4 Data Hasil Perhitungan Pasir


B.4.1 Data Hasil Perhitungan Partikel Pasir pada ID Kolom 53 mm dan Tinggi Bed Awal 0.5 cm
1. Densitas partikel = 5.186E+02 kg/m3 2. Volume partikel total = 3.040E-08 m3 5. Densitas gas = 1.2 kg/m3
2. ɸs = 0.75 3. Luas kolom = 2.205E-03 m2 6. Viskositas gas = 1.87E-05 kg/m.s
Tabel B.1 Data Hasil Perhitungan Partikel Pasir pada ID Kolom 53 mm dan Tinggi Bed Awal 0,5 cm

Flowrate Flowrate Tinggi


v Vunggu Voidage v'mf ΔP Perhitungan Kondisi Bed
(Q) (Q) Bed
(L/jam) (m3/s) (m) (m/s) (m3) ε (m/s) kg/ms2
400 1.111E-04 7.00E-03 5.039E-02 1.544E-05 9.98030E-01 5.029E-02 1.E-05 Minimum
800 2.222E-04 2.00E-02 1.008E-01 4.410E-05 9.99311E-01 1.007E-01 1.303E-04 Homogen
1200 3.333E-04 2.00E-02 1.512E-01 4.410E-05 9.99311E-01 1.511E-01 2.927E-04 Homogen
1600 4.444E-04 3.50E-02 2.016E-01 7.718E-05 9.99606E-01 2.015E-01 5.937E-04 Bubbling
2000 5.556E-04 4.50E-02 2.519E-01 9.923E-05 9.99694E-01 2.519E-01 9.615E-04 Bubbling
2400 6.667E-04 5.00E-02 3.023E-01 1.103E-04 9.99724E-01 3.023E-01 1.402E-03 Disperse
2800 7.778E-04 6.50E-02 3.527E-01 1.433E-04 9.99788E-01 3.526E-01 1.956E-03 Disperse
3200 8.889E-04 7.00E-02 4.031E-01 1.544E-04 9.99803E-01 4.030E-01 2.570E-03 Disperse
3600 1.000E-03 8.00E-02 4.535E-01 1.764E-04 9.99828E-01 4.534E-01 3.284E-03 Disperse
4000 1.111E-03 9.50E-02 5.039E-01 2.095E-04 9.99855E-01 5.038E-01 4.097E-03 Disperse
4400 1.222E-03 1.10E-01 5.543E-01 2.426E-04 9.99875E-01 5.542E-01 4.995E-03 Disperse
4800 1.333E-03 1.20E-01 6.047E-01 2.646E-04 9.99885E-01 6.046E-01 5.967E-03 Disperse
5200 1.444E-03 1.30E-01 6.551E-01 2.867E-04 9.99894E-01 6.550E-01 7.027E-03 Disperse
5600 1.556E-03 1.35E-01 7.054E-01 2.977E-04 9.99898E-01 7.054E-01 8.161E-03 Disperse
6000 1.667E-03 1.40E-01 7.558E-01 3.087E-04 9.99902E-01 7.558E-01 9.382E-03 Disperse
6400 1.778E-03 1.50E-01 8.062E-01 3.308E-04 9.99908E-01 8.062E-01 1.070E-02 Disperse
6800 1.889E-03 1.60E-01 8.566E-01 3.528E-04 9.99914E-01 8.565E-01 1.211E-02 Disperse
7200 2.000E-03 1.75E+01 9.070E-01 3.859E-04 9.99921E-01 9.069E-01 1.361E-02 Disperse
7600 2.111E-03 1.80E-01 9.574E-01 4.410E-04 9.99931E-01 9.573E-01 1.522E-02 Disperse
8000 2.222E-03 1.85E-01 1.008E+00 4.851E-04 9.99937E-01 1.008E+00 1.690E-02 Disperse
B.4.2 Data Hasil Perhitungan Partikel Pasir pada ID Kolom 53 mm dan Tinggi Bed Awal 1.5 cm
1. Densitas partikel = 5.186E+02 kg/m3 2. Volume partikel total = 9.121E-08 m3 5. Densitas gas = 1.2 kg/m3
2. ɸs = 0.75 3. Luas kolom = 2.205E-03 m2 6. Viskositas gas = 1.87E-05 kg/m.s

