You are on page 1of 4

Openo poly texhnic college

Sector:mechatronic servicing
Occuption:Industrial mechines and drives servicing
Module:conductloop check
module code:EEIMD070211
Final-exam(50%)
Exam Date:20feb,2021
Time allowed 1:30 hours
Instructor:Mr.koang yak geng
General instruction
Doing the following activities during exam time is forbidedden
 Using mobile phone,smart watches,scientific calculator(if you are not told to use)
 Trying to cheat,doing from your note,using any extra paper,using red ink pen
 if any one is caught cheating in any form/mean necessary as asigned invigilator or
supervisor,your final term examination result will be automatically zero points.
Examination direction
 Read the general instructions and exam instruction first before you start to answer the
question.
 Please make sure that the exam contains three part and 2 page including cover page
 If you have problem inform your invigilator immediately.
 one side paper you can write.
 Answer the question according you should follow the instructions.
 Time will be announced every 20 minute for your guiding of the remaining time.
 If you find problem in the test questionere,ask the supervisor, do not ask your classmate.
 you need to justify your answer for each question (applied for writing essay and
workoutworkout parts)
 Explaining and showing to every steps for your answer is expected.
 for your work to be understood and conveniente for evaluating,please write clearly and
very well and avoid erasures if possible.
 Donot forget to write your name,id on every paper(do it now if you donot do it yet)yet
 Do not detach any paper from this exam paper.

Name------------------------------------------------
ID-----------------------
Date---------------------------------- year
Exam parts Result
Parts i(20%)
Parts ii(10%)
Parts iii(20%)
Total(50%)

I.M.D level-4 extension


Final exam(50%)

1
Parts 1
Choose the best answers from the following choice (A,B,C,D)(20 marks)
1------is defined as pre-Commissioning activity which is initiated after installation of instruments

in the field and carry out the instrument loop checks between installed field instrument and
respective control system i.e. PLC or DCS.
A the loopchecking B conduct loop C testing D all
2-----it has no feedback
A,openloop B,closedloop C, shortcircuit D,None
3----it has feedback
A,openloop B, closedloop C,shortcircuit D,None
4,Verify the ferruling of the wiring on the field device,field junction box.
A,leveloop B temperature loop C,pressure loop D,simpleloop
5,While the transmitter signal impression is occuring in console engineer will call up the control

algorithm faceplate and by placing the control mode.


A,control loop B, control valves C,transmitter D all

Parts 2
Say true if the statement is correct or Say the false if the statement is
incorrect(10 marks)
1.Checking is the final process before the commissioning of the processing system.
2. Do not perform tests between assets and neutrals.
3. The loop checking checks the connection between each component in the control loop.
4.If resistance is than, mega-ohm- disconnect the appliances.
5. The fielding sensing device is properly installed in accordance with engineering specification.

Part3 workout(20 marks)


1.List the types of loopcheck?
2.Explain briefly the control loop valves
3.What is loop check procedure
4.Define the control loop,pressureloop,transmitter and temperature loop check.
Openo poly technic college
Sector:mechatronic servicing
Occuption:Industrial mechines and drives servicing
Module:installing instrumentation cabling and tubing
module code:EEIMD070211
Final-exam(50%)
Exam Date:20feb,2021

2
Time allowed 1:30 hours
Instructor:Mr.koang yak geng
General instruction
Doing the following activities during exam time is forbidedden
Using mobile phone,smart watches,scientific calculator(if you are not told to use)
 Trying to cheat,doing from your note,using any extra paper,using red ink pen
 if any one is caught cheating in any form/mean necessary as asigned invigilator or
supervisor,your final term examination result will be automatically zero points.
Examination direction
 Read the general instructions and exam instruction first before you start to
answer the question.
 Please make sure that the exam contains three part and 2 page including cover
page
 If you have problem inform your invigilator immediately.
 one side paper you can write.
 Answer the question according you should follow the instructions.
 Time will be announced every 20 minute for your guiding of the remaining time.
 If you find problem in the test questionere,ask the supervisor, do not ask your
classmate.
 you need to justify your answer for each question (applied for writing essay and
workoutworkout parts)
 Explaining and showing to every steps for your answer is expected.
 for your work to be understood and conveniente for evaluating,please writ clearly
and very well and avoid erasures if possible.
 Donot forget to write your name,id on every paper(do it now if you donot do it
yet)Do not detach any paper from this exam paper.

Name--------------------------------------------------------------
IDno--------------------------------------
Date---------------------------------------
Exam Results
Parti(20%)
Partii(10%)
Partiii(20%)
Total(100%)

I.M.D level-4
Program:extension
Final exam(50%)
Time(9:00 am)am
Part I
Choose the best answer from following choice equestion(A,B,C,D)
1.----is a collective term for measuring instrument that are used for indicating measuring and

3
recording.
A, instrumentation B,installation c, cabling D none
2.The ground portion transmit an electromagnetic pulse and ---an echo.
A.wiring B.recieves c.tubing d all
3.------is available to measure many electrical and chemical quantities.
A.laboraroty equipment B.equipment c.cabling D.wiring
4 the--------is then followed by commissioning and plant startup.
A.tubing B.plant C installation D.all
5.-----should be sufficienty supported to avoid vibration and sagging.
A.Tubing B.cabling C.wiring D.instruments
Part2
Say true if the statement is correct or say false if the statement is incorrect.
1.Air traffic control radar is distributed instrumentation system.
2.Instrumentation is used to measure many paramter phyisical valves.
3.The following point should be considersd when installing I&C equipment is not
mandatory
4.All instrumentation device listed in the instrument index should be not mounted and
concreted by the contractor to form accomplete operating system.
5.An instrumentation system is ahome security system.

Part3
work out (20 marks)marks
1.List the four types of instrumentation and control wiring.
2.What is the tubing.
3.Explain the cabling
4.Explain the installation
5.Explain laboratory instrumentation.

You might also like