You are on page 1of 1
[ Action Pla Anprovement of Earthing Cor ‘ition in Crank Section ee Feb Mar Aer aw Nhe Bee he os + Objective: Improvement of Earthing Conlon in 28.days Mon Wed. ow Crank Section 24.0220 01-04-20 2 Tit of Eating Systm Saye MonFri2e0220 © em | 24.020 Meeting within energy team 2days Fi Mon St 20-02-20 02.0220 + Earth bore mater purchasing (1) Copper Pati6O days Fil Mon mS Feat (1j "Sm. 2) Copper Road 10 Feet ("), (3) 28.02.20 09-03-20 Earth Chomal 4 Packet + Earth Wires & Thimble puchasing Earth wie (25 7days Fi Mona ms rm 04 cai), (18 mm 04 col, wire thimble size 28:02:20 09-03-20 | | 8B qyat6, Thimble size 25-10 4-25. The | e-toc 100 © New Eath tore instalation days Mon Weds 09.0320 11-09-20 Main earth wiesinstatation Adays Wed Mon wien 110320 160320 Machines wise earthing inspection & connection 11 days on Mons ato 160320 90.0320 4 Inspection of earth machine wise ‘Ways Mon Mon Eat 160320 900320 1° Ensure to meintan safety contion (Monthly Sdays.— Thu Wed oom ‘nonitorng) 26.03.20 01-0420 | | cea | = == =: ‘summary See nace Summey Progress od | rere BLL evened Qa oom

You might also like