BAR BENDING SCHEDULE FOR PROPOSED RESIDENTIAL/COMMERCIAL UNITS FOR

Mr. SAJID MIYA AT PEER GATE BHOPAL (M.P.)


CALCULATION QTY. OF REINFORCEMENT IN SECOND FLOOR BEAM
Total No. Bending Dimension Weight Summary
No. of
Weight of Bar in
S.No No. of Dia of bar Bar in Type of Cutting Length Total Length of Bar
Name of member of bar all
. member ( mm ) one Reinforcement of Bar ( m ) , in all member ( m ), Total Weight of Member Weight of 8 Weight of 10 Weight of 12 Weight of 16 Weight of
( kg/m ) Member A B C D E F
Member ( kg ), mm bars mm bars mm bars mm bars 20mm bars

A SLAB BEAM
1 B1(200X400) 1 16 1.577 2 2 ST. AT TOP 0.20 8.07 0.50 8.77 17.54 27.66 27.66
B1(200X400) 1 12 0.887 3 3 ST. AT BOTTOM 0.20 8.07 0.40 8.67 26.01 23.07 23.07
B1(200X400) 1 8 0.394 82 82 VERTICAL STIRRUP 0.15 0.35 0.15 0.35 0.08 0.08 1.16 94.77 37.36 37.36
TOTAL QTY. 88.09

2 B2 (200X400) 1 12 0.887 6 6 ST. AT TOP 0.50 14.61 0.70 15.81 94.86 84.14 84.14
B2 (200X400) 1 16 1.577 2 2 ST. AT BOTTOM 0.40 14.61 0.60 15.61 31.22 49.23 49.23
B2 (200X400) 1 8 0.394 98 98 VERTICAL STIRRUP 0.15 0.35 0.15 0.35 0.08 0.08 1.16 114.14 45.00 45.00
TOTAL QTY. 178.38

3 B3 (200X300) 1 12 0.887 3 3 ST. AT TOP 0.20 4.40 0.20 4.80 14.40 12.77 12.77
B3 (200X300) 1 12 0.887 3 3 ST. AT BOTTOM 0.20 4.40 0.20 4.80 14.40 12.77 12.77
B3 (200X300) 1 16 1.577 2 2 EX AT BOTTOM 3.52 - - 3.52 7.04 11.10 11.10
B3 (200X300) 1 8 0.394 45 45 VERTICAL STIRRUP 0.15 0.35 0.15 0.35 0.08 0.08 1.16 52.20 20.58 20.58
TOTAL QTY. 57.23

4 B4 (200X400) 2 16 1.577 2 4 ST. AT TOP 0.50 7.39 0.50 8.39 33.56 52.92 52.92
B4 (200X400) 2 16 1.577 2 4 ST. AT BOTTOM 0.40 7.39 0.40 8.19 32.76 51.66 51.66
B4 (200X400) 2 16 1.577 2 4 EX AT TOP 0.80 4.43 0.50 5.73 22.94 36.17 36.17
B4 (200X400) 2 16 1.577 2 4 EX AT BOTTOM 5.91 - - 5.91 23.65 37.29 37.29
B4 (200X400) 2 8 0.394 60 120 VERTICAL STIRRUP 0.15 0.35 0.15 0.35 0.08 0.08 1.16 139.48 54.99 54.99
TOTAL QTY. 233.03

5 B6 (200X400) 2 12 0.887 3 6 ST. AT TOP 0.50 7.76 0.50 8.76 52.56 46.62 46.62
B6 (200X400) 2 12 0.887 2 4 ST. AT BOTTOM 0.40 7.76 0.40 8.56 34.24 30.37 30.37
B6 (200X400) 2 16 1.577 2 4 EX AT TOP 0.50 4.66 0.50 5.66 22.62 35.68 35.68
B6 (200X400) 4 12 0.887 2 8 EX AT BOTTOM 6.21 - - 6.21 49.66 44.05 44.05
B6 (200X400) 2 8 0.394 63 126 VERTICAL STIRRUP 0.15 0.35 0.15 0.35 0.08 0.08 1.16 146.35 57.70 57.70
TOTAL QTY. 214.42

6 B6A (200X400) 2 12 0.887 6 12 ST. AT TOP 0.20 3.20 0.20 3.60 43.20 38.32 38.32
B6A (200X400) 2 16 1.577 3 6 ST. AT BOTTOM 0.20 3.20 0.20 3.60 21.60 34.06 34.06
B6A (200X400) 2 8 0.394 22 45 VERTICAL STIRRUP 0.15 0.35 0.15 0.35 0.08 0.08 1.16 51.81 20.43 20.43
TOTAL QTY. 92.81

7 B7 (200X400) 4 16 1.577 3 12 ST. AT TOP 0.50 4.40 0.50 5.40 64.80 102.19 102.19
B7 (200X400) 4 16 1.577 3 12 ST. AT BOTTOM 0.40 4.40 0.40 5.20 62.40 98.40 98.40
B7 (200X400) 4 16 1.577 2 8 EX AT TOP 0.50 2.64 0.50 3.64 29.12 45.92 45.92
B7 (200X400) 4 16 1.577 1 4 EX AT BOTTOM 3.52 - - 3.52 14.08 22.20 22.20
B7 (200X400) 4 8 0.394 36 145 VERTICAL STIRRUP 0.15 0.35 0.15 0.35 0.08 0.08 1.16 167.97 66.22 66.22
TOTAL QTY. 334.93