Tabel B.2 Data Hasil Perhitungan Partikel Pasir pada ID Kolom 53 mm dan Tinggi Bed Awal 1.5 cm
Flowrate Flowrate Tinggi
v Vunggun Voidage v'mf ΔP Perhitungan Kondisi Bed
(Q) (Q) Bed
(L/jam) (m3/s) (m) (m/s) (m3) ε (m/s) kg/ms2
400 1.111E-04 1.70E-02 5.039E-02 3.528E-05 9.974E-01 5.026E-02 8.E-06 Minimum
800 2.222E-04 3.00E-02 1.008E-01 4.410E-05 9.979E-01 1.006E-01 1.316E-04 Homogen
1200 3.333E-04 3.50E-02 1.512E-01 6.615E-05 9.986E-01 1.510E-01 5.872E-04 Homogen
1600 4.444E-04 4.00E-02 2.016E-01 7.718E-05 9.988E-01 2.013E-01 1.190E-03 Bubbling
2000 5.556E-04 5.00E-02 2.519E-01 8.820E-05 9.990E-01 2.517E-01 2.032E-03 Bubbling
2400 6.667E-04 5.50E-02 3.023E-01 9.923E-05 9.991E-01 3.021E-01 3.118E-03 Bubbling
2800 7.778E-04 7.50E-02 3.527E-01 1.103E-04 9.992E-01 3.524E-01 4.455E-03 Disperse
3200 8.889E-04 8.00E-02 4.031E-01 1.323E-04 9.993E-01 4.028E-01 6.231E-03 Disperse
3600 1.000E-03 9.00E-02 4.535E-01 1.323E-04 9.993E-01 4.532E-01 7.886E-03 Disperse
4000 1.111E-03 1.10E-01 5.039E-01 1.433E-04 9.994E-01 5.036E-01 9.983E-03 Disperse
4400 1.222E-03 1.15E-01 5.543E-01 1.544E-04 9.994E-01 5.540E-01 1.234E-02 Disperse
4800 1.333E-03 1.30E-01 6.047E-01 1.544E-04 9.994E-01 6.043E-01 1.468E-02 Disperse
5200 1.444E-03 1.45E-01 6.551E-01 1.985E-04 9.995E-01 6.548E-01 1.827E-02 Disperse
5600 1.556E-03 1.50E-01 7.054E-01 1.985E-04 9.995E-01 7.051E-01 2.119E-02 Disperse
6000 1.667E-03 1.55E-01 7.558E-01 1.985E-04 9.995E-01 7.555E-01 2.433E-02 Disperse
6400 1.778E-03 1.60E-01 8.062E-01 2.205E-04 9.996E-01 8.059E-01 2.823E-02 Disperse
6800 1.889E-03 1.80E-01 8.566E-01 2.426E-04 9.996E-01 8.563E-01 3.238E-02 Disperse
7200 2.000E-03 1.85E-01 9.070E-01 2.536E-04 9.996E-01 9.067E-01 3.655E-02 Disperse
7600 2.111E-03 1.90E-01 9.574E-01 2.646E-04 9.997E-01 9.571E-01 4.098E-02 Disperse
8000 2.222E-03 2.10E-01 1.008E+00 3.308E-04 9.997E-01 1.008E+00 4.670E-02 Disperse

B.4.3 Data Hasil Perhitungan Partikel Pasir pada ID Kolom 65 mm dan Tinggi Bed Awal 0.5 cm
1. Densitas partikel = 5.186E+02 kg/m3 2. Volume partikel total = 3.040E-08 m3 5. Densitas gas = 1.2 kg/m3
2. ɸs = 0.75 3. Luas kolom = 3.317E-03 m2 6. Viskositas gas = 1.87E-05 kg/m.s
Tabel B.3 Data Hasil Perhitungan Partikel Pasir pada ID Kolom 65 mm dan Tinggi Bed Awal 0,5 cm
Flowrate Flowrate Tinggi
v Vunggun Voidage v'mf ΔP Perhitungan Kondisi Bed
(Q) (Q) Bed
(L/jam) (m3/s) (m) (m/s) (m3) ε (m/s) kg/ms2
400 1.111E-04 6.00E-03 3.350E-02 1.990E-05 9.993E-01 3.345E-02 2.E-06 Minimum
800 2.222E-04 8.00E-03 6.700E-02 2.653E-05 9.989E-01 6.693E-02 1.930E-05 Minimum
1200 3.333E-04 1.50E-02 1.005E-01 4.975E-05 9.994E-01 1.004E-01 7.656E-05 Homogen
1600 4.444E-04 2.00E-02 1.340E-01 6.633E-05 9.995E-01 1.339E-01 1.528E-04 Homogen
2000 5.556E-04 2.50E-02 1.675E-01 8.292E-05 9.996E-01 1.674E-01 2.545E-04 Bubbling
2400 6.667E-04 3.00E-02 2.010E-01 9.950E-05 9.997E-01 2.009E-01 3.816E-04 Bubbling
2800 7.778E-04 3.50E-02 2.345E-01 1.161E-04 9.997E-01 2.344E-01 5.341E-04 Bubbling
3200 8.889E-04 4.50E-02 2.680E-01 1.492E-04 9.998E-01 2.680E-01 7.232E-04 Bubbling
3600 1.000E-03 5.00E-02 3.015E-01 1.658E-04 9.998E-01 3.015E-01 9.267E-04 Disperse
4000 1.111E-03 5.50E-02 3.350E-01 1.824E-04 9.998E-01 3.350E-01 1.156E-03 Disperse
4400 1.222E-03 6.00E-02 3.685E-01 1.990E-04 9.998E-01 3.685E-01 1.410E-03 Disperse
4800 1.333E-03 7.50E-02 4.020E-01 2.487E-04 9.999E-01 4.020E-01 1.708E-03 Disperse
5200 1.444E-03 8.00E-02 4.355E-01 2.653E-04 9.999E-01 4.355E-01 2.014E-03 Disperse
5600 1.556E-03 8.50E-02 4.690E-01 2.819E-04 9.999E-01 4.690E-01 2.344E-03 Disperse
6000 1.667E-03 9.00E-02 5.025E-01 2.985E-04 9.999E-01 5.025E-01 2.701E-03 Disperse
6400 1.778E-03 9.50E-02 5.360E-01 3.151E-04 9.999E-01 5.360E-01 3.082E-03 Disperse
6800 1.889E-03 1.00E-01 5.695E-01 3.317E-04 9.999E-01 5.695E-01 3.489E-03 Disperse
7200 2.000E-03 1.10E-01 6.030E-01 3.648E-04 9.999E-01 6.030E-01 3.930E-03 Disperse
7600 2.111E-03 1.20E-01 6.365E-01 3.980E-04 9.999E-01 6.365E-01 4.396E-03 Disperse
8000 2.222E-03 1.25E-01 6.700E-01 4.146E-04 9.999E-01 6.700E-01 4.880E-03 Disperse

