You are on page 1of 1
1 2 1 5 1 2 1 2 Le ° (DESIGN DATA) pot te ss paaten Hues FS ON 840 PoD CA. ~ 076 mm 1. [cope OF CONSTRUCTION. [12526 2: Thin. Allow.— 1.0 2, [caPacrry. 2.0 mo 3, |WAK, WORKING PRESSURE | 7.0 Ka/omta 4. [DESIGN PRESSURE 77 kg/emee 6 [RYDROTEST PRESSURE. 11.55 Ke/emee 6 [WORKING TEMPERATURE. | 60" © 7, [DESIGN TEMPARATURE. 100" « [JOINT EFFICIENCY. 0.7 SHBLL.0 DIL For Detalled reference ax under [RADIO Nil 10] PAINTING. PRIMER COAT 1. Weld 2, Handhole Detail 9. Skirt Assembly Detell 4, Foundation Detail etal 9096 090 01 + 9006 8090 02 FORMA No. + 9096 8090 09, 9006 8090 04 provided tn shell as per the plate available 8. All fittings ( Safety Valve, Syphon Pipe, Pressure NOZZLE DETAILS: (MATERIAL OF CONSTRUCTION.) SHELL/DISH/R. PAD. 1S 2062 OR BQUY. r 2. |pire. A106 ORD 3. [LANGE is 2002 / sa 105 4. [Borrow sx. 15 2082 OF BQUY. 3. | SocKET [S4i05/SA106 GR.B. SEAMLESS. Gauge & Drain Valve) shall be packed seperately. [SK.NO|MARK| SERVICE 4, Inspection by : Unfted En 1g Works = 1 [ou [am nase 1 Stagewlse 2_| xe [ar ovruer 1 5. Any Alternate materlal acceptable for 3._|.N3_ [PRESSURE GAUGE CONN, T Pressure may be wed. [xa [uNtoADER CONN. 1 6. Radlography {f needed shall be done by &_|NS_[SAPETY VALVE CONN, 7 Gamma Radiation [Ne [DRAIN VALVE CONN. ri 7. All Noszle, Flanges shall be SORF 4 of 150 7 Lw7_|SPARE CONN. 1 # Rating and Bolt holes to be off C.l. 8. [INSPECTION OPENING + _[125x100_[_1 2. sPECTiON ovgninc + [125x100 | 1 eet “| Rewsion 00 [pNsPsA050005 09] ‘ore AIR RECEIVER, 2 MANUFACTURED BY:M/S UNITED ENGINEERING WORKS, E> TREATWENT : SEE DRG. @ wi 7.0 Ka/omaa) WORKS, NASHIK “19096 4055 00”

You might also like