8 B8 (200X400) 1 16 1.577 3 3 ST. AT TOP 0.50 5.29 0.50 6.29 18.87 29.76 29.76
B8 (200X400) 1 16 1.577 3 3 ST. AT BOTTOM 0.40 5.29 0.40 6.09 18.27 28.81 28.81
B8 (200X400) 1 20 2.464 2 2 EX AT TOP 0.50 3.17 0.50 4.17 8.35 20.57 20.57
B8 (200X400) 4 16 1.577 2 8 EX AT BOTTOM 4.23 - - 4.23 33.86 53.39 53.39
B8 (200X400) 1 8 0.394 54 54 VERTICAL STIRRUP 0.15 0.35 0.15 0.35 0.08 0.08 1.16 62.52 24.65 24.65
TOTAL QTY. 157.18

9 B9 (200X300) 6 16 1.577 2 12 ST. AT TOP 0.20 1.50 0.20 1.90 22.80 35.95 35.95

1
BAR BENDING SCHEDULE FOR PROPOSED RESIDENTIAL/COMMERCIAL UNITS FOR
Mr. SAJID MIYA AT PEER GATE BHOPAL (M.P.)
CALCULATION QTY. OF REINFORCEMENT IN SECOND FLOOR BEAM
Total No. Bending Dimension Weight Summary
No. of
Weight of Bar in
S.No No. of Dia of bar Bar in Type of Cutting Length Total Length of Bar
Name of member of bar all
. member ( mm ) one Reinforcement of Bar ( m ) , in all member ( m ), Total Weight of Member Weight of 8 Weight of 10 Weight of 12 Weight of 16 Weight of
( kg/m ) Member A B C D E F
Member ( kg ), mm bars mm bars mm bars mm bars 20mm bars

B9 (200X300) 6 20 2.464 2 12 ST. AT BOTTOM 0.20 1.50 0.20 1.90 22.80 56.18 56.18
B9 (200X300) 6 16 1.577 3 18 ST. AT BOTTOM 0.20 1.50 0.20 1.90 34.20 53.93 53.93
B9 (200X300) 6 8 0.394 16 96 VERTICAL STIRRUP 0.15 0.35 0.15 0.35 0.08 0.08 1.16 111.36 43.90 43.90
TOTAL QTY. 189.97

10 B10 (200X400) 1 16 1.577 3 3 ST. AT TOP 0.50 17.54 0.50 18.54 55.62 87.71 87.71
B10 (200X400) 1 16 1.577 2 2 ST. AT BOTTOM 0.40 17.54 0.40 18.34 36.68 57.84 57.84
B10 (200X400) 1 20 2.464 2 2 EX AT TOP 0.50 10.52 0.50 11.52 23.05 56.79 56.79
B10 (200X400) 1 16 1.577 2 2 EX AT BOTTOM 14.03 - - 14.03 28.06 44.26 44.26
B10 (200X400) 1 8 0.394 176 176 VERTICAL STIRRUP 0.15 0.35 0.15 0.35 0.08 0.08 1.16 204.62 80.67 80.67
TOTAL QTY. 327.27

11 B11 (200X400) 1 16 1.577 3 3 ST. AT TOP 0.20 2.70 0.50 3.40 10.20 16.08 16.08
B11 (200X400) 1 16 1.577 2 2 ST. AT BOTTOM 0.20 2.70 0.40 3.30 6.60 10.41 10.41
B11 (200X400) 1 20 2.464 2 2 ST. AT BOTTOM 0.20 2.70 0.40 3.30 6.60 16.26 16.26
B11 (200X400) 1 8 0.394 28 28 VERTICAL STIRRUP 0.15 0.35 0.15 0.35 0.08 0.08 1.16 32.48 12.80 12.80
TOTAL QTY. 55.56

12 B12 A(200X400) 1 16 1.577 2 2 ST. AT TOP 0.50 3.70 0.50 4.70 9.40 14.82 14.82
B12 A(200X400) 1 16 1.577 2 2 ST. AT BOTTOM 0.40 3.70 0.40 4.50 9.00 14.19 14.19
B12 A(200X400) 1 16 1.577 1 1 EX AT TOP 0.50 2.22 0.50 3.22 3.22 5.08 5.08
B12 A(200X400) 1 12 0.887 1 1 EX AT BOTTOM 2.96 - - 2.96 2.96 2.63 2.63
B12 A(200X400) 1 8 0.394 38 38 VERTICAL STIRRUP 0.15 0.35 0.15 0.35 0.08 0.08 1.16 44.08 17.38 17.38
TOTAL QTY. 54.10

13 B13 (200X400) 1 12 0.887 3 3 ST. AT TOP 0.50 2.78 0.50 3.78 11.34 10.06 10.06
B13 (200X400) 1 12 0.887 3 3 ST. AT BOTTOM 0.40 2.78 0.40 3.58 10.74 9.53 9.53
B13 (200X400) 1 16 1.577 1 1 EX AT TOP 0.60 1.67 0.60 2.87 2.87 4.52 4.52
B13 (200X400) 1 8 0.394 29 29 VERTICAL STIRRUP 0.15 0.35 0.15 0.35 0.08 0.08 1.16 33.41 13.17 13.17
TOTAL QTY. 37.28

14 B14 (200X400) 1 16 1.577 3 3 ST. AT TOP 0.20 2.10 0.50 2.80 8.40 13.25 13.25
B14 (200X400) 1 16 1.577 2 2 ST. AT BOTTOM 0.20 2.10 0.40 2.70 5.40 8.52 8.52
B14 (200X400) 1 8 0.394 22 22 VERTICAL STIRRUP 0.15 0.35 0.15 0.35 0.08 0.08 1.16 25.52 10.06 10.06
TOTAL QTY. 31.82
TOTAL QTY. 2052.07
TOTAL QTY.

