Professional Documents
Culture Documents
Table of content
Acknowledgements
Executive Summary
1.0 Introduction
1.1 Overview
1.2 Aim
1.3 Objectives
1.4 Project Background
1.5 Location Site
1.6 Working Diary
6.0 Conclusion 44
9.0 Appendix 52
1
ACKNOWLEDGEMENT
Alhamdulillah, finally our group have successfully finish our Strata fieldwork
and report in given time. We were so grateful as for Allah that had gave us the
strength and good mind in proceeding our Advance Cadastral (SUG669). Indeed
its undeniable that we only able to finish our work in this semester survey camp
with the companion of Allah The Merciful and The Greatest Of All.
2
Lastly, thanks a lot to also to all my friends for their support and
encouragement for all the time in this time of survey camp. We believe that that
have help us in many ways and enable us to finish excellently.EXECUTIVE
SUMMARY
Executive Summary
Executive summary discuss about the project name, location, objective of the
project and the scope of works.
Project Name
Strata Survey of Kulim Square.
Location of Site
Kulim Square
3
4
Objectives
The objectives of this project is produce Certified Plan of the surveyed lot.
Purpose
Status of Project
Scope of works
The Strata survey project is being carried out on the lot with traverse done with three
good mark, detail of building being pick along the way and dimension survey which is
survey the dimension of parcel.There are 3 stages involved in performing this
subdivision project which is :
2. Survey fieldwork
i. Site reconnaissance and planning
ii. Traversing for horizontal control
iii. Find the Three Good Mark and other boundary marks alongside of traversing
line.
iv. Do a detail and topography survey of building in survey lot
v. Refixation
vi. Processing data at office
vii. Identify the three good marks using PO and New step
viii. Preparing the Certified Plan of Strata Plan.
Specification of Works
5
No. Specification Description
1. Preparation of JP Prepared according to
blueprint
2. Calculation of Unit Shared Calculated based on SIFUS
3. Survey for Vertical and Start the closed traverse
Horizontal control using a boundary mark that
have the azimuth bearing
4. Refixation Carried as identifying the
line that exceed regulation
tolerance
5. Detail and topography Pick up the edge of the
survey building as detail
6. Dimension Survey Survey or measure the
dimension of building parcel
using party wall survey
7. Prepared CPSP After all work done,
proceed CPSP
6
Milestone
8 FEB 2016
We were tested to do a simple control
traverse of four station.
The test also include fieldbook booking
Traverse test checked by Dr. Saiful
Aman
Briefing for the next day site visit
Finishing JP
7
11 FEB 2016 Move to site
Determine the position of old boundary
mark
Start work
Assume Datum
Night meeting we discuss about the site
work difficulty
13 FEB 2016 Finishing our traverse work
Do a detail or Topography Survey
Complete our Strata survey work
14 FEB 2016 Refixation
Calculation for Refixation
Identifying and declare old Boundary
mark
15 FEB 2016 Show a result for our fieldwork to Dr.
Saiful Aman
Proposed Table Of Content for report
16 FEB 2016 Finishing Report
CHAPTER 1 : INTRODUCTION
The strata title is a subdivision of a building or land into parcels of separate titles
which are called strata titles for each parcel. For it to be declared a strata titles it have to
meet a several conditions. The first condition is the building that must have two or more
storeys. The building also must on be an alienated land and must be held as one lot
8
under Final Title. Each parcel also is to be held under a separate title. When the building
is subdivided the title to the land which is the building being stands is retained but
register under a body called Management Corporation. As soon as the strata titles to the
parcels are registered it exits automatically.
AIM
The aim of the project is to carried out strata survey for the entire lot of Kulim Square
and produce the strata plan of the area digitally and hardcopy and the survey is being
done manually.
OBJECTIVES
1. To understand the all the concepts regarding Strata Title and procedures to conduct
Strata Title Survey(Subdivision Of Building) with accordance to Strata Title Act(STA)
1985.
2. To experience and familiarize with the work flows on producing Strata Title under
mentioned Act.