B.4.4 Data Hasil Perhitungan Partikel Pasir pada ID Kolom 65 mm dan Tinggi Bed Awal 1.5 cm
1. Densitas partikel = 5.186E+02 kg/m3 2. Volume partikel total = 9.121E-08 m3 5. Densitas gas = 1.2 kg/m3
2. ɸs = 0.75 3. Luas kolom = 3.3175E-03 m2 6. Viskositas gas = 1.87E-05 kg/m.s

Tabel B.4 Data Hasil Perhitungan Partikel Arang Aktif pada ID Kolom 65 mm dan Tinggi Bed Awal 1.5 cm
Flowrate Flowrate Tinggi v Vunggun Voidage v'mf ΔP Perhitungan Kondisi Bed
(Q) (Q) Bed
(L/jam) (m3/s) (m) (m/s) (m3) ε (m/s) kg/ms2
400 1.111E-04 5.00E-03 3.350E-02 4.975E-05 9.982E-01 3.344E-02 0 Fixed Bed
800 2.222E-04 5.00E-03 6.700E-02 6.633E-05 9.986E-01 6.691E-02 3.869E-05 Fixed Bed
1200 3.333E-04 5.00E-03 1.005E-01 7.628E-05 9.988E-01 1.004E-01 1.203E-04 Fixed Bed
1600 4.444E-04 5.00E-03 1.340E-01 9.950E-05 9.991E-01 1.339E-01 3.064E-04 Minimum
2000 5.556E-04 5.00E-03 1.675E-01 1.161E-04 9.992E-01 1.674E-01 5.463E-04 Minimum
2400 6.667E-04 5.00E-03 2.010E-01 1.327E-04 9.993E-01 2.009E-01 8.596E-04 Minimum
2800 7.778E-04 6.00E-03 2.345E-01 1.658E-04 9.994E-01 2.344E-01 1.309E-03 Minimum
3200 8.889E-04 6.00E-03 2.680E-01 2.322E-04 9.996E-01 2.679E-01 1.919E-03 Homogen
3600 1.000E-03 7.00E-03 3.015E-01 2.653E-04 9.997E-01 3.014E-01 2.511E-03 Homogen
4000 1.111E-03 7.00E-03 3.350E-01 2.819E-04 9.997E-01 3.349E-01 3.141E-03 Homogen
4400 1.222E-03 8.00E-03 3.685E-01 3.151E-04 9.997E-01 3.684E-01 3.886E-03 Homogen
4800 1.333E-03 8.00E-03 4.020E-01 3.317E-04 9.997E-01 4.019E-01 4.668E-03 Homogen
5200 1.444E-03 9.00E-03 4.355E-01 3.482E-04 9.997E-01 4.354E-01 5.524E-03 Bubbling
5600 1.556E-03 1.00E-02 4.690E-01 3.648E-04 9.997E-01 4.689E-01 6.455E-03 Bubbling
6000 1.667E-03 1.50E-02 5.025E-01 3.814E-04 9.998E-01 5.024E-01 7.461E-03 Bubbling
6400 1.778E-03 2.00E-02 5.360E-01 4.312E-04 9.998E-01 5.359E-01 8.635E-03 Bubbling
6800 1.889E-03 3.00E-02 5.695E-01 4.477E-04 9.998E-01 5.694E-01 9.795E-03 Bubbling
7200 2.000E-03 3.50E-02 6.030E-01 4.809E-04 9.998E-01 6.029E-01 1.108E-02 Bubbling
7600 2.111E-03 4.00E-02 6.365E-01 5.141E-04 9.998E-01 6.364E-01 1.243E-02 Bubbling
8000 2.222E-03 5.00E-02 6.700E-01 5.472E-04 9.998E-01 6.699E-01 1.386E-02 Bubbling

B.5 Data Hasil Perhitungan Zeolit


B.5.1 Data Hasil Perhitungan Partikel Zeolit pada ID Kolom 53 mm dan Tinggi Bed Awal 0.5 cm
1. Densitas partikel = 3.069E+03 kg/m3 2. Volume partikel total = 1.362E-08 m3 5. Densitas gas = 1.2 kg/m3
2. ɸs = 0.76 3. Luas kolom = 2.205E-03 m2 6. Viskositas gas = 1.87E-05 kg/m.s