2
BAR BENDING SCHEDULE FOR PROPOSED RESIDENTIAL/COMMERCIAL UNITS FOR
Mr. SAJID MIYA AT PEER GATE BHOPAL (M.P.)
CALCULATION QTY. OF REINFORCEMENT IN SECOND FLOOR BEAM
Total No. Bending Dimension Weight Summary
No. of
Weight of Bar in
S.No No. of Dia of bar Bar in Type of Cutting Length Total Length of Bar
Name of member of bar all
. member ( mm ) one Reinforcement of Bar ( m ) , in all member ( m ), Total Weight of Member Weight of 8 Weight of 10 Weight of 12 Weight of 16 Weight of
( kg/m ) Member A B C D E F
Member ( kg ), mm bars mm bars mm bars mm bars 20mm bars

C ROOF SLAB
1 Spacing Along Shorter Span 0.200 Spacing Along Longer Span 0.200
SLAB(S-1) 1 8 0.394 18 18 ALONG SHORTER SPAN AT BOTTOM 0.20 1.50 0.20 1.90 33.73 13.30 13.30
SLAB(S-1) 1 8 0.394 9 9 ALONG LONGER SPAN AT BOTTOM 0.20 3.35 0.20 3.75 31.88 12.57 12.57
SLAB(S-1) 1 8 0.394 6 6 ALONG LONGER SPAN AT TOP 0.20 3.35 0.20 3.75 20.63 8.13 8.13
SLAB(S-1) 1 8 0.394 11 11 ALONG SHORTER SPAN AT TOP 0.20 1.50 0.20 1.90 21.00 8.28 8.28
SLAB(S-1) 1 8 0.394 18 18 EX. AT TOP SHORT SPAN 0.20 0.90 0.20 1.30 23.08 9.10 9.10
SLAB(S-1) 1 8 0.394 9 9 EX. AT TOP LONGER SPAN 0.20 2.01 0.20 2.41 20.49 8.08 8.08
Total Qty. ( kg ) 59.44
1 Spacing Along Shorter Span 0.200 Spacing Along Longer Span 0.200
SLAB(S-1) 1 8 0.394 21 21 ALONG SHORTER SPAN AT BOTTOM 0.20 1.50 0.20 1.90 40.47 15.95 15.95
SLAB(S-1) 1 8 0.394 9 9 ALONG LONGER SPAN AT BOTTOM 0.20 4.06 0.20 4.46 37.91 14.95 14.95
SLAB(S-1) 1 8 0.394 6 6 ALONG LONGER SPAN AT TOP 0.20 4.06 0.20 4.46 24.53 9.67 9.67
SLAB(S-1) 1 8 0.394 13 13 ALONG SHORTER SPAN AT TOP 0.20 1.50 0.20 1.90 25.04 9.87 9.87
SLAB(S-1) 1 8 0.394 21 21 EX. AT TOP SHORT SPAN 0.20 0.90 0.20 1.30 27.69 10.92 10.92
SLAB(S-1) 1 8 0.394 9 9 EX. AT TOP LONGER SPAN 0.20 2.44 0.20 2.84 24.11 9.50 9.50
Total Qty. ( kg ) 70.86
1 Spacing Along Shorter Span 0.200 Spacing Along Longer Span 0.200
SLAB(S-1) 1 8 0.394 15 15 ALONG SHORTER SPAN AT BOTTOM 0.20 1.50 0.20 1.90 28.31 11.16 11.16
SLAB(S-1) 1 8 0.394 9 9 ALONG LONGER SPAN AT BOTTOM 0.20 2.78 0.20 3.18 27.03 10.66 10.66
SLAB(S-1) 1 8 0.394 6 6 ALONG LONGER SPAN AT TOP 0.20 2.78 0.20 3.18 17.49 6.90 6.90
SLAB(S-1) 1 8 0.394 9 9 ALONG SHORTER SPAN AT TOP 0.20 1.50 0.20 1.90 17.75 7.00 7.00
SLAB(S-1) 1 8 0.394 15 15 EX. AT TOP SHORT SPAN 0.20 0.90 0.20 1.30 19.37 7.64 7.64
SLAB(S-1) 1 8 0.394 9 9 EX. AT TOP LONGER SPAN 0.20 1.67 0.20 2.07 17.58 6.93 6.93
Total Qty. ( kg ) 50.28
1 Spacing Along Shorter Span 0.200 Spacing Along Longer Span 0.200
SLAB(S-1) 1 8 0.394 20 20 ALONG SHORTER SPAN AT BOTTOM 0.20 1.50 0.20 1.90 37.91 14.94 14.94
SLAB(S-1) 1 8 0.394 9 9 ALONG LONGER SPAN AT BOTTOM 0.20 3.79 0.20 4.19 35.62 14.04 14.04
SLAB(S-1) 1 8 0.394 6 6 ALONG LONGER SPAN AT TOP 0.20 3.79 0.20 4.19 23.05 9.09 9.09
SLAB(S-1) 1 8 0.394 12 12 ALONG SHORTER SPAN AT TOP 0.20 1.50 0.20 1.90 23.50 9.27 9.27
SLAB(S-1) 1 8 0.394 20 20 EX. AT TOP SHORT SPAN 0.20 0.90 0.20 1.30 25.94 10.22 10.22
SLAB(S-1) 1 8 0.394 9 9 EX. AT TOP LONGER SPAN 0.20 2.27 0.20 2.67 22.73 8.96 8.96
Total Qty. ( kg ) 66.52
2 Spacing Along Shorter Span 0.175 Spacing Along Longer Span 0.175
SLAB(S-2) 1 8 0.394 17 17 ALONG SHORTER SPAN AT BOTTOM 0.20 2.32 0.20 2.72 45.93 18.11 18.11
SLAB(S-2) 1 8 0.394 14 14 ALONG LONGER SPAN AT BOTTOM 0.20 2.78 0.20 3.18 45.34 17.87 17.87
SLAB(S-2) 1 8 0.394 9 9 ALONG LONGER SPAN AT TOP 0.20 2.78 0.20 3.18 28.47 11.23 11.23
SLAB(S-2) 1 8 0.394 11 11 ALONG SHORTER SPAN AT TOP 0.20 2.32 0.20 2.72 28.65 11.29 11.29
SLAB(S-2) 1 8 0.394 17 17 EX. AT TOP SHORT SPAN 0.20 1.39 0.20 1.79 30.26 11.93 11.93
SLAB(S-2) 1 8 0.394 14 14 EX. AT TOP LONGER SPAN 0.20 1.67 0.20 2.07 29.48 11.62 11.62
Total Qty. ( kg ) 82.05
2 Spacing Along Shorter Span 0.175 Spacing Along Longer Span 0.175
SLAB(S-2) 1 8 0.394 23 23 ALONG SHORTER SPAN AT BOTTOM 0.20 2.32 0.20 2.72 61.63 24.30 24.30
SLAB(S-2) 1 8 0.394 14 14 ALONG LONGER SPAN AT BOTTOM 0.20 3.79 0.20 4.19 59.74 23.55 23.55
SLAB(S-2) 1 8 0.394 9 9 ALONG LONGER SPAN AT TOP 0.20 3.79 0.20 4.19 37.52 14.79 14.79
SLAB(S-2) 1 8 0.394 14 14 ALONG SHORTER SPAN AT TOP 0.20 2.32 0.20 2.72 38.06 15.01 15.01
SLAB(S-2) 1 8 0.394 23 23 EX. AT TOP SHORT SPAN 0.20 1.39 0.20 1.79 40.60 16.01 16.01
SLAB(S-2) 1 8 0.394 14 14 EX. AT TOP LONGER SPAN 0.20 2.27 0.20 2.67 38.12 15.03 15.03
Total Qty. ( kg ) 108.68