3. To determine the buildings dimensions (horizontal and vertical) and compare with
the architect’s plan.
4. To identify type of the parcels of the bulding,eg: accessory parcels and the common
property.
5. To produce Certified Plan of the surveyed lot.
6. To produce Certified Strata Plan
PROJECT OVERVIEW
For this survey work our team has to perform various kind of works. These include
differential field test, traverse, detail or topography survey. Our survey for traverse work
does not include a solar observation because we conducted and manage to declare a
three good mark in which according to PKUP 2009, When three good mark are in
tolerance, there no need to do solar observation. All this work was conducted and
recorded manually using fieldbook. We were assigned at Kulim Square, Kedah for our
Strata survey work. The reconnaissance is being done to determine the previous
boundary mark and also to find us a suitable location for us to start our work. The
9
reconnaissance is being done based on the building plan that was obtained at the facility
unit.
We firstly start our work with EDM test or Total Station calibration involving pillar test.
The calibration we conducted according to regulation whereas the distance recorded
between pillar are calculated. After that, we start our work with DFT. The DFT are done
and conducted in order to check and make sure our total station is in good condition or
else. After DFT, then we proceed traverse work. The traverse work must being
conducted according to the KPUP 1 2015 survey regulations whereas the difference
between the circle right and the circle left is not more than 20” and the whole traverse
tolerance must not exceed 1’15” for angle miclosure with under 10” for each station and
must be over 1: 8000 for linear misclosure.
After finishing traverse work, we pick up a detail or topography surveying for building
includes. This surveying require us to take the detail of our site as much as we can in
order to make our site look more accurate and in position when we process in Autocad.
Then we also need to take the horizontal dimensions of each parcel and height for each
floor. This is to determine the area and calculate the unit share for each of the parcel and
this work were done by using Destometer as its function is to measure distance between
wall.
SITE LOCATION
KULIM SQUARE
10
11
GANT CHART
12
MILESTONE
7 February ( SUNDAY )
Briefing about Strata by Dr. Saiful Aman b. Sulaiman and En. Hezry b.
Presentation flow of strata work
We were given our site location which is Kulim Square.
8 February ( MONDAY )
Individual traversing test
Briefing about tomorrow’s program
9 February ( TUESDAY )
Site visit at 3 location
i. Kulim Square ( our site )
ii. Taman Jati
iii. Butterworth
10 February ( WEDNESDAY )
EDM Calibration by group at Kulim
11 February ( THURSDAY )
Find BKL and search for 3 good mark
The angle result between 3 good mark is 11” but approve by Dr. Saiful
12 February ( FRIDAY )
Break
13 February ( SATURDAY )
Start traversing
Dimension survey
14 February ( SUNDAY )
13
Refixation
15 February ( MONDAY )
Group discussion
Reporting
16 February ( TUESDAY )
Reporting
17 February ( WEDNESDAY )
Trip to Perlis
18 February ( THURSDAY )
Viva
Submit report
14
CHAPTER 2: PERSONAL AND EQUIPMENT
PERSONNAL
15
EQUIPMENT
NAME OF
EQUIPMENT QUANTITY / FUNCTIONS
EQUIPMENT
1 Unit
Integration of EDM and
Theodolite.
To measure the
Total Station
bearing(angle) and
distance.
3 Units
To stand(support) the
instrument like Total
Tripod
Station and Prism to
ensure they are firmly
stabilize on the ground.
2 Units
To reflects the beam of the
total station so the
Prism distance can be read and
recorded.
16
1 UNIT
use in the topograpgy
Miniprism detail
Same function as the
prism just the different in
size.
CHAPTER 3: METHODOLOGY
17
INTRODUCTION
In this chapter we will review the certain procedure that is being done for our group work.
In this survey all the work procedures must follow and obey the survey regulations that
has been fixed in order to fulfill the scope of our work.