Tabel B.5 Data Hasil Perhitungan Partikel Zeolit pada ID Kolom 53 mm dan Tinggi Bed Awal 0.5 cm
Flowrate Flowrate Tinggi
v Vunggun Voidage v'mf ΔP Perhitungan Kondisi Bed
(Q) (Q) Bed
(L/jam) (m3/s) (m) (m/s) (m3) ε (m/s) kg/ms2
400 1.111E-04 5.00E-03 5.039E-02 1.103E-05 9.988E-01 5.033E-02 0 Fixed Bed
800 2.222E-04 5.00E-03 1.008E-01 1.103E-05 9.988E-01 1.007E-01 0 Fixed Bed
1200 3.333E-04 5.00E-03 1.512E-01 1.103E-05 9.988E-01 1.510E-01 0 Fixed Bed
1600 4.444E-04 5.00E-03 2.016E-01 1.103E-05 9.988E-01 2.013E-01 0 Fixed Bed
2000 5.556E-04 5.00E-03 2.519E-01 1.103E-05 9.988E-01 2.516E-01 0 Fixed Bed
2400 6.667E-04 5.00E-03 3.023E-01 1.103E-05 9.988E-01 3.020E-01 0 Fixed Bed
2800 7.778E-04 5.00E-03 3.527E-01 1.103E-05 9.988E-01 3.523E-01 0 Fixed Bed
3200 8.889E-04 5.00E-03 4.031E-01 1.103E-05 9.988E-01 4.026E-01 0 Fixed Bed
3600 1.000E-03 5.00E-03 4.535E-01 1.103E-05 9.988E-01 4.529E-01 0 Fixed Bed
4000 1.111E-03 5.00E-03 5.039E-01 1.103E-05 9.988E-01 5.033E-01 0 Fixed Bed
4400 1.222E-03 5.00E-03 5.543E-01 1.103E-05 9.988E-01 5.536E-01 0 Fixed Bed
4800 1.333E-03 5.00E-03 6.047E-01 1.103E-05 9.988E-01 6.039E-01 0 Fixed Bed
5200 1.444E-03 5.00E-03 6.551E-01 1.103E-05 9.988E-01 6.542E-01 0 Fixed Bed
5600 1.556E-03 6.00E-03 7.054E-01 1.323E-05 9.990E-01 7.047E-01 3.361E-04 Minimum
6000 1.667E-03 6.00E-03 7.558E-01 1.323E-05 9.990E-01 7.551E-01 3.858E-04 Minimum
6400 1.778E-03 6.00E-03 8.062E-01 1.323E-05 9.990E-01 8.054E-01 4.389E-04 Minimum
6800 1.889E-03 7.00E-03 8.566E-01 1.544E-05 9.991E-01 8.559E-01 6.056E-04 Minimum
7200 2.000E-03 9.00E-03 9.070E-01 1.985E-05 9.993E-01 9.064E-01 1.481E-03 Bubbling
7600 2.111E-03 1.00E-02 9.574E-01 2.095E-05 9.993E-01 9.568E-01 1.759E-03 Bubbling
8000 2.222E-03 1.20E-02 1.008E+00 2.205E-05 9.994E-01 1.007E+00 2.058E-03 Bubbling
B.5.2 Data Hasil Perhitungan Partikel Zeolit pada ID Kolom 53 mm dan Tinggi Bed Awal 1.5 cm
1. Densitas partikel = 3.069E+03 kg/m3 2. Volume partikel total = 4.086E-08 m3 5. Densitas gas = 1.2 kg/m3
2. ɸs = 0.76 3. Luas kolom = 2.205E-03 m2 6. Viskositas gas = 1.87E-05 kg/m.s

Tabel B.6 Data Hasil Perhitungan Partikel Zeolit pada ID Kolom 53 mm dan Tinggi Bed Awal 1.5 cm
Flowrate Flowrate Tinggi
v Vunggun Voidage v'mf ΔP Perhitungan Kondisi Bed
(Q) (Q) Bed
(L/jam) (m3/s) (m) (m/s) (m3) ε (m/s) kg/ms2
400 1.111E-04 1.50E-02 5.039E-02 3.308E-05 9.988E-01 5.033E-02 0 Fixed Bed
800 2.222E-04 1.50E-02 1.008E-01 3.308E-05 9.988E-01 1.007E-01 0 Fixed Bed
1200 3.333E-04 1.50E-02 1.512E-01 3.308E-05 9.988E-01 1.510E-01 0 Fixed Bed
1600 4.444E-04 1.50E-02 2.016E-01 3.308E-05 9.988E-01 2.013E-01 0 Fixed Bed
2000 5.556E-04 1.50E-02 2.519E-01 3.308E-05 9.988E-01 2.516E-01 0 Fixed Bed
2400 6.667E-04 1.50E-02 3.023E-01 3.308E-05 9.988E-01 3.020E-01 0 Fixed Bed
2800 7.778E-04 1.50E-02 3.527E-01 3.308E-05 9.988E-01 3.523E-01 0 Fixed Bed
3200 8.889E-04 1.50E-02 4.031E-01 3.308E-05 9.988E-01 4.026E-01 0 Fixed Bed
3600 1.000E-03 1.50E-02 4.535E-01 3.308E-05 9.988E-01 4.529E-01 0 Fixed Bed
4000 1.111E-03 1.50E-02 5.039E-01 3.308E-05 9.988E-01 5.033E-01 0 Fixed Bed
4400 1.222E-03 1.50E-02 5.543E-01 3.308E-05 9.988E-01 5.536E-01 0 Fixed Bed
4800 1.333E-03 1.50E-02 6.047E-01 3.308E-05 9.988E-01 6.039E-01 0 Fixed Bed
5200 1.444E-03 1.50E-02 6.551E-01 3.308E-05 9.988E-01 6.542E-01 0 Fixed Bed
5600 1.556E-03 1.50E-02 7.054E-01 3.308E-05 9.988E-01 7.046E-01 0 Fixed Bed
6000 1.667E-03 1.50E-02 7.558E-01 3.308E-05 9.988E-01 7.549E-01 0 Fixed Bed
6400 1.778E-03 1.60E-02 8.062E-01 3.528E-05 9.988E-01 8.053E-01 6.785E-04 Minimum
6800 1.889E-03 1.60E-02 8.566E-01 3.528E-05 9.988E-01 8.556E-01 9.897E-04 Minimum
7200 2.000E-03 1.70E-02 9.070E-01 3.528E-05 9.988E-01 9.060E-01 1.982E-03 Minimum
7600 2.111E-03 1.80E-02 9.574E-01 3.749E-05 9.989E-01 9.563E-01 2.310E-03 Bubbling
8000 2.222E-03 2.00E-02 1.008E+00 3.749E-05 9.989E-01 1.007E+00 3.100E-03 Bubbling

