You are on page 1of 1

NOTES:

1. All dimensions are in millimeters


B C D E F B C D E 2. Use class class 20 for bases &beams ,
X-01 X-02 X-03 X-04 X-05 X-01 X-02
class 20 for columns and 20 for the slab
10,250 X-03 X-04 X-05 X-06
8,500 3.Read this drawing in conjunction
1,725 2,750 2,790 1,620 965 1,250 1,800 1,150 1,900 650 800 750 with relevant Architectural drawings.
4. Minimum cover for concrete is:
2T12-05 2T12-08 2T12-05 a. Foundation = 50mm
2T10-06 2T10-06
3T12-04 4T12-07 3T12-09 3T12-04 3T12-07 2T12-09 b. Columns = 25mm
2T12-08 2T12-10 c. Beams = 25mm
d. Slabs = 25mm
29T08-10-200 18T08-10-200 20T08-11-200 8T08-11-200
5. All reinforcement to be twisted bars
10T08-12-250
B.S 4449.
6. All steel reinforcement must be
approved by the Structural Engineer
2T16-01+2T12-02 3T12-03 4T12-01 3T12-02 2T12-03
7. SLABS
a. S1-250MM thick with hollow pot of
X-01 X-02 X-03 X-04 X-05 X-01 X-02 X-03 X-04 X-05 X-06 200mm thick with 50mm RC topping with
A142 mesh.
b. S2-250mm thick with hollow pot of
BEAM FB09 BEAM FB13 150mm thick with 100mm rc topping with
Scale 1:25 Scale 1:25 100mm RC with A142mesh
c.S3-175mm thick RC Slab
4 4 5 5 4 4 8 8 9 99 44 4 5 5 77 7 d.S4-200mm thick RC Slab
250

250

250

250

250

250

250

250
8 8 9 9 10 10
6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6

2 2
4 4 1 1 3 33 3 33 99 9 44 4 4 4 222 8 8 3 3 10 10

SECTION X01-X01 SECTION X02-X02 SECTION X03-X03 SECTION X04-X04 SECTION X05-X05 SECTION X01-X01 SECTION X02-X02 SECTION X03-X03 SECTION X04-X04 SECTION X05-X05 SECTION X06-X06
Scale 1:10 Scale 1:10 Scale 1:10 Scale 1:10 Scale 1:10 Scale 1:10 Scale 1:10 Scale 1:10 Scale 1:10 Scale 1:10 Scale 1:10

A B C D E 3 5a
X-01 X-02 X-03 X-01 X-02 X-03 X-01 X-02 X-03
2,700 4,300 5,850

820 960 720 575 750 1,225 900 650


1,515 2,620 1,515
2T12-03 2T12-03 3T12-08 3T12-09 3T12-11 2T12-03
2T10-04 2T10-04
3T12-02 3T12-05 3T12-02 3T12-05 2T10-10 3T12-02 3T12-05
2T10-04
12T08-12-200

12T08-06-200 12T08-06-200 22T08-06-200

3T12-07
3T12-01 3T12-01 4T12-01

X-01 X-02 X-03 X-01 X-02 X-03 X-01 X-02 X-03

BEAM FB10 BEAM FB11/FB12 BEAM FB15 REV REVISION SIGN DATE APPROVED

C4
Scale 1:25 Scale 1:25 Scale 1:25
2 2 2 3 3 5 5 5 2 2 2 3 3 5 5 5 2 2 2 3 3 5 5 5 C3
250

250

250

250

250

250

250

250

250
C2
4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
C1

2 2 2 1 11 55 5 2 2 2 1 1 1 5 55 2 2 2 1 1 5 5 5
C0

SECTION X01-X01 SECTION X02-X02 SECTION X03-X03 SECTION X01-X01 SECTION X02-X02 SECTION X03-X03 SECTION X01-X01 SECTION X02-X02 SECTION X03-X03 CLIENT

Scale 1:10 Scale 1:10 Scale 1:10 Scale 1:10 Scale 1:10 Scale 1:10 Scale 1:10 Scale 1:10 Scale 1:10
DANIEL OKERE

3 5 6 1 2 3 4 5
PROJECT
X-01 X-02 X-03 X-04 X-05 X-01 X-02 X-03 X-01 X-02 X-03
9,100 4,000 4,400
1,050 1,700 1,045 750 1,100 1,250 600 500
PROPOSED RESIDENTIAL
1,150 1,900 2,425 2,150 1,275
HOUSE IN RANGAU
2T12-04 2T12-07 2T12-03 6T12-03 KAJIADO COUNTY
2T10-05 2T10-04
3T12-03 4T12-06 3T12-08 3T12-02 3T12-05 4T12-02 4T12-04
CONSULTING CIVIL STRUCTURAL ENGINEER

WEIBULL ENGINEERING LTD,


12T08-05-200 7T08-05-200 P.O BOX 19555-00100,
20T08-09-200 23T08-09-200 18T08-06-200
NAIROBI, KENYA
TEL:254******
6T12-01 Email: weibullengineering@gmail.com
4T12-01 3T12-02 3T12-01 ARCHITECT

HK CONSULT
X-01 X-02 X-03 X-04 X-05 X-01 X-02 X-03 X-01 X-02 X-03 P.O BOX 19555-00125197-0060,
NAIROBI, KENYA
TEL:254-720833737
BEAM FB16 BEAM FB17 BEAM SB01 Email:info@hkconsult.co.ke

Scale 1:25 Scale 1:25 Scale 1:25 DRAWING TITLE

3 3 3 4 4 6 6 7 7 8 8 8 2 2 2 3 3 5 5 5
1ST FLOOR BEAM DETAILS
250

250

250

250

250

2 2 2 2 3 3 3 3 4 4 4 4

250

250

250
5 5 5 5 5 5 5 5 5 5 4 4 4 4 4 4
250

250

250

2 2 2 2 1 1 1 1 4 4 4 4 Designed by Drawn by
D.O.O B.O.O
3 33 1 1 2 22 2 22 8 88 2 2 2 1 1 1 5 5 5
Checked by Approved by
N.B D.O.O
SECTION X01-X01 SECTION X02-X02 SECTION X03-X03 SECTION X04-X04 SECTION X05-X05 SECTION X01-X01 SECTION X02-X02 SECTION X03-X03 SECTION X01-X01 SECTION X02-X02 SECTION X03-X03 Scale
AS INDICATED ON THE DRAWING
Date August 2020

Scale 1:10 Scale 1:10 Scale 1:10 Scale 1:10 Scale 1:10 Scale 1:10 Scale 1:10 Scale 1:10 Scale 1:10 Scale 1:10 Scale 1:10 Job No.
01-RANGAU
ACAD File:
STR01-RANGU
Status Drawing No: BEAM-02 CO REV