TY-4983-B-N-STP06-STP10
STOPE ADDENDUM
APPROVED NAME SIGNATURE _| DATE |
Eko ARB/Fajar -
D &BEngineer GP/Jotz ‘| 98/20
eee RL/Deprianto M al lgetaetiseeal
Mahendra f wy -20|
sen : R/Septian | L 9
Ventilation Engineer | 35 rah thakar { (
S/RisnoU |
Thotok S/ a
Geologist Sugeng BS/ Idhar| PaxsK/ 20/340
Dadang F/
Geotech Engineer Khairul F/ wich 5loe lg
Michel YP ;
Guntur AP,
Mine Planning Rohani a Gh KAD
Engineer Shidik K/
_ Ferdinand | Hee
Drill & Blast Supt. Allief H : R'm
Production Supt Tagan og 19 rgurs] 79°
Geology Manager RendraS «| sae
: loi
Manager \° ie | ibe
ronwacitanege [TWH EE
PEE a t
COMMUNICATION
SQUAD CHECK Geos & Mine Plan
STOPENOTEISSUED —_ Change grade based on BM June 2020
and Modified shape for the height of
shape
FILE:
M:\02 TOGURACI\03 STOPE NOTE\03.
YAHUT\15. 4983\2. NORTH
1fo ADDENDUM TY-4983-B-N-STP06-STP10
ISOMETRIC
Pe
FIGURE 01. ISOMETRIC VIEW FROM STOPE NOTE TY4942ANSTP.
1. MAIN ISSUE
Change local model gemod_ty4968bdc10sod01_4925_2.mdl to BM June 2020
and stope review based on height shape issue
‘gemod_ty4968bdci0s0d01_4925_2.mal
Pe SE | ee | cee | wn | ee
Trasessastos [25a Z 7 ia a
rvaseesiesrer | aaa a ia |
Taseeswunat [2a is is ie
Torwmbaurs | aie i eee ee ra
L
TABLE 01, UNDILUTED GRADE CALCULATION USING LOCAL MODEL FROM STOPE NOTE
igemod_ty4968bde10sod01_4925_2.mdl
Tons)
ae AU (g/t) AG (g/t) AU (ounces) AG (ounces)
fe 206 | as 60 19
3207 74 116 1201
z — aa eae [es
T¥-4985-6-N-STPOS 2.913 33 152
Tases-pustriont_| aya | a0] 56 5
TOTAL DILUTED ais oe aie “sae
TABI
2. DILUTED GRADE CALCULATION USING LOCAL MODEL FROM STOPE NOTEcae
En
ern)
FIGURE 03. SHAPE SECTION TY4983BNSTPO6-STP10_ADDENDUM.
Addendum grade of STP06 to STP10
BM JUNE 2020 (tog supert_jun20_dep_to_may20_200702,mal)
‘STOPING NAME TO AU (e/t) AG (est) ‘AU (ounces) ] AG (ounces)
TY.4909-84151706 Rev ia ay a
14905-81907 Reve f a7 a8 338
14909-15908 REVE 229 1489.
1¥-4999-6.151909 REVI 257 807
Tass Phowinve E ee
TOTALUNDILUTED | L I [2080 3492
TABLE 03, UNDILUTED GRADE CALCULATION USING BM JUNE 2020 AS AN ADDENDUM STOPE
Note
GM JUNE 2020 (tog supert jun20_dep_to_may20 200702 mal)
sromaMMe | TE 7 wa | acten) | avtouncms
[ rrases--ushoe neva | — fet Sane ee eee a
as0s-bust9o7 neve | 7566 sa_—| as | 99
vaaas--nstrag nev? [aio [3 | ga a
tases sT09-REVE-| Ze aaa va a
Ta943-.stP10-REVE | tase 38 iat 235
ToTALDIUTED om e3 263 ase
TABLE 04. DILUTED GRADE CALCULATION USING BM JUNE 2020 AS AN ADDENDUM STOPE NOTE
34,
57
Ramp up development grade calculation
BM JUNE 2020
Model Reserve asi] 43] 200] B96] a.
Dilusi aa 839] = - = =
Hrotal 728938 | 177] 896] 4,150)
[Recovery ssx] eas] 38] a77] —_asal_— 3.943
REFERENCE
Communication between Geos and mine planning to use BM June 2020 as design
reference — to_—replace = from ~—previous—local_-~—smodel,
gemod_ty4968bdc10sod01_4925_2.mdlmdl
STOP! PE DI
Only minor change. Adjust the height of stope based on new proposed ramp up
development.
RIN¢ IGN
No change ring design and blasting sequence
ER TICH EPAI NT