELPER 8 2 PERFORM Vacuum TEST SKETCH TO ANNULAR JOINTS 80 80 M
4 13520 PANDIT HELPER 8 4 APPLY SOAP ON WELD JOINTS
5 25329 RUBEN HELPER 8 2 OPERATING Vacuum BOX
6 22322 PREM HELPER 8 2 SHIFTING Vacuum PUMP
7 25391 MARWAN ELECTRICIAN 8 2 WITH ARRAMCO INSPECTOR
8 80 M WELD JOINTS ACCEPTED
9
10 REMOVE AIR BLOWER 2 2 EA
11 INSTALL MANWAY 24 " IN VERTICAL POSITION 2 2 EA
12 TIGH NUD AND BOLT
13
14 20776 DHAN HELPER 8 4 EQUIPMENT STANDBY MAN
15 11997 GIRI HELPER 8 4 D DOOR STANDBYMAN
16 20991 CHAUHAN WELDER 8 2 PERFORM WELDING ON INSPECTOR MARKED LOCATIONS
17 REMOVING WELDING CABLES OUTSIDE
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1670 AIR COMPRESSOR 10 7866.7 1


2 GR1865 GENERATOR 10 2622 2
3 WM2094 WELDING MACHINE 8 2562.7 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# REPORTING DATE 21-Jun-20

SERVICE ORDER NO. 6510932388 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of PERMIT START 7:05:00
L.I. Description FOAM PIPE MODIFICATION PERMIT CLOSED 16:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 23999 PHILIP FAB 8 2 3 " FOAM PIPE INSTALLATION - 2 EA
2 21055 LIBRES FAB 8 2 LIFTING MANUALLY USING THE ROPE FOR LIFTING
3 20925 SOMESWAR WELDER 8 2 CUTTING 3 " PIPE - 2 EA
4 19454 NAGENDRAN FAB 8 FIT UP 3 " ELBOW - 2 EA
5 FIT UP 3 "FLANGE - 2 EA
6 12875 BISHESWAR OPERATOR 8 OPERATING MANLIFT
7 25329 RUBEN HELPER 8 2 ASSISTING FABRICATOR & FIE WATCH ( MAKE SCAFFOLD ARANGE FIRE BARRIERS)
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 WM1714 WELDING MACHINE 8 6278 1


2 ML1597 MANLIFT 8 1597 2
3 GR 1865 GENERATOR 8 2629 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# REPORTING DATE 22-Jun-20

SERVICE ORDER NO. 6510932388 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of PERMIT START 7:05:00
L.I. Description FOAM PIPE MODIFICATION PERMIT CLOSED 16:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 23999 PHILIP FAB 8 2 3 " FOAM PIPE INSTALLATION - 10 JOINTS
2 21865 NAUSAD FAB 8 2 3" PIPE CUTTING 8 8 EA
3 19454 NAGENDRAN FAB 8 2 90 DEG ELBOW FITTINGS - 3 EA
4 45 DEG ELBOW FITTING -1 EA
5 3" PIPE ERECTION - 5 EA 25 25 M
6 20991 CHAUHAN WELDER 8 2 3" PIPE FULL WELDING - 4 JOINTS
7 3" PIPE TACK WELD - 8 JOINTS
8 12875 BISHESWAR OPERATOR 8 OPERATING MANLIFT
9
10 25329 RUBEN HELPER 8 2 EXTERNAL CONTRETE BREAKING FOR CP CABLE LAYING ( 2 FT DEPTH ) 5 5 M
11 25391 MARWAN ELECTRICIAN 8 2 ARRANGE CP CABLES INSIDE THE PIPE
12 21197 GUNJA HELPER 8 2 ASSISTING FORKLIFT FOR ARRANGE SCRAP MATERIALS
13 FLAG MAN
14 13520 PANDIT HELPER 8 2 PERFORMING HOUSEKEEPING IN YARD
15 20776 DHAN HELPER 8 2 PERFORMING HOUSEKEEPING IN YARD
16 ASSIST LOADER
17
18 1623 MOHAMMED KHAN PAINTER 8 2 WIND GRIDER WALKWAY HANDRAIL SAND PAPERING 130 130 M
19 17594 DILLY BLASTER 8 2 1.5 INCH PIPE & 1 INCH STEEL BAR & VERTICAL SUPPORT
20 13219 DINESH BLASTER 8 2
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 WM1714 WELDING MACHINE 8 6285 1


2 ML1597 MANLIFT 8 4267.4 2
3 GR 1865 GENERATOR 8 2636 3
4 AC1670 AIR COMPRESSOR 6 7872.3 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 480 REPORTING DATE 21-Jun-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1054915 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT PERMIT START 7:05:00
L.I. Description TANK HYDROTEST PERMIT CLOSED 19:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 4 PERMIT RECEIVER
2 23421 SARFUDIN S.O 8 4 SAFETY OFFICER
3 23205 MEK HELPER 8 4 D DOOR MANWAY CLOSING ( 45 NUD & BOLDS ) 1 1 EA
4 13520 PANDIT HELPER 8 4 LEAK CHECKING AROUND THE TANK
5 20776 DHAN HELPER 8 4 LEAK CHECKING ALL MARINE HOSES & TIGHT
6 11997 GIRI HELPER 8 4 HYDROTEST 1 1 EA
7 21197 GUNJA HELPER 8 4 TANK WATER LEVEL AT - 0.8 M
8 HOUSEKEEPING @ YARD AREA
9 ARRANGING PLATES NEAR DIKE WALL USING FORKLIFT
10 SHIFTING COUNTER WEIGHT BOX NEAR DIKE WALL
11
12 21865 NAUSAD FAB 8 2 MARINE HOSE LEAK CHECKING
13 20991 CHAUHAN WELDER 8 2 WORK UNTILL 7 O CLK
14
15 25391 MARWAN ELECTRICIAN 8 ELECTRICIAN
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1670 AIR COMPRESSOR IDLE 7866.7 1


2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 480 REPORTING DATE 22-Jun-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1054915 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT PERMIT START 7:05:00
L.I. Description TANK HYDROTEST PERMIT CLOSED 19:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 4 PERMIT RECEIVER
2 23421 SARFUDIN S.O 8 2 SAFETY OFFICER
3 23205 MEK HELPER 8 4 HYDROTEST 1 1 EA
4 11997 GIRI HELPER 8 4 TANK WATWER LEVEL AT- 9.2 M
5 TANK 106 STNDBY MAN
6 TANK 110 STNDBY MAN
7 ASISTING FOR FORKLIFT & CP WORKS
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# REPORTING DATE 23-Jun-20

