PROBLEM ANALYSIS WORKSHEET - Group C (3)

Syndicate Group C (3) - GM 9

Akbar Prasandhika 29319011


Andan Anjani 29319039
Muhammad Wildan F 29319008
Okta Paulia 29319038
Sarah Kamilia Nugroho 29319035
Shinta Ayu Widyastuti 29319082

DESCRIBE THE PROBLEM : Panther Panels are Burrs and other rough spots

SPECIFICATION IS IS NOT DISTINCTIONS CHANGES

WHAT:
● OBJECT Panther Panels Cheetah Panels Panther panels are burss and -Valenti’s brother on Line#3.
● DEVIATION Burrs and other Defected Cheetah panels has no issues
rough spots -Valenti is suspected by Farells
to be drunk while working.
WHERE:
● OBJECT The panels line #1, The panel line #3
PLACE #2, and #4
Any complaint
● PROCESS Being rejected

WHEN:
● TIME Line#1: 11.00 AM Line#3: any burrs Time production
Line#2: 09.30 AM and other rough
Line#4: 11.20 AM spots

The rejected product for every


HOW MUCH: Line#1: 9-10 Line#3: no rejected machine
● MEASURE / products/hour products
FREQUENCY Line#2: a dozen
products/hour
Line#4: 7
products/hour

Getting worse Defective product


● Trend (more defect
product)

POSSIBLE CAUSES: THE MOST POSSIBLE CAUSE:

1. The minimum rejected products from Line#1, Line#2, The problem would be repeated in other lines because of the
Line#3, Line#4. Broken machine. bad influence.
2. Exposure from the outside element of the panels, such as
Valenti is suspected while he has a lot of buddies and has
a brother at Line #3.

VERIFICATION:
Do not accuse Valenti as a root of the problem without evidence
or proven act.