3
BAR BENDING SCHEDULE FOR PROPOSED RESIDENTIAL/COMMERCIAL UNITS FOR
Mr. SAJID MIYA AT PEER GATE BHOPAL (M.P.)
CALCULATION QTY. OF REINFORCEMENT IN SECOND FLOOR BEAM
Total No. Bending Dimension Weight Summary
No. of
Weight of Bar in
S.No No. of Dia of bar Bar in Type of Cutting Length Total Length of Bar
Name of member of bar all
. member ( mm ) one Reinforcement of Bar ( m ) , in all member ( m ), Total Weight of Member Weight of 8 Weight of 10 Weight of 12 Weight of 16 Weight of
( kg/m ) Member A B C D E F
Member ( kg ), mm bars mm bars mm bars mm bars 20mm bars

2 Spacing Along Shorter Span 0.175 Spacing Along Longer Span 0.175
SLAB(S-2) 1 8 0.394 22 22 ALONG SHORTER SPAN AT BOTTOM 0.20 1.90 0.20 2.30 50.93 20.08 20.08
SLAB(S-2) 1 8 0.394 12 12 ALONG LONGER SPAN AT BOTTOM 0.20 3.70 0.20 4.10 48.61 19.17 19.17
SLAB(S-2) 1 8 0.394 8 8 ALONG LONGER SPAN AT TOP 0.20 3.70 0.20 4.10 30.81 12.15 12.15
SLAB(S-2) 1 8 0.394 14 14 ALONG SHORTER SPAN AT TOP 0.20 1.90 0.20 2.30 31.48 12.41 12.41
SLAB(S-2) 1 8 0.394 22 22 EX. AT TOP SHORT SPAN 0.20 1.14 0.20 1.54 34.10 13.44 13.44
SLAB(S-2) 1 8 0.394 12 12 EX. AT TOP LONGER SPAN 0.20 2.22 0.20 2.62 31.07 12.25 12.25
Total Qty. ( kg ) 89.49
2 Spacing Along Shorter Span 0.175 Spacing Along Longer Span 0.175
SLAB(S-2) 1 8 0.394 10 10 ALONG SHORTER SPAN AT BOTTOM 0.20 1.53 0.20 1.93 19.58 7.72 7.72
SLAB(S-2) 1 8 0.394 10 10 ALONG LONGER SPAN AT BOTTOM 0.20 1.60 0.20 2.00 19.49 7.68 7.68
SLAB(S-2) 1 8 0.394 6 6 ALONG LONGER SPAN AT TOP 0.20 1.60 0.20 2.00 12.49 4.92 4.92
SLAB(S-2) 1 8 0.394 6 6 ALONG SHORTER SPAN AT TOP 0.20 1.53 0.20 1.93 12.52 4.93 4.93
SLAB(S-2) 1 8 0.394 10 10 EX. AT TOP SHORT SPAN 0.20 0.92 0.20 1.32 13.37 5.27 5.27
SLAB(S-2) 1 8 0.394 10 10 EX. AT TOP LONGER SPAN 0.20 0.96 0.20 1.36 13.25 5.22 5.22
Total Qty. ( kg ) 35.75
3 Spacing Along Shorter Span 0.175 Spacing Along Longer Span 0.175
SLAB(S-3) 1 8 0.394 19 19 ALONG SHORTER SPAN AT BOTTOM 0.20 2.10 0.20 2.50 47.64 18.78 18.78
SLAB(S-3) 1 8 0.394 13 13 ALONG LONGER SPAN AT BOTTOM 0.20 3.16 0.20 3.56 46.28 18.25 18.25
SLAB(S-3) 1 8 0.394 8 8 ALONG LONGER SPAN AT TOP 0.20 3.16 0.20 3.56 29.19 11.51 11.51
SLAB(S-3) 1 8 0.394 12 12 ALONG SHORTER SPAN AT TOP 0.20 2.10 0.20 2.50 29.59 11.66 11.66
