SUBMITTED BY –
B2539
The problems faced by JSW Steel were as follows –
1. Rakes or Rail
2. Whether they will get a clean barge
3. If they will be able to complete their quarterly target
4. If they will be able to deliver the goods on time to JSAW
5. BOXN and JUMBO availability
6. Moving ahead as per the mission of the organization
Dilemma –
Cost of transportation –
= 2480.4 + 30
= 2510.4
=2480.4+25
=2505.4
= 30000-10%
= 27000
If delayed contribution margin
Class I barge
= 27000 – 2510.4
= 24489.6
Class II barge
= 27000 – 2505.4
= 24494.6
= 23820
= 30000 – 20%
= 24000