You are on page 1of 1
TEM Form of Comuet JEM.CE 2011 For Chil Enginecring Works (6) inthe case where the suspension only affess part or paris ofthe Works, leet to teat sue Dart or parts as having been omted from the Warks under Clause 5150" (©) inthe case where the suspension affects the whole of the Works, feminate the Contact, nde Clause 62 a ihe Employer has committed a default under Clase 8211), 43 DATE FOR COMPLETION 481 Date for Compt (1) The Contractor mst construct and complete the Works on or before (@) the Date for Completion oF such other extended date as may be determined by the Engineer under Clase 44 of ©) such varied Date for Completion as may be fixe by the Engineer under Clause 432, 432 Entitlement to Vary Date for Completion (1) Ihe Bagineer wishes in good ‘thro avance ot postpone the Pate for Completion, he may afer consultation with the Cootactor determine and fix the varied Date for Completion, ‘The Engineer rst confit this tothe Contactor in writing. (2) As part of the consulistion proces, the Contactar must after being notified by the Engineer, reduce in reagonsble timo to the Fnginoce (®) 4 revised construction programme taking into considerations of the advanced or postponed Dete for Completion; nd (©) any incense or decrease in Costs ©) The Bngineer in determining and fixing the vated Date for Completion under this Clause may also sotify the Contactar a the fntease in Coss which be senile @) The provision ofthis Clause is seperate and distinct ftom the provision of Cus 44, 4 EXTENDED DATE FOR COMPLETION 441 Extended Date for Completion 0) ‘The Engineer may cetfy extensian to Dato for Completion of the Works by fixing an extended ‘Date for Completion if hare is doy to the completion ofthe Worcs which hasbeen enused by any ‘ofthe following evant o combination of them: (@) any variation instructed under Cause $1; () ay clreumnsance oF occurence entitling the Contrctor to an extended Date for ‘Completion by eason of an express provision of the Contract (©) theoceurrenes of n Employer's Risk ora combination ofthese tisha, (@)_therelosaton of ny buried serves or mains which ae nt shown on the Dasrngs; oF (©) aay actof prevention or breach oF Contact by the Employer, 2) The carfcate issued under Clnse 44.1 is refered wo as Ceviiete of Extended Date for Completion forthe purposes of the Contrst, This Certificate mute lente to the Contractor with copy tothe Employer, (8) The Catitieate of Extended Date fe Completion mast (@) catty the extended date on or before which dhe Contractor is required to complete the Works and (0) state the event ited in Clause 44.1) whieh the Engineer hes reli on in go exeifjing inching wating where applicable the relevant express provision or provisions of the Contractor the at of prevestion or breach of the Contract (©The institution of Engineers, Page 37 of 69 Malaysia

You might also like