You are on page 1of 4
TY-4983-B-N-STP06-STP10 STOPE ADDENDUM APPROVED NAME SIGNATURE _| DATE | Eko ARB/Fajar - D &BEngineer GP/Jotz ‘| 98/20 eee RL/Deprianto M al lgetaetiseeal Mahendra f wy -20| sen : R/Septian | L 9 Ventilation Engineer | 35 rah thakar { ( S/RisnoU | Thotok S/ a Geologist Sugeng BS/ Idhar| PaxsK/ 20/340 Dadang F/ Geotech Engineer Khairul F/ wich 5loe lg Michel YP ; Guntur AP, Mine Planning Rohani a Gh KAD Engineer Shidik K/ _ Ferdinand | Hee Drill & Blast Supt. Allief H : R'm Production Supt Tagan og 19 rgurs] 79° Geology Manager RendraS «| sae : loi Manager \° ie | ibe ronwacitanege [TWH EE PEE a t COMMUNICATION SQUAD CHECK Geos & Mine Plan STOPENOTEISSUED —_ Change grade based on BM June 2020 and Modified shape for the height of shape FILE: M:\02 TOGURACI\03 STOPE NOTE\03. YAHUT\15. 4983\2. NORTH 1 fo ADDENDUM TY-4983-B-N-STP06-STP10 ISOMETRIC Pe FIGURE 01. ISOMETRIC VIEW FROM STOPE NOTE TY4942ANSTP. 1. MAIN ISSUE Change local model gemod_ty4968bdc10sod01_4925_2.mdl to BM June 2020 and stope review based on height shape issue ‘gemod_ty4968bdci0s0d01_4925_2.mal Pe SE | ee | cee | wn | ee Trasessastos [25a Z 7 ia a rvaseesiesrer | aaa a ia | Taseeswunat [2a is is ie Torwmbaurs | aie i eee ee ra L TABLE 01, UNDILUTED GRADE CALCULATION USING LOCAL MODEL FROM STOPE NOTE igemod_ty4968bde10sod01_4925_2.mdl Tons) ae AU (g/t) AG (g/t) AU (ounces) AG (ounces) fe 206 | as 60 19 3207 74 116 1201 z — aa eae [es T¥-4985-6-N-STPOS 2.913 33 152 Tases-pustriont_| aya | a0] 56 5 TOTAL DILUTED ais oe aie “sae TABI 2. DILUTED GRADE CALCULATION USING LOCAL MODEL FROM STOPE NOTE cae En ern) FIGURE 03. SHAPE SECTION TY4983BNSTPO6-STP10_ADDENDUM. Addendum grade of STP06 to STP10 BM JUNE 2020 (tog supert_jun20_dep_to_may20_200702,mal) ‘STOPING NAME TO AU (e/t) AG (est) ‘AU (ounces) ] AG (ounces) TY.4909-84151706 Rev ia ay a 14905-81907 Reve f a7 a8 338 14909-15908 REVE 229 1489. 1¥-4999-6.151909 REVI 257 807 Tass Phowinve E ee TOTALUNDILUTED | L I [2080 3492 TABLE 03, UNDILUTED GRADE CALCULATION USING BM JUNE 2020 AS AN ADDENDUM STOPE Note GM JUNE 2020 (tog supert jun20_dep_to_may20 200702 mal) sromaMMe | TE 7 wa | acten) | avtouncms [ rrases--ushoe neva | — fet Sane ee eee a as0s-bust9o7 neve | 7566 sa_—| as | 99 vaaas--nstrag nev? [aio [3 | ga a tases sT09-REVE-| Ze aaa va a Ta943-.stP10-REVE | tase 38 iat 235 ToTALDIUTED om e3 263 ase TABLE 04. DILUTED GRADE CALCULATION USING BM JUNE 2020 AS AN ADDENDUM STOPE NOTE 3 4, 57 Ramp up development grade calculation BM JUNE 2020 Model Reserve asi] 43] 200] B96] a. Dilusi aa 839] = - = = Hrotal 728938 | 177] 896] 4,150) [Recovery ssx] eas] 38] a77] —_asal_— 3.943 REFERENCE Communication between Geos and mine planning to use BM June 2020 as design reference — to_—replace = from ~—previous—local_-~—smodel, gemod_ty4968bdc10sod01_4925_2.mdlmdl STOP! PE DI Only minor change. Adjust the height of stope based on new proposed ramp up development. RIN¢ IGN No change ring design and blasting sequence ER TICH EPAI NT

You might also like