SERVICE ORDER NO. 6510932388 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of PERMIT START 7:05:00
L.I. Description FOAM PIPE MODIFICATION PERMIT CLOSED 16:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 23999 PHILIP FAB 8 3 " FOAM PIPE INSTALLATION -4 JOINTS
2 21865 NAUSAD FAB 8 3" PIPE CUTTING 4 4 EA
3 21055 LIBRES FAB 8 90 DEG ELBOW FITTINGS - 3 EA
4 TEE JOINT - 1 EA
5 3" PIPE ERECTION - 8 8 M
6 20991 CHAUHAN WELDER 8 3" PIPE FULL WELDING -3 JOINTS
7 3" PIPE TACK WELD - 3 JOINTS
8 12875 BISHESWAR OPERATOR 8 OPERATING MANLIFT
9
10 25329 RUBEN HELPER 8 2 CP CAPLE LAYING AND BACKFILLING
11 25391 MARWAN ELECTRICIAN 8 2 FOAM CHAMPER DISMANTLE AND CLEAN 4 4 EA
12 21197 GUNJA HELPER 8 2 UNLOADING BLASTING SET 6 6 EA
13 16678 SELVARAJ MASON 8 2 UNLOAD WELDING ROD
14 23205 MEK HELPER 8 2 UNLOAD PUMP
15 11997 GIRI HELPER 8 2
16
17
18
19
20 19454 NAGENDRAN FAB 8 WENT TO YANBU ID SCHEDULE
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 WM1714 WELDING MACHINE 8 6299.6 1


2 ML1597 MANLIFT 8 4271.5 2
3 GR 1865 GENERATOR 8 2649 3
4 AC1670 AIR COMPRESSOR IDLE 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 480 REPORTING DATE 23-Jun-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1054915 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT PERMIT START 7:05:00
L.I. Description TANK HYDROTEST PERMIT CLOSED 19:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 4 PERMIT RECEIVER
2 23421 SARFUDIN S.O 8 2 SAFETY OFFICER
3 13520 PANDIT HELPER 8 4 HYDROTEST 1 1 EA
4 20776 DHAN HELPER 8 4 TANK 110 STNDBY MAN
5 TANK 106 STNDBY MAN
6
7 AT 75 % PERCENTAGE PERFOMED TANK CALIBRATION
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# REPORTING DATE 24-Jun-20

SERVICE ORDER NO. 6510932388 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of PERMIT START 7:05:00
L.I. Description FOAM PIPE MODIFICATION PERMIT CLOSED 3:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 23999 PHILIP FAB 8 FOAM PIPE MODIFICATION ABOVE 17 M
2 21865 NAUSAD FAB 8 3 " PIPE FIT UP 3 3 EA
3 21055 LIBRES FAB 8
4 20991 CHAUHAN WELDER 8 3 " PIPE WELDING 3 3 EA
5 12875 BISHESWAR OPERATOR 8
6
7
8
9
DUE TO HIGH
10 25329 RUBEN HELPER 8 PUMP SHIFTING TO NEAR THE D DOOR ( MANUALLY ) 1 TEMPRATURE(47 DEG)
11 25391 MARWAN ELECTRICIAN 8 HOSE SHIFTING TO NEAR THE D DOOR ( MANUALLY ) 5 ARAMCO STOPPED WORK AT
3 O CLK.
12 23205 MEK HELPER 8 ARRANGE HOSES 5
13 11997 GIRI HELPER 8
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 WM1714 WELDING MACHINE 8 1


2 ML1597 MANLIFT 8 2
3 GR 1865 GENERATOR 8 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 480 REPORTING DATE 23-Jun-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1054915 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT PERMIT START 7:05:00
L.I. Description TANK HYDROTEST PERMIT CLOSED 15:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 PERMIT RECEIVER
2 23421 SARFUDIN S.O 8 SAFETY OFFICER
3 13520 PANDIT HELPER 8 HYDROTEST 1 1 EA
4 20776 DHAN HELPER 8 TANK 110 STNDBY MAN
5 TANK 106 STNDBY MAN
6 TANK LEVEL - 18.7 M
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# REPORTING DATE 25-Jun-20

SERVICE ORDER NO. 6510932388 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of PERMIT START 7:05:00
L.I. Description FOAM PIPEPAINTING PERMIT CLOSED 3:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 PERMIT RECEIVER
2 23421 SARFUDIN S.O 8 SAFETY OFFICER
3 12875 BISHESWAR OPERATOR 8
4 13520 PANDIT HELPER 8 3" PIPE PAINTING 27 27 M
5 11997 GIRI HELPER 8
6 23205 MEK HELPER 8 TANK 106 STANDBY MAN
7 20776 DHAN HELPER 8 TANK 116 STANDBY MAN
8 25329 RUBEN HELPER 8 TANK 109 CP CABLE CHECKING
9 25391 MARWAN ELECTRICIAN 8 TANK 109 CP CABLE CHECKING
10
11 HYTROTEST TANK LEVEL - 14 M
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 WM1714 WELDING MACHINE idle 1


2 ML1597 MANLIFT 8 2
3 GR 1865 GENERATOR idle 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 240 REPORTING DATE 26-Jun-20

SERVICE ORDER NO. 6510932388 Service Line Item# 1064505 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of PERMIT START 7:05:00
L.I. Description WIND GRIDER WALKWAY HANDRAIL PAINTING PERMIT CLOSED 3:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 PERMIT RECEIVER
2
3
4 13520 PANDIT HELPER 8 WIND GRIDER WALKWAY HANDRAIL & 2 " STEEL BAR PAINTING 20 M
5 11997 GIRI HELPER 8 WIND GRIDER WALKWAY HANDRAIL & 2 " STEEL BAR PAINTING 20 M
6 23205 MEK HELPER 8 WIND GRIDER WALKWAY HANDRAIL & 2 " STEEL BAR PAINTING 20 M
7 1623 MOHAMMED KHAN PAINTER 8 WIND GRIDER WALKWAY HANDRAIL & 2 " STEEL BAR PAINTING 20 M
8 17594 DILLY BLASTER 8 WIND GRIDER WALKWAY HANDRAIL & 2 " STEEL BAR PAINTING 20 M
9 13219 DINESH BLASTER 8 WIND GRIDER WALKWAY HANDRAIL & 2 " STEEL BAR PAINTING 20 M
10 VERTICAL SUPPORT PAINTING 80 EA
11
12
13 20991 CHAUHAN WELDER 8 3 " FLANGE FIT UP & WELDING IN FOAM DRAIN LINE
14 21865 NAUSAD FAB 8 3 " FLANGE CUTTING
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 WM1714 WELDING MACHINE 6 6307.1 1