18
FLOW OF WORK
FIELDWORK
OFFICE WORK
Survey for
Calculation of Unit
Vertical and
Preparation of Shared are based on
Horizontal control
Unit Shared SIFUS
Comparison
Reconaissance Between Traverse
And Strata Plan
Send for
EDM
approval Calibratio
n
Preparation DFT
Send To of CPSP
Building
Commissioner Traverse
For Approval
Three
Field
Good
Procedure
Send to Mark
Refixation
Field
Process
Detail
JUPEM Survey
Dimensio
n Survey
Produce
PA
RECONNAISSANCE
19
As a work start, firstly we must reconnaissance the area that we want to conduct the
survey. In our case, we were given a task to finish the work in Kulim Square. This
procedure enable us to get the first look of our work and also the general view of our
site. The objective of the reconnaissance is:
1. We can get the general idea of what our site look like
2. Can help us locate the old boundary mark and identify the condition of it.
3. Can help us identify the location to start our new traverse work.
EDM CALLIBRATION
1. To test the accuracy and error of instrument which is Total Station.
2. Tolerance of EDM is ±0.010mm.
Procedures:
1. Setting up the total station at pillar 1.
2. Next, place the prism at pillar 2.
3. Observe the distance and record.
4. Set up others prism for the rest of pillar
5. Observe distance from pillar 1 to 3.
6. Observations are taking for each of pillar. Repeat the step 5 until finish
observation to pillar 10.
7. Next, place the total station at pillar 2. Observe distance to prism at pillar 3.
8. Repeat the step until last at pillar 10.
9. 17 observations have been made.
10. Differences between absolute distance and observation distance are shown. If
the differences below than 10mm, the instrument are stay in good condition
1. The differential field test is being done on order to tested the total station is in the
good condition or not.
2. The differential field test tolerance is 0.010 meters and this process is should be
done when to start a new job.
3. To start the differential field tests establish a line that was about 95.269 m long.
4. Place the total station between the prisms.
20
5. Then measure the distance and compare it to the original distance.
95.269 m
A B
20.496 m 74.772 m
A C B
DATUM
21
6. Then the data are calculated as it is observed
7. It been calculated to compared the interior angle of the boundary marks as state
in certified plan and the observation.
8. The different of new and old interior angle must not more than 10”
TRAVERSE
Purpose to carry out a traverse are for used as horizontal control. Through traversing the
coordinate from the datum can transfer to each our new station using bearing and
distance from observation.
We were starting our traverse by using 3 good mark with the angle approved by Dr.
Saiful Aman is 11” as our baseline.
Procedure:
1. After get the datum we can start our traverse work.
2. To start the traverse work first set the total station at the station 1. For our site we
choose the additional station mentioned above as our first station.
3. Then target the prism at the station 2 using face left and set the bearing that we
get.
4. Then target the prism at the station 3 or foresight station using the same face.
5. Target the prism at the station 2 again but this time using face right.
6. Then target the prism at the station 3 or foresight station using the same face.
7. Observed all the boundary marks that have been found.
8. Repeat the step until we arrived at the last station and finish our work.
We obtained 10” for closed bearing and get C correction -0.77” for each station and the
linear misclosure was 1: 39682. Boundary mark
.Refixation
Refixation need to applied if the position of the boundary marks went missing or out of
position from its original position. The difference of boundaries mark that have been
observed and the actual position which is the Old Boundary Mark is called vector
displacement.
22
Nobserved– NOldboundarymark = ⩟ Latitude
Eobserved – EOldboundarymark = ⩟ Departure
According to the PKUP 2009 tolerance for refixation is the different of vector
displacement between old boundaries and observed is not more than 0.05 meter for
urban and for development area is 0.1 m. If the different is out of tolerance, the old
boundary mark needs to be refix because it is out of its actual position.
For lot of Kulim Square, there have 18 boundary marks according to the certified plan.
But in the meantime, while the traversing is on progress, we just find two marks of the lot
which are the mark of TNB area and the other are missing. After make the comparison
between old and observed from the traverse station, the two marks need to refix
because it’s out of tolerance.
According to the PKUP 2009, if any boundary marks that found are out of tolerance
and the other are missing, its need to refix by demarcate the new marks.
