MATERIAL of EXPLOSIVE
Charge per deck = 60 Kg Matriks of Charge :
Charge per hole = 60 Kg 4 meter = 30 Kg/Hole
5 meter = 40 Kg/Hole
AN = 1,260 Kg 6 meter = 50 Kg/Hole
Emulsion Matrik = 2,940 Kg 7 meter = 90 Kg/Hole
Emulsion = 4,200 Kg 8 meter = 110 Kg/Hole
9 meter = 110 Kg/Hole
ACCESSORIES
Booster 200 g = Pcs Detonating Cord = - m
Booster 400 g = 70 Pcs LIL = - Roll
IHD :
IHD 400 ms, 9 m = Pcs Bell Wire = 2 Roll
IHD 500 ms, 9 m = - Pcs Electronic Detonator = 70 Pcs
IHD 3000 ms, 12 m = - Pcs Remote Firing = - Pcs
IHD 3100 ms, 12 m = Pcs
TLD : Delay EDD :
TLD 17 ms, 12 m = - Pcs Inter Hole = 81 ms
TLD 25 ms, 12 m = - Pcs Inter Row = 51 ms
TLD 42 ms, 12 m = Pcs
TLD 109 ms, 12 m = Pcs
TLD 176 ms, 12 m = Pcs
LEGEND
= 17 ms = Tracking Line
= 25 ms = Free face
= 42 ms = Beda tinggi
= 67 ms = Batubara
= 100/200 ms
= 109/218 ms Material = NAF
= 150 ms
= 176 ms
CROSS SECTION HOLE AND TIME WINDOW
NOTE :
F-AI-PRO-04-007 Rev.00