2 2
3 GR 1865 GENERATOR 6 6307.1 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 240 & 480 REPORTING DATE 27-Jun-20

SERVICE ORDER NO. 6510932388 Service Line Item# 1064505 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of PERMIT START 7:05:00
L.I. Description WIND GRIDER WALKWAY HANDRAIL PAINTING & DE WATERING HYDRO TEST PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 2 PERMIT RECEIVER
2 23421 SARFUDIN S.O 8 2 SAFETY OFFICER
3 1623 MOHAMMED KHAN PAINTER 8 2 WIND GRIDER WALKWAY PAINTING 35 35 M
4 23205 MEK HELPER 8 2 TANK LADDER PAINTING
5 25329 RUBEN HELPER 8 2 HANDRAIL PAINTING 25 25 M
6 VERTICAL SUPPORT PAINTING 100 100 EA
7
8 13520 PANDIT HELPER 8 4 DE WATERING
9 11997 GIRI HELPER 8 4 WORK UNTILL 7 O CLK
10 20776 DHAN HELPER 8 4 STANDBY MAN
11
12
13 25391 MARWAN ELECTRICIAN 8 SHUNT INSTALLATION IN SHELL TOPSIDE 6 6 EA
14 21865 NAUSAD FAB 8 MAKING HOLE USING DRILL BIT - 12 NUD & BOLD
15
16 20991 CHAUHAN WELDER 8 ASSISTING
17
18 17594 DILLY BLASTER 8 PREPARATION FOR BLASTING
19 13219 DINESH BLASTER 8 ARRANGE ALL HOSES
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 WM1714 WELDING MACHINE IDLE 6307.1 1


2 2
3 GR 1865 GENERATOR 8 2672 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 480 REPORTING DATE 28-Jun-20

SERVICE ORDER NO. 6510949239 Service Line Item# 1054915 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT PERMIT START 7:05:00
L.I. Description TANK HYDROTEST PERMIT CLOSED 19:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 4 PERMIT RECEIVER
2 23421 SARFUDIN S.O 8 2 SAFETY OFFICER
3 25329 RUBEN HELPER 8 4 HYDROTEST 1 1 EA
4 20776 DHAN HELPER 8 4 TANK 110 STNDBY MAN
5 TANK 106 STNDBY MAN
6 WATER LEVEL - 0.380
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 240 REPORTING DATE 28-Jun-20

SERVICE ORDER NO. 6510932388 Service Line Item# 1064505 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of PERMIT START 7:05:00
L.I. Description WIND GRIDER WALKWAY HANDRAIL PAINTING PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 2 PERMIT RECEIVER
2 23421 SARFUDIN S.O 8 2 SAFETY OFFICER
3 1623 MOHAMMED KHAN PAINTER 8 2 WIND GRIDER WALKWAY PAINTING 35 35 M
4 TANK LADDER PAINTING 15 15 M
5 5" VALVE AND NIPPLE PAINTING 4 4 EA
6 23205 MEK HELPER 8 2 3 " VALVE DISMANTLE & RE INSTALL 2 2 EA
7 25391 MARWAN ELECTRICIAN 8 2 APPLY WATER IN FOAM PIPE
8 13520 PANDIT HELPER 8 2 FOAM CHAMPER PIPE TIGHTNING 8 8 EA
9 11997 GIRI HELPER 8 2 ASSIST WITH BOOM TRUCK
10 25391 MARWAN ELECTRICIAN 8 2 ARRANGE FIRE MONITOR HOSE & ASSIST FOR FOAM PIPE CLEANING
11
12
13 20987 SUDESH WELDER 8 5 " NIPPLE & SLIP ON FLANGE WELDING 2 2 EA
14 21865 NAUSAD FAB 8 5" NIPPLE & SLIP ON FLANGE FIT UP 2 2 EA
15 6"&5" GASKET CUTTING 3 3 EA
16
17
18 17594 DILLY BLASTER 8 PREPARATION FOR BLASTING
19 13219 DINESH BLASTER 8 ARRANGE ALL HOSES
20 20991 CHAUHAN WELDER 8 GOING TO PASSPORT RENEWAL
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 WM1714 WELDING MACHINE 3 6310.1 1


2 2
3 GR 1865 GENERATOR 3 2674 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 480 REPORTING DATE 29-Jun-20

SERVICE ORDER NO. 6510932388 Service Line Item# 1054915 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of PART OFF PERMIT START 7:05:00
L.I. Description TANK HYDROTEST PERMIT CLOSED 5:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 2 PERMIT RECEIVER
2 23421 SARFUDIN S.O 8 2 SAFETY OFFICER
3 23205 MEK HELPER 8 2 16 " MANWAY OPENING ( 150 NUD & BOLD ) 3 3 EA
4 11997 GIRI HELPER 8 2 16 " AIRBLOWER INSTALATION 3 3 EA
5 13520 PANDIT HELPER 8 2 D DOOR OPENING (60 NUD & BOLD ) 1 1 EA
6 13936 JIMMY OPRTR 8 2 16 " SPOOL OPENING (60 NUD & BOLD ) 1 1 EA
7 25391 MARWAN ELECTRICIAN 8 2 6 ' REDUCER DISMANTLE 3 3 EA
8 6" VALVE DISMANTLE 2 2 EA
9 6" GLASS VALVE DISMANTLE 1 1 EA
10 16 " MARINE HOSE DISMANTLE ( 90 NUD & BOLD ) 9 9 EA
11 5" NIPPLE INSTALLATION ( 20 BOLD ) 2 2 EA
12
13 1623 MOHAMMED KHAN PAINTER 8 STANDBY MAN
14 21865 NAUSAD FAB 8 FABRICATE SUPPORT FOR FIRE WATER LINE VALVE 2 2 EA
15 20991 CHAUHAN WELDER 8 WELDING SUPPORTS 2 2 EA
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 WM1714 WELDING MACHINE 4 6314.1 1