The new marks can be demarcated by calculating the missing line from the traverse
station to the boundary marks. Missing line (bearing & distance) between station and old
boundary can check by using the Casio Scientific calculator by:
Methodology of offset to demarcate the new boundary marks that more than 1 meter
from traverse station.
23
1. Based on figure above, instrument setting up at station 4 and reference bearing
from 3.
2. Open the offset bearing 191 02 40 (calculated missing line from coordinate)
3. Demarcate the new boundary at the distance that has been calculated which is
8.004.
1. Firstly choose the station where we want to setup the total station and the prism as
the RO. For example our group pick station # to put the total station at # as our RO.
2. Then we observed the edges of buildings to ensure that the building located wholly
in the lot.
3. Then decide what type of detail that want to take to be put in the CP. Our group
choose the edge of the building as our detail.
4. Then target the RO station using circle left which is station 9.
5. Then target the topography detail that we want to take and take the point detail that
is the horizontal bearing,vertical bearing and the distance of the point.
6. We manually booking the detail and topography survey we have take in fieldbook
DIMENSION SURVEY
Measurement the Dimension of Building
24
The horizontal dimensions of the building have been shown in the building plan.
Therefore, we only need to re-measure (inspection) the dimensions of the building and
compare with the dimensions of the building in the building plan to ensure it is not
exceed the displacement limit which is 0.005m. But still, if there any exceed in
displacement, we should inform the building plan to be amended. The instrument to be
used in accordance to this stage of work is the Distometer. It only measures distance by
shooting laser from the Distometer to any point end of it.
FLOOR 5
FLOOR 4
FLOOR 3
FLOOR 2
FLOOR 1
During this stage of work, the actions have been taken are:
i. With sketches of each floor of the building with respect to each unit parcels on each
floor.
ii. The sketches are made without scale.
25
i. For each floor, the height is taken at the staircase, where a piece of paper is held by
a person above or below perpendicular to the line of measurement to stop the
measurement laser of the Distometer (Same as concept of Prism). This is to acquire
the accurate distance for the desired measurement.
ii. The height measurement is measured to the 0.01m.
iii. The Distometer is held vertically upward and level horizontally (same as the concept
of Total Station) by balancing the level bubble attached with the Distometer.
iv. Each measurement must be made many times to obtain precise values. And all the
values must be averaged to a value.
v. All the data obtained are recorded in the Field Book.
vi. The width of the ceiling or floor must also be measured and be subtracted to obtain
the true height of each floor.
i. All the length and width of each unit of parcel will be re-measured and compare with the
dimensions in the building plan to ensure it is not exceed 0.005m.
ii. The entire dimension of each unit parcels is measured to the 0.01m.
iii. The Distometer is held horizontally by balancing the level bubble attached with the
Distometer.
iv. Each measurement must be made many times to obtain precise values. And all the
values must be averaged to a value.
v. All the data obtained are recorded in the Field Book.
vi. The width of the walls between two unit of parcels must also be measured to
determine the actual area of the parcel.
i. The title number for each floor and each unit of parcels must be declared.
ii. Storey at the ground of the building is declared as Floor 1 and so forth.
iii. Numbering the parcel is start from first floor and so forth.
iv. All numbering must be unique and cannot be repeated.
UNIT SHARE
1. According to the paragraph 10 (1) (h) AHS 1985 every JTB must prepare every unit
share.
26
2. To prepare unit share every JTB must follow this formula:
FIELD WORK
27
Date 10 Feb 2016
EDM TOPCON EDM SERIES NO OL 3654
Model
Site Location : NO.2B , JALAN KILANG LAMA, KAWASAN
PERINDUSTRIAN KULIM, 09000 KULIM KEDAH
Pillar No
Horizontal
FROM TO Actual Distance (B) Differences (A-B)
Distance (A)
28
…………………………… 1
(Surveyor signature)
FATIN FATEHA BINTI ABD
C = -0.05/n = ±0.003
RAHMAN n
n = No. of observation
Table : EDM Calibration Form
TRAVERSE
1. For datum the different
2. We do a traverse for 13 station including Three Good Mark
3. Along the traversing work, we pick up an old boundary mark to check whether it in
position or not.