SLAB(S-3) 1 8 0.394 19 19 EX. AT TOP SHORT SPAN 0.20 1.26 0.20 1.66 31.63 12.47 12.47
SLAB(S-3) 1 8 0.394 13 13 EX. AT TOP LONGER SPAN 0.20 1.90 0.20 2.30 29.85 11.77 11.77
Total Qty. ( kg ) 84.44
4 Spacing Along Shorter Span 0.175 Spacing Along Longer Span 0.200
SLAB(S-4) 1 8 0.394 26 26 ALONG SHORTER SPAN AT BOTTOM 0.20 3.29 0.20 3.69 94.78 37.37 37.37
SLAB(S-4) 1 8 0.394 17 17 ALONG LONGER SPAN AT BOTTOM 0.20 4.32 0.20 4.72 82.36 32.47 32.47
SLAB(S-4) 1 8 0.394 11 11 ALONG LONGER SPAN AT TOP 0.20 4.32 0.20 4.72 51.31 20.23 20.23
SLAB(S-4) 1 8 0.394 16 16 ALONG SHORTER SPAN AT TOP 0.20 3.29 0.20 3.69 58.34 23.00 23.00
SLAB(S-4) 1 8 0.394 26 26 EX. AT TOP SHORT SPAN 0.20 1.97 0.20 2.37 60.98 24.04 24.04
SLAB(S-4) 1 8 0.394 17 17 EX. AT TOP LONGER SPAN 0.20 2.59 0.20 2.99 52.21 20.58 20.58
Total Qty. ( kg ) 157.69
6 Spacing Along Shorter Span 0.175 Spacing Along Longer Span 0.175
SLAB(S-5) 1 8 0.394 26 26 ALONG SHORTER SPAN AT BOTTOM 0.20 3.16 0.20 0.40 3.96 103.53 40.81 40.81
SLAB(S-5) 1 8 0.394 19 19 ALONG LONGER SPAN AT BOTTOM 0.20 4.40 0.20 4.80 91.47 36.06 36.06
SLAB(S-5) 1 8 0.394 12 12 ALONG LONGER SPAN AT TOP 0.20 4.40 0.20 4.80 56.80 22.39 22.39
SLAB(S-5) 1 8 0.394 16 16 ALONG SHORTER SPAN AT TOP 0.20 3.16 0.20 0.40 3.96 63.70 25.11 25.11
SLAB(S-5) 1 8 0.394 26 26 EX. AT TOP SHORT SPAN 0.20 1.90 0.20 0.40 2.70 70.48 27.79 27.79
SLAB(S-5) 1 8 0.394 19 19 EX. AT TOP LONGER SPAN 0.20 2.64 0.20 3.04 57.93 22.84 22.84
Total Qty. ( kg ) 175.01
6 Spacing Along Shorter Span 0.175 Spacing Along Longer Span 0.175
SLAB(S-5) 1 8 0.394 31 31 ALONG SHORTER SPAN AT BOTTOM 0.20 2.70 0.20 0.40 3.50 107.50 42.38 42.38
SLAB(S-5) 1 8 0.394 16 16 ALONG LONGER SPAN AT BOTTOM 0.20 5.20 0.20 5.60 92.00 36.27 36.27
SLAB(S-5) 1 8 0.394 10 10 ALONG LONGER SPAN AT TOP 0.20 5.20 0.20 5.60 57.44 22.65 22.65
SLAB(S-5) 1 8 0.394 19 19 ALONG SHORTER SPAN AT TOP 0.20 2.70 0.20 0.40 3.50 65.90 25.98 25.98
SLAB(S-5) 1 8 0.394 31 31 EX. AT TOP SHORT SPAN 0.20 1.62 0.20 0.40 2.42 74.33 29.30 29.30
SLAB(S-5) 1 8 0.394 16 16 EX. AT TOP LONGER SPAN 0.20 3.12 0.20 3.52 57.83 22.80 22.80
Total Qty. ( kg ) 179.38
7 Spacing Along Shorter Span 0.175 Spacing Along Longer Span 0.200