2 2
3 GR 1865 GENERATOR 4 2678 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# REPORTING DATE 29-Jun-20

SERVICE ORDER NO. 6510932388 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of PERMIT START 7:05:00
L.I. Description BLASTING HOSE PREPARATION PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 23326 SURESH PAINTER 8 WHEEL BARROW ASSEMBLE
2 23360 ARIF ALI PAINTER 8
3 23329 NITIN BLASTER 8 BLASTING SET ARRANGEMENT
4 6170 NOBLE BLASTER 8 BLASTING SET ARRANGEMENT
5 20856 JOHINDRA BLASTER 8 BLASTING SET ARRANGEMENT
6 18796 ANIF BLASTER 8 BLASTING SET ARRANGEMENT
7 18961 UDIM BLASTER 8 BLASTING SET ARRANGEMENT
8 19069 DINESH BLASTER 8 BLASTING SET ARRANGEMENT
9 20783 MAN BAHADUR BLASTER 8 BLASTING SET ARRANGEMENT
10 18790 RAM SHREE BLASTER 8 BLASTING SET ARRANGEMENT
11 17594 DILLY BLASTER 8 BLASTING SET ARRANGEMENT
12 13219 DINESH BLASTER 8 BLASTING SET ARRANGEMENT
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 210 REPORTING DATE 30-Jun-20

SERVICE ORDER NO. 6510932388 Service Line Item# 1001212 TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT PERMIT START 7:05:00
L.I. Description RUST REMOVAL PERMIT CLOSED 5:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 2 PERMIT RECEIVER
2 23421 SARFUDIN S.O 8 2 SAFETY OFFICER
3 23205 MEK HELPER 8 2 PERFORM FOAM PIPE TEST
4 25329 RUBEN HELPER 8 2 DISMANTLE TOP SIDE ON THE FOAM CHAMBER REMOVE SANDS 3 3 EA
5 13520 PANDIT HELPER 8 2 PERFORM FIR WATER LINE TEST WITH ARAMCO
6 21865 NAUSAD FAB 8 2 CLEAN THE FIRE SPRINKLER AND RE INSTALL SPRINKLER 5 5 EA
7 Vacuum TANKER 6" HOSE CONNECTION
8 UNLOAD & CONNECT THE HOSE FOR WATER SUCKING 15 15 EA
9 DISCONNECT & LOAD THE HOSE AFTER WATER SUCKING 15 15 EA
10
11 AFTER FOAM & FIRE WATER TEST
12 ALL WATER LAYING ON THE FLOATING ROOF
13 FLOATING ROOF RUST CLEANING USING WIPER 1000 1000 M²
14 SHIFTING COMPRESSOR & GENERATOR
15 ARRANGE COMPRESSOR HOSES & ARRANGE ELECTRIC CABLES FOR LIGHTS
16
17 20776 DHAN HELPER 8 2 EQUIPMENT STANDBY MAN
18 11997 GIRI HELPER 8 2 D DOOR STANDBY MAN
19 1623 MOHAMMED KHAN PAINTER 8
20 25391 MARWAN ELECTRICIAN 8
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1669 AIR COMPRESSOR 8 4885.8 1


2 GR 1865 GENERATOR 8 2691 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 140 REPORTING DATE 1-Jul-20

SERVICE ORDER NO. 6510932388 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT PERMIT START 7:05:00
L.I. Description BOTTOM PLATE BLASTING PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 20783 MAN BAHADUR BLASTER 8 BOTTOM PLATE BLASTING 37.5 37.5 M²
2 18790 RAM SHREE BLASTER 8
3 18796 ANIF BLASTER 8
4 6170 NOBLE BLASTER 8
5 20856 JOHINDRA BLASTER 8
6 17594 DILLY BLASTER 8
7 18961 UDIM BLASTER 8
8 19069 DINESH BLASTER 8
9 13219 DINESH BLASTER 8
10 23329 NITIN BLASTER 8 TANK CALIBRATION PERFORMING BY JATCO PEOPLE
11 PERFORMING 4 HOURS
12 23326 SURESH PAINTER 8 THEY ARE COMING AT 10 O CLK
13 23360 ARIF ALI PAINTER 8
14 1623 MOHAMMED KHAN PAINTER 8 AFTER CALIBRATION WE START BLASTING WORKS
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 140 REPORTING DATE 1-Jul-20

SERVICE ORDER NO. 6510932388 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of PART OF PERMIT START 7:05:00
L.I. Description ASSISTING BLASTING WORKS PERMIT CLOSED 4:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 PERMIT RECEIVER
2 23421 SARFUDIN S.O 8 SAFETY OFFICER
3 23205 MEK HELPER 8 GRIT FILLING ON SAND PORT
4 25329 RUBEN HELPER 8 ARRANGING AIR HOSES LOT OF TIME .
5 13520 PANDIT HELPER 8 PERFORM BLASTING PREPARATION WORKS
6 20776 DHAN HELPER 8 EQUIPMENT STANDBY MAN
7 11997 GIRI HELPER 8 D DOOR STANDBY MAN
8 25391 MARWAN ELECTRICIAN 8 6" HOSE DISMANTLING
9 ASSIST FOR CALIBRATION
10
11 1. 1 AIR COMPRESSOR AUTOMATICALLY TURN OFF WHEN TWO BLASTERS
12 BLASTING
13
14
15 TANK CALIBRATION PERFORMING BY JATCO PEOPLE
16 PERFORMING 4 HOURS
17 THEY ARE COMING AT 10 O CLK
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1669 AIR COMPRESSOR 4 4888.8 1


2 AC1682 AIR COMPRESSOR 4 4819 2
3 AC1612 AIR COMPRESSOR 4 4060.8 3
4 4
5 GR 1865 GENERATOR 8 2691 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 140 & 150 REPORTING DATE 2-Jul-20

SERVICE ORDER NO. 6510932388 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT PERMIT START 7:05:00
L.I. Description BOTTOM PLATE BLASTING PERMIT CLOSED 6:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 20783 MAN BAHADUR BLASTER 8 BOTTOM PLATE BLASTING 285 285 M²
2 18790 RAM SHREE BLASTER 8 ROOF LEGS PAINTING 15 15 EA
3 18796 ANIF BLASTER 8
4 6170 NOBLE BLASTER 8 SHELL PLATE BLASTING ( FIBRE COATED SHELL) 10 10 M²
5 20856 JOHINDRA BLASTER 8
6 17594 DILLY BLASTER 8
7 18961 UDIM BLASTER 8
8 19069 DINESH BLASTER 8
9 13219 DINESH BLASTER 8
10 23329 NITIN BLASTER 8 ONLY 6 BLASTERS
PERFORMING BLASTING
11 WORKS.
12 23326 SURESH PAINTER 8 2 BOTTOM PLATE PAINTING 330 330 M²
13 23360 ARIF ALI PAINTER 8 2 MIXING PAINT
14 1623 MOHAMMED KHAN PAINTER 8 2
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1669 AIR COMPRESSOR 10 4897.7 1


2 AC1682 AIR COMPRESSOR 10 4827.7 2
3 AC1612 AIR COMPRESSOR 10 4069.8 3
4 AC1673 AIR COMPRESSOR 10 6075 4
5 AC1618 AIR COMPRESSOR 10 3815.5 5
6 GR 1865 GENERATOR 10 2703 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 140 & 150 REPORTING DATE 2-Jul-20

SERVICE ORDER NO. 6510932388 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of PART OF PERMIT START 7:05:00
L.I. Description ASSISTING BLASTING WORKS PERMIT CLOSED 6:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 PERMIT RECEIVER
2 23421 SARFUDIN S.O 8 SAFETY OFFICER
3 23205 MEK HELPER 8 GRIT FILLING ON SAND PORT FOR 6 BLASTERS 7 TON
4 25329 RUBEN HELPER 8 BOTTOM PLATE CLEANING AFTER BLASTING 330 330 M²
5 13520 PANDIT HELPER 8 2
6 20947 SHYAM HELPER 8 2
7
8 20776 DHAN HELPER 8 2 EQUIPMENT STANDBY MAN
9 11997 GIRI HELPER 8 2 D DOOR STANDBY MAN
10 BOTH STANDBY WORKING ON BOTTOM PLATE CLEANING
11 25391 MARWAN ELECTRICIAN 8 SECONDARY SEAL FABRIC REMOVAL 70 70 M
12 19135 AWDESH FAB 8
13 21055 LIBRES FAB 8
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1669 AIR COMPRESSOR 4 4888.8 1


2 AC1682 AIR COMPRESSOR 4 4819 2
3 AC1612 AIR COMPRESSOR 4 4060.8 3
4 4
5 GR 1865 GENERATOR 8 2691 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 140 REPORTING DATE 4-Jul-20

SERVICE ORDER NO. 6510932388 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT PERMIT START 7:05:00
L.I. Description BOTTOM PLATE BLASTING PERMIT CLOSED 6:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 20783 MAN BAHADUR BLASTER 8 BOTTOM PLATE BLASTING 270 270 M²
2 18790 RAM SHREE BLASTER 8 ROOF LEGS BLASTING 10 10 EA
3 18796 ANIF BLASTER 8
4 6170 NOBLE BLASTER 8 SHELL PLATE BLASTING ( FIBRE COATED SHELL) 30 30 M²
5 20856 JOHINDRA BLASTER 8
6 17594 DILLY BLASTER 8 ROOF DRAIN PIPE 4 " BLASTING 12 12 M
7 18961 UDIM BLASTER 8
8 19069 DINESH BLASTER 8
9 13219 DINESH BLASTER 8 FILLING GRIT ON SAND PORT
10 23329 NITIN BLASTER 8 FILLING GRIT ON SAND PORT
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1669 AIR COMPRESSOR 8 4905.7 1 ABRASIVE GRIT 9.5 TON


2 AC1682 AIR COMPRESSOR 8 4835.7 2
3 AC1612 AIR COMPRESSOR 8 4077.8 3
4 AC1673 AIR COMPRESSOR 8 6082 4
5 AC1618 AIR COMPRESSOR 8 3822.5 5
6 GR 1865 GENERATOR 8 2711 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 140 REPORTING DATE 4-Jul-20

SERVICE ORDER NO. 6510932388 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of PART OF PERMIT START 7:05:00
L.I. Description ASSISTING BLASTING WORKS PERMIT CLOSED 6:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 PERMIT RECEIVER
2 23421 SARFUDIN S.O 8 SAFETY OFFICER
3 23205 MEK HELPER 8 2 GRIT FILLING ON SAND PORT FOR 6 BLASTERS 9.5 TON
4 25329 RUBEN HELPER 8 2 BOTTOM PLATE CLEANING AFTER BLASTING 300 300 M²
5 13520 PANDIT HELPER 8 2
6 20947 SHYAM HELPER 8 2
7
8 20776 DHAN HELPER 8 2 EQUIPMENT STANDBY MAN
9 11997 GIRI HELPER 8 2 D DOOR STANDBY MAN
10 BOTH STANDBY WORKING ON BOTTOM PLATE CLEANING
11 25391 MARWAN ELECTRICIAN 8 SECONDARY SEAL FABRIC REMOVAL 60 60 M
12 19135 AWDESH FAB 8 NO LINE ITEM
13 21055 LIBRES FAB 8 AS PER T&I RECOMMAND WE PERFORM
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 140 REPORTING DATE 5-Jul-20

SERVICE ORDER NO. 6510932388 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT PERMIT START 7:05:00
L.I. Description BOTTOM PLATE BLASTING PERMIT CLOSED 6:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 20783 MAN BAHADUR BLASTER 8 2 BOTTOM PLATE BLASTING 285 285 M²
2 18790 RAM SHREE BLASTER 8 2 ROOF LEGS BLASTING 10 10 EA
3 18796 ANIF BLASTER 8 2
4 6170 NOBLE BLASTER 8 2 SHELL PLATE BLASTING ( FIBRE COATED SHELL) 20 20 M²
5 20856 JOHINDRA BLASTER 8 2
6 17594 DILLY BLASTER 8
7 18961 UDIM BLASTER 8 2
8 19069 DINESH BLASTER 8 2
9 13219 DINESH BLASTER 8 FILLING GRIT ON SAND PORT
10 23329 NITIN BLASTER 8 FILLING GRIT ON SAND PORT
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1669 AIR COMPRESSOR 8 4915.8 1 ABRASIVE GRIT 9.5 TON