4. Tolerance of Linear Miclosure for traverse reference form PKUP 2009 is 1 : 8000.
5. For this traverse the linear misclosed is 1: 39 682
6. In which we are in standard of PKUP 2009 and our work is accepted.
BEARING/ANGLE
F Line T Dista Final
Stn Vertica
nce
Face Left Face Mean Final o l Angle Distance
r
Right Angle Bearing (m) (m)
Differentia Field Test A B H 95.269 95.269
l
(95.269
)
C A 20.496 20.496
(20.496
)
C B 74.772 74.772
(74.772
)
CA + CB 95.268
29
1 207 03 47 27 03 47 357 59 45 2 357 59 40 3 20.933 20.933
4 M -1.5” PK PK
T
6 356 47 14
5 M -2.3” PK PK
T
8 253 55 52
30
11 126 30 29 306 30 28
15 C -9.2” PK BL (41.917
T )
1 282 44 23 102 44 27
GARISAN 1-2 27 03 57
DIBACA
SEPATUTNY DIBACA 27 03 47
A IAITU STN 1, 2, 3,4,5, 7, 9,10,11,
TIKAIAN BAGI 13 - 00 00 10” 12,13, 14, 15
STN
PEMBETUL -00 00 PE STN
AN 0.77” R
31
DETAIL AND TOPOGRAPHY SURVEY
1. The detail and topography survey we done along the way we concede our
traverse.
2. We pick a detail of edge of the building of every block in our survey lot.
3. The block still in survey lot and are identified in exact position.
32
11 11 27 38 07 00 11 12 07 00 10 100 47.639 47.639
7
12 ( TOPO) M -6.2 PK BG
T N
100 07 00 11
7
33
Refixation
1. After completing the traversing, procedure of refixation has been done by
demarcate the new mark
2. All the missing mark has been planted new picket and the two boundary
marks that have been found also has been refix on the right position.
34
UNIT From To Coordinate Bearing Distance
N E
4 -62027.898 -10237.649
H -62035.753 -10239.183 191 02 40 8.004
I -62010.615 -10238.593 356 52 30 17.308
5 -62000.979 -10217.603
K -62010.450 -10224.690 216 48 20 11.830
J -62005.749 -10224.690 236 03 20 8.544
L -62003.511 -10226.436 253 59 49 9.190
M -61995.406 -10228.011 298 09 38 11.806
7 -61968.425 -10239.662
N -61993.493 -10229.277 157 30 30 27.136
O -61987.574 -10238.053 175 11 50 19.219
P -61983.597 -10237.959 173 35 50 15.270
Q -61978.768 -10240.444 184 19 20 10.375
R -61966.572 -10246.721 284 41 37 7.298
10 -61875.074 -10178.730
A -61869.259 -10181.076 338 01 42 6.270
11 -61912.236 -10128.532
B -61908.786 -10122.137 61 43 40 7.262
C -61917.099 -10125.635 149 15 40 5.670
12 -61972.249 -10140.699
D -61983.963 -10137.482 164 40 00 12.158
13 -62054.226 -10167.094
E -62031.263 -10139.308 50 26 40 36.035
F -62027.016 -10156.368 21 31 00 29.234
G -62065.912 -10177.212 220 51 40 15.470
SHARED
1. Calculated using SIFUS formula
2. In our site, the building in our traverse lot include three block (A,B,C) and we
responsible to calculate the unit shared and draw the plan of block A only.
