You are on page 1of 1

Issue Date : 06.05.

2013
Revision No : 00
Revision Date :
Zenith Gemi İşletmeciliği A.Ş. Issued by : DPA
Approved by : Managing Director

PV BREAKER - PV - DECK SEAL / NRV (NON RETURN VALVE)


MAST RISER CHECK LOG
Vessel : STI VILLE
PV Breaker PV Valve D/Seal & Non-retun
Working Press:+2300mmWG Working Press:+2000mmWG Mast Riser
Date -700mmWG -350mmWG Valve
Checked Liquid level Checked Condition Checked Condition Checked Condition

N/A N/A

N/A N/A

N/A N/A

N/A N/A

N/A N/A

N/A N/A

N/A N/A

N/A N/A

N/A N/A

N/A N/A

N/A N/A

N/A N/A

N/A N/A

N/A N/A

N/A N/A

N/A N/A

N/A N/A

N/A N/A

N/A N/A

N/A N/A

N/A N/A

N/A N/A

N/A N/A

N/A N/A

Chief Officer

Note : Checks will be carried out before each cargo, tank washing and gasfree operation in line with the manifacturers maintenance and
inspection instructions and results of condition will be recorded to this form by relevant Officer. Also each equipment’s pipes/
corrosion/fitting will be checked. PV Breaker antifreeze condition will be tested unnualy for proper solution as per maker instructions by
densitymeter. If test result found off spec, the solution should be changed. The solution will be tested and filled if the level of solution
changed at any time.
Not : Kontrollar her yük, tank yıkama ve gasfree operasyonundan önce yapımcının bakım ve kontroller talimatına uygun olarak yapılacak ve kontrol
sonuçları, ilgili Zabit tarafından bu forma kaydedilecektir. Ekipmanların devre/paslanması/bağlantıları kontrol edilecektir. PV Breaker antifrizi
uygun karışım için yapımcı firma talimatlarına uygun senelik periyotlarda density ölçer ile test edilecektir. Şayet test sonucu spec dışı
bulunursa karışım değiştirilecektir. Şayet solusyon seviyesinde her hangi bir zamanda değişiklik olursa karışım test edilecek ve tamamlanacaktır.

Form No : ZN-425.001 Page : 1/1