2 AC1682 AIR COMPRESSOR 8 4845 2
3 AC1612 AIR COMPRESSOR 8 4085.9 3
4 AC1673 AIR COMPRESSOR 8 6087.6 4
5 AC1618 AIR COMPRESSOR 8 3822.9 5
6 GR 1865 GENERATOR 8 2720 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 140 REPORTING DATE 5-Jul-20

SERVICE ORDER NO. 6510932388 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of PART OF PERMIT START 7:05:00
L.I. Description ASSISTING BLASTING WORKS PERMIT CLOSED 6:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 PERMIT RECEIVER
2 23421 SARFUDIN S.O 8 SAFETY OFFICER
3 23205 MEK HELPER 8 2 GRIT FILLING ON SAND PORT FOR 6 BLASTERS 9 TON
4 25329 RUBEN HELPER 8 2 BOTTOM PLATE CLEANING AFTER BLASTING 285 285 M²
5 13520 PANDIT HELPER 8 2
6 20947 SHYAM HELPER 8 2
7
8 20776 DHAN HELPER 8 2 EQUIPMENT STANDBY MAN
9 11997 GIRI HELPER 8 2 D DOOR STANDBY MAN
10 BOTH STANDBY WORKING ON BOTTOM PLATE CLEANING
11 25391 MARWAN ELECTRICIAN 8 2 PRIMARY SEAL FABRIC REMOVAL 60 60 M
12 19135 AWDESH FAB 8 2 NO LINE ITEM
13 21055 LIBRES FAB 8 2 AS PER T&I RECOMMAND WE PERFORM
14 ARAMCO TIME SHEET
15 16678 SELVARAJ MASON 8 2 MAKING CONCRETE 1.5 M³
16 APPLY ON LEAK DEDUCTION AREA & CP CABLE EXCAVATION
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 140 REPORTING DATE 6-Jul-20

SERVICE ORDER NO. 6510932388 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT PERMIT START 7:05:00
L.I. Description BOTTOM PLATE BLASTING PERMIT CLOSED 6:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 20783 MAN BAHADUR BLASTER 8 BOTTOM PLATE BLASTING 280 280 M²
2 18790 RAM SHREE BLASTER 8 ROOF LEGS BLASTING 10 10 EA
3 18796 ANIF BLASTER 8
4 6170 NOBLE BLASTER 8 SHELL PLATE BLASTING ( FIBRE COATED SHELL) 10 10 M²
5 20856 JOHINDRA BLASTER 8
6 13219 DINESH BLASTER 8
7 18961 UDIM BLASTER 8
8 19069 DINESH BLASTER 8
9
10 23329 NITIN BLASTER 8 ASSIST BLASTERS
11 17594 DILLY BLASTER 8
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1669 AIR COMPRESSOR 8 4922.1 1 ABRASIVE GRIT 9.5 TON


2 AC1682 AIR COMPRESSOR 8 4857 2
3 AC1612 AIR COMPRESSOR 8 4092.1 3
4 AC1673 AIR COMPRESSOR 8 6093.9 4
5 AC1618 AIR COMPRESSOR 8 3834.8 5
6 GR 1865 GENERATOR 8 2732 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 140 REPORTING DATE 6-Jul-20

SERVICE ORDER NO. 6510932388 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of PART OF PERMIT START 7:05:00
L.I. Description ASSISTING BLASTING WORKS PERMIT CLOSED 6:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 PERMIT RECEIVER
2 23421 SARFUDIN S.O 8 SAFETY OFFICER
3 23205 MEK HELPER 8 2 GRIT FILLING ON SAND PORT FOR 6 BLASTERS 9 TON
4 25329 RUBEN HELPER 8 2
5 13520 PANDIT HELPER 8 2
6 20947 SHYAM HELPER 8 2
7
8 20776 DHAN HELPER 8 2 EQUIPMENT STANDBY MAN
9 11997 GIRI HELPER 8 2 D DOOR STANDBY MAN
10 BOTH STANDBY WORKING ON BOTTOM PLATE CLEANING
11 25391 MARWAN ELECTRICIAN 8 2 PRIMARY SEAL FABRIC REMOVAL 100 100 M
12 19135 AWDESH FAB 8 2 NO LINE ITEM
13 21055 LIBRES FAB 8 2 AS PER T&I RECOMMAND WE PERFORM
14 ARAMCO TIME SHEET
15 16678 SELVARAJ MASON 8 MAKING CONCRETE 1.5 M³
16 APPLY ON LEAK DEDUCTION AREA & CP CABLE EXCAVATION
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 140 REPORTING DATE 6-Jul-20

SERVICE ORDER NO. 6510932388 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of PART OF PERMIT START 7:05:00
L.I. Description ASSISTING BLASTING WORKS PERMIT CLOSED 6:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 PERMIT RECEIVER
2 23421 SARFUDIN S.O 8 SAFETY OFFICER
3 23205 MEK HELPER 8 GRIT FILLING ON SAND PORT FOR 6 BLASTERS 12 TON
4 25329 RUBEN HELPER 8
5 13520 PANDIT HELPER 8
6
7
8 20776 DHAN HELPER 8 EQUIPMENT STANDBY MAN
9 11997 GIRI HELPER 8 D DOOR STANDBY MAN
10 BOTH STANDBY WORKING ON BOTTOM PLATE CLEANING
11
12 19135 AWDESH FAB 8 NO LINE ITEM
13 21055 LIBRES FAB 8 AS PER T&I RECOMMAND WE PERFORM
14 ARAMCO TIME SHEET
15
16 25391 MARWAN ELECTRICIAN 8 CP CAPLE JUNCTION BOX WORK
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 140 REPORTING DATE 8-Jul-20

SERVICE ORDER NO. 6510932388 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT PERMIT START 7:05:00
L.I. Description BOTTOM PLATE BLASTING PERMIT CLOSED 15:30:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 20783 MAN BAHADUR BLASTER 8 2 BOTTOM PLATE BLASTING 400 400 M²
2 18790 RAM SHREE BLASTER 8 2
3 18796 ANIF BLASTER 8 2
4 6170 NOBLE BLASTER 8 2 SHELL PLATE BLASTING ( FIBRE COATED SHELL) 30 30 M²
5 20856 JOHINDRA BLASTER 8 2 ROOF LEGS BLASTING 10 10 EA
6 23329 NITIN BLASTER 8 2
7 18961 UDIM BLASTER 8 2
8 19069 DINESH BLASTER 8 2
9 17594 DILLY BLASTER 8 2
10 ASSIST BLASTERS
11
12 13936 JIMMY OPRTR 8 SHIFTING SAND TO YARD
13 SCRAP PLATE LOADING
14 20991 CHAUHAN WELDER 8 GOING TO PASSPORT OFFICE
15
16 24671 SONNY FAB 8 2 DRIP PLATE FABRICATE & FIT UP OLD PLATE 6 6 EA
17 23999 PHILIP FAB 8 2
18 24492 MUHAMMED GUL HELPER 8 2 FIRE WATCH
19 21855 HARICHARAN WELDER 8 2 TACK WELD
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1669 AIR COMPRESSOR 8 4944.5 1 ABRASIVE GRIT 12 TON


2 AC1682 AIR COMPRESSOR 8 4879.5 2
3 AC1612 AIR COMPRESSOR 8 4110.3 3
4 AC1673 AIR COMPRESSOR 8 6112.6 4
5 AC1618 AIR COMPRESSOR 8 3865.8 5
6 GR 1865 GENERATOR 8 2764 6
7 SL2066 BOBCAT 7
8 WM1714 WELDING MACHINE 8 6339.1 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 140 REPORTING DATE 8-Jul-20

SERVICE ORDER NO. 6510932388 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of PART OF PERMIT START 7:05:00
L.I. Description ASSISTING BLASTING WORKS PERMIT CLOSED 3:30:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 PERMIT RECEIVER
2 23421 SARFUDIN S.O 8 SAFETY OFFICER
3 23205 MEK HELPER 8 2 GRIT FILLING ON SAND PORT FOR 6 BLASTERS 12 TON
4 25329 RUBEN HELPER 8 2 BOTTOM PLATE CLEANING 250 M²
5 13520 PANDIT HELPER 8 2
6 16678 SELVARAJ MASON 8 2 FLAG MAN & ASSIST FOR SCRAP PLATE SHIFTING
7
8 20776 DHAN HELPER 8 2 EQUIPMENT STANDBY MAN
9 11997 GIRI HELPER 8 2 D DOOR STANDBY MAN
10 BOTH STANDBY WORKING ON BOTTOM PLATE CLEANING
11
12 19135 AWDESH FAB 8 2 NO LINE ITEM
13 21055 LIBRES FAB 8 2 AS PER T&I RECOMMAND WE PERFORM
14 SEAL FABRIC RE INSTALLATION
15 ARAMCO TIME SHEET
16 25391 MARWAN ELECTRICIAN 8 CP CAPLE JUNCTION BOX WORK
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 140 REPORTING DATE 9-Jul-20

SERVICE ORDER NO. 6510932388 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of DIRECT PERMIT START 7:05:00
L.I. Description BOTTOM PLATE BLASTING PERMIT CLOSED 15:30:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 20783 MAN BAHADUR BLASTER 8 BOTTOM PLATE BLASTING 220 220 M²
2 18790 RAM SHREE BLASTER 8 4" PIPE BLASTING 25 25 M
3 18796 ANIF BLASTER 8 6" PIPE BLASTING 25 25 M
4 6170 NOBLE BLASTER 8 SHELL PLATE BLASTING ( FIBRE COATED SHELL) 10 10 M²
5 20856 JOHINDRA BLASTER 8 ROOF LEGS BLASTING 10 10 EA
6 23329 NITIN BLASTER 8
7 18961 UDIM BLASTER 8
8 19069 DINESH BLASTER 8
9 17594 DILLY BLASTER 8
10
11
12 13936 JIMMY OPRTR 8 SAND LEVELLING & SHIFTING
13
14 20991 CHAUHAN WELDER 8 2 DRIP PLATE WELDING 12 12 M
15 DRIP PLATE GRINDING 12 12 M
16 24671 SONNY FAB 8 2 DRIP PLATE FABRICATE & FIT UP OLD PLATE 6 6 EA
17 23999 PHILIP FAB 8 2
18 24492 MUHAMMED GUL HELPER 8 2 FIRE WATCH
19 21855 HARICHARAN WELDER 8 2 TACK WELD
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 AC1669 AIR COMPRESSOR IDLE 1 ABRASIVE GRIT 12 TON


2 AC1682 AIR COMPRESSOR 8 4890.3 2
3 AC1612 AIR COMPRESSOR 8 4123.9 3
4 AC1673 AIR COMPRESSOR 8 6131 4
5 AC1618 AIR COMPRESSOR 8 3874 5
6 GR 1865 GENERATOR IDLE 2784 6
7 SL2066 BOBCAT 7
8 WM1714 WELDING MACHINE 8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 140 REPORTING DATE 9-Jul-20

SERVICE ORDER NO. 6510932388 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of PART OF PERMIT START 7:05:00
L.I. Description ASSISTING BLASTING WORKS PERMIT CLOSED 3:30:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 PERMIT RECEIVER
2 23421 SARFUDIN S.O 8 SAFETY OFFICER
3 23205 MEK HELPER 8 2 GRIT FILLING ON SAND PORT FOR 6 BLASTERS 12 TON
4 25329 RUBEN HELPER 8 2 BOTTOM PLATE CLEANING 250 M²
5 13520 PANDIT HELPER 8 2
6 16678 SELVARAJ MASON 8 2
7 19344 RAJKUMAR HELPER 8
8 22322 PREM HELPER 8
9
10 11997 GIRI HELPER 8 2 D DOOR STANDBY MAN
11 20776 DHAN HELPER 8 2 EQUIPMENT STANDBY MAN
12 19135 AWDESH FAB 8 2 NO LINE ITEM
13 21055 LIBRES FAB 8 2 AS PER T&I RECOMMAND WE PERFORM
14 20885 MOHAN HELPER 8 2 SEAL FABRIC RE INSTALLATION
15 24944 SAROJ HELPER 8 2 ARAMCO TIME SHEET
16 24592 DINESH HELPER 8 2
17 21865 NAUSAD FAB 8 2
18 19454 NAGENDRAN FAB 8 2
19
20 25391 MARWAN ELECTRICIAN 8 2 DRILLING ON FOAM DAM AND SHELL - 18 HOLES (10 MM)
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 140 / NO LINE ITEM REPORTING DATE 10-Jul-20

