You are on page 1of 1

FINAL DST SUMMARY

B-3
RESERVOIR HC-3U BETA FIELD TARAKAN BASIN

Welltest
Time Choke WHP WHT Qg Qcond Qw API WC CGR P@Gauge T@Gauge PI Remarks
Test DST#2
Hours ''/64" Psi F MMSCFD BCPD BWPD (%) (bbl/MMSCF) (Psi) F MMSCFD/psi Cl-, SG,CO2, H2s
Date April, 08 2014
Zone HC-3U
Interval 10648-10674 ft MD / 9010-9036 ft TVD
Netpay (ft) 36
Porosity (%) 20
Gun TCP 4-1/2" HSD PJ4505 HMX Gun
Perforation 5 spf
8-Apr-14 Flowing-1 4 16 2878 104 3.58 117 11 46 8.6 33 3807 229 0.04773 9000mg/lt,0.682,2%,0 ppm
LAMPIRAN

Shut in-1 4 0 3882 230


Flowing-2 4 24 2731 122 8.01 244 35 46 12.5 30 3681 228 0.03907 9000mg/lt,0.682,2%,0 ppm
Shut in-2 4 0 3886 230
Flowing-3 4 32 2365 121 12.83 334 131 46 28.2 26 3534 228 0.03719 9000mg/lt,0.682,2%,0 ppm
until Shut in-3 4 0 3879 229
Flowing-4 4 40 1996 127 15.57 339 270 46 44.3 22 3421 228 0.03523 9000mg/lt,0.682,2%,0 ppm
Shut in-4 4 0 3863 229
Extended flow 24 64 986 131 20.24 365 452 46 55.3 18 3113 225 0.02774 9000mg/lt,0.682,2%,0 ppm
Final Build Up 48 0 3843 228
13-Apr-14 Flowing-5 128 0 451 20.80 342 352 46 50.7 16 9000mg/lt,0.682,2%,0 ppm
Gambar A.1. Final DST Summary Reservoir Zone HC-3U