4
BAR BENDING SCHEDULE FOR PROPOSED RESIDENTIAL/COMMERCIAL UNITS FOR
Mr. SAJID MIYA AT PEER GATE BHOPAL (M.P.)
CALCULATION QTY. OF REINFORCEMENT IN SECOND FLOOR BEAM
Total No. Bending Dimension Weight Summary
No. of
Weight of Bar in
S.No No. of Dia of bar Bar in Type of Cutting Length Total Length of Bar
Name of member of bar all
. member ( mm ) one Reinforcement of Bar ( m ) , in all member ( m ), Total Weight of Member Weight of 8 Weight of 10 Weight of 12 Weight of 16 Weight of
( kg/m ) Member A B C D E F
Member ( kg ), mm bars mm bars mm bars mm bars 20mm bars

SLAB(S-6) 1 8 0.394 26 26 ALONG SHORTER SPAN 0.20 4.06 0.20 4.46 114.81 45.26 45.26
SLAB(S-6) 1 8 0.394 21 21 ALONG LONGER SPAN AT BOTTOM 0.20 4.33 0.20 4.73 100.75 39.72 39.72
SLAB(S-6) 1 8 0.394 13 13 ALONG LONGER SPAN AT TOP 0.20 4.33 0.20 4.73 62.34 24.58 24.58
SLAB(S-6) 1 8 0.394 16 16 ALONG SHORTER SPAN AT TOP 0.20 4.06 0.20 0.40 4.86 77.01 30.36 30.36
SLAB(S-6) 1 8 0.394 25 25 EX. AT TOP SHORT SPAN 0.20 2.44 0.20 2.84 70.17 27.66 27.66
SLAB(S-6) 1 8 0.394 21 21 EX. AT TOP LONGER SPAN 0.20 2.60 0.20 3.00 63.86 25.18 25.18
Total Qty. ( kg ) 192.76
7 Spacing Along Shorter Span 0.175 Spacing Along Longer Span 0.200
SLAB(S-7) 1 8 0.394 31 31 ALONG SHORTER SPAN 0.20 3.70 0.20 4.10 125.93 49.65 49.65
SLAB(S-7) 1 8 0.394 20 20 ALONG LONGER SPAN AT BOTTOM 0.20 5.20 0.20 5.60 109.20 43.05 43.05
SLAB(S-7) 1 8 0.394 12 12 ALONG LONGER SPAN AT TOP 0.20 5.20 0.20 5.60 67.76 26.71 26.71
SLAB(S-7) 1 8 0.394 19 19 ALONG SHORTER SPAN AT TOP 0.20 3.70 0.20 0.40 4.50 84.73 33.40 33.40
SLAB(S-7) 1 8 0.394 30 30 EX. AT TOP SHORT SPAN 0.20 2.22 0.20 2.62 77.85 30.69 30.69
SLAB(S-7) 1 8 0.394 20 20 EX. AT TOP LONGER SPAN 0.20 3.12 0.20 3.52 68.64 27.06 27.06
Total Qty. ( kg ) 210.57
SECOND FLOOR SLAB Total Qty. Steel ( kg ) 1562.93
SECOND FLOOR BEAM Total Qty. ( kg ) 2052.07 1310.12 757.72 314.34 1083.02 149.80
SECOND FLOOR SLAB & BEAM Total Qty. ( kg ) 3615.00
SECOND FLOOR BEAM Total Qty. ( kg ) 3.61 1.31 0.76 0.31 1.08 0.15
DIA OF BARS 8MM 10MM 12MM 16MM 20MM
243.1 82.87 56.51 11.77
2463.03 1067.02 231.47 1026.51 138.03
1.07 0.23 1.03 0.14

5
BAR BENDING SCHEDULE FOR PROPOSED RESIDENTIAL UNITS FOR
G.O.s AT POLICE LINE, ITARSI, (M.P.)
CALCULATION FOR QUANTITY OF CONCRETE IN FOOTINGS AND COLUMN
Size of Member ( m ) Concrete Concrete Grade of
No. of
S.No. Name of Member in one in all Con. (M-
L B D Member
Member Members 20 )
SUPER STRUCTURE
A FLOOR BEAM (VERTICAL DIRECTION)
1 B11 (200X400) 0.65 0.2 0.4 0.052 4 0.208
2 B2 (200X400) 3.30 0.2 0.4 0.264 2 0.528
3 B4 (200X400) 8.00 0.2 0.4 0.64 4 2.56
4 B2 (200X300) 3.71 0.2 0.3 0.2226 4 0.8904
5 B6 (200X400) 5.20 0.2 0.4 0.416 4 1.664
6 B6 (200X400) 3.85 0.2 0.4 0.308 4 1.232
7 B5 (200X400) 3.51 0.2 0.4 0.2808 4 1.1232
8 B1 (200X300) 2.60 0.2 0.3 0.156 4 0.624
9 CB1 (200X100) 0.30 0.2 0.1 0.006 8 0.048
10 B1 (200X300) 2.30 0.2 0.3 0.138 4 0.552
11 B11 (200X400) 0.65 0.2 0.4 0.052 12 0.624
12 B5 A(200X400) 4.10 0.2 0.4 0.328 8 2.624
13 B10 (200X400) 2.30 0.2 0.4 0.184 4 0.736
14 B8 (200X400) 2.30 0.2 0.4 0.184 8 1.472
15 B5A (200X400) 3.51 0.2 0.4 0.2808 4 1.1232
16 B4 (200X400) 3.30 0.2 0.4 0.264 2 0.528

B FLOOR BEAM (VERTICAL DIRECTION)


1 B1 (200X300) 1.20 0.2 0.3 0.072 8 0.576
2 B2 (200X300) 3.70 0.2 0.3 0.222 4 0.888
3 B4 (200X400) 3.70 0.2 0.4 0.296 4 1.184
4 B2 (200X300) 3.70 0.2 0.3 0.222 4 0.888
5 B4A (200X400) 3.70 0.2 0.4 0.296 12 3.552
6 B7 (200X400) 3.75 0.2 0.4 0.3 8 2.4
7 B3 (200X400) 1.63 0.2 0.4 0.1304 4 0.5216
8 CB1 (200X300) 1.60 0.2 0.3 0.096 4 0.384
9 B11 (200X400) 0.65 0.2 0.4 0.052 8 0.416
10 B9 (200X400) 0.40 0.2 0.4 0.032 4 0.128
11 B12 (200X300) 2.60 0.2 0.3 0.156 2 0.312
12 B6 (200X400) 5.15 0.2 0.4 0.412 4 1.648
13 B9 (200X400) 1.40 0.2 0.4 0.112 4 0.448
14 B3 (200X400) 1.63 0.2 0.4 0.1304 8 1.0432
15 B4 (200X400) 3.70 0.2 0.4 0.296 2 0.592
16 B5a (200X400) 5.00 0.2 0.4 0.4 2 0.8

C ROOF SLAB
1 SLAB(S-1) 4.10 3.50 0.125 1.79375 4 7.175
2 SLAB(S-2) 3.60 3.50 0.125 1.575 4 6.3

STUDIO PLUS ARCHITECTS, 6


BHOPAL
BAR BENDING SCHEDULE FOR PROPOSED RESIDENTIAL UNITS FOR
G.O.s AT POLICE LINE, ITARSI, (M.P.)
CALCULATION FOR QUANTITY OF CONCRETE IN FOOTINGS AND COLUMN
Size of Member ( m ) Concrete Concrete Grade of
No. of
S.No. Name of Member in one in all Con. (M-
L B D Member
Member Members 20 )
3 SLAB(S-1) 3.60 4.00 0.125 1.8 4 7.2
4 SLAB(S-5) 2.60 3.00 0.125 0.975 4 3.9
5 SLAB(S-3) 1.00 2.60 0.125 0.325 4 1.3
6 SLAB(S-4) 2.30 2.40 0.125 0.69 4 2.76
7 SLAB(S-5) 1.30 2.40 0.125 0.39 4 1.56
8 SLAB(S-3) 1.00 3.51 0.125 0.43875 4 1.755
9 SLAB(S-5) 3.51 5.00 0.125 2.19375 4 8.775
10 SLAB(S-9) 1.40 2.40 0.15 0.504 4 2.016
11 SLAB(S-5) 1.70 2.10 0.125 0.44625 4 1.785
12 SLAB(S-9) 1.60 2.10 0.15 0.504 4 2.016
13 SLAB(CS8) 1.00 2.10 0.15 0.315 4 1.26
14 SLAB(S-7) 2.40 7.40 0.125 2.22 8 17.76
15 CANTILEVER 2.25 2.40 0.125 0.675 2 1.35
16 CANTILEVER 2.25 3.00 0.125 0.84375 8 6.75
GROUND FLOOR ROOF 105.9796
FIRST FLOOR ROOF 105.9796 CUM
TERRASE FLOOR ROOF 105.9796 CUM
GRAND TOTAL OF SHEET 317.9388 CUM

STUDIO PLUS ARCHITECTS, 7


BHOPAL
OR
N
( Qty.
From
Column

STUDIO PLUS ARCHITECTS, 8


BHOPAL
OR
N
( Qty.
From
Column

Err:509

STUDIO PLUS ARCHITECTS, 9


BHOPAL
BAR BENDING SCHEDULE FOR PROPOSED R
Mr. SAJID MIYA AT PEER G
CALCULATION QTY. OF REINFORCEM
Total No. Bending Di
Weight of No. of Bar of Bar in Type of
Name of No. of Dia of bar
S.No. bar in one all Reinforce
member member ( mm )
( kg/m ) Member Member ment A B

5 B6 (200X400) 2 12 0.887 3 6 ST. AT TOP 0.50 3.79


B6 (200X400) 2 12 0.887 2 4 ST. AT BO 0.40 3.79
B6 (200X400) 2 16 1.577 2 4 EX AT TOP 0.50 2.27
B6 (200X400) 4 12 0.887 2 8 EX AT BOTTOM 3.03
B6 (200X400) 2 8 0.394 31 63 VERTICAL 0.15 0.35