3. Below are the result of calculated Unit Shared of M1 building:
SIFUS
Keluasan Petak
Tingkat Petak 2
Kegunaan Unit Syer
(m ) Aksesori
1 1 60.6 Kediaman - 52
1 2 60.6 Kediaman - 52
1 3 60.6 Kediaman - 52
1 4 60.6 Kediaman - 52
35
1 5 60.6 Kediaman - 52
1 6 60.6 Kediaman - 52
1 7 60.6 Kediaman - 52
1 8 60.6 Kediaman - 52
1 9 60.6 Kediaman - 52
1 10 60.6 Kediaman - 52
1 11 60.6 Kediaman - 52
1 12 60.6 Kediaman - 52
Jumlah Unit Syer 624
Pengiraan
Petak : M3/1/1
Petak aksesori : Tiada
Jenis petak : Kediaman
Ciri-ciri skim : Tiada lif dan tiada penyaman udara
Keluasan petak : 60.6 m2
Keluasan petak aksesori : Tiada
Pengiraan unit syer : (60.6 x 0.85 x 1) = 51.51
Unit syer : 52
1.049 8.344
2.656
A
6.210
3.838
0.681
B C 1.136
2.071 4.702 2.633
Parcel 1 - 60:
36
Area A = 2.656 x 1.049
=2.786 m²
37
VERTICAL PLAN
Refer to the appendix
38
FLOOR PLAN
Refer to the appendix
39
STOREY PLAN
40
CHAPTER 5: CONCLUSION
41
Alhamdulilllah finally we have been able to finish this site work on time.It was so hard for
us to finish as we had face so many obstacle while try to complete this task. But, with the
hard work and taught field site, we manage to train our mind along with our body
physically and psychologically and we believe that this experience will be helpful for us in
the future. We have learn so many new things when we do all the site survey. The new
things that we really learn is the new flow and also amendments of the Strata survey. In
add, we also able to learn the skill in making good plan and form. The real survey
environment with manually booking work also give us a new idea on how fieldwork be
done. In a ways, we think that we really grateful to have this opportunity to had a
practical work on Strata survey in this survey camp because we had learn so many
things.
CHAPTER 6: RECOMENDATION
PROBLEM STATEMENT AND RECOMMENDATION
42
In our Strata work, we have face many obstruction. Firstly, the venue of our discussion
room are a bit lack of basic facilities which is difficult to us to do our work and discussion
for our task smoothly. We thinks that SUG department should provide more facilities to
easier and make sure student can do their work in comfortable atmosphere. The use of
internet in discussion room were also limited. As in our line of work, we need a better
supply of internet connection in order for us to search an online information regarding
our work. We think that our need of internet are crucial as it can help us a lot in
completing our working report and many more.
In our field work, we think that old boundary mark in Kulim Square are very hard to find
because several of them are in people house or in boundaries of house area. This had
effect our work as we can only proceed our work using only several point of boundary
mark. We also think that our survey work in real field were so extreme because of the
hot weather, so it can effect our work. The hot weather can be a major problem for us as
it can physically effect our traversing and measurement for linear miclosure. As it
happen, we may had our traverse not closed or under specification of regulation given
and not in allowable tolerance. Other difficulty we face while doing our field work is the
surface condition of our Strata area. The land were a bit hard and rough which had
slower our work. So, we think that the area for Strata can be given appropriately
considering our time at the same time it can help us complete our work easily without
obstruction.
While completing a dimension survey, we had face a permission problem as the house
owner did not give permission to enter their house. This has effect our work especially in
time as it dragging our group time. So, we suggest that department can issued a
permission so that we can proceed our work for dimension survey faster and in more
proper way with permission letter or else.
For subdivision work we done, we need the use of Total Station almost all the time, so
we need to have a continuous battery power. The continuous power will easier our work
and we requesting that the department can supply more batteries in the future so that we
can finish our job on time.
INDIVIDUAL COMMENT
43
AMIR AIZAT BIN MOHD RASDI
2014395545
Firstly, I sincerely want to thanks our lecturers and group members because give a full
commitment in this survey camp until we manage to finish successfully. From the survey
that I have done, many new things that I have discover while conducting Strata survey
which is generally on how to produce CPSP
From this field scheme, I have learned more about how to conduct the Strata survey and
how to carry out survey manually. In this survey work, we apply all the knowledge that
we have learned in UiTM to carry out the measurement to conduct this survey work.
