You are on page 1of 3

Compliance & Response Sheet

66/11kV GIS SUBSTATION RG -37 ROHINI


Document Title : FIRE DETECTION & ALARM SYSTEM LAYOUT -CONTROL ROOM BUILDING ALONG WITH GIS HALL - SWITCHING STATION
Document no: 5427PN096 -R37- 000-SYD-SRI-S8150-GA-0023

Sl. No TATA Power - DDL 3D FIRE


Independent Response Indicator (RI) needs to be installed for every room /hall/enclosed and Noted and incorporated.
1
one common Response Indicator (RI) need to be installed on exit point.
Smoke Sensors need to be installed on both building ceiling and false ceiling. Noted and incorporated.
2
Consider 2 set of Beam Detector to ensure reliability. We clearify that as per datasheet of beam detector,the standard coverage of a single beam detector is 70 X 15 MTR
which can be further extended to 100 MTR. Since, GIS hall size is only 11.15 X 9.1 Mtr. so, additional beam detected in
3
not required.

Zones-1 & 2 can be further divided in to two. 4 zones in total, in place of two. Noted and incorporated. However, please note that only Zone -1 can be divided in two zones as Zone-2 is serving to
4 single Beam Detector. Hence, It is not feasible to split Zone -2.
Consider one more Hooter (common) nearby guard room for notification of all area. Noted and incorporated.
5
Fire Alarm Detection & Alarm System shall be limited only to Grid Substation only. As per telephonic discussion , Fire Alarm Detection & Alarm System is to be provided in switching station except area
6
enclosed between grid A-B & 1-3. We confirm the same and drawing has been revised accrodingly.
7 Consider BG-ABS - 2 Type MCP Noted and confirmed.Please refer datasheet for MCP.

Document Title : SCHEMATIC DIAGRAM FIRE DETECTION & ALARM SYSTEM - SWITCHING STATION
Document no: 5427PN096 -R37- 000-SYD-SRI-S8150-PI-0022

Sl. No TATA Power - DDL 3D FIRE


Zones-1 & 2 can be further divided in to two. 4 zones in total, in place of two. Noted and incorporated. However, please note that only Zone -1 can be divided in two zones as Zone-2 is serving to
8
single Beam Detector. Hence, It is not feasible to split Zone -2.

Document Title : FIRE EXTINGUISHER LAYOUT - SWITCHING STATION


Document no : 5427PN096-R37-000-SYD-SRI-S8150-GA-0024

Sl. No TATA Power -DDL 3D FIRE


SITC of Fire Exterguisher is limited to Switching Station only. As per telephonic discussion , 2 Nos. of DCP Fire Extinguisher (25 Kg Cap.) has been provided in both Open Tr. (3800 x
9
3655) .
Location of extinguishers shall be on entrance point and shall be visible from entrance point. It Noted and confirmed.
10
should be conspicuous place from entrance.

Document Title : LHS CABLE LAYOUT - SWITCHING STATION


Document no : 5427PN096-R37-000-SYD-SRI-S8150-GA-0026

Sl. No TATA Power -DDL 3D FIRE


LHS Cables need to be wrapped on Cables to ensure that the LHSC should touch the surface We clarify that if LHS Cables are wrapped around the Cables , it will cause problems while maintenance work and it will
of the cables. get damaged during maintenance activities . As per the standard industrial practice,the LHS cable is laid in zig-zag
11 fashion on the top of cable and not wrapped around cable.Same has been incorporated in the drawing.

Unrestricted
Compliance & Response Sheet
66/11kV GIS SUBSTATION RG -37 ROHINI
Document Title : FIRE DETECTION & ALARM SYSTEM LAYOUT -CONTROL ROOM BUILDING ALONG WITH GIS HALL - GRID STATION
Document no: 5427PN096 -R37- 000-SYD-SRI-S8150-GA-0021

Sl. No TATA Power - DDL 3D FIRE


Independent Response Indicator (RI) needs to be installed for every room /hall/enclosed and Noted and incorporated.
1
one common Response Indicator (RI) need to be installed on exit point.
2 Smoke Sensors need to be installed on both building ceiling and false ceiling. Noted and incorporated.
Consider 2 set of Beam Detector to ensure reliability. We clearify that as per datasheet of beam detector,the standard coverage of a single beam
3 detector is 70 X 15 MTR which can be further extended to 100 MTR. Since, GIS hall size is only
11.15 X 9.1 Mtr. so, additional beam detected in not required.
Zones-1 & 2 can be further divided in to two. 4 zones in total, in place of two. Noted and incorporated. However, please note that only Zone -1 can be divided in two zones as
4
Zone-2 is serving to single Beam Detector. Hence, It is not feasible to split Zone -2.
5 Consider one more Hooter (common) nearby guard room for notification of all area. Noted and incorporated.
Fire Alarm Detection & Alarm System shall be limited only to Grid Substation only. As per telephonic discussion , Fire Alarm Detection & Alarm System is to be provided in switching
6 station except area enclosed between grid A-B & 1-3. We confirm the same and drawing has been
revised accrodingly.
7 Consider BG-ABS - 2 Type MCP Noted and confirmed.Please refer datasheet for MCP.

Document Title : SCHEMATIC DIAGRAM FIRE DETECTION & ALARM SYSTEM - GRID STATION
Document no: 5427PN096 -R37- 000-SYD-SRI-S8150-PI-0021

Sl. No TATA Power - DDL 3D FIRE


Zones-1 & 2 can be further divided in to two. 4 zones in total, in place of two. Noted and incorporated. However, please note that only Zone -1 can be divided in two zones as
8
Zone-2 is serving to single Beam Detector. Hence, It is not feasible to split Zone -2.

Document Title : FIRE EXTINGUISHER LAYOUT - GRID STATION


Document no : 5427PN096-R37-000-SYD-SRI-S8150-GA-0022

Sl. No TATA Power - DDL 3D FIRE


SITC of Fire Exterguisher is limited to Switching Station only. As per telephonic discussion , 2 Nos. of DCP Fire Extinguisher (25 Kg Cap.) has been provided in
9
both Open Tr. (3800 x 3655) .
Location of extinguishers shall be on entrance point and shall be visible from entrance point. It Noted and confirmed.
10
should be conspicuous place from entrance.

Document Title : LHS CABLE LAYOUT - GRID STATION


Document no : 5427PN096-R37-000-SYD-SRI-S8150-GA-0025

Sl. No TATA Power -DDL 3D FIRE


LHS Cables need to be wrapped on Cables to ensure that the LHSC should touch the surface We clarify that if LHS Cables are wrapped around the Cables , it will cause problems while
of the cables. maintenance work and it will get damaged during maintenance activities . As per the standard
11 industrial practice,the LHS cable is laid in zig-zag fashion on the top of cable and not wrapped
around cable.Same has been incorporated in the drawing.

Unrestricted
Compliance & Response Sheet
66/11kV GIS SUBSTATION RG -37 ROHINI
Document Title : TECHNICAL DATASHEET - FIRE DETECTION & ALARM SYSTEM
Document no: 5427PN096 -R37- 000-SYD-SRI-S8150-DS-0022

Sl. No TATA Power - DDL 3D FIRE


Minimum No. of Zones supported by the Fire Alarm Panel : 10 Zones Noted and Confirmed that we have provided 10 Zone Conventional Fire Alarm Panel.
1

Consider BG-ABS2 for Manual Call point Noted and please find enclosed revised datasheet of Manual Call point
2

Unrestricted