10 B10 (200X400) 1 16 1.577 3 3 ST. AT TOP 0.50 2.31


B10 (200X400) 1 16 1.577 2 2 ST. AT BO 0.40 2.31
B10 (200X400) 1 20 2.464 2 2 EX AT TOP 0.50 1.39
B10 (200X400) 1 16 1.577 2 2 EX AT BOTTOM 1.85
B10 (200X400) 1 8 0.394 24 24 VERTICAL 0.15 0.35

13 B13 (200X400) 1 12 0.887 3 3 ST. AT TOP 0.50 2.78


B13 (200X400) 1 12 0.887 3 3 ST. AT BO 0.40 2.78
B13 (200X400) 1 16 1.577 1 1 EX AT TOP 0.60 1.67
B13 (200X400) 1 8 0.394 29 29 VERTICAL 0.15 0.35

2 Spacing Along Shorter Span 0.175 Spacing Along Longer Span 0.175
SLAB(S-2) 1 8 0.394 17 17 ALONG SHORTER SPAN AT 0.20
SLAB(S-2) 1 8 0.394 14 14 ALONG LONGER SPAN AT 0.20
SLAB(S-2) 1 8 0.394 9 9 ALONG LONGER SPAN AT 0.20
SLAB(S-2) 1 8 0.394 11 11 ALONG SHORTER SPAN AT 0.20
SLAB(S-2) 1 8 0.394 17 17 EX. AT TOP SHORT SPAN 0.20
SLAB(S-2) 1 8 0.394 14 14 EX. AT TOP LONGER SPAN 0.20

2 Spacing Along Shorter Span 0.175 Spacing Along Longer Span 0.175
SLAB(S-2) 1 8 0.394 23 23 ALONG SHORTER SPAN AT 0.20
SLAB(S-2) 1 8 0.394 14 14 ALONG LONGER SPAN AT 0.20
SLAB(S-2) 1 8 0.394 9 9 ALONG LONGER SPAN AT 0.20
SLAB(S-2) 1 8 0.394 14 14 ALONG SHORTER SPAN AT 0.20
SLAB(S-2) 1 8 0.394 23 23 EX. AT TOP SHORT SPAN 0.20
SLAB(S-2) 1 8 0.394 14 14 EX. AT TOP LONGER SPAN 0.20

SECOND FLOOR SLAB


SECOND FLOOR BEAM
SECOND FLOOR SLAB & BEAM
SECOND FLOOR BEAM
DIA OF BARS
R PROPOSED RESIDENTIAL/COMMERCIAL UNITS FOR
MIYA AT PEER GATE BHOPAL (M.P.)
F REINFORCEMENT IN SECOND FLOOR BEAM
Bending Dimension Total Weight Summary
Cutting
Length of
Length of Total
Bar in all Weight of Weight of Weight of
Bar ( m ) , Weight of
C D E F member ( 8 mm 10 mm 12 mm
m ), Member (
bars bars bars
kg ),

0.50 4.79 28.74 25.49 25.49


0.40 4.59 18.36 16.29 16.29
0.50 3.27 13.10 20.65
- - 3.03 24.26 21.52 21.52
0.15 0.35 0.08 0.08 1.16 72.66 28.65 28.65
TOTAL QTY. 112.59
0.50 3.31 9.94 15.68
0.40 3.11 6.23 9.82
0.50 2.39 4.78 11.77
- - 1.85 3.70 5.84
0.15 0.35 0.08 0.08 1.16 28.00 11.04 11.04
TOTAL QTY. 54.15
0.50 3.78 11.33 10.05 10.05
0.40 3.58 10.73 9.52 9.52
0.60 2.87 2.87 4.52
0.15 0.35 0.08 0.08 1.16 33.38 13.16 13.16
TOTAL QTY. 37.26

2.31 0.20 2.71 45.80 18.05 18.05


2.78 0.20 3.18 45.20 17.82 17.82
2.78 0.20 3.18 28.39 11.19 11.19
2.31 0.20 2.71 28.56 11.26 11.26
1.39 0.20 1.79 30.18 11.90 11.90
1.67 0.20 2.07 29.40 11.59 11.59
Total Qty. ( kg ) 81.81

2.31 0.20 2.71 61.49 24.24 24.24


3.79 0.20 4.19 59.59 23.49 23.49
3.79 0.20 4.19 37.43 14.76 14.76
2.31 0.20 2.71 37.98 14.97 14.97
1.39 0.20 1.79 40.52 15.97 15.97
2.27 0.20 2.67 38.03 14.99 14.99
Total Qty. ( kg ) 108.44
Total Qty. Steel ( kg ) 394.25
Total Qty. ( kg ) 204.00 243.10 0.00 82.87
Total Qty. ( kg ) 598.25
Total Qty. ( kg ) 0.60 0.24 0.00 0.08
8MM 10MM 12MM

243.1 82.87
Summary

Weight of Weight of
16 mm 20mm
bars bars

20.65

15.68
9.82
11.77
5.84

4.52
56.51 11.77

0.06 0.01
16MM 20MM

56.51 11.77