You are on page 1of 8

Name : Nicole Allen A.

Carlos
Subject/ Schedule : MBA 102 – Managerial Statistics with Computer Applications / Sat. 10:00 am – 1:00 pm
Researcher : Nicole Allen A. Carlos

Proposed Thesis Title : Managing Occupational Stress in a Construction Company

Title of Statement of Literature and Conceptual Framework Statistical Proposed Output


Research the Problem Studies (Structure) Analysis, of the Research
Sampling of
Respondents

1. Managing How does - Stress, Fatigue Random -Showing the


Coping Strategies
Occupational employees of a and Workload: (Independent Variable)
Sampling of impact of
Stress in a construction Determining the Respondents, occupational stress
Workload
Construction company Combined Affect (Moderating Attitude of Data Collection, on task related
Variable)
Managers and
Company manages on Human Descriptive factors of
Supervisors
Environment
occupational Performance (Moderating
(Intervening
Variable)
Statistical employees and
Variable)
stress in their Analysis workers in a
pressured - Dealing with Skills and construction
Abilities
environment? Occupational (Moderating company.
Variable)
Stress A Self-
Changed Model Stress Levels of -Identifying the
Participants/ Employees
and Workers strategies needed
(Dependent Variable)
to cope up with
- Occupational work related
Stress: stressors and to
Preventing provide
Suffering, preventive stress
Enhancing management
Wellbeing solution to
enhance the
wellbeing of the
workers and the
company

Proposed Thesis Title : Effectiveness of Project Management for Construction Planning

Title of Research Statement of Literature and Conceptual Framework (Structure) Statistical Proposed Output of
the Problem Studies Analysis, the Research
Sampling of
Respondents
2. Effectiveness of How can - Fundamental Analysis, - Present the
Construction Planning
Project Project Concepts for (Independent Variable) Economic viewpoint of the
Management Management Construction Evaluation, owner which focuses
for achieve a Project Scheduling, attention on the cost
Construction Management Cost Oriented Schedule Oriented Random effectiveness of
successful
Strategy Strategy (Moderating
Planning understanding (Moderating Variable) Variable) Sampling of facility construction
of the entire - Project Respondents rather than
construction management competitive provision
Direct Cost Time Oriented
planning research (Intervening Scheduling of services.
Variable) (Intervening
process from experiences and Variable)

the viewpoint of perspectives Resource


- All participants can
Indirect
the owner? Cost Oriented respond more
(Intervening Scheduling
Variable) (Intervening effectively to the
Variable)
owner's needs in their
Performance
(Dependent Variable)
own work and in
communicating with
other participants.

Proposed Thesis Title : The Effects of Skilled Worker Shortage in the Construction Industry

Title of Statement of Literature and Conceptual Framework Statistical Proposed


Research the Problem Studies (Structure) Analysis, Output of the
Sampling of Research
Respondents
3. The Effects What are the - Shortage of eneral effects Analysis, -Elaborate the
of Skilled
Worker
general effects of
skilled
skilled workers
seen curbing
of skill Economic
Evaluation,
effects of the
shortage of
Shortage worker shortage construction shortages in Random skilled workers
In the
Construction
in the
construction
sector’s growth
the Sampling of
Respondents
towards the
safety, quality of
Industry industry with a
view to improving
- The Challenge of
Labour Shortage
construction Random,
Descriptive
work, project
delays, rework,
the delivery of for Sustainable industry with a Statistical and overall
construction
projects? - The Impact of the
view to Analysis performance,
and satisfaction
Labor Shortage in improving the of the client.
the Construction
Industry delivery of
construction
projects
Employment Demand
(Independent Variable)

Shortage of
References
Skilled Workers
(Moderating Variable)

Stress, Fatigue and Workload: Determining the Combined Affect on Human Performance
By Jessica Lynn Mc Lauglin M.S. University of Central Florida, 2002 B.S. University of Central Florida, 2000 A dissertation submitted
Safety
(Dependent Variable)
in partial fulfillment of the requirements for the degree of Doctor of Philosophy in the Department of Industrial Engineering and
Quality of Work
(Dependent Variable)

Project Delays
(Dependent Variable)
Management Systems in the College of Engineering and Computer Science at the University of Central Florida Orlando, Florida
http://etd.fcla.edu/CF/CFE0001639/mock_jessica_l_200705_PhD.pdf

Dealing with Occupational Stress – A Self- Changed Model

By Muhamad Saiful Bahri Yusoff, Department of Medical Education, School of Medical Sciences, Universiti Sains Malaysia, 16150
Kota Bharu, Kelantan, Malaysia.
https://www.omicsonline.org/open-access/dealing-with-occupational-stress-a-selfchanged-model-23296879.1000138.php?aid=20917

Occupational Stress: Preventing Suffering, Enhancing Wellbeing

By James Campbell Quick and Demetria F. Henderson. Int J Environ Res Public Health. May 2016. Cary Cooper, Academic Editor
https://www.ncbi.nlm.nih.gov/pmc/articles/PMC4881084/

Fundamental Concepts for Construction Project Management

By Chris Hendrickson, Department of Civil and Environmental Engineering, Carnegie Mellon University, Pittsburgh. First Edition
originally printed by Prentice Hall, ISBN 0-13-731266-0, 1989 with co-author Tung Au. Second Edition prepared for world wide web
publication in 2000. Version 2.2 prepared Summer, 2008.
https://www.cmu.edu/cee/projects/PMbook/10_Fundamental_Scheduling_Procedures.html

Project management research experiences and perspectives

By David Wilemon, Director, Innovation Management Program, School of Management, Syracuse University
Research Conference 2000: Project Management Research at the Turn of the Millennium, Paris, France. Newtown Square, PA:
Project Management Institute.
https://www.pmi.org/learning/library/project-management-research-experiences-perspectives-1084

Shortage of skilled workers seen curbing construction sector’s growth

By Doris Dumlao-Abadilla - Reporter / @philbizwatcherPhilippine Daily Inquirer / 04:07 AM December 25, 2019

https://business.inquirer.net/286077/shortage-of-skilled-workers-seen-curbing-construction-sectors-growth#ixzz6F3DLkgN7

The Challenge of Labour Shortage for Sustainable Construction

By Faizul Azli Mohd-Rahim , Nurul Safwah Mohd-Yusoff , Wang Chen , Nurshuhada Zainon , Sumiani Yusoff & Rafikullah Deraman
Department of Civil Engineering Faculty of Engineering UNIVERSITY OF MALAYA. Journal of the Malaysian Institute of Planners
SPECIAL ISSUE V (2016), Page 77 – 88
https://pdfs.semanticscholar.org/1cc8/fad8dc05a09bec866d1d91b2e03262863e99.pdf

The Impact of the Labor Shortage in the Construction Industry


By Giatec Scientific Inc. https://www.giatecscientific.com/education/the-impact-of-the-labor-shortage-in-the-construction-industry/

eneral effects of skill shortages in the construction industry


with a view to
improving the delivery of construction projects
eneral effects of skill shortages in the construction industry
with a view to
improving the delivery of construction projects
eneral effects of skill shortages in the construction industry
with a view to
improving the delivery of construction projects
eneral effects of skill shortages in the construction industry
with a view to
improving the delivery of construction projects
eneral effects of skill shortages in the construction industry
with a view to
improving the delivery of construction projects
eneral effects of skill shortages in the construction industry
with a view to
improving the delivery of construction projects
eneral effects of skill shortages in the construction industry
with a view to
improving the delivery of construction projects

You might also like