B.5.3 Data Hasil Perhitungan Partikel Zeolit pada ID Kolom 65 mm dan Tinggi Bed Awal 0.5 cm
1. Densitas partikel = 3.069E+03 kg/m3 2. Volume partikel total = 1.362E-08 m3 5. Densitas gas = 1.2 kg/m3
2. ɸs = 0.76 3. Luas kolom = 3.317E-03 m2 6. Viskositas gas = 1.87E-05 kg/m.s
Tabel B.7 Data Hasil Perhitungan Partikel Zeolit pada ID Kolom 65 mm dan Tinggi Bed Awal 0.5 cm
Flowrate Flowrate Tinggi
v Vunggun Voidage v'mf ΔP Perhitungan Kondisi Bed
(Q) (Q) Bed
(L/jam) (m3/s) (m) (m/s) (m3) ε (m/s) kg/ms2
400 1.111E-04 5.00E-03 3.350E-02 1.658E-05 9.992E-01 3.347E-02 0 Fixed Bed
800 2.222E-04 5.00E-03 6.700E-02 1.658E-05 9.992E-01 6.695E-02 0 Fixed Bed
1200 3.333E-04 5.00E-03 1.005E-01 1.658E-05 9.992E-01 1.004E-01 0 Fixed Bed
1600 4.444E-04 5.00E-03 1.340E-01 1.658E-05 9.992E-01 1.339E-01 0 Fixed Bed
2000 5.556E-04 5.00E-03 1.675E-01 1.658E-05 9.992E-01 1.674E-01 0 Fixed Bed
2400 6.667E-04 5.00E-03 2.010E-01 1.658E-05 9.992E-01 2.008E-01 0 Fixed Bed
2800 7.778E-04 5.00E-03 2.345E-01 1.658E-05 9.992E-01 2.343E-01 0 Fixed Bed
3200 8.889E-04 5.00E-03 2.680E-01 1.658E-05 9.992E-01 2.678E-01 0 Fixed Bed
3600 1.000E-03 5.00E-03 3.015E-01 1.658E-05 9.992E-01 3.013E-01 0 Fixed Bed
4000 1.111E-03 5.00E-03 3.350E-01 1.658E-05 9.992E-01 3.347E-01 0 Fixed Bed
4400 1.222E-03 5.00E-03 3.685E-01 1.658E-05 9.992E-01 3.682E-01 0 Fixed Bed
4800 1.333E-03 5.00E-03 4.020E-01 1.658E-05 9.992E-01 4.017E-01 0 Fixed Bed
5200 1.444E-03 5.00E-03 4.355E-01 1.658E-05 9.992E-01 4.352E-01 0 Fixed Bed
5600 1.556E-03 5.00E-03 4.690E-01 1.658E-05 9.992E-01 4.686E-01 0 Fixed Bed
6000 1.667E-03 5.00E-03 5.025E-01 1.658E-05 9.992E-01 5.021E-01 0 Fixed Bed
6400 1.778E-03 6.00E-03 5.360E-01 1.990E-05 9.993E-01 5.357E-01 1.038E-04 Minimum
6800 1.889E-03 6.00E-03 5.695E-01 1.990E-05 9.993E-01 5.691E-01 1.198E-04 Minimum
7200 2.000E-03 7.00E-03 6.030E-01 2.322E-05 9.994E-01 6.027E-01 1.654E-04 Minimum
7600 2.111E-03 8.00E-03 6.365E-01 2.653E-05 9.995E-01 6.362E-01 3.842E-04 Minimum
8000 2.222E-03 1.00E-02 6.700E-01 3.317E-05 9.996E-01 6.698E-01 4.439E-04 Minimum

B.5.4 Data Hasil Perhitungan Partikel Zeolit pada ID Kolom 65 mm dan Tinggi Bed Awal 1.5 cm
1. Densitas partikel = 3.069E+03 kg/m3 2. Volume partikel total = 4.086E-07 m3 5. Densitas gas = 1.2 kg/m3
2. ɸs = 0.76 3. Luas kolom = 3.317E-03 m2 6. Viskositas gas = 1.87E-05 kg/m.s

Tabel B.8 Data Hasil Perhitungan Partikel Zeolit pada ID Kolom 65 mm dan Tinggi Bed Awal 1.5 cm
Flowrate Flowrate Tinggi
v Vunggun Voidage v'mf ΔP Perhitungan Kondisi Bed
(Q) (Q) Bed
(L/jam) (m3/s) (m) (m/s) (m3) ε (m/s) kg/ms2
400 1.111E-04 1.50E-02 3.350E-02 4.975E-05 9.992E-01 3.347E-02 0 Fixed Bed
800 2.222E-04 1.50E-02 6.700E-02 4.975E-05 9.992E-01 6.695E-02 0 Fixed Bed
1200 3.333E-04 1.50E-02 1.005E-01 4.975E-05 9.992E-01 1.004E-01 0 Fixed Bed
1600 4.444E-04 1.50E-02 1.340E-01 4.975E-05 9.992E-01 1.339E-01 0 Fixed Bed
2000 5.556E-04 1.50E-02 1.675E-01 4.975E-05 9.992E-01 1.674E-01 0 Fixed Bed
2400 6.667E-04 1.50E-02 2.010E-01 4.975E-05 9.992E-01 2.008E-01 0 Fixed Bed
2800 7.778E-04 1.50E-02 2.345E-01 4.975E-05 9.992E-01 2.343E-01 0 Fixed Bed
3200 8.889E-04 1.50E-02 2.680E-01 4.975E-05 9.992E-01 2.678E-01 0 Fixed Bed
3600 1.000E-03 1.50E-02 3.015E-01 4.975E-05 9.992E-01 3.013E-01 0 Fixed Bed
4000 1.111E-03 1.50E-02 3.350E-01 4.975E-05 9.992E-01 3.347E-01 0 Fixed Bed
4400 1.222E-03 1.50E-02 3.685E-01 4.975E-05 9.992E-01 3.682E-01 0 Fixed Bed
4800 1.333E-03 1.50E-02 4.020E-01 4.975E-05 9.992E-01 4.017E-01 0 Fixed Bed
5200 1.444E-03 1.50E-02 4.355E-01 4.975E-05 9.992E-01 4.352E-01 0 Fixed Bed
5600 1.556E-03 1.50E-02 4.690E-01 4.975E-05 9.992E-01 4.686E-01 0 Fixed Bed
6000 1.667E-03 1.50E-02 5.025E-01 4.975E-05 9.992E-01 5.021E-01 0 Fixed Bed
6400 1.778E-03 1.50E-02 5.360E-01 4.975E-05 9.992E-01 5.356E-01 0 Fixed Bed
6800 1.889E-03 1.50E-02 5.695E-01 4.975E-05 9.992E-01 5.691E-01 0 Fixed Bed
7200 2.000E-03 1.60E-02 6.030E-01 5.307E-05 9.992E-01 6.026E-01 3.024E-04 Minimum
7600 2.111E-03 1.60E-02 6.365E-01 5.307E-05 9.992E-01 6.360E-01 4.954E-04 Minimum
8000 2.222E-03 1.70E-02 6.700E-01 5.638E-05 9.993E-01 6.695E-01 5.675E-04 Minimum

B.6 Data Hasil Perhitungan Arang Aktif


B.6.1 Data Hasil Perhitungan Partikel Arang Aktif pada ID Kolom 53 mm dan Tinggi Bed Awal 0.5 cm
1. Densitas partikel = 1.134E+03 kg/m3 2. Volume partikel total = 4.043E-08 m3 5. Densitas gas = 1.2 kg/m3
2. ɸs = 0.79 3. Luas kolom = 2.205E-03 m2 6. Viskositas gas = 1.87E-05 kg/m.s
Tabel B.9 Data Hasil Perhitungan Partikel Arang Aktif pada ID Kolom 53 mm dan Tinggi Bed Awal 0.5 cm
Flowrate Flowrate Tinggi
v Vunggun Voidage v'mf ΔP Perhitungan Kondisi Bed
(Q) (Q) Bed
(L/jam) (m3/s) (m) (m/s) (m3) ε (m/s) kg/ms2
400 1.111E-04 5.00E-03 5.039E-02 1.103E-05 9.9633E-01 5.020E-02 0 Fixed Bed
800 2.222E-04 5.00E-03 1.008E-01 1.103E-05 9.9633E-01 1.004E-01 0 Fixed Bed
1200 3.333E-04 5.00E-03 1.512E-01 1.103E-05 9.9633E-01 1.506E-01 0 Minimum
1600 4.444E-04 5.00E-03 2.016E-01 1.103E-05 9.9633E-01 2.008E-01 0 Minimum
2000 5.556E-04 5.00E-03 2.519E-01 1.103E-05 9.9633E-01 2.510E-01 0 Minimum
2400 6.667E-04 5.00E-03 3.023E-01 1.103E-05 9.9633E-01 3.012E-01 0 Minimum
2800 7.778E-04 7.00E-03 3.527E-01 1.103E-05 9.9633E-01 3.514E-01 0 Minimum
3200 8.889E-04 1.30E-02 4.031E-01 1.103E-05 9.9633E-01 4.016E-01 0 Homogen
3600 1.000E-03 1.50E-02 4.535E-01 1.103E-05 9.9633E-01 4.518E-01 0 Homogen
4000 1.111E-03 1.80E-02 5.039E-01 1.323E-05 9.9694E-01 5.024E-01 4.069E-04 Homogen
4400 1.222E-03 1.90E-02 5.543E-01 1.323E-05 9.9694E-01 5.526E-01 4.923E-04 Homogen
4800 1.333E-03 2.00E-02 6.047E-01 1.323E-05 9.9694E-01 6.028E-01 5.858E-04 Bubbling
5200 1.444E-03 2.50E-02 6.551E-01 1.544E-05 9.9738E-01 6.533E-01 1.179E-03 Bubbling
5600 1.556E-03 3.00E-02 7.054E-01 1.874E-05 9.9784E-01 7.039E-01 1.970E-03 Bubbling
6000 1.667E-03 4.00E-02 7.558E-01 1.764E-05 9.9771E-01 7.541E-01 2.060E-03 Bubbling
6400 1.778E-03 4.50E-02 8.062E-01 1.985E-05 9.9796E-01 8.046E-01 2.778E-03 Bubbling
6800 1.889E-03 5.00E-02 8.566E-01 1.985E-05 9.9796E-01 8.549E-01 3.135E-03 Bubbling
7200 2.000E-03 6.00E-02 9.070E-01 2.205E-05 9.9817E-01 9.053E-01 3.955E-03 Bubbling
7600 2.111E-03 6.50E-02 9.574E-01 2.205E-05 9.9817E-01 9.556E-01 4.406E-03 Bubbling
8000 2.222E-03 7.00E-02 1.008E+00 2.205E-05 9.9817E-01 1.006E+00 4.882E-03 Bubbling

B.6.2 Data Hasil Perhitungan Partikel Arang Aktif pada ID Kolom 53 mm dan Tinggi Bed Awal 1.5 cm
1. Densitas partikel = 1.134E+03 kg/m3 2. Volume partikel total = 1.213E-07 m3 5. Densitas gas = 1.2 kg/m3
2. ɸs = 0.79 3. Luas kolom = 2.205E-03 m2 6. Viskositas gas = 1.87E-05 kg/m.s
Tabel B.10 Data Hasil Perhitungan Partikel Arang Aktif pada ID Kolom 53 mm dan Tinggi Bed Awal 1.5 cm
Flowrate Flowrate Tinggi
v Vunggun Voidage v’mf ΔP Perhitungan Kondisi Bed
(Q) (Q) Bed
(L/jam) (m3/s) (m) (m/s) (m3) ε (m/s) kg/ms2
400 1.111E-04 1.50E-02 5.039E-02 3.308E-05 9.963E-01 5.020E-02 0 Fixed Bed
800 2.222E-04 1.50E-02 1.008E-01 3.308E-05 9.963E-01 1.004E-01 0 Fixed Bed
1200 3.333E-04 1.50E-02 1.512E-01 3.308E-05 9.963E-01 1.506E-01 0 Fixed Bed
1600 4.444E-04 1.50E-02 2.016E-01 3.308E-05 9.963E-01 2.008E-01 0 Fixed Bed
2000 5.556E-04 1.50E-02 2.519E-01 3.308E-05 9.963E-01 2.510E-01 0 Minimum
2400 6.667E-04 1.50E-02 3.023E-01 3.308E-05 9.963E-01 3.012E-01 0 Minimum
2800 7.778E-04 1.60E-02 3.527E-01 3.308E-05 9.963E-01 3.514E-01 0 Minimum
3200 8.889E-04 2.00E-02 4.031E-01 3.308E-05 9.963E-01 4.016E-01 0 Homogen
3600 1.000E-03 2.50E-02 4.535E-01 3.749E-05 9.968E-01 4.520E-01 6.982E-04 Homogen
4000 1.111E-03 3.00E-02 5.039E-01 3.969E-05 9.969E-01 5.024E-01 1.221E-03 Bubbling
4400 1.222E-03 3.00E-02 5.543E-01 4.410E-05 9.972E-01 5.528E-01 2.216E-03 Bubbling
4800 1.333E-03 3.50E-02 6.047E-01 4.410E-05 9.972E-01 6.030E-01 2.637E-03 Bubbling
5200 1.444E-03 4.00E-02 6.551E-01 5.513E-05 9.978E-01 6.536E-01 4.952E-03 Bubbling
5600 1.556E-03 4.00E-02 7.054E-01 6.615E-05 9.982E-01 7.042E-01 7.179E-03 Bubbling
6000 1.667E-03 4.50E-02 7.558E-01 6.615E-05 9.982E-01 7.544E-01 8.241E-03 Bubbling
6400 1.778E-03 5.50E-02 8.062E-01 6.615E-05 9.982E-01 8.047E-01 9.376E-03 Disperse
6800 1.889E-03 6.00E-02 8.566E-01 8.820E-05 9.986E-01 8.554E-01 1.323E-02 Disperse
7200 2.000E-03 7.50E-02 9.070E-01 8.820E-05 9.986E-01 9.058E-01 1.484E-02 Disperse
7600 2.111E-03 8.00E-02 9.574E-01 9.923E-05 9.988E-01 9.562E-01 1.763E-02 Disperse
8000 2.222E-03 9.00E-02 1.008E+00 8.820E-05 9.986E-01 1.006E+00 1.832E-02 Disperse

B.6.3 Data Hasil Perhitungan Partikel Arang Aktif pada ID Kolom 65 mm dan Tinggi Bed Awal 0.5 cm
3. Densitas partikel = 1.134E+03 kg/m3 2. Volume partikel total = 4.043E-08 m3 5. Densitas gas = 1.2 kg/m3
4. ɸs = 0.79 3. Luas kolom = 3.3175E-03 m2 6. Viskositas gas = 1.87E-05 kg/m.s
Tabel B.11 Data Hasil Perhitungan Partikel Arang Aktif pada ID Kolom 65 mm dan Tinggi Bed Awal 0.5 cm
Flowrate Flowrate Tinggi
v Vunggun Voidage v'mf ΔP Perhitungan Kondisi Bed
(Q) (Q) Bed
(L/jam) (m3/s) (m) (m/s) (m3) ε (m/s) kg/ms2
400 1.111E-04 5.00E-03 3.350E-02 1.658E-05 9.976E-01 3.342E-02 0 Fixed Bed
800 2.222E-04 5.00E-03 6.700E-02 1.658E-05 9.976E-01 6.684E-02 0 Fixed Bed
1200 3.333E-04 5.00E-03 1.005E-01 1.658E-05 9.976E-01 1.003E-01 0 Fixed Bed
1600 4.444E-04 5.00E-03 1.340E-01 1.658E-05 9.976E-01 1.337E-01 0 Minimum
2000 5.556E-04 5.00E-03 1.675E-01 1.658E-05 9.976E-01 1.671E-01 0 Minimum
2400 6.667E-04 5.00E-03 2.010E-01 1.658E-05 9.976E-01 2.005E-01 0 Minimum
2800 7.778E-04 6.00E-03 2.345E-01 1.990E-05 9.980E-01 2.340E-01 5.871E-05 Minimum
3200 8.889E-04 6.00E-03 2.680E-01 1.990E-05 9.980E-01 2.675E-01 7.665E-05 Homogen
3600 1.000E-03 7.00E-03 3.015E-01 2.322E-05 9.983E-01 3.010E-01 1.663E-04 Homogen
4000 1.111E-03 7.00E-03 3.350E-01 2.322E-05 9.983E-01 3.344E-01 2.052E-04 Homogen
4400 1.222E-03 8.00E-03 3.685E-01 2.653E-05 9.985E-01 3.680E-01 3.259E-04 Homogen
4800 1.333E-03 8.00E-03 4.020E-01 2.653E-05 9.985E-01 4.014E-01 3.878E-04 Homogen
5200 1.444E-03 9.00E-03 4.355E-01 2.985E-05 9.986E-01 4.349E-01 5.393E-04 Bubbling
5600 1.556E-03 1.00E-02 4.690E-01 3.317E-05 9.988E-01 4.684E-01 7.037E-04 Bubbling
6000 1.667E-03 1.50E-02 5.025E-01 3.317E-05 9.988E-01 5.019E-01 8.077E-04 Bubbling
6400 1.778E-03 2.00E-02 5.360E-01 3.317E-05 9.988E-01 5.354E-01 9.190E-04 Bubbling
6800 1.889E-03 3.00E-02 5.695E-01 3.317E-05 9.988E-01 5.688E-01 1.037E-03 Bubbling
7200 2.000E-03 3.50E-02 6.030E-01 3.648E-05 9.989E-01 6.024E-01 1.269E-03 Bubbling
7600 2.111E-03 4.00E-02 6.365E-01 3.980E-05 9.990E-01 6.359E-01 1.512E-03 Bubbling
8000 2.222E-03 5.00E-02 6.700E-01 4.975E-05 9.992E-01 6.695E-01 1.915E-03 Bubbling

B.6.4 Data Hasil Perhitungan Partikel Arang Aktif pada ID Kolom 65 mm dan Tinggi Bed Awal 1.5 cm
3. Densitas partikel = 1.134E+03 kg/m3 2. Volume partikel total = 1.213E-07 m3 5. Densitas gas = 1.2 kg/m3
4. ɸs = 0.79 3. Luas kolom = 3.317E-03 m2 6. Viskositas gas = 1.87E-05 kg/m.s
Tabel B.12 Data Hasil Perhitungan Partikel Arang Aktif pada ID Kolom 65 mm dan Tinggi Bed Awal 1.5 cm
Flowrate Flowrate Tinggi
v Vunggun Voidage v'mf ΔP Perhitungan Kondisi Bed
(Q) (Q) Bed
(L/jam) (m3/s) (m) (m/s) (m3) ε (m/s) kg/ms2
400 1.111E-04 c 3.350E-02 4.975E-05 9.976E-01 3.342E-02 0 Fixed Bed
800 2.222E-04 1.50E-02 6.700E-02 4.975E-05 9.976E-01 6.684E-02 0 Fixed Bed
1200 3.333E-04 1.50E-02 1.005E-01 4.975E-05 9.976E-01 1.003E-01 0 Fixed Bed
1600 4.444E-04 1.50E-02 1.340E-01 4.975E-05 9.976E-01 1.337E-01 0 Minimum
2000 5.556E-04 1.50E-02 1.675E-01 4.975E-05 9.976E-01 1.671E-01 0 Minimum
2400 6.667E-04 1.50E-02 2.010E-01 4.975E-05 9.976E-01 2.005E-01 0 Minimum
2800 7.778E-04 1.50E-02 2.345E-01 4.975E-05 9.976E-01 2.339E-01 0 Minimum
3200 8.889E-04 1.60E-02 2.680E-01 5.307E-05 9.977E-01 2.674E-01 8.625E-05 Homogen
3600 1.000E-03 1.60E-02 3.015E-01 5.307E-05 9.977E-01 3.008E-01 1.091E-04 Homogen
4000 1.111E-03 1.60E-02 3.350E-01 5.307E-05 9.977E-01 3.342E-01 1.347E-04 Homogen
4400 1.222E-03 1.80E-02 3.685E-01 5.970E-05 9.980E-01 3.678E-01 4.345E-04 Homogen
4800 1.333E-03 2.00E-02 4.020E-01 6.633E-05 9.982E-01 4.013E-01 7.756E-04 Bubbling
5200 1.444E-03 2.50E-02 4.355E-01 8.292E-05 9.985E-01 4.349E-01 1.456E-03 Bubbling
5600 1.556E-03 3.00E-02 4.690E-01 9.950E-05 9.988E-01 4.684E-01 2.111E-03 Bubbling
6000 1.667E-03 4.00E-02 5.025E-01 9.950E-05 9.988E-01 5.019E-01 2.423E-03 Bubbling
6400 1.778E-03 4.50E-02 5.360E-01 9.950E-05 9.988E-01 5.354E-01 2.757E-03 Bubbling
6800 1.889E-03 5.00E-02 5.695E-01 1.161E-04 9.990E-01 5.689E-01 3.557E-03 Bubbling
7200 2.000E-03 5.50E-02 6.030E-01 1.161E-04 9.990E-01 6.024E-01 3.988E-03 Bubbling
7600 2.111E-03 6.00E-02 6.365E-01 1.327E-04 9.991E-01 6.359E-01 4.860E-03 Bubbling
8000 2.222E-03 7.00E-02 6.700E-01 1.327E-04 9.991E-01 6.694E-01 5.385E-03 Bubbling