Thankfully I got a very good team member. Our cooperation were just amazing because
of chemistry between us in doing our task. Without my other team member cooperation
and commitment in this task all of us maybe cannot finish on time. A big appreciation to
our lecturers,Dr. Saiful Aman and En. Hezry for their guidance throughout this entire
practical. Thanks for their help and information in which had help us a lot and till we
manage to clearly proceed and finish our work successfully.
KAMALNOAH
44
Firstly, I sincerely want to thanks our lecturers and group members because give a full
commitment in this survey camp until we manage to finish successfully. From the survey
that I have done, many new things that I have discover while conducting Strata Title
survey which is generally on how to produce CPSP
From this field scheme, I have learned more about how to conduct the Strata Title survey
and how to carry out survey manually. In this survey work, we apply all the knowledge
that we have learned in UiTM to carry out the measurement to conduct this survey work.
Thankfully I got a very good team member. Our cooperation were just amazing because
of chemistry between us in doing our task. Without my other team member cooperation
and commitment in this task all of us maybe cannot finish on time. A big appreciation to
our lecturers,Dr. Saiful Aman and En. Hezry for their guidance throughout this entire
practical. Thanks for their help and information in which had help us a lot and till we
manage to clearly proceed and finish our work successfully.
SYIKIN
Alhamdulillah, thank to Allah S.A.W, as I being able to finish the task of Strata Title
Survey in Cadastral Survey work on time successfully. I really appreciate that I able to
learned a lot during completing Strata Title work.
Thank to Dr. Saiful Aman for good guidance along the way as my group completing this
fieldwork. I also want to thank my other group member as the have help me a lot while
we finishing this work together.
Through this Strata work, I also experiencing many new thing and generally increasing
my knowledge along the way till we finally finish our Strata project. The obstacle such as
an extreme field site with hot whether has tested me and all my friend to the limit and I
ensure everyone that we had change a lot and become more motivated.
In a way, I really honor to join survey camp as it actually give many help to me because I
manage to gradually add my experience on real Strata work and also being able to add
a
and advertise my knowledge.
Lastly, I hope that we can continuously doing a good job maybe next time in the future.
With the experience and more knowledgeable information we get during the time of we
concede this survey fieldwork hopefully will make us a better person on the future.
45
RABIATUL
Thank a lot to Allah and Alhamdulillah for all blessed on me and also my group member
along the journey of our Strata Title work that finally we manage to end it and finish it on
time. Also, I want to give a million thanks to Dr. Saiful Aman for all help and informative
knowledge he has give to us till we manage to complete the given work.
With the help of other teammate or group members on my team, I also had gain many
thing especially experience and information on how real site of Strata Title survey being
done.
Besides that, I also excited to handle main instrument such as Total Station and
experience doing the traverse work. I think that being able to learn how to do Dimension
survey and processing the survey data like producing plan of CPCP had make me more
confident about this course future work. I believe that other teammates also experiencing
and felt the same thing as me.
Lastly, I am really happy to finally end our work successfully and hopefully all of us
including me can make something with this experience while conducting other survey
work in next survey camp.
FATIN
I really feel so grateful because finally we manage to do a good job finishing our Strata
Title survey. Alhamdulillah and thank to Allah because give a strong and good health as
we manage to conduct and finishing our work on time
I also felt so grateful because I able to learned many thing in this survey camp and
hopefully, with all the knowledge I gain can be helpful to me in the future. Experiencing
new things such as Dimension survey using party wall method really test my physical
and psychology. With extreme weather and many other obstacles I face while we try to
find old boundary mark had makes me more strong in both body and mind.
In the end, with the help of other group member and not to mention, a big help from Dr.
Saiful Aman and En. Hezry along the way had give me a way and idea to finish and
learned more on Strata fieldwork.
Last but not least, I hope that this survey camp can be continue as it can generate many
new knowledge and experience for student especially on how Geomatics work actually
done in real life
46
APPENDIX
47
REFERENCES
48