Professional Documents
Culture Documents
PILES
- Kelly Method
- CFA (Continuous Flight Auger)
Method
- Grab
- Rotary Twin System
- Front-Of-Wall Method
ADVANTAGES
APPLICATIONS
1) Set oscillator on
position. 4) Commence drilling
up to design toe level.
CONSTRUCTION METHODOLOGY
Location:
No. 50 Collyer Quay
Client:
CLIFFORD DEVELOPMENT Pte.
Ltd.
Main Contractor:
HYUNDAI Engineering &
Construction Co., Ltd.
Workscope:
Foundation Bored Pile works
DESCRIPTION:
MILESTONES:
Location:
Marina Boulevard, Marina Bay
Client:
BFC DEVELOPMENT Pte., Ltd.
Main Contractor:
KAJIMA – TIONG SENG Joint
Venture
Workscope:
Wall Retaining Systems – Secant
Piling works
DESCRIPTION:
MILESTONES: