Zones-1 & 2 can be further divided in to two. 4 zones in total, in place of two. Noted and incorporated. However, please note that only Zone -1 can be divided in two zones as Zone-2 is serving to
4 single Beam Detector. Hence, It is not feasible to split Zone -2.
Consider one more Hooter (common) nearby guard room for notification of all area. Noted and incorporated.
5
Fire Alarm Detection & Alarm System shall be limited only to Grid Substation only. As per telephonic discussion , Fire Alarm Detection & Alarm System is to be provided in switching station except area
6
enclosed between grid A-B & 1-3. We confirm the same and drawing has been revised accrodingly.
7 Consider BG-ABS - 2 Type MCP Noted and confirmed.Please refer datasheet for MCP.
Document Title : SCHEMATIC DIAGRAM FIRE DETECTION & ALARM SYSTEM - SWITCHING STATION
Document no: 5427PN096 -R37- 000-SYD-SRI-S8150-PI-0022
Unrestricted
Compliance & Response Sheet
66/11kV GIS SUBSTATION RG -37 ROHINI
Document Title : FIRE DETECTION & ALARM SYSTEM LAYOUT -CONTROL ROOM BUILDING ALONG WITH GIS HALL - GRID STATION
Document no: 5427PN096 -R37- 000-SYD-SRI-S8150-GA-0021
Document Title : SCHEMATIC DIAGRAM FIRE DETECTION & ALARM SYSTEM - GRID STATION
Document no: 5427PN096 -R37- 000-SYD-SRI-S8150-PI-0021
Unrestricted
Compliance & Response Sheet
66/11kV GIS SUBSTATION RG -37 ROHINI
Document Title : TECHNICAL DATASHEET - FIRE DETECTION & ALARM SYSTEM
Document no: 5427PN096 -R37- 000-SYD-SRI-S8150-DS-0022
Consider BG-ABS2 for Manual Call point Noted and please find enclosed revised datasheet of Manual Call point
2
Unrestricted