SERVICE ORDER NO. 6510932388 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of PART OF PERMIT START 7:05:00
L.I. Description ASSISTING BLASTING WORKS / SEAL FABRIC INSTALLATION PERMIT CLOSED 2:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 PERMIT RECEIVER
2
3
4 22322 PREM HELPER 8 BOTTOM PLATE GRIT CLEANING 450 450 M²
5 13520 PANDIT HELPER 8
6 25391 MARWAN ELECTRICIAN 8 TANK GROUNDING CABLE INSTALLATION 6 6 ROLL
7 19344 RAJKUMAR HELPER 8 BRING 6 ROLLS TO TANK TOPSIDE WIND GRIDER AND INSTALLATION
8
9 1623 MOHAMMED PAINTER 8 PAINT PUMP PREPARATION
10
11
12 19135 AWDESH FAB 8 NO LINE ITEM
13 21055 LIBRES FAB 8 AS PER T&I RECOMMAND WE PERFORM
14 24592 DINESH HELPER 8 SEAL FABRIC RE INSTALLATION
15 21865 NAUSAD FAB 8 ARAMCO TIME SHEET
16
17
18
19 11997 GIRI HELPER 8 D DOOR STANDBY MAN
20 20776 DHAN HELPER 8 EQUIPMENT STANDBY MAN
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 380 REPORTING DATE 9-Jul-20

SERVICE ORDER NO. 6510932388 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of PERMIT START 7:05:00
L.I. Description DRIP PLATE WELDING PERMIT CLOSED 14:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 20991 CHAUHAN WELDER 8 DRIP PLATE WELDING ( 2 PASS ) 8 8 M
2 DRIP PLATE GRINDING 8 8 M
3 19454 NAGENDRAN FAB 8 DRIP PLATE FABRICATE & FIT UP OLD PLATE 4 4 EA
4 23999 PHILIP FAB 8
5 21855 HARICHARAN WELDER 8 TACK WELD
6 DRIP PLATE WELDING ( ROOT PASS ) 6 6 M
7
8
9
10
11
12
13
14
15
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 GR 1865 GENERATOR 6 2796 1


2 WM1696 WELDING MACHINE 6 4989 2
3 AC1673 AIR COMPRESSOR 6 6142.3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 140 REPORTING DATE 9-Jul-20

SERVICE ORDER NO. 6510932388 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of PART OF PERMIT START 7:05:00
L.I. Description ASSISTING BLASTING WORKS PERMIT CLOSED 3:30:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 24060 KALEESWARAN JR.ENG 8 PERMIT RECEIVER
2 23421 SARFUDIN S.O 8 SAFETY OFFICER
3 23205 MEK HELPER 8 2 GRIT FILLING ON SAND PORT FOR 6 BLASTERS 12 TON
4 25329 RUBEN HELPER 8 2 BOTTOM PLATE CLEANING 250 M²
5 13520 PANDIT HELPER 8 2
6 16678 SELVARAJ MASON 8 2
7 19344 RAJKUMAR HELPER 8
8 22322 PREM HELPER 8
9
10 11997 GIRI HELPER 8 2 D DOOR STANDBY MAN
11 20776 DHAN HELPER 8 2 EQUIPMENT STANDBY MAN
12 19135 AWDESH FAB 8 2 NO LINE ITEM
13 21055 LIBRES FAB 8 2 AS PER T&I RECOMMAND WE PERFORM
14 20885 MOHAN HELPER 8 2 SEAL FABRIC RE INSTALLATION
15 24944 SAROJ HELPER 8 2 ARAMCO TIME SHEET
16 24592 DINESH HELPER 8 2
17 21865 NAUSAD FAB 8 2
18 19454 NAGENDRAN FAB 8 2
19
20 25391 MARWAN ELECTRICIAN 8 2 DRILLING ON FOAM DAM AND SHELL - 18 HOLES (10 MM)
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :
ARABIAN FAL LIMITED COMPANY
FOREMAN DAILY TIMESHEET REPORT

CONTRACT NUMBER 6600036109 RPO Line# 380 REPORTING DATE 9-Jul-20

SERVICE ORDER NO. 6510932388 Service Line Item# TIME REACHED CONTROL ROOM 6:45:00
TANK NUMBER NJBP 116 Direct / Part of PERMIT START 7:05:00
L.I. Description DRIP PLATE WELDING PERMIT CLOSED 14:00:00

MANPOWER DETAIL
WORKING PRODUCTION QTY.
SN FALCO # NAME CATEGORY WORK DESCRIPTION UNIT REMARKS
RH OT IDLE REG OT TOTAL
1 20991 CHAUHAN WELDER 8 2 DRIP PLATE WELDING ( 2 PASS ) 12 12 M
2 DRIP PLATE GRINDING 12 12 M
3 19454 NAGENDRAN FAB 8 2 DRIP PLATE FABRICATE & FIT UP OLD PLATE 11 11 EA
4 23999 PHILIP FAB 8 2 GAS CUT & GRINDING 33 33 M
5 21855 HARICHARAN WELDER 8 2 TACK WELD
6 DRIP PLATE WELDING ( ROOT PASS ) 6 6 M
7
8
9 19135 AWDESH FAB 8 NO LINE ITEM
10 21055 LIBRES FAB 8 AS PER T&I RECOMMAND WE PERFORM
11 21865 NAUSAD FAB 8 SEAL FABRIC RE INSTALLATION
12 ARAMCO TIME SHEET
13
14 25391 MARWAN ELECTRICIAN 8 PERFORMING CP CAPLE LAYING 50 M
15 JUNCTION BOX TO DIKE WALL
16
17
18
19
20
EQUIPMENT DETAILS MATERIAL CONSUMPTION
SN DOOR# EQUIPMENT TYPE WORKING HRS MTR SN ITEM NO. MATERIAL DESCRIPTION QTY CONSUMED UNIT REMARKS

1 GR 1865 GENERATOR 6 2796 1


2 WM1696 WELDING MACHINE 6 4989 2
3 AC1673 AIR COMPRESSOR 6 6142.3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10

SUBMITTED BY: FM / LM/ WPR CHECKED BY: SUPT. / GF REVIEWED BY: WRD PLANNER REC. APPROVAL: PROJ. MNGR. APPROVED BY: GENERAL MANAGER
Name : KALEESWARAN Name : FAROOK BASHA Name : APPARAO GUJJALI Name : MERVIN DELA CRUZ Name : MOHAMMED HADI KHURSAN
Falco # : 24060 Falco # : 5445 Falco # : 20066 Falco # : 13849 Falco # : 5282
Signature : Signature : Signature : Signature : Signature :

You might also like