Blast Review

26 September 2016
LMO BUMA

PT. DNX Indonesia


Blast Summary
 Pit West Seam Q  Pit ON
load shot Load Shot
Burden x Spasi : 9 x 10 Burden x Spasi : 9 x 10
Total hole : 104 Total hole : 100
Avg Depth : 12 m Avg Depth :7m
Avg stem deck : 5m Avg Stem deck : 3.4 m
Tonnage : 26,482 Kg Tonnage : 12,035 Kg
PF : 0.24 Kg/BCM PF : 0.19 Kg/BCM
 Pit West Seam R
load shot
Burden x Spasi : 9 x 10
Total hole : 70
Avg Depth : 8.5 m
Avg Stem deck :4m
Tonnage : 12,224 Kg
PF : 0.22 Kg/BCM

Insert file name here by selecting View, Header & Footer, Footer
Pit West Seam Q (Loadshot)

Before After

Insert file name here by selecting View, Header & Footer, Footer
General Info Pit West Seam Q (load shot)
Green Flag
 Good heave good movement untuk keseluruhan lokasi

Red Flag
 Terdapat un blasted area di sisi selatan lokasi (tidak ada lubang
bor (bekas parit air)
 Sisi selatan bagian free face jarak lubang dengan freeface jauh
(potensi boulder)
Tidak di bor (gap)

Insert file name here by selecting View, Header & Footer, Footer

Jarak freeface dengan lubang jauh,


Potensi material keras
Pit West Seam R (Load shot)

Before After

Insert file name here by selecting View, Header & Footer, Footer
General Info Pit West Seam R (Load shot)
Green Flag
 Good Heave dan Good Movement terbentuk

Red Flag
 Good heave mayor crack di sisi selatan lokasi, terdapat
potensi boulder di sebagian area (10 lubang sisi selatan bagian
timur)
 Un blasted area di arah pintu masuk karena tidak ada lubang
bor di sisi utara bagian barat

Potensi boulder, major crack 10 lubang sisi selatan

Insert file name here by selecting View, Header & Footer, Footer
Pit ON (Load shot)

After

Insert file name here by selecting View, Header & Footer, Footer
General Info Pit ON
Green Flag
 Good Heave dan Good Movement terbentuk untuk seluruh area

Red Flag
 Perlu dipasang digging limit antara blasted area dan unblasted
area (belum diblasting)

UnBlasted area

Blasting area

Insert file name here by selecting View, Header & Footer, Footer
Stemming Before and After Gassing

Lokasi seam Q

Rata-rata column rise 40 cm

Insert file name here by selecting View, Header & Footer, Footer
Stemming Before and After Gassing

Lokasi seam R

Rata-rata column rise 40 cm

Insert file name here by selecting View, Header & Footer, Footer
Stemming Before and After Gassing

Lokasi ON Utara

Rata-rata column rise 40 cm

Insert file name here by selecting View, Header & Footer, Footer
Stemming Before and After Gassing

Lokasi west R

Rata-rata column rise 40 cm

Insert file name here by selecting View, Header & Footer, Footer
Additional Information
 Total tonnage Load Shot 26 September 2016 = 50,741 kg
 Total tonnage Sleep load 26 September 2016 = 28,247 kg
 Total Man Power attendance 30 Person
 Blaster : 3 orang
 Pengawas : 4 Orang
 Operator : 3 orang
 Asisten Operator : 3 Orang
 Blast Crew : 15 Orang

Insert file name here by selecting View, Header & Footer, Footer
Terimakasih