You are on page 1of 1

Appropriate Job Safety Analysis shall be submitted for review and approval by

concerned Saudi Aramco Organization.

Hydro test procedure must be verified & approved by Saudi Aramco before any test
are carried out.

Certified work permit receiver will obtain a properly signed work permit from Saudi
Aramco Representative prior to start hydro test water disposal into evaporation
pound.

Evaporation ponds must meet the requirements of SAES-A-104 Section 14.2. New
evaporation ponds may require an environmental impact assessment per SAEP-13
Appropriate barricades & Warning signs must be installed around the evaporation
pond to avoid the entry of unauthorized personnel & other animals that live in desert
Only authorized personnel are allowed to enter evaporation pond area.

Do not discharge wastewater to local environments.


As far as possible locate the disposal site within the existing pipeline corridor while
ensuring adequate pipeline access and without causing damage to the existing road
ways, pipelines, private entities or other structures.
Do not dispose wastewater in marine areas to wetland or sensitive terrestrial
environments, including specified conservation areas (list of locations is available
from Saudi Aramco).
Separator pond should be sited to minimize exposure risk to nearby facilities
personnel.